This risk assessment form evaluates potential hazards for a photography shoot at a college field. It identifies slip hazards from wet grass, injury from spiky bushes, and risks from bad weather or other people using the field. Existing controls include concrete paths, maintained bushes, weather forecasts, and the large open space. Further actions recommended are choosing dry days, staying away from bushes, only going in good weather, and only using the field when free of others. The form provides a risk rating matrix to evaluate likelihood and severity of each hazard.
Measures of Central Tendency: Mean, Median and Mode
Risk assessment (field)
1. RISK ASSESSMENT RECORDING FORM
Location or
Address: Priestley College Field
Date Assessment
Undertaken: 22/12/16
Assessment undertaken
By: Ben Clarke
Activity or
Situation: Photography Shoot
Review
Date:
Signature
(1) Hazard Risk (2) Who might be harmed and how? (3) What controls exist to reduce
risk
(4) What action can be taken
to further reduce risk?
Slippery ground
Cut by spikey bushes
Bad Weather
Other people who are using the field
2
2
2
1
Anyone who is walking on the grass
could slip if the grass is wet from
bad weather.
If the ball or the model was to go
into the bushes they are spikey and
can be cut by the twigs or leaves.
If the weather is bad the terrain can
become slippery and cause people
to fall over.
As it is a football field other people
may be playing football and the ball
may hit the crew or cast.
Concrete paths along the side to
walk into the field safely.
The bushes and trees are regularly
maintained and cut back to prevent
injury.
Weather forecasts are in place so I
will know when bad weather will
take place.
The field is large and open so that
the ball is less likely to hit any
spectators.
Choose to do the photoshoot
when the ground will be dry.
Stay away from these areas to
prevent any injury.
Only go on days where the
weather won’t be bad.
Only use the field when it is free.
1. List hazards something with the potential to cause harm here:
Seek to quantify the level of risk the likelihood of harm arising based on the number of persons affected, how often they are exposed to the hazard and the
severity of any consequence.
2. List groups of people who are especially at risk from the significant hazards which you have identified
3. List existing controls here or note where the information may be found
4. List the risks which are not adequately controlled and the action you will take. Have regard for the level of risk, the cost of any action and the benefit you expect to
gain.
2. RISK RATING
a SEVERITY b LIKELIHOOD c FINAL SCORE RATING: what needs to be done
5 Dying or being permanently disabled 5 Will almost certainly happen 16-25 Stop! Do not start activity again until risk is
controlled
4 Serious injury/long term illness 4 Highly likely to happen 10-15 High risk level, High priority. Take action
straight away to control the risk
3 Temporary disability/3 days off sick 3 Not so likely 6-9 Medium risk level. Tighten up controls and
make a plan to do something about risk
2 Will need medical attention 2 Even less likely 3-5 Fairly low risk level. Low priority but keep
possible action in mind
1 Minor injury eg. Bruise, graze 1 Unlikely to happen at all 1-2 Low or trivial risk. No further action
required.
SO: a x b = c
Action Required Responsible Person Date for Completion