Pre Engineered Building Manufacturers Hyderabad.pptx
Bus Terminal-Bachelor thesis project 2006
1. Bus Terminal
( Bachelor thesis project)
( 2006)
The complex consist of four separate
buildings: the main bus terminal, mainte-
nance area, gas station and employee
accommodation block. The bus terminal
provides 18 unloading and 25 loading bays.
It will cater for a maximum 86 bus move-
ments per hour. The design includes two
separate wings for arrival and departure
lounges,connected through a huge double
height oval atrium. Curve in concourse
design employed helps match a larger sur-
face area to a smaller human scale.