This standard operating procedure outlines the steps for setting up a staging area. The 11 steps include: 1) selecting and inspecting the stage and skirting materials, 2) pushing the stage to the designated area, 3) aligning and opening the stage, 4) making final adjustments, 5) adjusting the stage level, 6) securing the staging together if needed, 7) checking stability, 8) skirting the stage, and 9) setting any required equipment on the stage. The objective is to ensure the staging area is set up according to standards and is ready for clients.