Mail của Chris
Thanks for your time for today's audit preparation, please help to bring my thanks to other attendees,
Bao, Tuan, Quoc, Trung, Thu as well.
As what I said in today's closing meeting, the big issue I met today is, part of factory I will be under
construction soon, the production stopped, semi-finished products warehouse, yarn production
process and weaving process were settled here before. But now, they were move to site 4, where
was not accessed by auditor last time. Yarn production process can be assessed in Factory III, but no
weaving process was visible in Factory II and Factory III, this is the key process for bag production, as
for a full audit, this process must be reviewed during audit. If you can postpone the construction
plan 2 weeks later, let's say after BRC audit, and to restore the original appearance, that'll be great.
As per our audit plan (also confirmed with factory before), it doesn't allow the factory spent 1 month
to recover. I hope you can shorten the time frame. Anyway, please let me know your final decision
by tomorrow morning.
Below is the brief summary regarding to the findings issued by Primark auditor for your reference. I will
review the documentations as planned tomorrow morning in the meeting room.
No. Non-Compliance
[please include reference to local
law requirements]
Comments by Chris on Jun 15, 2016
1 There is no smoke detector or
sprinkler in chemical storage room
and stocked bag warehouse in
factory 1.
With on-site review, factory installed smoke detector
in the warehouse, but not maintain smoke detector
checking records, need to prepare relevant records.
Factory can finish it by Friday.
2
Some machine oil containers in
chemical storage room do not have
proper labels.
With on-site review, chemical materials in the
warehouse were with proper labels. Suggest factory
prepare secondary container for liquid chemical
materials, and have someone to check the material
label termly.
3
All electrical boxes and control
panels in 3 factories are not well -
equipped with anti - shocking mats
to ensure workers' safety.
With on-site review, found some of anti-shocking
mats' size are not big enough. Some electrical boxes
still not be with anti-shocking mats, for example in
canteen area of Factory II. Some mats are not settled
in the right area, for example, in Factory I.
4
Some electrical wires in 3 factories
are not well - insulated.
With on-site review, still found some wires are not
well insulated. - factory will check all the wires again
to reduce the safety risk.
5 Some staircases in yarning areas of
factory 1 and PP Multi yarning
section of factory 3 only have one
handrail.
With on-site review, handrail installed in Factory III is
ok, but factory also need to prepare handrail
checking records.
6 Some lights in PP warehouse &
chemical storage room of factory 1
and finished goods warehouse of
factory 3 do not have anti -
explosive covers.
With on-site review, most of lights were with
explosive covers (although they are not standard,
factory will try to change to standard ones, but need
to step by step), there are 2-3 lights missing explosive
covers.
7 Some running belts of machines in
laminating area of factory 1 and PP
With on-site review, the machines with running belt
in Factory II without covers, about 50% sewing
No. Non-Compliance
[please include reference to local
law requirements]
Comments by Chris on Jun 15, 2016
Multi yarning machines of factory 3
do not have complete covers.
machines in Factory II did not have completed belt
cover. Factory can finish the corrective actions by
Friday.
8 Clinic room of each factory only has
one bed.
Auditor suggested factory to have 2 beds in each
clinic room, with on-site review, this should be ok.
9
There are insufficient lights for
training room and sample room of
factory 2.
The reason cause to this finding is some lights in this
room were broken, factory had changed new lights
and all ok now. Suggest factory to check all the lights
within 3 factories, including production area,
inspection area, workshop office area, etc. to make
sure all the lights do work. - this should be check
before the end of this week.
10
There are no exit signs and
emergency lights at exit door of
sample sewing room on the 1st
floor
and staircases of factory 2.
With on-site review, the NC found by audit was
improved, but the emergency exits are not enough in
yarning section of Factory III, only one emergency
exit available in this area. Factory agreed to add one
emergency exit in this area, need to add exit
identification/sign and emergency light, the door also
need to change the opening direction of the door.
This need time to prepare, suppose to be finished by
the end of this week.
11 Forklift of factory 2 is not locked
and the forklift fence is not strong
enough to ensure workers' safety.
Additionally, the fence of the
mezzanine of factory 3 where PP
bags and carton boxes are kept is
not strong and safe enough.
With on-site review, the corrective action on forklift
is ok. But for the fence of the mezzanine of Factory
III, found they are not strong enough, somewhere
ever has gap in the button, not safety enough.
Factory promised to improve immediately and
supposed to finish it before Saturday. Factory also
need to prepare checking records.
12 Factory does not round to 1 if
the decimal of the calculation of
entitled annual leaves is larger
than 0.5 as the law requires.
Furthermore, factory only pays
100% the basic salary for
remaining annual leaves at the
end of the year 2015 when
factory does not determine/
notify a timetable for annual
leaves of workers in advance.
Documentation review by tomorrow.
13 Severance allowance is not
settled within 7 days of
termination or resignation as
per legal requirements.
Documentation review by tomorrow.
14 Factory provides first aid training
for internal first aid team (38
workers) but has not yet conducted
Documentation review by tomorrow.
No. Non-Compliance
[please include reference to local
law requirements]
Comments by Chris on Jun 15, 2016
first aid training for all workers
about basic response to accidents
(together with OSH training) as per
legal requirements.
15 Resigned workers who had
maternity leave during their
employment period did not receive
the severance payment for these
maternity or probationary and
apprenticeship periods which were
not covered by the unemployment
insurance as required by law.
Documentation review by tomorrow.
16 When workers' actual piece-rate
earnings are below minimum wage,
factory compensates workers at
least minimum wage for ordinary
hours of work. However, in
February when there are 25 normal
working days, factory divides by 26
days instead of 25 days as per legal
requirements and therefore their
piece rate compensation is
calculated incorrectly. Additionally,
factory does not deduct the period
of time when workers join trainings
such as fire drill trainings, first aid
trainings, health checks etc. when
calculating piece rate payment.
Documentation review by tomorrow.
17 OSH collaborator network is not
provided with responsibility
allowance.
Documentation review by tomorrow.
Should you have any problems, let's discuss tomorrow.

More Related Content

Viewers also liked (9)

Depliant ccn pdf
Depliant ccn pdfDepliant ccn pdf
Depliant ccn pdf
 
Английский алфавит
Английский алфавитАнглийский алфавит
Английский алфавит
 
Field Based Application of Automated Image Processing Using Windows Phone Gui...
Field Based Application of Automated Image Processing Using Windows Phone Gui...Field Based Application of Automated Image Processing Using Windows Phone Gui...
Field Based Application of Automated Image Processing Using Windows Phone Gui...
 
Relationship between Health MDGs and Environmental Health
Relationship between Health MDGs and Environmental HealthRelationship between Health MDGs and Environmental Health
Relationship between Health MDGs and Environmental Health
 
Convolvulaceae
ConvolvulaceaeConvolvulaceae
Convolvulaceae
 
Kyle Galli PowerPoint
Kyle Galli PowerPointKyle Galli PowerPoint
Kyle Galli PowerPoint
 
9 pernos
9 pernos9 pernos
9 pernos
 
Estrategias para que la educación del siglo xxi sea puerta de entrada e inclu...
Estrategias para que la educación del siglo xxi sea puerta de entrada e inclu...Estrategias para que la educación del siglo xxi sea puerta de entrada e inclu...
Estrategias para que la educación del siglo xxi sea puerta de entrada e inclu...
 
Apcamp
ApcampApcamp
Apcamp
 

Similar to Mail của chris

PARTIAL REPORT KA11034 AHMAD SHAHROOM
PARTIAL REPORT KA11034 AHMAD SHAHROOMPARTIAL REPORT KA11034 AHMAD SHAHROOM
PARTIAL REPORT KA11034 AHMAD SHAHROOM
Shahroom Sam
 
Industrial Training Report
Industrial Training ReportIndustrial Training Report
Industrial Training Report
Het Vyas
 
Due diligence Solarif- Audit report Kiwa - 150502184-a (Phonosolar) rev.00 (1)
Due diligence Solarif- Audit report Kiwa - 150502184-a (Phonosolar) rev.00 (1)Due diligence Solarif- Audit report Kiwa - 150502184-a (Phonosolar) rev.00 (1)
Due diligence Solarif- Audit report Kiwa - 150502184-a (Phonosolar) rev.00 (1)
SANJAY KUMAR
 
5 s modul
5 s modul5 s modul
5 s modul
edibayu
 
Domijump BSCI certificate
Domijump BSCI certificateDomijump BSCI certificate
Domijump BSCI certificate
Dan wang
 

Similar to Mail của chris (20)

Quality Control Basics (Part 3): When To Do Product Quality Inspections?
Quality Control Basics (Part 3): When To Do Product Quality Inspections?Quality Control Basics (Part 3): When To Do Product Quality Inspections?
Quality Control Basics (Part 3): When To Do Product Quality Inspections?
 
Plastop report
Plastop reportPlastop report
Plastop report
 
Pharmaceutical plant layout
Pharmaceutical plant layoutPharmaceutical plant layout
Pharmaceutical plant layout
 
PARTIAL REPORT KA11034 AHMAD SHAHROOM
PARTIAL REPORT KA11034 AHMAD SHAHROOMPARTIAL REPORT KA11034 AHMAD SHAHROOM
PARTIAL REPORT KA11034 AHMAD SHAHROOM
 
Industrial Training Report
Industrial Training ReportIndustrial Training Report
Industrial Training Report
 
mgt.docx
mgt.docxmgt.docx
mgt.docx
 
IMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDY
IMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDYIMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDY
IMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDY
 
HOW TO START A BUSINESS? - TIPS FOR AN ENTREPRENEUR
HOW TO START A BUSINESS?  - TIPS FOR AN ENTREPRENEURHOW TO START A BUSINESS?  - TIPS FOR AN ENTREPRENEUR
HOW TO START A BUSINESS? - TIPS FOR AN ENTREPRENEUR
 
Puro water plant
Puro water plantPuro water plant
Puro water plant
 
Due diligence Solarif- Audit report Kiwa - 150502184-a (Phonosolar) rev.00 (1)
Due diligence Solarif- Audit report Kiwa - 150502184-a (Phonosolar) rev.00 (1)Due diligence Solarif- Audit report Kiwa - 150502184-a (Phonosolar) rev.00 (1)
Due diligence Solarif- Audit report Kiwa - 150502184-a (Phonosolar) rev.00 (1)
 
Audit exercise no. 1
Audit exercise no. 1Audit exercise no. 1
Audit exercise no. 1
 
Internship report dawlance
Internship report dawlanceInternship report dawlance
Internship report dawlance
 
5 s modul
5 s modul5 s modul
5 s modul
 
Hrm of haier china
Hrm of haier chinaHrm of haier china
Hrm of haier china
 
Report on JIT , for Projects and Seminars
Report on JIT , for Projects and SeminarsReport on JIT , for Projects and Seminars
Report on JIT , for Projects and Seminars
 
Domijump BSCI certificate
Domijump BSCI certificateDomijump BSCI certificate
Domijump BSCI certificate
 
Batch Documentation Review - Part 2
Batch Documentation Review - Part 2Batch Documentation Review - Part 2
Batch Documentation Review - Part 2
 
Jishu hozen1
Jishu hozen1Jishu hozen1
Jishu hozen1
 
BRITANNIA INDUSTRIES LIMITED ZHAGADIYA, GUJRAT
BRITANNIA INDUSTRIES LIMITED ZHAGADIYA, GUJRATBRITANNIA INDUSTRIES LIMITED ZHAGADIYA, GUJRAT
BRITANNIA INDUSTRIES LIMITED ZHAGADIYA, GUJRAT
 
Productivity improvement through better planning
Productivity improvement through better planningProductivity improvement through better planning
Productivity improvement through better planning
 

Recently uploaded

一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
mefyqyn
 
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
mefyqyn
 
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样
mefyqyn
 

Recently uploaded (20)

Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[
Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[
Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[
 
Mergers and Acquisitions in Kenya - An explanation
Mergers and Acquisitions in Kenya - An explanationMergers and Acquisitions in Kenya - An explanation
Mergers and Acquisitions in Kenya - An explanation
 
Embed-1-1.pdfohediooieoiehohoiefoloeohefoi
Embed-1-1.pdfohediooieoiehohoiefoloeohefoiEmbed-1-1.pdfohediooieoiehohoiefoloeohefoi
Embed-1-1.pdfohediooieoiehohoiefoloeohefoi
 
Embed-3-2.pdfkp[k[odk[odk[d[ok[d[pkdkdkl
Embed-3-2.pdfkp[k[odk[odk[d[ok[d[pkdkdklEmbed-3-2.pdfkp[k[odk[odk[d[ok[d[pkdkdkl
Embed-3-2.pdfkp[k[odk[odk[d[ok[d[pkdkdkl
 
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
 
Skill Development in Law, Para Legal & other Fields and Export of Trained Man...
Skill Development in Law, Para Legal & other Fields and Export of Trained Man...Skill Development in Law, Para Legal & other Fields and Export of Trained Man...
Skill Development in Law, Para Legal & other Fields and Export of Trained Man...
 
HOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASES
HOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASESHOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASES
HOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASES
 
Respondent Moot Memorial including Charges and Argument Advanced.docx
Respondent Moot Memorial including Charges and Argument Advanced.docxRespondent Moot Memorial including Charges and Argument Advanced.docx
Respondent Moot Memorial including Charges and Argument Advanced.docx
 
Bad Spaniel's Consumer Survey on the Use of Disclaimers
Bad Spaniel's Consumer Survey on the Use of DisclaimersBad Spaniel's Consumer Survey on the Use of Disclaimers
Bad Spaniel's Consumer Survey on the Use of Disclaimers
 
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
 
Supreme Court Regulation No. 3 of 2023 on Procedure for Appointment of Arbitr...
Supreme Court Regulation No. 3 of 2023 on Procedure for Appointment of Arbitr...Supreme Court Regulation No. 3 of 2023 on Procedure for Appointment of Arbitr...
Supreme Court Regulation No. 3 of 2023 on Procedure for Appointment of Arbitr...
 
posts-harmful-to-secular-structure-of-the-country-539103-1.pdf
posts-harmful-to-secular-structure-of-the-country-539103-1.pdfposts-harmful-to-secular-structure-of-the-country-539103-1.pdf
posts-harmful-to-secular-structure-of-the-country-539103-1.pdf
 
TTD - PPT on social stock exchange.pptx Presentation
TTD - PPT on social stock exchange.pptx PresentationTTD - PPT on social stock exchange.pptx Presentation
TTD - PPT on social stock exchange.pptx Presentation
 
(Hamad khadam ) ENGLISH LEGAL 2.0.docx
(Hamad khadam )   ENGLISH LEGAL 2.0.docx(Hamad khadam )   ENGLISH LEGAL 2.0.docx
(Hamad khadam ) ENGLISH LEGAL 2.0.docx
 
Streamline Legal Operations: A Guide to Paralegal Services
Streamline Legal Operations: A Guide to Paralegal ServicesStreamline Legal Operations: A Guide to Paralegal Services
Streamline Legal Operations: A Guide to Paralegal Services
 
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证成绩单原件一模一样
 
Asif_Sultan_Syeda_vs_UT_of_J_K.pdf op[ke[k
Asif_Sultan_Syeda_vs_UT_of_J_K.pdf op[ke[kAsif_Sultan_Syeda_vs_UT_of_J_K.pdf op[ke[k
Asif_Sultan_Syeda_vs_UT_of_J_K.pdf op[ke[k
 
Embed-4-2.pdf vk[di-[sd[0edKP[p-[kedkpodekp
Embed-4-2.pdf vk[di-[sd[0edKP[p-[kedkpodekpEmbed-4-2.pdf vk[di-[sd[0edKP[p-[kedkpodekp
Embed-4-2.pdf vk[di-[sd[0edKP[p-[kedkpodekp
 
Comprehensive Guide on Drafting Directors' Report and its ROC Compliances und...
Comprehensive Guide on Drafting Directors' Report and its ROC Compliances und...Comprehensive Guide on Drafting Directors' Report and its ROC Compliances und...
Comprehensive Guide on Drafting Directors' Report and its ROC Compliances und...
 
Essential Components of an Effective HIPAA Safeguard Program
Essential Components of an Effective HIPAA Safeguard ProgramEssential Components of an Effective HIPAA Safeguard Program
Essential Components of an Effective HIPAA Safeguard Program
 

Mail của chris

  • 1. Mail của Chris Thanks for your time for today's audit preparation, please help to bring my thanks to other attendees, Bao, Tuan, Quoc, Trung, Thu as well. As what I said in today's closing meeting, the big issue I met today is, part of factory I will be under construction soon, the production stopped, semi-finished products warehouse, yarn production process and weaving process were settled here before. But now, they were move to site 4, where was not accessed by auditor last time. Yarn production process can be assessed in Factory III, but no weaving process was visible in Factory II and Factory III, this is the key process for bag production, as for a full audit, this process must be reviewed during audit. If you can postpone the construction plan 2 weeks later, let's say after BRC audit, and to restore the original appearance, that'll be great. As per our audit plan (also confirmed with factory before), it doesn't allow the factory spent 1 month to recover. I hope you can shorten the time frame. Anyway, please let me know your final decision by tomorrow morning. Below is the brief summary regarding to the findings issued by Primark auditor for your reference. I will review the documentations as planned tomorrow morning in the meeting room. No. Non-Compliance [please include reference to local law requirements] Comments by Chris on Jun 15, 2016 1 There is no smoke detector or sprinkler in chemical storage room and stocked bag warehouse in factory 1. With on-site review, factory installed smoke detector in the warehouse, but not maintain smoke detector checking records, need to prepare relevant records. Factory can finish it by Friday. 2 Some machine oil containers in chemical storage room do not have proper labels. With on-site review, chemical materials in the warehouse were with proper labels. Suggest factory prepare secondary container for liquid chemical materials, and have someone to check the material label termly. 3 All electrical boxes and control panels in 3 factories are not well - equipped with anti - shocking mats to ensure workers' safety. With on-site review, found some of anti-shocking mats' size are not big enough. Some electrical boxes still not be with anti-shocking mats, for example in canteen area of Factory II. Some mats are not settled in the right area, for example, in Factory I. 4 Some electrical wires in 3 factories are not well - insulated. With on-site review, still found some wires are not well insulated. - factory will check all the wires again to reduce the safety risk. 5 Some staircases in yarning areas of factory 1 and PP Multi yarning section of factory 3 only have one handrail. With on-site review, handrail installed in Factory III is ok, but factory also need to prepare handrail checking records. 6 Some lights in PP warehouse & chemical storage room of factory 1 and finished goods warehouse of factory 3 do not have anti - explosive covers. With on-site review, most of lights were with explosive covers (although they are not standard, factory will try to change to standard ones, but need to step by step), there are 2-3 lights missing explosive covers. 7 Some running belts of machines in laminating area of factory 1 and PP With on-site review, the machines with running belt in Factory II without covers, about 50% sewing
  • 2. No. Non-Compliance [please include reference to local law requirements] Comments by Chris on Jun 15, 2016 Multi yarning machines of factory 3 do not have complete covers. machines in Factory II did not have completed belt cover. Factory can finish the corrective actions by Friday. 8 Clinic room of each factory only has one bed. Auditor suggested factory to have 2 beds in each clinic room, with on-site review, this should be ok. 9 There are insufficient lights for training room and sample room of factory 2. The reason cause to this finding is some lights in this room were broken, factory had changed new lights and all ok now. Suggest factory to check all the lights within 3 factories, including production area, inspection area, workshop office area, etc. to make sure all the lights do work. - this should be check before the end of this week. 10 There are no exit signs and emergency lights at exit door of sample sewing room on the 1st floor and staircases of factory 2. With on-site review, the NC found by audit was improved, but the emergency exits are not enough in yarning section of Factory III, only one emergency exit available in this area. Factory agreed to add one emergency exit in this area, need to add exit identification/sign and emergency light, the door also need to change the opening direction of the door. This need time to prepare, suppose to be finished by the end of this week. 11 Forklift of factory 2 is not locked and the forklift fence is not strong enough to ensure workers' safety. Additionally, the fence of the mezzanine of factory 3 where PP bags and carton boxes are kept is not strong and safe enough. With on-site review, the corrective action on forklift is ok. But for the fence of the mezzanine of Factory III, found they are not strong enough, somewhere ever has gap in the button, not safety enough. Factory promised to improve immediately and supposed to finish it before Saturday. Factory also need to prepare checking records. 12 Factory does not round to 1 if the decimal of the calculation of entitled annual leaves is larger than 0.5 as the law requires. Furthermore, factory only pays 100% the basic salary for remaining annual leaves at the end of the year 2015 when factory does not determine/ notify a timetable for annual leaves of workers in advance. Documentation review by tomorrow. 13 Severance allowance is not settled within 7 days of termination or resignation as per legal requirements. Documentation review by tomorrow. 14 Factory provides first aid training for internal first aid team (38 workers) but has not yet conducted Documentation review by tomorrow.
  • 3. No. Non-Compliance [please include reference to local law requirements] Comments by Chris on Jun 15, 2016 first aid training for all workers about basic response to accidents (together with OSH training) as per legal requirements. 15 Resigned workers who had maternity leave during their employment period did not receive the severance payment for these maternity or probationary and apprenticeship periods which were not covered by the unemployment insurance as required by law. Documentation review by tomorrow. 16 When workers' actual piece-rate earnings are below minimum wage, factory compensates workers at least minimum wage for ordinary hours of work. However, in February when there are 25 normal working days, factory divides by 26 days instead of 25 days as per legal requirements and therefore their piece rate compensation is calculated incorrectly. Additionally, factory does not deduct the period of time when workers join trainings such as fire drill trainings, first aid trainings, health checks etc. when calculating piece rate payment. Documentation review by tomorrow. 17 OSH collaborator network is not provided with responsibility allowance. Documentation review by tomorrow. Should you have any problems, let's discuss tomorrow.