isk-Based Inspection (RBI) is a systematic approach that enables users to make informed business decisions regarding inspection and maintenance expenditure. It identifies, assesses and maps industrial risks (due to corrosion and stress cracking), which can compromise equipment integrity in both pressurized equipment and structural elements.
RBI combines the principles of risk with operational experience to obtain a safe and cost effective inspection program targeting inspection where and when it is needed. Also addresses risks that can be controlled through proper inspections and analysis.
2. Reduce Operating margins
and improve Availability
at your plant
Risk is dynamic and changes with time
Arrelic Reliability Private Limited | arrelic.com RBI - Risk Based Inspection 01
3. C
O
N
T
E
N
T
RBI
Arrelic RBI Methodology
Likelihood Assessment – Degradation Mechanism
Consequence Assessment
Risk Ranking
Strategy Management: Inspection
RBI Data Sensitivity
Arrelic Reliability Private Limited | arrelic.com RBI 02
4. “ A risk assessment and management process that is
focussed on loss of containment due to material
deterioration. These risks are managed primarily
through equipment inspection ” - API 580
RBI
RBI focusses on relative risk
RBI is the strongest tool for managing the risk of pressure containing equipment
Chaos
Fire-Fight
Bureaucracy
Excellent
Weak Strong
SYSTEMS
PEOPLE
WeakStrong
Performance = People x Systems
Arrelic Reliability Private Limited | arrelic.com RBI - Risk Based Inspection 03
5. Residual Risk Factors:
✓ Human Error
✓ Natural Disasters
✓ External Events
✓ Consequential effects from associated equipment in the same unit
✓ Deliberate acts
✓ Fundamental limitations of inspection methods
✓ Design Errors
✓ Unanticipated damage mechanisms
Can risk be reduced to zero?
Arrelic Reliability Private Limited | arrelic.com RBI - Risk Based Inspection 04
6. Upfront corrosion
engineering & data
gathering
Sustainable RBI Process
RBI System Identification
▪ RBI System Definition
▪ Potential Degradation Mechanism
Collecting & Loading Design & Process Data
Executing Inspection Strategies
• Documenting Inspections
• Updating Plans and Inspection History
• Generalizing & Tracking
Recommendations
Developing Inspection Strategies
• Generating RBI Recommendations
• Finalizing Inspection Strategies
Risk Assessment
• Degradation Mechanism Evaluation
• Consequence Evaluation
• Risk Ranking
Other Historical Data
• Maintenance History
• Process Excursion Conditions
A
B
C
D
RBI
Methodology
Arrelic Reliability Private Limited | arrelic.com RBI - Risk Based Inspection 05
9. Cumulative
Likelihood of
Failure (LOF)
from
individual
PDM
evaluation
Risk = LOF
x COF
Risk Ranking
based on a
5 x 5 Risk
Matrix
Cumulative
Consequence
of Failure
(COF) from
individual
Consequence
Evaluation
R
i
s
k
R
a
n
k
i
n
g
R
e
s
u
l
t
s
Arrelic Reliability Private Limited | arrelic.com RBI - Risk Based Inspection 08
10. Risk Assessment
and set rules of
strategy are basis
to generate RBI
Guidelines
Review/ Assessment
of RBI
recommendations
Strategy Management: Inspection
Steps for Arrelic
RBI Strategy
Management
Approval
becomes
Inspection tasks.
These tasks
include inspection,
scope, interval
and method
Arrelic Reliability Private Limited | arrelic.com RBI - Risk Based Inspection 09
11. Identify the input
values that have the
greatest impact on
risk/criticality
Predict effects of
changing these input
variables
RBI Data Sensitivity
1
2
Arrelic Reliability Private Limited | arrelic.com RBI - Risk Based Inspection 10