Contingency
Name Ash and Dan
Project Vegetarian Recipe Cards
Risk to project Contingency plan
One of the team members
suffering from fatigue and
therefore the quality of work
suffering as a result.
Have designated break times, which can be brought
forward if fatigue is suffered earlier than expected.
A team member suffering
from burns to the skin, as a
result of an accident in the
kitchen.
Team members could swap job roles or make
adjustments to the specifics of the job. This could then
enable the team member with burns to work from home
or perhaps do specific work that would see them moving
around and doing challenging work being done at a later
point when a recovery has been made.
The oven not working at
Dan’s house on the day of
cooking.
Food preparation could be moved to Ash’s house, to
enable the cooking of the meals to be complete.
The camera running out of
battery or power.
I will make sure the camera is fully charged before use
and during use I will turn it off between taking
photographs. Make sure to have a spare battery within
my possession when using the camera at all times.
Creative Media Production
A team member struggling to
complete their workload on
time.
Ask for help from the other team member and if this team
member has completed their work, the team members
could look to split the struggling team members workload.
Alternatively help could be sought from the tutor of the
course.
Extreme weather conditions If there are heavy snow blizzards and neither of us are
able to attend college, then that could be detrimental to
our project. We will both have to complete the work from
home with limited communication. We could aid our
communication by using Skype.
Loss of internet connection If either of us lose internet connection and cannot
complete the work, we will have to move to another
classroom where we can still both move together. If the
loss of connection is large scale we will have to begin
working on paper.
Corrupt USB stick If either of our USB sticks happen to become corrupt we
will go to an IT technician to see if they can fix the
problem. If the problem is not fixable, then we will go on
the computers used for the work, and see if any of it is
saved on the desktop.
Creative Media Production
Team member cut by a knife
during food preparation
The first-aid kit will be used to prevent any further
damage/infection. We will then see if they are able to
carry on. If they are not, job roles will be changed to suit
the injured team member.
Creative Media Production

More Related Content

Viewers also liked

Homeless pres
Homeless presHomeless pres
Homeless pres
ashboyne
 
Homeless moodboard
Homeless moodboardHomeless moodboard
Homeless moodboard
ashboyne
 
Pre production techniques
Pre production techniquesPre production techniques
Pre production techniques
ashboyne
 
Recipe cards
Recipe cardsRecipe cards
Recipe cards
ashboyne
 
Italian mood board
Italian mood boardItalian mood board
Italian mood board
ashboyne
 
Pre production techniques pro-forma-1
Pre production techniques pro-forma-1Pre production techniques pro-forma-1
Pre production techniques pro-forma-1
ashboyne
 
Peer feedback factual layout
Peer feedback factual layoutPeer feedback factual layout
Peer feedback factual layout
ashboyne
 
Flatplan fanzine
Flatplan fanzineFlatplan fanzine
Flatplan fanzine
ashboyne
 
Irn bru final evaluation
Irn bru final evaluationIrn bru final evaluation
Irn bru final evaluation
ashboyne
 

Viewers also liked (13)

Task 1
Task 1Task 1
Task 1
 
Irn bru
Irn bruIrn bru
Irn bru
 
Attila
AttilaAttila
Attila
 
Homeless pres
Homeless presHomeless pres
Homeless pres
 
Homeless moodboard
Homeless moodboardHomeless moodboard
Homeless moodboard
 
Pre production techniques
Pre production techniquesPre production techniques
Pre production techniques
 
Recipe cards
Recipe cardsRecipe cards
Recipe cards
 
Italian mood board
Italian mood boardItalian mood board
Italian mood board
 
Task 1
Task 1Task 1
Task 1
 
Pre production techniques pro-forma-1
Pre production techniques pro-forma-1Pre production techniques pro-forma-1
Pre production techniques pro-forma-1
 
Peer feedback factual layout
Peer feedback factual layoutPeer feedback factual layout
Peer feedback factual layout
 
Flatplan fanzine
Flatplan fanzineFlatplan fanzine
Flatplan fanzine
 
Irn bru final evaluation
Irn bru final evaluationIrn bru final evaluation
Irn bru final evaluation
 

Similar to Contingency (20)

5. pre production(3)
5. pre production(3)5. pre production(3)
5. pre production(3)
 
Contingency planning
Contingency planningContingency planning
Contingency planning
 
5. pre production(3)
5. pre production(3)5. pre production(3)
5. pre production(3)
 
Contingency
ContingencyContingency
Contingency
 
5. pre production
5. pre production5. pre production
5. pre production
 
5. pre production(3)
5. pre production(3)5. pre production(3)
5. pre production(3)
 
5. pre production(3)
5. pre production(3)5. pre production(3)
5. pre production(3)
 
Mel olivia planning booklet (2) 2
Mel olivia planning booklet (2) 2Mel olivia planning booklet (2) 2
Mel olivia planning booklet (2) 2
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Problem solving
Problem solvingProblem solving
Problem solving
 
Problem solving
Problem solvingProblem solving
Problem solving
 
Problem solving louis fmp
Problem solving louis fmpProblem solving louis fmp
Problem solving louis fmp
 
Problem solving fmp
Problem solving fmpProblem solving fmp
Problem solving fmp
 
unit 3 pre production
unit 3 pre productionunit 3 pre production
unit 3 pre production
 
Problem solving
Problem solvingProblem solving
Problem solving
 
Problem Solving.pptx
Problem Solving.pptxProblem Solving.pptx
Problem Solving.pptx
 
Problem solving
Problem solvingProblem solving
Problem solving
 
Problem solving 2
 Problem solving 2 Problem solving 2
Problem solving 2
 
Problem solving
Problem solvingProblem solving
Problem solving
 
Problem solving
Problem solvingProblem solving
Problem solving
 

More from ashboyne

Opportunities handout(1)
Opportunities handout(1)Opportunities handout(1)
Opportunities handout(1)
ashboyne
 
Homeless evaluation
Homeless evaluationHomeless evaluation
Homeless evaluation
ashboyne
 
Sash mindmap
Sash mindmapSash mindmap
Sash mindmap
ashboyne
 
Factual layout evaluation
Factual layout evaluationFactual layout evaluation
Factual layout evaluation
ashboyne
 
Task4 mood board irn bru
Task4 mood board irn bruTask4 mood board irn bru
Task4 mood board irn bru
ashboyne
 
Task4 mood board irn bru
Task4 mood board irn bruTask4 mood board irn bru
Task4 mood board irn bru
ashboyne
 
Task4 mood board irn bru
Task4 mood board irn bruTask4 mood board irn bru
Task4 mood board irn bru
ashboyne
 
Task 3 irn bru
Task 3 irn bruTask 3 irn bru
Task 3 irn bru
ashboyne
 
Irn bru constraints handout(1)
Irn bru constraints handout(1)Irn bru constraints handout(1)
Irn bru constraints handout(1)
ashboyne
 
Writing copy 7 research 1
Writing copy 7 research 1Writing copy 7 research 1
Writing copy 7 research 1
ashboyne
 
Writing copy 7 research 1
Writing copy 7 research 1Writing copy 7 research 1
Writing copy 7 research 1
ashboyne
 
Evaluation of final photographs 2.2
Evaluation of final photographs 2.2Evaluation of final photographs 2.2
Evaluation of final photographs 2.2
ashboyne
 
Peer feedback factual layout
Peer feedback factual layoutPeer feedback factual layout
Peer feedback factual layout
ashboyne
 
Tabloid flatplan
Tabloid flatplanTabloid flatplan
Tabloid flatplan
ashboyne
 
Broadsheet layout design
Broadsheet layout designBroadsheet layout design
Broadsheet layout design
ashboyne
 

More from ashboyne (20)

Sash
SashSash
Sash
 
Opportunities handout(1)
Opportunities handout(1)Opportunities handout(1)
Opportunities handout(1)
 
Task 6
Task 6Task 6
Task 6
 
Label page
Label pageLabel page
Label page
 
Homeless evaluation
Homeless evaluationHomeless evaluation
Homeless evaluation
 
Sash mindmap
Sash mindmapSash mindmap
Sash mindmap
 
Factual layout evaluation
Factual layout evaluationFactual layout evaluation
Factual layout evaluation
 
Task4 mood board irn bru
Task4 mood board irn bruTask4 mood board irn bru
Task4 mood board irn bru
 
Task4 mood board irn bru
Task4 mood board irn bruTask4 mood board irn bru
Task4 mood board irn bru
 
Task4 mood board irn bru
Task4 mood board irn bruTask4 mood board irn bru
Task4 mood board irn bru
 
Task 3 irn bru
Task 3 irn bruTask 3 irn bru
Task 3 irn bru
 
Irn bru constraints handout(1)
Irn bru constraints handout(1)Irn bru constraints handout(1)
Irn bru constraints handout(1)
 
Writing copy 7 research 1
Writing copy 7 research 1Writing copy 7 research 1
Writing copy 7 research 1
 
Writing copy 7 research 1
Writing copy 7 research 1Writing copy 7 research 1
Writing copy 7 research 1
 
Evaluation of final photographs 2.2
Evaluation of final photographs 2.2Evaluation of final photographs 2.2
Evaluation of final photographs 2.2
 
Peer feedback factual layout
Peer feedback factual layoutPeer feedback factual layout
Peer feedback factual layout
 
Tabloid flatplan
Tabloid flatplanTabloid flatplan
Tabloid flatplan
 
Broadsheet layout design
Broadsheet layout designBroadsheet layout design
Broadsheet layout design
 
Task 6
Task 6Task 6
Task 6
 
Bandposters
BandpostersBandposters
Bandposters
 

Recently uploaded

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Recently uploaded (20)

AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 

Contingency

  • 1. Creative Media Production Contingency Name Ash and Dan Project Vegetarian Recipe Cards Risk to project Contingency plan One of the team members suffering from fatigue and therefore the quality of work suffering as a result. Have designated break times, which can be brought forward if fatigue is suffered earlier than expected. A team member suffering from burns to the skin, as a result of an accident in the kitchen. Team members could swap job roles or make adjustments to the specifics of the job. This could then enable the team member with burns to work from home or perhaps do specific work that would see them moving around and doing challenging work being done at a later point when a recovery has been made. The oven not working at Dan’s house on the day of cooking. Food preparation could be moved to Ash’s house, to enable the cooking of the meals to be complete. The camera running out of battery or power. I will make sure the camera is fully charged before use and during use I will turn it off between taking photographs. Make sure to have a spare battery within my possession when using the camera at all times.
  • 2. Creative Media Production A team member struggling to complete their workload on time. Ask for help from the other team member and if this team member has completed their work, the team members could look to split the struggling team members workload. Alternatively help could be sought from the tutor of the course. Extreme weather conditions If there are heavy snow blizzards and neither of us are able to attend college, then that could be detrimental to our project. We will both have to complete the work from home with limited communication. We could aid our communication by using Skype. Loss of internet connection If either of us lose internet connection and cannot complete the work, we will have to move to another classroom where we can still both move together. If the loss of connection is large scale we will have to begin working on paper. Corrupt USB stick If either of our USB sticks happen to become corrupt we will go to an IT technician to see if they can fix the problem. If the problem is not fixable, then we will go on the computers used for the work, and see if any of it is saved on the desktop.
  • 3. Creative Media Production Team member cut by a knife during food preparation The first-aid kit will be used to prevent any further damage/infection. We will then see if they are able to carry on. If they are not, job roles will be changed to suit the injured team member.