precedencediagram along with assembly tree for
Electric motor clutch Assembly
Precedence Diagram
Precedence Diagram is designed to show all the possible assembly sequences of a product. To
develop the precedence diagram for a product, each individual assembly operation is assigned a
number and is represented by an appropriate circle with the number inscribed. The circles are
connected by arrows showing the precedence diagram is usually organised into coloums .All the
Operations that can be carried out first are placed in the first column, and so on .usually one
operation appears in the first column: the placing of the base part (the host) on the work carrier
where assembling takes place.
To draw the precedence diagram, one places the base part in column-I. Assembly operations
that can only be performed when the operation in column I has been performed are placed in column
II. Lines are then drawn to connect operations in columns I and II. Third- stage operations are
placed in column Ill with appropriate connecting lines, and so on until the diagram is complete. -
following all the lines from a given operation to the left indicates all the operations that must be
completed before the operation under consideration can be per-formed.
Figure shows the precedence diagram for the clutch assembly. The frame is chosen as the base part.
The precedence diagram (a) is based on the individual parts of the clutch. This means that all these
parts are assembled on a single assembling machine.
In the assembly of the clutch shown in (a) there are 14 operations, and it is probably impractical to
carry out all these on a single assembling machine for the simple reason that it would be difficult to
design all the proper fixtures, and fixtures may be in the way of assembling some parts. Therefore, it
is probably better to treat groups of parts as subassemblies. This is indicated in Fig (a) by the dashed
lines enclosing the proper operations. Thus, if a product is broken down into a number of
subassemblies, all assembly sequences for each one can be easily studied and evaluated. In addition,
if these subassem blies can be mechanically assembled, separate assembling machines may be used.
Figure 14-20b shows the precedence diagram for the subassemblies of th clutch assembly. The clutch
is divided into four subassemblies. It can be seen tha no flexibility exists in the ordering of
operations 1, 4, 2, 6, and 7. Operations and 5, however, can be carried out in any order except that
they can not

More Related Content

Similar to Precedence diagram along with assembly tree for

UNIVERSITY OF NORTHAMPTONFACULTY OF SCIENCE TECHNOLOGY SCH.docx
UNIVERSITY OF NORTHAMPTONFACULTY OF SCIENCE TECHNOLOGY SCH.docxUNIVERSITY OF NORTHAMPTONFACULTY OF SCIENCE TECHNOLOGY SCH.docx
UNIVERSITY OF NORTHAMPTONFACULTY OF SCIENCE TECHNOLOGY SCH.docx
dickonsondorris
 
Introduction to MATLAB 7 - WIlliam PALM III.ppt
Introduction to MATLAB 7 - WIlliam PALM III.pptIntroduction to MATLAB 7 - WIlliam PALM III.ppt
Introduction to MATLAB 7 - WIlliam PALM III.ppt
HassenMOuakkad
 
Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...
Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...
Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...
fhhjsjekmdme
 
Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...
Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...
Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...
fjsjekkdmnem
 
Caterpillar cat 336 f ln excavator (prefix zbj) service repair manual (zbj000...
Caterpillar cat 336 f ln excavator (prefix zbj) service repair manual (zbj000...Caterpillar cat 336 f ln excavator (prefix zbj) service repair manual (zbj000...
Caterpillar cat 336 f ln excavator (prefix zbj) service repair manual (zbj000...
fhhjsjekmdme
 
Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...
Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...
Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...
fjdkksmemd
 

Similar to Precedence diagram along with assembly tree for (20)

Automated assembly systems
Automated assembly systemsAutomated assembly systems
Automated assembly systems
 
UNIVERSITY OF NORTHAMPTONFACULTY OF SCIENCE TECHNOLOGY SCH.docx
UNIVERSITY OF NORTHAMPTONFACULTY OF SCIENCE TECHNOLOGY SCH.docxUNIVERSITY OF NORTHAMPTONFACULTY OF SCIENCE TECHNOLOGY SCH.docx
UNIVERSITY OF NORTHAMPTONFACULTY OF SCIENCE TECHNOLOGY SCH.docx
 
40823(me8099)
40823(me8099)40823(me8099)
40823(me8099)
 
Assembly and Details machine drawing pdf
Assembly and Details  machine drawing pdfAssembly and Details  machine drawing pdf
Assembly and Details machine drawing pdf
 
Assembly and Details
Assembly and Details  Assembly and Details
Assembly and Details
 
Engineering drawing 1 UniKL LDD 10303
Engineering drawing  1 UniKL LDD 10303Engineering drawing  1 UniKL LDD 10303
Engineering drawing 1 UniKL LDD 10303
 
Introduction to MATLAB 7 - WIlliam PALM III.ppt
Introduction to MATLAB 7 - WIlliam PALM III.pptIntroduction to MATLAB 7 - WIlliam PALM III.ppt
Introduction to MATLAB 7 - WIlliam PALM III.ppt
 
Caterpillar Cat 336F LN Excavator (Prefix ZBJ) Service Repair Manual (ZBJ0000...
Caterpillar Cat 336F LN Excavator (Prefix ZBJ) Service Repair Manual (ZBJ0000...Caterpillar Cat 336F LN Excavator (Prefix ZBJ) Service Repair Manual (ZBJ0000...
Caterpillar Cat 336F LN Excavator (Prefix ZBJ) Service Repair Manual (ZBJ0000...
 
Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...
Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...
Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...
 
Caterpillar Cat 336F LN Excavator (Prefix ZBJ) Service Repair Manual (ZBJ0000...
Caterpillar Cat 336F LN Excavator (Prefix ZBJ) Service Repair Manual (ZBJ0000...Caterpillar Cat 336F LN Excavator (Prefix ZBJ) Service Repair Manual (ZBJ0000...
Caterpillar Cat 336F LN Excavator (Prefix ZBJ) Service Repair Manual (ZBJ0000...
 
Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...
Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...
Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...
 
Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...
Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...
Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...
 
Caterpillar Cat 336F LN Excavator (Prefix ZBJ) Service Repair Manual (ZBJ0000...
Caterpillar Cat 336F LN Excavator (Prefix ZBJ) Service Repair Manual (ZBJ0000...Caterpillar Cat 336F LN Excavator (Prefix ZBJ) Service Repair Manual (ZBJ0000...
Caterpillar Cat 336F LN Excavator (Prefix ZBJ) Service Repair Manual (ZBJ0000...
 
IRJET- Design and Analysis of Lift Arm for Three Point Hitch of Tractor
IRJET- Design and Analysis of Lift Arm for Three Point Hitch of TractorIRJET- Design and Analysis of Lift Arm for Three Point Hitch of Tractor
IRJET- Design and Analysis of Lift Arm for Three Point Hitch of Tractor
 
Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...
Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...
Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...
 
Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...
Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...
Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...
 
Caterpillar Cat 336F L and 336F LN Excavator (Prefix ZBJ) Service Repair Manu...
Caterpillar Cat 336F L and 336F LN Excavator (Prefix ZBJ) Service Repair Manu...Caterpillar Cat 336F L and 336F LN Excavator (Prefix ZBJ) Service Repair Manu...
Caterpillar Cat 336F L and 336F LN Excavator (Prefix ZBJ) Service Repair Manu...
 
Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...
Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...
Caterpillar cat 336 f l excavator (prefix zbj) service repair manual (zbj0000...
 
Caterpillar cat 336 f ln excavator (prefix zbj) service repair manual (zbj000...
Caterpillar cat 336 f ln excavator (prefix zbj) service repair manual (zbj000...Caterpillar cat 336 f ln excavator (prefix zbj) service repair manual (zbj000...
Caterpillar cat 336 f ln excavator (prefix zbj) service repair manual (zbj000...
 
Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...
Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...
Caterpillar Cat 336F L Excavator (Prefix ZBJ) Service Repair Manual (ZBJ00001...
 

More from Ashok Mannava (20)

Sole_Proprietorship_Presentation.pptx
Sole_Proprietorship_Presentation.pptxSole_Proprietorship_Presentation.pptx
Sole_Proprietorship_Presentation.pptx
 
Model QP (1).docx
Model QP (1).docxModel QP (1).docx
Model QP (1).docx
 
notes_9 Lec PP and CAPP.pptx
notes_9 Lec PP and CAPP.pptxnotes_9 Lec PP and CAPP.pptx
notes_9 Lec PP and CAPP.pptx
 
Cell_Manufacturing.ppt
Cell_Manufacturing.pptCell_Manufacturing.ppt
Cell_Manufacturing.ppt
 
Computer assisted part programming.pdf
Computer assisted part programming.pdfComputer assisted part programming.pdf
Computer assisted part programming.pdf
 
Group Technology Basics.ppt
Group Technology Basics.pptGroup Technology Basics.ppt
Group Technology Basics.ppt
 
Ie550nc
Ie550ncIe550nc
Ie550nc
 
443439858 the-mesopotamian-civiliation-ppt
443439858 the-mesopotamian-civiliation-ppt443439858 the-mesopotamian-civiliation-ppt
443439858 the-mesopotamian-civiliation-ppt
 
Uvl simplysupported beam
Uvl simplysupported beamUvl simplysupported beam
Uvl simplysupported beam
 
What is technology
What is technologyWhat is technology
What is technology
 
Transducer
TransducerTransducer
Transducer
 
Cmm
CmmCmm
Cmm
 
Capacitance
CapacitanceCapacitance
Capacitance
 
Auto cad material
Auto cad materialAuto cad material
Auto cad material
 
L5 2018 09_17
L5 2018 09_17L5 2018 09_17
L5 2018 09_17
 
Agriculture chapter 10
Agriculture chapter 10Agriculture chapter 10
Agriculture chapter 10
 
Agricultural revolution
Agricultural revolutionAgricultural revolution
Agricultural revolution
 
77102350 7-8-cutting-tool-materials-complete-ppt
77102350 7-8-cutting-tool-materials-complete-ppt77102350 7-8-cutting-tool-materials-complete-ppt
77102350 7-8-cutting-tool-materials-complete-ppt
 
Compressor final
Compressor finalCompressor final
Compressor final
 
Dht
DhtDht
Dht
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 

Precedence diagram along with assembly tree for

  • 1. precedencediagram along with assembly tree for Electric motor clutch Assembly Precedence Diagram Precedence Diagram is designed to show all the possible assembly sequences of a product. To develop the precedence diagram for a product, each individual assembly operation is assigned a number and is represented by an appropriate circle with the number inscribed. The circles are connected by arrows showing the precedence diagram is usually organised into coloums .All the Operations that can be carried out first are placed in the first column, and so on .usually one operation appears in the first column: the placing of the base part (the host) on the work carrier where assembling takes place. To draw the precedence diagram, one places the base part in column-I. Assembly operations that can only be performed when the operation in column I has been performed are placed in column II. Lines are then drawn to connect operations in columns I and II. Third- stage operations are placed in column Ill with appropriate connecting lines, and so on until the diagram is complete. - following all the lines from a given operation to the left indicates all the operations that must be completed before the operation under consideration can be per-formed. Figure shows the precedence diagram for the clutch assembly. The frame is chosen as the base part. The precedence diagram (a) is based on the individual parts of the clutch. This means that all these parts are assembled on a single assembling machine. In the assembly of the clutch shown in (a) there are 14 operations, and it is probably impractical to carry out all these on a single assembling machine for the simple reason that it would be difficult to design all the proper fixtures, and fixtures may be in the way of assembling some parts. Therefore, it is probably better to treat groups of parts as subassemblies. This is indicated in Fig (a) by the dashed lines enclosing the proper operations. Thus, if a product is broken down into a number of subassemblies, all assembly sequences for each one can be easily studied and evaluated. In addition, if these subassem blies can be mechanically assembled, separate assembling machines may be used. Figure 14-20b shows the precedence diagram for the subassemblies of th clutch assembly. The clutch is divided into four subassemblies. It can be seen tha no flexibility exists in the ordering of operations 1, 4, 2, 6, and 7. Operations and 5, however, can be carried out in any order except that they can not