FECHA: JULIO 2010
No. RENGLON CANTIDAD UNIDAD TRANSPORTE TOTAL
NO CALIFICADA CALIFICADA TOTAL LOCALES NO LOCALES TOTAL
1 CAPTACION 4 U
LIMPIA Y CHAPEO 144.00 m² 216.00 216.00 216.00
TRAZO Y ESTAQUEADO 128.00 ml 480.00 480.00 480.00
EXCAVACION 16.00 m³ 336.00 336.00 336.00
MUROS DE CAPTACION DE MAMPOSTERIA 16.00 m³ 1,920.00 1,920.00 1,920.00 3,840.00 5,760.00 7,680.00
CAJA DE MAMPOSTERIA 20.40 m³ 2,244.00 2,244.00 5,455.00 4,860.00 10,315.00 12,559.00
TAPADERAS DE CONCRETO 1.76 m³ 1,560.00 1,560.00 370.00 3,654.02 4,024.02 5,584.02
REPELLO + AFINADO EN CAJA DE MAMPOSTERIA 80.00 m² 960.00 960.00 175.00 720.00 895.00 1,855.00
MATERIAL FILTRANTE 24.00 m² 1,200.00 1,200.00 2,200.00 2,200.00 3,400.00
CONTRA CUNETA DE CONCRETO 24.00 ml 1,552.00 1,552.00 370.00 720.00 1,090.00 2,642.00
TUBERIA, ACCESORIOS Y VALVULAS global 600.00 600.00 2,275.48 2,275.48 2,875.48
TRANSPORTE 200 qq 5,000.00 5,000.00
TOTAL RENGLON 1,032.00 10,036.00 11,068.00 10,490.00 16,069.50 26,559.50 5,000.00 42,627.50
2 CAJA REUNIDORA DE CAUDALES DE 1 M³ 3 U
LIMPIA Y CHAPEO 12.00 m² 18.00 18.00 18.00
TRAZO Y ESTAQUEADO 15.00 ml 56.25 56.25 56.25
EXCAVACION 3.00 m³ 63.00 63.00 63.00
MUROS + FONDO DE MAMPOSTERIA 6.15 m³ 1,200.00 1,200.00 2,820.00 1,530.00 4,350.00 5,550.00
LOSA + TAPADERA DE CONCRETO 0.90 m³ 1,050.00 1,050.00 191.25 1,378.01 1,569.26 2,619.26
REPELLO + AFINADO 41.70 m² 540.00 540.00 112.50 360.00 472.50 1,012.50
TUBERIA, ACCESORIOS Y VALVULAS global 300.00 300.00 1,784.76 1,784.76 2,084.76
TRANSPORTE 63 qq 1,575.00 1,575.00
TOTAL RENGLON 205.88 3,090.00 3,295.88 3,123.75 5,052.77 8,176.52 1,575.00 13,047.39
3 LINEA DE CONDUCCION 14238 ML.
LIMPIA Y CHAPEO 14,238.00 m² 7,119.00 7,119.00 7,119.00
TRAZO Y ESTAQUEADO 14,238.00 ml 3,559.50 3,559.50 3,559.50
EXCAVACION 8,460.00 m³ 177,660.00 177,660.00 177,660.00
RELLENO 8,436.00 m³ 118,104.00 118,104.00 118,104.00
TUBERIA PVC Ø 3/4" C-250 396.00 ml 297.00 297.00 3,714.48 3,714.48 4,011.48
TUBERIA PVC Ø 1" C-160 534.00 ml 400.50 400.50 6,155.24 6,155.24 6,555.74
TUBERÍA PVC Ø 1½" C-160 552.00 ml 414.00 414.00 10,435.56 10,435.56 10,849.56
TUBERÍA PVC Ø 2" C-160 6420.00 ml 6,420.00 6,420.00 189,111.80 189,111.80 195,531.80
TUBERÍA PVC Ø 1½" C-250 1170.00 ml 877.50 877.50 33,214.35 33,214.35 34,091.85
TUBERÍA PVC Ø 2" C-250 4242.00 ml 4,242.00 4,242.00 188,104.42 188,104.42 192,346.42
TUBERÍA HG Ø 1" TL 66.00 ml 148.50 148.50 2,464.00 2,464.00 2,612.50
TUBERÍA HG Ø 1½" TL 54.00 ml 121.50 121.50 3,294.00 3,294.00 3,415.50
TUBERÍA HG Ø 2" TL 804.00 ml 2,412.00 2,412.00 61,640.00 61,640.00 64,052.00
ACCESORIOS global 690.00 690.00 12,634.69 12,634.69 13,324.69
VALVULAS DE AIRE 17.00 u 935.00 935.00 8,364.05 8,364.05 9,299.05
VALVULAS DE LIMPIEZA 22.00 u 1,320.00 1,320.00 3,490.51 3,490.51 4,810.51
CAJAS PARA VALVULAS DE AIRE Y LIMPIEZA 39.00 u 7,800.00 7,800.00 1,455.00 7,546.50 9,001.50 16,801.50
MANO DE OBRA MATERIALES
PROYECTO DE AGUA POTABLE
CANTON MORALES, ALDEA GRANADILLO, COLOTENANGO, HUEHUETENANGO
PRESUPUESTO
FECHA: JULIO 2010
No. RENGLON CANTIDAD UNIDAD TRANSPORTE TOTAL
NO CALIFICADA CALIFICADA TOTAL LOCALES NO LOCALES TOTAL
MANO DE OBRA MATERIALES
PROYECTO DE AGUA POTABLE
CANTON MORALES, ALDEA GRANADILLO, COLOTENANGO, HUEHUETENANGO
PRESUPUESTO
TRANSPORTE 320 qq 8,000.00 8,000.00
TOTAL RENGLON 306,442.50 26,078.00 332,520.50 1,455.00 530,169.60 531,624.60 8,000.00 872,145.10
4 ANCLAJE PARA TUBERIA DE HG 190.00 U
SOPORTES DE CONCRETO ARMADO 190.00 u 2,850.00 8,550.00 11,400.00 3,515.00 18,129.80 21,644.80 33,044.80
TRANSPORTE 171.00 qq 4,275.00 4,275.00
TOTAL RENGLON 2,850.00 8,550.00 11,400.00 3,515.00 18,129.80 21,644.80 4,275.00 37,319.80
5 TANQUE DE DISTRIBUCION 20 M³ MAMPOSTERIA 1 U
LIMPIA Y CHAPEO 27.00 m² 40.50 40.50 40.50
TRAZO Y ESTAQUEADO 21.00 ml 78.75 78.75 78.75
EXCAVACION 22.00 m³ 462.00 462.00 462.00
FONDO DE MAMPOSTERIA 4.20 m³ 525.00 525.00 498.75 960.00 1,458.75 1,983.75
MUROS DE MAMPOSTERIA 35.00 m³ 4,375.00 4,375.00 6,025.00 8,445.00 14,470.00 18,845.00
LOSA + TAPADERA + VIGA 2.90 m³ 2,465.00 2,465.00 585.00 3,867.12 4,452.12 6,917.12
REPELLO + AFINADO 89.00 m² 1,260.00 1,260.00 225.00 240.00 465.00 1,725.00
ESCALERAS + VENTILACION global 300.00 300.00 588.20 588.20 888.20
TUBERIA Y ACCESORIOS global 200.00 200.00 1,069.06 1,069.06 1,269.06
CAJAS PARA VALVULAS 3.00 u 600.00 600.00 101.25 724.00 825.25 1,425.25
TRANSPORTE 194 qq 4,850.00 4,850.00
TOTAL RENGLON 581.25 9,725.00 10,306.25 7,435.00 15,893.38 23,328.38 4,850.00 38,484.63
6 PASO DE ZANJON TIPO E 3 U
LIMPIA Y CHAPEO 54.00 m² 81.00 81.00 81.00
EXCAVACION 4.95 m³ 103.95 103.95 103.95
BASES DE CONCRETO 5.40 m3 225.00 900.00 1,125.00 1,923.75 5,929.38 7,853.13 8,978.13
ACCESORIOS DEL PASO DE ZANJON global 450.00 450.00 2,085.00 2,085.00 2,535.00
TRANSPORTE 60 qq 1,500.00 1,500.00
TOTAL RENGLON 409.95 1,350.00 1,759.95 1,923.75 8,014.38 9,938.13 1,500.00 13,198.08
7 PASO AEREO DE 12 mts. 2 U
LIMPIA Y CHAPEO 24.00 m² 36.00 36.00 36.00
EXCAVACION 3.30 m³ 42.00 42.00 42.00
MUERTOS DE CONCRETO 12.00 m³ 1,320.00 1,320.00 2,075.00 4,800.00 6,875.00 8,195.00
ZAPATAS 1.20 m³ 600.00 600.00 240.00 1,506.70 1,746.70 2,346.70
COLUMNAS 1.56 m³ 1,200.00 1,200.00 2,072.50 3,331.40 5,403.90 6,603.90
CABLEADO Y ACCESORIOS global 800.00 800.00 6,817.64 6,817.64 7,617.64
TRANSPORTE 132 qq 3,300.00 3,300.00
TOTAL RENGLON 78.00 3,920.00 3,998.00 4,387.50 16,455.74 20,843.24 3,300.00 28,141.24
FECHA: JULIO 2010
No. RENGLON CANTIDAD UNIDAD TRANSPORTE TOTAL
NO CALIFICADA CALIFICADA TOTAL LOCALES NO LOCALES TOTAL
MANO DE OBRA MATERIALES
PROYECTO DE AGUA POTABLE
CANTON MORALES, ALDEA GRANADILLO, COLOTENANGO, HUEHUETENANGO
PRESUPUESTO
8 PASO AEREO DE 18 mts. 5 U
LIMPIA Y CHAPEO 90.00 m² 135.00 135.00 135.00
EXCAVACION 8.25 m³ 173.25 173.25 173.25
MUERTOS DE CONCRETO 43.25 m³ 5,625.00 5,625.00 8,018.75 19,500.00 27,518.75 33,143.75
ZAPATAS 3.00 m³ 1,650.00 1,650.00 600.00 3,766.75 4,366.75 6,016.75
COLUMNAS 3.90 m³ 3,320.00 3,320.00 5,181.25 8,328.50 13,509.75 16,829.75
CABLEADO Y ACCESORIOS global 3,000.00 3,000.00 19,194.10 19,194.10 22,194.10
TRANSPORTE 330 qq 8,250.00 8,250.00
TOTAL RENGLON 308.25 13,595.00 13,903.25 13,800.00 50,789.35 64,589.35 8,250.00 86,742.60
9 PASO AEREO DE 20 mts. 2.00 U
LIMPIA Y CHAPEO 36.00 m² 54.00 54.00 54.00
EXCAVACION 3.30 m³ 69.30 69.30 69.30
MUERTOS DE CONCRETO 17.30 m³ 2,250.00 2,250.00 3,207.50 7,800.00 11,007.50 13,257.50
ZAPATAS 1.20 m³ 660.00 660.00 240.00 1,506.70 1,746.70 2,406.70
COLUMNAS 1.56 m³ 1,328.00 1,328.00 2,072.50 3,331.40 5,403.90 6,731.90
CABLEADO Y ACCESORIOS global 1,200.00 1,200.00 7,677.64 7,677.64 8,877.64
TRANSPORTE 90 qq 2,250.00 2,250.00
TOTAL RENGLON 123.30 5,438.00 5,561.30 5,520.00 20,315.74 25,835.74 2,250.00 33,647.04
10 PASO AEREO DE 30 mts. 4 U
LIMPIA Y CHAPEO 72.00 m² 108.00 108.00 108.00
EXCAVACION 6.60 m³ 138.60 138.60 138.60
MUERTOS DE CONCRETO 34.60 m³ 4,500.00 4,500.00 6,415.00 15,600.00 22,015.00 26,515.00
ZAPATAS 2.40 m³ 1,320.00 1,320.00 480.00 3,013.40 3,493.40 4,813.40
COLUMNAS 3.12 m³ 2,656.00 2,656.00 4,145.00 6,662.80 10,807.80 13,463.80
CABLEADO Y ACCESORIOS global 3,200.00 3,200.00 17,183.28 17,183.28 20,383.28
TRANSPORTE 400 qq 10,000.00 10,000.00
TOTAL RENGLON 246.60 11,676.00 11,922.60 11,040.00 42,459.48 53,499.48 10,000.00 75,422.08
11 PASO AEREO DE 40 mts. 3 U
LIMPIA Y CHAPEO 54.00 m² 81.00 81.00 81.00
EXCAVACION 4.95 m³ 103.95 103.95 103.95
MUERTOS DE CONCRETO 25.95 m³ 3,375.00 3,375.00 4,811.25 11,700.00 16,511.25 19,886.25
ZAPATAS 1.98 m³ 990.00 990.00 412.50 2,927.58 3,340.08 4,330.08
COLUMNAS 2.55 m³ 1,992.00 1,992.00 2,103.75 5,312.61 7,416.36 9,408.36
CABLEADO Y ACCESORIOS global 2,400.00 2,400.00 14,147.46 14,147.46 16,547.46
TRANSPORTE 300 qq 7,500.00 7,500.00
TOTAL RENGLON 184.95 8,757.00 8,941.95 7,327.50 34,087.65 41,415.15 7,500.00 57,857.10
12 PASO AEREO DE 75 mts. 1 U
FECHA: JULIO 2010
No. RENGLON CANTIDAD UNIDAD TRANSPORTE TOTAL
NO CALIFICADA CALIFICADA TOTAL LOCALES NO LOCALES TOTAL
MANO DE OBRA MATERIALES
PROYECTO DE AGUA POTABLE
CANTON MORALES, ALDEA GRANADILLO, COLOTENANGO, HUEHUETENANGO
PRESUPUESTO
LIMPIA Y CHAPEO 25.00 m² 37.50 37.50 37.50
EXCAVACION 6.30 m³ 132.30 132.30 132.30
RELLENO 3.60 m³ 50.40 50.40 50.40
MUERTOS DE CONCRETO 8.65 m³ 1,125.00 1,125.00 1,603.75 3,900.00 5,503.75 6,628.75
ZAPATAS 1.22 m³ 450.00 450.00 245.00 1,275.86 1,520.86 1,970.86
COLUMNAS 1.56 m³ 900.00 900.00 1,016.25 4,370.55 5,386.80 6,286.80
CABLEADO Y ACCESORIOS global 1,500.00 1,500.00 8,469.10 8,469.10 9,969.10
TRANSPORTE 110 qq 2,750.00 2,750.00
TOTAL RENGLON 220.20 3,975.00 4,195.20 2,865.00 18,015.51 20,880.51 2,750.00 27,825.71
13 RED DE DISTRIBUCION 10188 ML.
TRAZO Y ESTAQUEADO 10,188.00 ml 2,547.00 2,547.00 2,547.00
EXCAVACION 6,255.00 m³ 87,570.00 87,570.00 87,570.00
RELLENO 6,248.00 m³ 43,736.00 43,736.00 43,736.00
TUBERIA PVC Ø 3/4" C-250 5490.00 ml 5,490.00 5,490.00 51,496.20 51,496.20 56,986.20
TUBERIA PVC Ø 1" C-160 2484.00 ml 2,484.00 2,484.00 28,632.24 28,632.24 31,116.24
TUBERÍA PVC Ø 1¼" C-160 384.00 ml 576.00 576.00 5,557.76 5,557.76 6,133.76
TUBERÍA PVC Ø 1½" C-160 102.00 ml 76.50 76.50 1,928.31 1,928.31 2,004.81
TUBERÍA PVC Ø 2" C-160 1386.00 ml 1,386.00 1,386.00 40,826.94 40,826.94 42,212.94
TUBERÍA PVC Ø 2" C-250 240.00 ml 240.00 240.00 10,642.40 10,642.40 10,882.40
TUBERÍA HG Ø 1" TL 60.00 ml 135.00 135.00 2,240.00 2,240.00 2,375.00
TUBERÍA HG Ø 2" TL 42.00 ml 126.00 126.00 3,220.00 3,220.00 3,346.00
ACCESORIOS global 635.00 635.00 3,821.14 3,821.14 4,456.14
TRANSPORTE 80 qq 2,000.00 2,000.00
TOTAL RENGLON 133,853.00 11,148.50 145,001.50 0.00 148,364.99 148,364.99 2,000.00 295,366.49
14 CAJA ROMPE PRESION DE 1 M³ CON VALVULA FLOTE 19 U
LIMPIA Y CHAPEO 76.00 m² 114.00 114.00 114.00
TRAZO Y ESTAQUEADO 95.00 ml 356.25 356.25 356.25
EXCAVACION 19.00 m³ 399.00 399.00 399.00
MUROS + FONDO DE MAMPOSTERIA 38.95 m³ 6,650.00 6,650.00 17,860.00 9,690.00 27,550.00 34,200.00
LOSA + TAPADERA DE CONCRETO 5.70 m³ 4,750.00 4,750.00 1,211.25 8,727.37 9,938.62 14,688.62
REPELLO + AFINADO 264.10 m² 2,850.00 2,850.00 712.50 2,280.00 2,992.50 5,842.50
TUBERIA, ACCESORIOS Y VALVULAS global 1,425.00 1,425.00 13,084.82 13,084.82 14,509.82
TRANSPORTE 399 qq 9,975.00 9,975.00
TOTAL RENGLON 1,303.88 15,675.00 16,978.88 19,783.75 33,782.19 53,565.94 9,975.00 80,519.81
15 CONEXIONES DOMICILIARES 130 U
TRAZO Y ESTAQUEADO 2,340.00 ml 585.00 585.00 585.00
EXCAVACION 2,600.00 m³ 36,400.00 36,400.00 36,400.00
RELLENO 2,599.00 m³ 18,193.00 18,193.00 18,193.00
TUBERIA, ACCESORIOS Y VALVULAS global 5,850.00 5,850.00 103,793.89 103,793.89 109,643.89
FECHA: JULIO 2010
No. RENGLON CANTIDAD UNIDAD TRANSPORTE TOTAL
NO CALIFICADA CALIFICADA TOTAL LOCALES NO LOCALES TOTAL
MANO DE OBRA MATERIALES
PROYECTO DE AGUA POTABLE
CANTON MORALES, ALDEA GRANADILLO, COLOTENANGO, HUEHUETENANGO
PRESUPUESTO
BASES DE CONCRETO 130.00 u 4,550.00 4,550.00 1,300.00 1,657.50 2,957.50 7,507.50
TRANSPORTE 32.50 qq 812.50 812.50
TOTAL RENGLON 55,178.00 10,400.00 65,578.00 1,300.00 105,451.39 106,751.39 812.50 173,141.89
16 HIPOCLORADOR 1 U
TRAZO Y ESTAQUEADO 4.00 ml 25.00 25.00 25.00
DEPOSITO DE CONCRETO ARMADO 1.00 m³ 765.00 765.00 550.00 1,166.17 1,716.17 2,481.17
TUBERIA Y ACCESORIOS global 150.00 150.00 327.25 327.25 477.25
TRANSPORTE 15 qq 375.00 375.00
TOTAL RENGLON 25.00 915.00 940.00 550.00 1,493.42 2,043.42 375.00 3,358.42
17 SUMIDEROS PARA CONEXIONES 130 U
TRAZO Y ESTAQUEADO 468.00 ml 117.00 117.00 117.00
EXCAVACION 150.80 m³ 2,111.20 2,111.20 2,111.20
TRAMPA DE GRASA Y SUMIDERO 130.00 u 32,500.00 32,500.00 39,325.00 64,010.83 103,335.83 135,835.83
TRANSPORTE 780 qq 19,500.00 19,500.00
TOTAL RENGLON 2,228.20 32,500.00 34,728.20 39,325.00 64,010.83 103,335.83 19,500.00 157,564.03
COSTO DIRECTO DEL TOTAL DE RENGLONES 505,270.95 176,828.50 682,099.45 133,841.25 1,128,555.70 1,262,396.95 91,912.50 2,036,408.90

More Related Content

What's hot

Presupuesto pisos-de-adoquin
Presupuesto pisos-de-adoquinPresupuesto pisos-de-adoquin
Presupuesto pisos-de-adoquin
Juan Caceres
 
Analisis unitarios-estructura
Analisis unitarios-estructuraAnalisis unitarios-estructura
Analisis unitarios-estructura
Marlin Mendo
 
03.03 analisis-de-costos-unitarios-linea-de-conduccion-dn-160 mm
03.03 analisis-de-costos-unitarios-linea-de-conduccion-dn-160 mm03.03 analisis-de-costos-unitarios-linea-de-conduccion-dn-160 mm
03.03 analisis-de-costos-unitarios-linea-de-conduccion-dn-160 mm
oscar armando mamani quispe
 

What's hot (20)

01.00 planilla de metrados
01.00 planilla de metrados01.00 planilla de metrados
01.00 planilla de metrados
 
Presupuesto pisos-de-adoquin
Presupuesto pisos-de-adoquinPresupuesto pisos-de-adoquin
Presupuesto pisos-de-adoquin
 
Presupuesto Obra de Saneamiento
Presupuesto Obra de SaneamientoPresupuesto Obra de Saneamiento
Presupuesto Obra de Saneamiento
 
Presupuesto apertura carretera
Presupuesto apertura carreteraPresupuesto apertura carretera
Presupuesto apertura carretera
 
Analisissubpresupuestovarios
AnalisissubpresupuestovariosAnalisissubpresupuestovarios
Analisissubpresupuestovarios
 
Apu sardineles
Apu sardinelesApu sardineles
Apu sardineles
 
C u-tanque-y-pozo-de-percolacion
C u-tanque-y-pozo-de-percolacionC u-tanque-y-pozo-de-percolacion
C u-tanque-y-pozo-de-percolacion
 
Cuadrillas de trabajo
Cuadrillas de trabajoCuadrillas de trabajo
Cuadrillas de trabajo
 
Factores de-escala-para-autocad
Factores de-escala-para-autocadFactores de-escala-para-autocad
Factores de-escala-para-autocad
 
precios unitarios.pdf
precios unitarios.pdfprecios unitarios.pdf
precios unitarios.pdf
 
01. muro de contención
01. muro de contención01. muro de contención
01. muro de contención
 
Analisis unitarios-estructura
Analisis unitarios-estructuraAnalisis unitarios-estructura
Analisis unitarios-estructura
 
Cuadrillas
CuadrillasCuadrillas
Cuadrillas
 
Revista digital p&c año 31 noviembre 2020
Revista digital p&c año 31 noviembre 2020Revista digital p&c año 31 noviembre 2020
Revista digital p&c año 31 noviembre 2020
 
Analisis de precios unitarios
Analisis de precios unitariosAnalisis de precios unitarios
Analisis de precios unitarios
 
Presupuesto
PresupuestoPresupuesto
Presupuesto
 
ANÁLISIS DE COSTOS UNITARIOS DE OBRA
ANÁLISIS DE COSTOS UNITARIOS DE OBRA ANÁLISIS DE COSTOS UNITARIOS DE OBRA
ANÁLISIS DE COSTOS UNITARIOS DE OBRA
 
Suplemento Tecnico 316.1-Feb (2).pdf
Suplemento Tecnico 316.1-Feb (2).pdfSuplemento Tecnico 316.1-Feb (2).pdf
Suplemento Tecnico 316.1-Feb (2).pdf
 
Trabajo 02 - METRADOS DE ARQUITECTURA Y ESTRUCTURAS
Trabajo 02 - METRADOS DE ARQUITECTURA Y ESTRUCTURASTrabajo 02 - METRADOS DE ARQUITECTURA Y ESTRUCTURAS
Trabajo 02 - METRADOS DE ARQUITECTURA Y ESTRUCTURAS
 
03.03 analisis-de-costos-unitarios-linea-de-conduccion-dn-160 mm
03.03 analisis-de-costos-unitarios-linea-de-conduccion-dn-160 mm03.03 analisis-de-costos-unitarios-linea-de-conduccion-dn-160 mm
03.03 analisis-de-costos-unitarios-linea-de-conduccion-dn-160 mm
 

Viewers also liked (8)

Cantidades de obra y presupuesto casa
Cantidades de obra y presupuesto casaCantidades de obra y presupuesto casa
Cantidades de obra y presupuesto casa
 
Presupuestos 2
Presupuestos 2Presupuestos 2
Presupuestos 2
 
Estudio económico parte 01 costos de producción
Estudio económico parte 01   costos de producciónEstudio económico parte 01   costos de producción
Estudio económico parte 01 costos de producción
 
formato presupuesto
formato presupuestoformato presupuesto
formato presupuesto
 
Presupuesto de eventos
Presupuesto de eventosPresupuesto de eventos
Presupuesto de eventos
 
Cómo crear un presupuesto del evento
Cómo crear un presupuesto del eventoCómo crear un presupuesto del evento
Cómo crear un presupuesto del evento
 
Calculo de cantidades de acuerdo a planos
Calculo de cantidades de acuerdo a planosCalculo de cantidades de acuerdo a planos
Calculo de cantidades de acuerdo a planos
 
Planificacion y organizacion de eventos y banquete
Planificacion y organizacion de eventos y banquetePlanificacion y organizacion de eventos y banquete
Planificacion y organizacion de eventos y banquete
 

Similar to 020 ejemplo de presupuesto (mano de obra, materiales y transporte)

Queen burger pres 2 p+f
Queen burger pres 2 p+fQueen burger pres 2 p+f
Queen burger pres 2 p+f
RofoMG
 
Data penawaran subur jaya
Data penawaran subur jayaData penawaran subur jaya
Data penawaran subur jaya
verytudjuka
 
2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes
Deny Sulistio
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliah
Reguti
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliah
Sekertariat_Akmaliah
 
1.concretos mortero 179
1.concretos mortero 1791.concretos mortero 179
1.concretos mortero 179
jjjj
 
7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oe7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oe
Kashmir Brown
 
Maiz grano para blog
Maiz grano para blogMaiz grano para blog
Maiz grano para blog
Miguel Lopez
 
128249253 deped-estimate
128249253 deped-estimate128249253 deped-estimate
128249253 deped-estimate
imaduddin91
 

Similar to 020 ejemplo de presupuesto (mano de obra, materiales y transporte) (20)

Queen burger pres 2 p+f
Queen burger pres 2 p+fQueen burger pres 2 p+f
Queen burger pres 2 p+f
 
Data penawaran subur jaya
Data penawaran subur jayaData penawaran subur jaya
Data penawaran subur jaya
 
2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliah
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliah
 
Lista de precios iccu 2016
Lista de precios iccu 2016 Lista de precios iccu 2016
Lista de precios iccu 2016
 
1.concretos mortero 179
1.concretos mortero 1791.concretos mortero 179
1.concretos mortero 179
 
Sorgo para blog
Sorgo para blogSorgo para blog
Sorgo para blog
 
7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oe7. m. darul ikhsan pematang duku oe
7. m. darul ikhsan pematang duku oe
 
Maiz grano para blog
Maiz grano para blogMaiz grano para blog
Maiz grano para blog
 
128249253 deped-estimate
128249253 deped-estimate128249253 deped-estimate
128249253 deped-estimate
 
Space 134 - Statement of Probable Cost
Space 134 - Statement of Probable CostSpace 134 - Statement of Probable Cost
Space 134 - Statement of Probable Cost
 
Magazina M1
Magazina M1Magazina M1
Magazina M1
 
Aluminium Architectural Section Profiles Manufacturer & Supplier
Aluminium Architectural Section Profiles Manufacturer & SupplierAluminium Architectural Section Profiles Manufacturer & Supplier
Aluminium Architectural Section Profiles Manufacturer & Supplier
 
Gjendje magazine
Gjendje magazineGjendje magazine
Gjendje magazine
 
Dyqani D1
Dyqani D1Dyqani D1
Dyqani D1
 
Facade man hour
Facade man hourFacade man hour
Facade man hour
 
Inventario 16 09-10
Inventario 16 09-10Inventario 16 09-10
Inventario 16 09-10
 
Tema 12 diapositivas
Tema 12 diapositivasTema 12 diapositivas
Tema 12 diapositivas
 
Revit Samples
Revit SamplesRevit Samples
Revit Samples
 

Recently uploaded

Top profile Call Girls In Sagar [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Sagar [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Sagar [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Sagar [ 7014168258 ] Call Me For Genuine Models We ...
nirzagarg
 
Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...
gajnagarg
 
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
ZurliaSoop
 
K Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CVK Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CV
K VENKAT NAVEEN KUMAR
 
Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
Howrah [ Call Girls Kolkata ₹7.5k Pick Up & Drop With Cash Payment 8005736733...
Howrah [ Call Girls Kolkata ₹7.5k Pick Up & Drop With Cash Payment 8005736733...Howrah [ Call Girls Kolkata ₹7.5k Pick Up & Drop With Cash Payment 8005736733...
Howrah [ Call Girls Kolkata ₹7.5k Pick Up & Drop With Cash Payment 8005736733...
HyderabadDolls
 
Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7
Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7
Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
gynedubai
 
Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...
Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...
Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...
Angela Justice, PhD
 
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
gajnagarg
 
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
ZurliaSoop
 

Recently uploaded (20)

Top profile Call Girls In Sagar [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Sagar [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Sagar [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Sagar [ 7014168258 ] Call Me For Genuine Models We ...
 
Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...
 
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
 
K Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CVK Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CV
 
Call Girl In Gwalior Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class C...
Call Girl In Gwalior Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class C...Call Girl In Gwalior Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class C...
Call Girl In Gwalior Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class C...
 
Mysore Escorts Service Girl ^ 9332606886, WhatsApp Anytime Mysore
Mysore Escorts Service Girl ^ 9332606886, WhatsApp Anytime MysoreMysore Escorts Service Girl ^ 9332606886, WhatsApp Anytime Mysore
Mysore Escorts Service Girl ^ 9332606886, WhatsApp Anytime Mysore
 
Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...
 
Howrah [ Call Girls Kolkata ₹7.5k Pick Up & Drop With Cash Payment 8005736733...
Howrah [ Call Girls Kolkata ₹7.5k Pick Up & Drop With Cash Payment 8005736733...Howrah [ Call Girls Kolkata ₹7.5k Pick Up & Drop With Cash Payment 8005736733...
Howrah [ Call Girls Kolkata ₹7.5k Pick Up & Drop With Cash Payment 8005736733...
 
Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7
Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7
Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Athwa gate \ Call Girls Service Ahmedabad - 450+ Call Girl Cash Payment 80057...
Athwa gate \ Call Girls Service Ahmedabad - 450+ Call Girl Cash Payment 80057...Athwa gate \ Call Girls Service Ahmedabad - 450+ Call Girl Cash Payment 80057...
Athwa gate \ Call Girls Service Ahmedabad - 450+ Call Girl Cash Payment 80057...
 
DMER-AYUSH-MIMS-Staff-Nurse-_Selection-List-04-05-2024.pdf
DMER-AYUSH-MIMS-Staff-Nurse-_Selection-List-04-05-2024.pdfDMER-AYUSH-MIMS-Staff-Nurse-_Selection-List-04-05-2024.pdf
DMER-AYUSH-MIMS-Staff-Nurse-_Selection-List-04-05-2024.pdf
 
Ganga Path Project (marine drive project) Patna ,Bihar .pdf
Ganga Path Project (marine drive project) Patna ,Bihar .pdfGanga Path Project (marine drive project) Patna ,Bihar .pdf
Ganga Path Project (marine drive project) Patna ,Bihar .pdf
 
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
 
Dating Call Girls inTiruvallur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Dating Call Girls inTiruvallur { 9332606886 } VVIP NISHA Call Girls Near 5 St...Dating Call Girls inTiruvallur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Dating Call Girls inTiruvallur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
 
Novo Nordisk Kalundborg. We are expanding our manufacturing hub in Kalundborg...
Novo Nordisk Kalundborg. We are expanding our manufacturing hub in Kalundborg...Novo Nordisk Kalundborg. We are expanding our manufacturing hub in Kalundborg...
Novo Nordisk Kalundborg. We are expanding our manufacturing hub in Kalundborg...
 
Personal Brand Exploration ppt.- Ronnie Jones
Personal Brand  Exploration ppt.- Ronnie JonesPersonal Brand  Exploration ppt.- Ronnie Jones
Personal Brand Exploration ppt.- Ronnie Jones
 
Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...
Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...
Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...
 
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
 
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
 
Only Cash On Delivery Call Girls Service In Amritsar 📞6378878445📞 Just📲 Call ...
Only Cash On Delivery Call Girls Service In Amritsar 📞6378878445📞 Just📲 Call ...Only Cash On Delivery Call Girls Service In Amritsar 📞6378878445📞 Just📲 Call ...
Only Cash On Delivery Call Girls Service In Amritsar 📞6378878445📞 Just📲 Call ...
 

020 ejemplo de presupuesto (mano de obra, materiales y transporte)

  • 1. FECHA: JULIO 2010 No. RENGLON CANTIDAD UNIDAD TRANSPORTE TOTAL NO CALIFICADA CALIFICADA TOTAL LOCALES NO LOCALES TOTAL 1 CAPTACION 4 U LIMPIA Y CHAPEO 144.00 m² 216.00 216.00 216.00 TRAZO Y ESTAQUEADO 128.00 ml 480.00 480.00 480.00 EXCAVACION 16.00 m³ 336.00 336.00 336.00 MUROS DE CAPTACION DE MAMPOSTERIA 16.00 m³ 1,920.00 1,920.00 1,920.00 3,840.00 5,760.00 7,680.00 CAJA DE MAMPOSTERIA 20.40 m³ 2,244.00 2,244.00 5,455.00 4,860.00 10,315.00 12,559.00 TAPADERAS DE CONCRETO 1.76 m³ 1,560.00 1,560.00 370.00 3,654.02 4,024.02 5,584.02 REPELLO + AFINADO EN CAJA DE MAMPOSTERIA 80.00 m² 960.00 960.00 175.00 720.00 895.00 1,855.00 MATERIAL FILTRANTE 24.00 m² 1,200.00 1,200.00 2,200.00 2,200.00 3,400.00 CONTRA CUNETA DE CONCRETO 24.00 ml 1,552.00 1,552.00 370.00 720.00 1,090.00 2,642.00 TUBERIA, ACCESORIOS Y VALVULAS global 600.00 600.00 2,275.48 2,275.48 2,875.48 TRANSPORTE 200 qq 5,000.00 5,000.00 TOTAL RENGLON 1,032.00 10,036.00 11,068.00 10,490.00 16,069.50 26,559.50 5,000.00 42,627.50 2 CAJA REUNIDORA DE CAUDALES DE 1 M³ 3 U LIMPIA Y CHAPEO 12.00 m² 18.00 18.00 18.00 TRAZO Y ESTAQUEADO 15.00 ml 56.25 56.25 56.25 EXCAVACION 3.00 m³ 63.00 63.00 63.00 MUROS + FONDO DE MAMPOSTERIA 6.15 m³ 1,200.00 1,200.00 2,820.00 1,530.00 4,350.00 5,550.00 LOSA + TAPADERA DE CONCRETO 0.90 m³ 1,050.00 1,050.00 191.25 1,378.01 1,569.26 2,619.26 REPELLO + AFINADO 41.70 m² 540.00 540.00 112.50 360.00 472.50 1,012.50 TUBERIA, ACCESORIOS Y VALVULAS global 300.00 300.00 1,784.76 1,784.76 2,084.76 TRANSPORTE 63 qq 1,575.00 1,575.00 TOTAL RENGLON 205.88 3,090.00 3,295.88 3,123.75 5,052.77 8,176.52 1,575.00 13,047.39 3 LINEA DE CONDUCCION 14238 ML. LIMPIA Y CHAPEO 14,238.00 m² 7,119.00 7,119.00 7,119.00 TRAZO Y ESTAQUEADO 14,238.00 ml 3,559.50 3,559.50 3,559.50 EXCAVACION 8,460.00 m³ 177,660.00 177,660.00 177,660.00 RELLENO 8,436.00 m³ 118,104.00 118,104.00 118,104.00 TUBERIA PVC Ø 3/4" C-250 396.00 ml 297.00 297.00 3,714.48 3,714.48 4,011.48 TUBERIA PVC Ø 1" C-160 534.00 ml 400.50 400.50 6,155.24 6,155.24 6,555.74 TUBERÍA PVC Ø 1½" C-160 552.00 ml 414.00 414.00 10,435.56 10,435.56 10,849.56 TUBERÍA PVC Ø 2" C-160 6420.00 ml 6,420.00 6,420.00 189,111.80 189,111.80 195,531.80 TUBERÍA PVC Ø 1½" C-250 1170.00 ml 877.50 877.50 33,214.35 33,214.35 34,091.85 TUBERÍA PVC Ø 2" C-250 4242.00 ml 4,242.00 4,242.00 188,104.42 188,104.42 192,346.42 TUBERÍA HG Ø 1" TL 66.00 ml 148.50 148.50 2,464.00 2,464.00 2,612.50 TUBERÍA HG Ø 1½" TL 54.00 ml 121.50 121.50 3,294.00 3,294.00 3,415.50 TUBERÍA HG Ø 2" TL 804.00 ml 2,412.00 2,412.00 61,640.00 61,640.00 64,052.00 ACCESORIOS global 690.00 690.00 12,634.69 12,634.69 13,324.69 VALVULAS DE AIRE 17.00 u 935.00 935.00 8,364.05 8,364.05 9,299.05 VALVULAS DE LIMPIEZA 22.00 u 1,320.00 1,320.00 3,490.51 3,490.51 4,810.51 CAJAS PARA VALVULAS DE AIRE Y LIMPIEZA 39.00 u 7,800.00 7,800.00 1,455.00 7,546.50 9,001.50 16,801.50 MANO DE OBRA MATERIALES PROYECTO DE AGUA POTABLE CANTON MORALES, ALDEA GRANADILLO, COLOTENANGO, HUEHUETENANGO PRESUPUESTO
  • 2. FECHA: JULIO 2010 No. RENGLON CANTIDAD UNIDAD TRANSPORTE TOTAL NO CALIFICADA CALIFICADA TOTAL LOCALES NO LOCALES TOTAL MANO DE OBRA MATERIALES PROYECTO DE AGUA POTABLE CANTON MORALES, ALDEA GRANADILLO, COLOTENANGO, HUEHUETENANGO PRESUPUESTO TRANSPORTE 320 qq 8,000.00 8,000.00 TOTAL RENGLON 306,442.50 26,078.00 332,520.50 1,455.00 530,169.60 531,624.60 8,000.00 872,145.10 4 ANCLAJE PARA TUBERIA DE HG 190.00 U SOPORTES DE CONCRETO ARMADO 190.00 u 2,850.00 8,550.00 11,400.00 3,515.00 18,129.80 21,644.80 33,044.80 TRANSPORTE 171.00 qq 4,275.00 4,275.00 TOTAL RENGLON 2,850.00 8,550.00 11,400.00 3,515.00 18,129.80 21,644.80 4,275.00 37,319.80 5 TANQUE DE DISTRIBUCION 20 M³ MAMPOSTERIA 1 U LIMPIA Y CHAPEO 27.00 m² 40.50 40.50 40.50 TRAZO Y ESTAQUEADO 21.00 ml 78.75 78.75 78.75 EXCAVACION 22.00 m³ 462.00 462.00 462.00 FONDO DE MAMPOSTERIA 4.20 m³ 525.00 525.00 498.75 960.00 1,458.75 1,983.75 MUROS DE MAMPOSTERIA 35.00 m³ 4,375.00 4,375.00 6,025.00 8,445.00 14,470.00 18,845.00 LOSA + TAPADERA + VIGA 2.90 m³ 2,465.00 2,465.00 585.00 3,867.12 4,452.12 6,917.12 REPELLO + AFINADO 89.00 m² 1,260.00 1,260.00 225.00 240.00 465.00 1,725.00 ESCALERAS + VENTILACION global 300.00 300.00 588.20 588.20 888.20 TUBERIA Y ACCESORIOS global 200.00 200.00 1,069.06 1,069.06 1,269.06 CAJAS PARA VALVULAS 3.00 u 600.00 600.00 101.25 724.00 825.25 1,425.25 TRANSPORTE 194 qq 4,850.00 4,850.00 TOTAL RENGLON 581.25 9,725.00 10,306.25 7,435.00 15,893.38 23,328.38 4,850.00 38,484.63 6 PASO DE ZANJON TIPO E 3 U LIMPIA Y CHAPEO 54.00 m² 81.00 81.00 81.00 EXCAVACION 4.95 m³ 103.95 103.95 103.95 BASES DE CONCRETO 5.40 m3 225.00 900.00 1,125.00 1,923.75 5,929.38 7,853.13 8,978.13 ACCESORIOS DEL PASO DE ZANJON global 450.00 450.00 2,085.00 2,085.00 2,535.00 TRANSPORTE 60 qq 1,500.00 1,500.00 TOTAL RENGLON 409.95 1,350.00 1,759.95 1,923.75 8,014.38 9,938.13 1,500.00 13,198.08 7 PASO AEREO DE 12 mts. 2 U LIMPIA Y CHAPEO 24.00 m² 36.00 36.00 36.00 EXCAVACION 3.30 m³ 42.00 42.00 42.00 MUERTOS DE CONCRETO 12.00 m³ 1,320.00 1,320.00 2,075.00 4,800.00 6,875.00 8,195.00 ZAPATAS 1.20 m³ 600.00 600.00 240.00 1,506.70 1,746.70 2,346.70 COLUMNAS 1.56 m³ 1,200.00 1,200.00 2,072.50 3,331.40 5,403.90 6,603.90 CABLEADO Y ACCESORIOS global 800.00 800.00 6,817.64 6,817.64 7,617.64 TRANSPORTE 132 qq 3,300.00 3,300.00 TOTAL RENGLON 78.00 3,920.00 3,998.00 4,387.50 16,455.74 20,843.24 3,300.00 28,141.24
  • 3. FECHA: JULIO 2010 No. RENGLON CANTIDAD UNIDAD TRANSPORTE TOTAL NO CALIFICADA CALIFICADA TOTAL LOCALES NO LOCALES TOTAL MANO DE OBRA MATERIALES PROYECTO DE AGUA POTABLE CANTON MORALES, ALDEA GRANADILLO, COLOTENANGO, HUEHUETENANGO PRESUPUESTO 8 PASO AEREO DE 18 mts. 5 U LIMPIA Y CHAPEO 90.00 m² 135.00 135.00 135.00 EXCAVACION 8.25 m³ 173.25 173.25 173.25 MUERTOS DE CONCRETO 43.25 m³ 5,625.00 5,625.00 8,018.75 19,500.00 27,518.75 33,143.75 ZAPATAS 3.00 m³ 1,650.00 1,650.00 600.00 3,766.75 4,366.75 6,016.75 COLUMNAS 3.90 m³ 3,320.00 3,320.00 5,181.25 8,328.50 13,509.75 16,829.75 CABLEADO Y ACCESORIOS global 3,000.00 3,000.00 19,194.10 19,194.10 22,194.10 TRANSPORTE 330 qq 8,250.00 8,250.00 TOTAL RENGLON 308.25 13,595.00 13,903.25 13,800.00 50,789.35 64,589.35 8,250.00 86,742.60 9 PASO AEREO DE 20 mts. 2.00 U LIMPIA Y CHAPEO 36.00 m² 54.00 54.00 54.00 EXCAVACION 3.30 m³ 69.30 69.30 69.30 MUERTOS DE CONCRETO 17.30 m³ 2,250.00 2,250.00 3,207.50 7,800.00 11,007.50 13,257.50 ZAPATAS 1.20 m³ 660.00 660.00 240.00 1,506.70 1,746.70 2,406.70 COLUMNAS 1.56 m³ 1,328.00 1,328.00 2,072.50 3,331.40 5,403.90 6,731.90 CABLEADO Y ACCESORIOS global 1,200.00 1,200.00 7,677.64 7,677.64 8,877.64 TRANSPORTE 90 qq 2,250.00 2,250.00 TOTAL RENGLON 123.30 5,438.00 5,561.30 5,520.00 20,315.74 25,835.74 2,250.00 33,647.04 10 PASO AEREO DE 30 mts. 4 U LIMPIA Y CHAPEO 72.00 m² 108.00 108.00 108.00 EXCAVACION 6.60 m³ 138.60 138.60 138.60 MUERTOS DE CONCRETO 34.60 m³ 4,500.00 4,500.00 6,415.00 15,600.00 22,015.00 26,515.00 ZAPATAS 2.40 m³ 1,320.00 1,320.00 480.00 3,013.40 3,493.40 4,813.40 COLUMNAS 3.12 m³ 2,656.00 2,656.00 4,145.00 6,662.80 10,807.80 13,463.80 CABLEADO Y ACCESORIOS global 3,200.00 3,200.00 17,183.28 17,183.28 20,383.28 TRANSPORTE 400 qq 10,000.00 10,000.00 TOTAL RENGLON 246.60 11,676.00 11,922.60 11,040.00 42,459.48 53,499.48 10,000.00 75,422.08 11 PASO AEREO DE 40 mts. 3 U LIMPIA Y CHAPEO 54.00 m² 81.00 81.00 81.00 EXCAVACION 4.95 m³ 103.95 103.95 103.95 MUERTOS DE CONCRETO 25.95 m³ 3,375.00 3,375.00 4,811.25 11,700.00 16,511.25 19,886.25 ZAPATAS 1.98 m³ 990.00 990.00 412.50 2,927.58 3,340.08 4,330.08 COLUMNAS 2.55 m³ 1,992.00 1,992.00 2,103.75 5,312.61 7,416.36 9,408.36 CABLEADO Y ACCESORIOS global 2,400.00 2,400.00 14,147.46 14,147.46 16,547.46 TRANSPORTE 300 qq 7,500.00 7,500.00 TOTAL RENGLON 184.95 8,757.00 8,941.95 7,327.50 34,087.65 41,415.15 7,500.00 57,857.10 12 PASO AEREO DE 75 mts. 1 U
  • 4. FECHA: JULIO 2010 No. RENGLON CANTIDAD UNIDAD TRANSPORTE TOTAL NO CALIFICADA CALIFICADA TOTAL LOCALES NO LOCALES TOTAL MANO DE OBRA MATERIALES PROYECTO DE AGUA POTABLE CANTON MORALES, ALDEA GRANADILLO, COLOTENANGO, HUEHUETENANGO PRESUPUESTO LIMPIA Y CHAPEO 25.00 m² 37.50 37.50 37.50 EXCAVACION 6.30 m³ 132.30 132.30 132.30 RELLENO 3.60 m³ 50.40 50.40 50.40 MUERTOS DE CONCRETO 8.65 m³ 1,125.00 1,125.00 1,603.75 3,900.00 5,503.75 6,628.75 ZAPATAS 1.22 m³ 450.00 450.00 245.00 1,275.86 1,520.86 1,970.86 COLUMNAS 1.56 m³ 900.00 900.00 1,016.25 4,370.55 5,386.80 6,286.80 CABLEADO Y ACCESORIOS global 1,500.00 1,500.00 8,469.10 8,469.10 9,969.10 TRANSPORTE 110 qq 2,750.00 2,750.00 TOTAL RENGLON 220.20 3,975.00 4,195.20 2,865.00 18,015.51 20,880.51 2,750.00 27,825.71 13 RED DE DISTRIBUCION 10188 ML. TRAZO Y ESTAQUEADO 10,188.00 ml 2,547.00 2,547.00 2,547.00 EXCAVACION 6,255.00 m³ 87,570.00 87,570.00 87,570.00 RELLENO 6,248.00 m³ 43,736.00 43,736.00 43,736.00 TUBERIA PVC Ø 3/4" C-250 5490.00 ml 5,490.00 5,490.00 51,496.20 51,496.20 56,986.20 TUBERIA PVC Ø 1" C-160 2484.00 ml 2,484.00 2,484.00 28,632.24 28,632.24 31,116.24 TUBERÍA PVC Ø 1¼" C-160 384.00 ml 576.00 576.00 5,557.76 5,557.76 6,133.76 TUBERÍA PVC Ø 1½" C-160 102.00 ml 76.50 76.50 1,928.31 1,928.31 2,004.81 TUBERÍA PVC Ø 2" C-160 1386.00 ml 1,386.00 1,386.00 40,826.94 40,826.94 42,212.94 TUBERÍA PVC Ø 2" C-250 240.00 ml 240.00 240.00 10,642.40 10,642.40 10,882.40 TUBERÍA HG Ø 1" TL 60.00 ml 135.00 135.00 2,240.00 2,240.00 2,375.00 TUBERÍA HG Ø 2" TL 42.00 ml 126.00 126.00 3,220.00 3,220.00 3,346.00 ACCESORIOS global 635.00 635.00 3,821.14 3,821.14 4,456.14 TRANSPORTE 80 qq 2,000.00 2,000.00 TOTAL RENGLON 133,853.00 11,148.50 145,001.50 0.00 148,364.99 148,364.99 2,000.00 295,366.49 14 CAJA ROMPE PRESION DE 1 M³ CON VALVULA FLOTE 19 U LIMPIA Y CHAPEO 76.00 m² 114.00 114.00 114.00 TRAZO Y ESTAQUEADO 95.00 ml 356.25 356.25 356.25 EXCAVACION 19.00 m³ 399.00 399.00 399.00 MUROS + FONDO DE MAMPOSTERIA 38.95 m³ 6,650.00 6,650.00 17,860.00 9,690.00 27,550.00 34,200.00 LOSA + TAPADERA DE CONCRETO 5.70 m³ 4,750.00 4,750.00 1,211.25 8,727.37 9,938.62 14,688.62 REPELLO + AFINADO 264.10 m² 2,850.00 2,850.00 712.50 2,280.00 2,992.50 5,842.50 TUBERIA, ACCESORIOS Y VALVULAS global 1,425.00 1,425.00 13,084.82 13,084.82 14,509.82 TRANSPORTE 399 qq 9,975.00 9,975.00 TOTAL RENGLON 1,303.88 15,675.00 16,978.88 19,783.75 33,782.19 53,565.94 9,975.00 80,519.81 15 CONEXIONES DOMICILIARES 130 U TRAZO Y ESTAQUEADO 2,340.00 ml 585.00 585.00 585.00 EXCAVACION 2,600.00 m³ 36,400.00 36,400.00 36,400.00 RELLENO 2,599.00 m³ 18,193.00 18,193.00 18,193.00 TUBERIA, ACCESORIOS Y VALVULAS global 5,850.00 5,850.00 103,793.89 103,793.89 109,643.89
  • 5. FECHA: JULIO 2010 No. RENGLON CANTIDAD UNIDAD TRANSPORTE TOTAL NO CALIFICADA CALIFICADA TOTAL LOCALES NO LOCALES TOTAL MANO DE OBRA MATERIALES PROYECTO DE AGUA POTABLE CANTON MORALES, ALDEA GRANADILLO, COLOTENANGO, HUEHUETENANGO PRESUPUESTO BASES DE CONCRETO 130.00 u 4,550.00 4,550.00 1,300.00 1,657.50 2,957.50 7,507.50 TRANSPORTE 32.50 qq 812.50 812.50 TOTAL RENGLON 55,178.00 10,400.00 65,578.00 1,300.00 105,451.39 106,751.39 812.50 173,141.89 16 HIPOCLORADOR 1 U TRAZO Y ESTAQUEADO 4.00 ml 25.00 25.00 25.00 DEPOSITO DE CONCRETO ARMADO 1.00 m³ 765.00 765.00 550.00 1,166.17 1,716.17 2,481.17 TUBERIA Y ACCESORIOS global 150.00 150.00 327.25 327.25 477.25 TRANSPORTE 15 qq 375.00 375.00 TOTAL RENGLON 25.00 915.00 940.00 550.00 1,493.42 2,043.42 375.00 3,358.42 17 SUMIDEROS PARA CONEXIONES 130 U TRAZO Y ESTAQUEADO 468.00 ml 117.00 117.00 117.00 EXCAVACION 150.80 m³ 2,111.20 2,111.20 2,111.20 TRAMPA DE GRASA Y SUMIDERO 130.00 u 32,500.00 32,500.00 39,325.00 64,010.83 103,335.83 135,835.83 TRANSPORTE 780 qq 19,500.00 19,500.00 TOTAL RENGLON 2,228.20 32,500.00 34,728.20 39,325.00 64,010.83 103,335.83 19,500.00 157,564.03 COSTO DIRECTO DEL TOTAL DE RENGLONES 505,270.95 176,828.50 682,099.45 133,841.25 1,128,555.70 1,262,396.95 91,912.50 2,036,408.90