The High Velocity Hurricane Zone
Roof Drainage Requirements


  PRESENTED BY THE OFFICE OF
  BUILDING CODE COMPLIANCE
Why is roof drainage so important?


         Roofs are typically designed for a 30 psf. live load.*
         One square foot of water, one inch deep, weighs 5.2
          lbs.
         The maximum depth of water allowed by Code is 5”,
          weighing 26 lbs./ft.2.
         It would take only one hour at the design rainfall rate
          for 5” to accumulate.
         There are 3000 roof collapses a year in the USA,
          many because of inadequate drainage.                      2

1/13/2005
Roof Slopes


        A roof with a slope of 1:240 is considered the
         same as a dead-level roof for a roof to be
         considered to have a positive slope it must
         have a slope of more than 1:240.
        The Florida Building Code Requires a slope of
         1:48 or a ¼” per foot.*
        This is done to preclude ponding instability.
                                                          3

1/13/2005
SECTION 1515 HIGH VELOCITY HURRICANE
     ZONES - PERFORMANCE REQUIREMENTS



             §1515.2.2.1 All roofing systems must be
              installed to assure drainage.
             In new construction the minimum deck
              slope shall be not less than
             1/4:12.


                                                        4

1/13/2005
Ponding Instability

        Ponding instability is a phenomenon that
         occurs anytime that water accumulates on a
         roof. When water accumulates on a roof the
         roof deflects under the weight of the water
         consequently, more water ponds and the more
         water that ponds the more it deflects and
         continues to compound itself until failure
         occurs or the situation is remedied.
                                                       5

1/13/2005
Primary scupper could be easily blocked.
            Primary scupper could be easily blocked.
             Overflow provisions are not provided.
              Overflow provisions are not provided.
                                                       7

1/13/2005
All three roof drains on this section are blocked. No
            All three roof drains on this section are blocked. No
            overflow provisions were provided.
            overflow provisions were provided.

                                                                    8

1/13/2005
Debris blocked scupper.
            Debris blocked scupper.
            No overflow provisions. 9
            No overflow provisions.
1/13/2005
Strainer is blocked with debris, but flow through the top
            Strainer is blocked with debris, but flow through the top
            of the strainer is still possible.
            of the strainer is still possible.                          10

1/13/2005
11

1/13/2005
Properties of water

             Water weighs 8.33 lbs./gal.
             There are 231 in.3 in one gallon.
             There are 7.48 gallons in a cubic foot.
             A cubic foot of water weighs 62.4 lbs.
             A rainfall of 1 gpm = 8.02 ft.3/hr


                                                        12

1/13/2005
Where do we find drainage
     information in the FBC?

               Chapter 15, Building Volume HVHZ 1514.4*
               Chapter 16, Building Volume HVHZ 1614.1
               Chapter 11, Plumbing Volume P1102.3
               ASCE 7-98
               Chapter 8 Code of Miami-Dade County
               Drainage design requires the coordination of the
                Architect, Structural Engineer and Plumbing
                Engineer.
                                                                   13

1/13/2005
Building (Changed)

               HIGH VELOCITY HURRICANE ZONES -
                GENERAL
      §1611.1.7 In any conflict between ASCE 7 with
        commentary and this code, the more stringent
        requirement shall apply.
      1612.1.3 No building structure or part thereof shall be
        designed for live loads less than those specified in this
        chapter or ASCE-7 with commentary, except as
        otherwise noted in this code.

                                                                    14

1/13/2005
HVHZ
       §1514.4.2 Overflow drains and scuppers. Where roof
        drains are required, overflow drains having the same
        size as the roof drains shall be installed with the inlet
        flow line located 2 inches (51 mm) above the low
        point of the roof, overflow scuppers shall be a
        minimum of 4 inches (102mm) in height and shall be
        placed in walls or parapets with the inlet flow line not
        less than 2 inches (51mm) above the roof surface,
            excluding sumps, or more than 4 inches (102 mm) above the roof surface
            and shall be located as close as practical to required vertical leaders or
            downspouts or wall and parapet scuppers . Overflow drains and
            scuppers shall also comply with the Florida Building
            Code, Plumbing, and §1616 of this code.*                                     15

1/13/2005
Florida Building Code Plumbing

       P1107.3 Sizing of secondary drains. Secondary (emergency) roof drain
            systems shall be sized in accordance with §P1106 based on the rainfall rate
                                    but with the sizing
            for which the primary system is sized
            adjusted by dividing the values for
            horizontally projected roof area in Table
            P1106.2, Table P1106.3 and Table P1106.6
            by two. The minimum cross-sectional area of an
            overflow scupper shall be three times the cross-
            sectional area of the primary roof drain and the
            scupper shall have a minimum opening dimension of
            4 inches (102 mm). The flow through the primary system shall not
            be considered when sizing the secondary roof drain system.
                                                                                          16

1/13/2005
Florida Building Code Plumbing (new)

       1107.3 Sizing of secondary drains. Secondary
        (emergency) roof drain systems shall be sized in
        accordance with Section 1106 based on the rainfall
        rate for which the primary system is sized in Tables
        1106.2, 1106.3 and 1106.6. Scuppers shall be sized to
        prevent the depth of ponding water from exceeding
        that for which the roof was designed as determined by
        Section 1101.7. Scuppers shall not have an opening
        dimension of less than 4 inches (102 mm). The flow
        through the primary system shall not be considered
        when sizing the secondary roof drain system.            17

1/13/2005
When are roof drains required?

        Unless roofs are sloped to drain over roof edges, roof drains shall
         be installed at each low point of the roof. (HVHZ 1514.4)
        “Drains or scuppers installed to provide overflow drainage shall
         be not less in aggregate area than as shown in Figure 1616.3, but
         not less than 4 inches (102 mm) dimension in any direction and
         shall be placed in parapets not less than 2 inches (51 mm) nor
         more than 4 inches (102 mm) above the roof deck” (HVHZ
         1616.3)*
        All roof systems must be installed to assure drainage. (HVHZ
         1515.2.2.1)
        In new construction the minimum deck slope shall be ¼ : 12.
         (HVHZ 1515.2.2.1)
        Primary drains are to be sized per Table P1106.2.                 18

1/13/2005
Could a Scupper be Used as a Primary Roof
     Drain?


         Where required for roof drainage, scuppers
          shall be placed level with the roof surface in a
          wall or parapet. (HVHZ 1514.4)*
         The scupper shall be located as determined by
          the roof slope and contributing roof area.
          (HVHZ 1514.4)
         Parapet wall roof drainage scupper location
          shall comply with the FBC Building Volume.
          Plumbing (1106.5)                                  19

1/13/2005
Using a Scupper as a
     Primary Drain



         When using a scupper as a primary means of
          roof drainage care must be exercised to direct
          the water away from the building.
         The Code does not allow water to be drained
          less than a foot from the wall of the building.


                                                            20

1/13/2005
When is secondary or overflow drainage
    required?


        When roof drains are required. (HVHZ 1514.4.2)
        When roof perimeter construction extends above the
         roof, where water would be trapped if the primary
         drains allow build-up for any reason. (P1107.1)
        When parapets or curbs are constructed, water build-
         up in excess of that considered in the design shall be
         prevented. (HVHZ 1616.1)

                                                                  21

1/13/2005
Structural Concerns

       No accumulation in excess of that considered in the
        design. (HVHZ 1616.1)
       No more than 5” of water accumulation when not
        designed per 1616.1. (HVHZ 1616.2)
       Depth caused by hydraulic head needed to cause flow
        through the secondary drain shall be included in
        determining the load. (HVHZ 1616.2)
       All roofs shall be designed with sufficient slope or
        camber. (HVHZ 1614.4)
                                                               22

1/13/2005
What is Hydraulic Head?


        Is the amount of head needed to
         cause water to flow out of a
         drain or a scupper at a set rate.
             Example for a 4” roof drain to be able
              to drain 170 Gals. Per minute it must
              have 2” of head over the drain. With
              1” of head it will only drain 80 G.P.M
                                                       23

1/13/2005
How do you size a primary drain

       First establish the projected horizontal area of
        the roof (square footage) including any vertical
        wall that drains unto the roof (do not include
        parapets)
       Next establish the rate of rainfall. 4.7” for
        Miami-Dade.
       Size as per Table 1106.2 of the Plumbing
        Code.
                                                           24

1/13/2005
TABLE 1106.2




            Only section of table that may be   25
            used for Miami-Dade County
1/13/2005
Example #1
             2500 sq. ft. of roof
             area.

               Minimum roof
               pitch is ¼” per
               foot.

                Job is located
                in Miami-Dade
                County
Example #1

       With this information go to Figure 1106.1
        Chapter 11 of the Plumbing Code. Or go to
        Appendix “B” Rates of rainfall for various
        cities . Here you will determine that the rate
        for Miami –Dade is 4.7”. The commentary tells
        us that we should go to the next higher number
        in the table, in this case 5”

                                                         27

1/13/2005
Figure 1106.1
Plumbing Code
APPENDIX PB RATES OF RAINFALL FOR
    VARIOUS CITIES



    Florida:
    Jacksonville    4.3”
    Key West        4.3”
    Miami-Dade      4.7”
    Tampa           4.5”

    Next you go to table table 1106.2
                                        29

1/13/2005
Zoom version of
    figure 1106.1


                      Miami-Dade



                                   30

1/13/2005
Diameter             HORIZONTALLY PROJECTED ROOF AREA (square feet)
of Leader
Inches                    Rainfall rate (inches per hour)
            1        2       3        4         5           6          7
2”          2880     1440      960      720         575         480        360
3”          8800     4400      2930     2200        1760        1470

4”          18400                                   3680

5”          34600                                   6920

6”          54000                                   10800

8”          116000                                  23200
If you work your way down the 5” column until you get to a number
that is higher than 2500 in this case 3680 and follow that across to the
left it establishes a 4” leader.
It has been established that a
                                                         4” roof drain is required.
                                                         There is 144 cubic inches of
                                                         water in a 12” x 12” x 1”
                                                         deep section and there are
                                                         231cu. in. of water in a gallon
                                                         of water .
                                                         144 ÷ 231 ÷ 60 = .0104 gals
                                                         per minute per square foot.
                                                         .0104 is the gallons per
                                                         minute that fall on one
                                                         square foot of roof at a
                                                         design rainfall rate of
                                                         1”.
Since the rate of rainfall for Miami-Dade is 5” per hour the square footage of the roof
is multiplied by 5 then by .0104.
In this case 2500 x 5 x .0104 = 130 gals. per minute is the amount of rain falling on
that roof.
This is a 2500 sq.ft. roof
            that according to table
            P1106.2 requires a 4” roof
            drain

            After establishing the 130
            gals per min. go to table
            C8-1 in ASCE 7-98 and
            find the hydraulic head




                                         34

1/13/2005
This table comes from ASCE 7-98. ASCE 7- 98 is a Standard adopted
by the Florida Building Code




This is the table that is used to establish the hydraulic head of drains and
scuppers.
This table is found in the commentary
to the IPC and it is almost identical to
the one in ASCE 7-98
Roof Drainage

       130 gals per minute on a 4” drain you may interpolate
        and obtain about 1 ¾” hydraulic head.
       This means that at its design capacity there is going to
        be 1 ¾” of water over the drain, this is fine since the
        code requires the roof to be designed in a way that
        the maximum amount of water that can accumulate is
        less than 5”.
       This means that the secondary drain has to be placed
        a minimum of 1 ¾” above the roof. *
                                                                   37

1/13/2005
Why the concern with hydraulic head?

       §1616.2 Where roofs are not designed in accordance
        with §1616.1, overflow drains or scuppers shall be
        placed to prevent an accumulation of more than 5
        inches (927 mm) of water on any portion of the roof.
        In determining the load that could result should the
        primary drainage system be blocked, the loads caused
        by the depth of water (i.e., head) needed to cause the
        water to flow out the scuppers or secondary drainage
        system shall be included.*
                                                                 38

1/13/2005
When is secondary or overflow
    drainage required?

         When roof drains are required. (1514.4.2)
         When roof perimeter construction extends
          above the roof, where water would be trapped
          if the primary drains allow build-up for any
          reason. (1107.1)
         When parapets or curbs are constructed, water
          build-up in excess of that considered in the
          design shall be prevented. (1616.1)
                                                          39

1/13/2005
Roof Drainage

       The code requires that the secondary drainage has to be sized
        using table 1106.2 and dividing the values by two.*

       1107.3 Sizing of secondary drains. Secondary (emergency) roof drain
        systems shall be sized in accordance with Section 1106 based on the
            rainfall rate for which the primary system is sized but with the
            sizing adjusted by dividing the values for horizontally
            projected roof area in Tables 1106.2, 1106.3 and 1106.6 by
            two. The minimum cross-sectional area of an over-flow scupper shall be
            three times the cross-sectional area of the primary roof drain and the
            scupper shall have a minimum opening dimension of 4 inches (102 mm).
            The flow through the primary system shall not be considered when sizing
            the secondary roof drain system.
                                                                                      40

1/13/2005
As per the requirements of 1107.3 we have
created a table to accomplish this.

Diameter of Leader   4”      5”       If you compare this table with
2”                   360     288      1106.2 you will notice that we
3”                   1100    880      have taken those values and
4”                   2300    1840
                                      divided them by two.
5”                   4325    3460
6”                   6750    5400
8”                   14500   11600




Consequently we are required a 5” secondary drain.
Roof Drainage


            The head over the primary has been established at 1
            ¾”, 130 gals per min on a 5” drain would give us 1
            ½” of hydraulic head. Place the secondary at 2”
            above the deck with 1 ½” of hydraulic head this
            would give us a maximum of 3 ½” of water on the
            roof even if the primary were to become clogged.
            There are drains that have a dam built in, or the drain
            can placed at a location were the 2” above the low
            point in the deck happens to be on deck.
                                                                      42

1/13/2005
Example #2, roof slopes at ¼ in./ft. to a single interior drain.



                                  90”



                 85’




                       3’ High Continuous Parapet
Size the primary drain for example roof #2.


             Roof area       90’ x 85’ = 7650 ft.2
             Rainfall rate for Miami =5”
             Read down the 5” rainfall column of Table
              1106.2 until a projected roof area figure that is
              equal to or greater than the sample roof area is
              found. Then read across the Table to find the
              required drain size.
             A 6” drain is found to be required.               45

1/13/2005
Establish the hydraulic head at the
     primary drain for example roof #2


         To establish rainfall in gallons per minute. Multiply
          square footage, times the Miami rainfall rate, then
          multiply times the conversion factor.
         7650 x 5 x 0.0104 = 398 gal/min.
         Refer to ASCE 7-98 Table C8-1.
         Hydraulic head for a 6” drain, that must drain 398
          gal/min., falls between 3” and 3.5”.
         Interpolation is necessary to establish an exact
          hydraulic head.                                         47

1/13/2005
Establishing hydraulic head above the
primary drain




540 – 380 = 160 -- 3.5 – 3 = .5 -- .5 ÷ 160 = .003125
398 – 380 = 18        18 x .003125 = .05625
3 + .05625 = 3.056”
In this case is it worth the trouble to do interpolation?
.0625 = 1/16” Round it off to 31/16”?
Could overflow scuppers be used
    to provide secondary drainage?

      The easy way to figure this is to just divide the
       distance from the primary to the parapet by 4
       to obtain the height of water at the primary.
      In this case divide 42.5’ ÷ 4 = 10.6” consequently
        you could not use a scupper as a means of
        secondary drainage.
      You would have 10.6” of water on the roof
       before it reached the scupper.
                                                           49

1/13/2005
Secondary Drain


             Piping must be separate. Why? (1107.2)*
             Secondary must discharge above grade. Why?
              (1107.2)
             Discharge must be in a location where it would be
              normally observed. Why? (1107.2)
             Height placement of the invert of the secondary
              drain must be above the depth of water of the
              primary drain at its design flow. This requirement
              seems to be implied by the Code, though not
                                                                   50

1/13/2005
              explicit.
A secondary drain will be required,
     how is it sized?

             The projected roof areas shown in Table
              1106.2 must be divided by two.
             Then read down the 5” rainfall column until
              a figure equal to or greater than the
              projected roof area is found.
             Projected roof area 7650 ft.2

                                                            51

1/13/2005
Table 1106.2 with sizing adjusted by dividing values
by two

                              Projected roof area 7650 ft.2


         Diameter of Leader     4”      5”              5”
         2”                     360     288             575
         3”                    1100     880            1760
         4”                    2300    1840            3680
         5”                    4325    3460            6920
         6”                    6750    5400            10800
         8”                    14500   11600           23200



   Overflow drain size – 8” diameter
Establish the hydraulic head above the
      secondary drain

      For an 8” secondary drain the head falls between 2.5”-
       3”.
      2.5” +[( 398-340 ÷ 560-340) x .5] = hd
      2.5” + [(58 ÷ 220) x .5] = hd
      2.5” + 0.1318 = 2.63”
      If the primary drain could not handle the peak flow for
       any reason, the secondary would accommodate the
       design flow.
      At the design rainfall rate, there would be a depth of
       water 2.6” above the secondary drain.                     53

1/13/2005
This table comes from ASCE 7-98. ASCE 7- 98 is a
Standard adopted by the Florida Building Code




This is the table that is used to establish the hydraulic head of drains and
scuppers.
          In this case the Hydraulic head will be 2.6” Roughly 2 ½”?
Alternate method




The GPM remains at 398. Subtract 340 from 398 = 58. Subtract 340
on the table from the 560 on the table = 220. Subtract 2.5” from the 3”
of hydraulic head on the table = .5. Divide .5 into 220 = .002272.
Multiply 58 x .002272 = .1318. Add .1318 to 2.5 = 2.6318 round off
to 2.6”.
Are the structural rain load
   requirements of the Code met?
         Depth above the primary = 3.06”
         Placement of the invert of the secondary = 4” above
          the low point.
         Depth above the secondary = 2.6”
         3.06” + .94” + 2.6” = 6.6”
         This depth of water exceeds maximum 5” load
          allowed by the Code.
         Even if the secondary was placed with the invert at the
          point of the hydraulic head of the primary you still
          have 5.66” of water on the roof.
         Even though the plumbing requirements are met, the 56
1/13/2005 structural requirements are not.
Secondary drain


Primary drain
                The max allowed by
                the code is 5”
Options



         Go to a bigger primary.
         Go to a bigger secondary.
         Or both.
         Or design the structure to withstand this rain
          load.

                                                           58

1/13/2005
TABLE 1106.7
             SIZING SCUPPERS FOR A 5” PER HOUR RATE OF RAINFALL
                        HORIZONTALLY PROJECTED ROOF AREA (SQUARE FEET)



HEAD IN                                       LENGTH OF WEIR IN INCHES
INCHES


                  4              6              8             12             16             20             24

     1           230            346            461            692           923            1153           1384



     2           641            961           1282           1923           2564           3205           3846



     3           1153          1730           2307           3461           4615           5769           6923



     4           1794          2692           3589           5384           7179           8974          10769



Note: to adjust this table for other than a 5” design rain fall rate multiply the square footage on the table by 5
then divide by the local design rain fall rate. Example: For 4” of design rainfall rate a 4” long scupper with a 1”
head would accommodate 287 square feet. 230 x 5 /4 = 287
Flow in gallons per minute
     Drainage system                            Depth of water over drain inlet or hydraulic head

                                           1        2     2.5      3     3.5      4      4.5        5
4 inch roof drain                          80      170    180
6 inch roof drain                         100      190    270     380    540
8 inch roof drain                         125      230    340     560    850 1,100 1,170
6 inch wide open scupper                   18       50             90         140        194
24 inch wide open scupper                  72      200            360         560        776
6 inch wide 4 inch high closed scupper     18       50             90         140        177
24 inch wide 4 inch high closed scupper    72      200            360         560        708
6 inch wide 6-inch high closed scupper     18       50             90         140        164
24 inch wide 6-inch high closed scupper    72      200            360         560        776

This table is similar to the ones found in ASCE 7 98 and in
the Plumbing Commentary.

EXAMPLE: for a 24” long scupper with a 1” head take the
72 ÷.0104 ÷ 5 = 1385
Formulas
         To obtain the gallons per minute that fall on a
          given roof at the rate for Miami-Dade County (5”
          per hour).
         There is 144 cubic inches in a section of roof 12” x
          12” x 1”.
         There is 231 cubic inches in a gallon.
         If you divide 144 by 231 you obtain accumulation of
          rainfall in gals. per hour per sq. ft.
         To obtain gals. Per minute divide the result by 60
         144 ÷ 231 ÷ 60 =.0104
         Square feet of roof x 5” x .0104 = gpm falling on the   61

1/13/2005 roof.
Formulas
             Formula to calculate amount ponding water on the
              roof:
            V   =   4p       x   W       x   L       x   D
                         3           2           2           2

             V= Cubic Feet
             W= Width
             L= Length
             D= Depth
             Depth must be expressed in feet or                  62

1/13/2005     decimal of feet
Formulas

             Francis Formula:
             Q =3.33 (b-0.2H)H1.5
             b = scupper with in feet
             Q = Flow in Cu. Ft. per Sec.
             H = Hydraulic head in feet (or height of
              scupper)

                                                         63

1/13/2005
Formulas



             Factory Mutual Formula for Flow:
             Q = 2.9 b(H)1.5
             Q = Flow in gallons per minute
             b = Base or in this case width of scupper
             H = Hydraulic head or height of scupper

                                                          64

1/13/2005
Estimating Weight of Ponded Roof Water
    V = 4p x W x L x D
               3 2 2 2

   Example; A pond 70’ long by 40’ wide and 7/8”deep at
     the center:
   V= 4 x 3.14 ¸ 3 x 40 ¸ 2 x 70 ¸ 2 x (7/8” ¸12) =
                                                 2

   4.18 x 20 x 35 x .0364 = 106.67 Cu. Ft. = V

       V= 106.67 Cu. Ft. x 62.4 = 6656.65 lbs ¸ 2000 = 3.3   65

1/13/2005 Tons
Flow in gallons per minute
     Drainage system                            Depth of water over drain inlet or hydraulic head

                                           1        2     2.5      3     3.5      4      4.5        5
4 inch roof drain                          80      170    180
6 inch roof drain                         100      190    270     380    540
8 inch roof drain                         125      230    340     560    850 1,100 1,170
6 inch wide open scupper                   18       50             90         140        194
24 inch wide open scupper                  72      200            360         560        776
6 inch wide 4 inch high closed scupper     18       50             90         140        177
24 inch wide 4 inch high closed scupper    72      200            360         560        708
6 inch wide 6-inch high closed scupper     18       50             90         140        164
24 inch wide 6-inch high closed scupper    72      200            360         560        776

This table is similar to the ones found in ASCE 7 98 and in the Plumbing
Commentary.
11 ' 0 "
                                                                 A s p e r A S C E 7 9 8 T a b le
                                                                 C 8 - 1 a 1 2 " w id e s c u p p e r
                                                                 w ith 2 " o f h e a d w ill a c c e p t
                                                                 1 0 0 g p m , a n d 2 1 /4 " w ill
                                                                 accept 140gpm . .
4 " r o o f d r a in

                                                                                                                                                   0'4"
                                                                              W it h 1 3 / 4 " o f h e a d n e e d e d t o m a k e t h e
                                                                              a 4 " r o o f d r a in a c c e p t t h e 1 3 0 g p m a n d
                                                                              1 " o f s e p a r a t io n , t h e m a x im u m d is t a n c e
                                                                              f r o m t h e l o w p o in t t o t h e s c u p p e r is 1 1 '
                       2 5 0 0 S q . F t. ro o f                              a n d t h is o n ly le a v e s 2 1 / 4 " f o r t h e s c u p p e r
                       S lo p e 1 /4 " p e r fo o t
                       130 G pm .                                               t o d o it s w o r k o r i t w ill e x c e e d t h e 5 "
                       H e a d R q d . 1 3 /4 "                               m a x im u m a llo w e d o n r o o f .
              0' 4"
THE END

                      68

1/13/2005

More Related Content

What's hot

RETAINING WALL
RETAINING WALLRETAINING WALL
RETAINING WALLYash Patel
 
Electricity transmission, generation and distribution
Electricity transmission, generation and distributionElectricity transmission, generation and distribution
Electricity transmission, generation and distributionKuNal MeHta
 
Millau Bridge (Operations Management)
Millau Bridge (Operations Management)Millau Bridge (Operations Management)
Millau Bridge (Operations Management)Rohan Negi
 
Vs types of footings vandana miss
Vs types of footings vandana missVs types of footings vandana miss
Vs types of footings vandana missSHAMJITH KM
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnelspartha sharma
 
The gable roof
The gable roofThe gable roof
The gable roofmnauth
 
Electrical Systems in a Building
Electrical Systems in a BuildingElectrical Systems in a Building
Electrical Systems in a BuildingGAURAV. H .TANDON
 
Leaning tower of Pisa
Leaning tower of PisaLeaning tower of Pisa
Leaning tower of PisaSumit Shokeen
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge pptSAI KIRAN
 
Moment Resisting Frame.pdf
Moment Resisting Frame.pdfMoment Resisting Frame.pdf
Moment Resisting Frame.pdfZeinab Awada
 
Basics of Hydro power plant
Basics of  Hydro power plant Basics of  Hydro power plant
Basics of Hydro power plant Prasad Vejendla
 
510 tunneling safety 2016
510 tunneling safety 2016510 tunneling safety 2016
510 tunneling safety 2016John Newquist
 
BASE ISOLATION SYSTEM
BASE ISOLATION SYSTEMBASE ISOLATION SYSTEM
BASE ISOLATION SYSTEMSyed Jaber
 
Computer Applications in Mining Engineering, AKS University
Computer Applications in Mining Engineering, AKS UniversityComputer Applications in Mining Engineering, AKS University
Computer Applications in Mining Engineering, AKS UniversityProf-GoldSmith Briz
 

What's hot (20)

Tro arch pp
Tro arch ppTro arch pp
Tro arch pp
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
RETAINING WALL
RETAINING WALLRETAINING WALL
RETAINING WALL
 
Electricity transmission, generation and distribution
Electricity transmission, generation and distributionElectricity transmission, generation and distribution
Electricity transmission, generation and distribution
 
Millau Bridge (Operations Management)
Millau Bridge (Operations Management)Millau Bridge (Operations Management)
Millau Bridge (Operations Management)
 
Vs types of footings vandana miss
Vs types of footings vandana missVs types of footings vandana miss
Vs types of footings vandana miss
 
super adobe technology
super adobe technologysuper adobe technology
super adobe technology
 
Eurasia tunnel1
Eurasia tunnel1Eurasia tunnel1
Eurasia tunnel1
 
Tunnel boring machines123
Tunnel boring machines123Tunnel boring machines123
Tunnel boring machines123
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnels
 
The gable roof
The gable roofThe gable roof
The gable roof
 
Electrical Systems in a Building
Electrical Systems in a BuildingElectrical Systems in a Building
Electrical Systems in a Building
 
Leaning tower of Pisa
Leaning tower of PisaLeaning tower of Pisa
Leaning tower of Pisa
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge ppt
 
Moment Resisting Frame.pdf
Moment Resisting Frame.pdfMoment Resisting Frame.pdf
Moment Resisting Frame.pdf
 
NATM-Time cycle presentation (2)
NATM-Time cycle presentation (2)NATM-Time cycle presentation (2)
NATM-Time cycle presentation (2)
 
Basics of Hydro power plant
Basics of  Hydro power plant Basics of  Hydro power plant
Basics of Hydro power plant
 
510 tunneling safety 2016
510 tunneling safety 2016510 tunneling safety 2016
510 tunneling safety 2016
 
BASE ISOLATION SYSTEM
BASE ISOLATION SYSTEMBASE ISOLATION SYSTEM
BASE ISOLATION SYSTEM
 
Computer Applications in Mining Engineering, AKS University
Computer Applications in Mining Engineering, AKS UniversityComputer Applications in Mining Engineering, AKS University
Computer Applications in Mining Engineering, AKS University
 

Similar to The High Velocity Hurricane Zone Roof Drainage Requirements

Chapter Five-CANAL APPURTENANT STRUCTURES.pdf
Chapter Five-CANAL APPURTENANT STRUCTURES.pdfChapter Five-CANAL APPURTENANT STRUCTURES.pdf
Chapter Five-CANAL APPURTENANT STRUCTURES.pdfAbdanurJihad
 
Basement construction report
Basement construction reportBasement construction report
Basement construction reportANKITAARORA85
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16Leo Youngman
 
Case studies of failures of earthen dams
Case studies of failures of earthen dams Case studies of failures of earthen dams
Case studies of failures of earthen dams uzma shaikh
 
perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)William Godwin
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point systemAnshuman Tyagi
 
Virginia Constructed Wetlands Design Spec
Virginia Constructed Wetlands Design SpecVirginia Constructed Wetlands Design Spec
Virginia Constructed Wetlands Design SpecFu Michael Justin
 
L14 - ONSITE SANITATION.pptx
L14 - ONSITE SANITATION.pptxL14 - ONSITE SANITATION.pptx
L14 - ONSITE SANITATION.pptxPRACHI DESSAI
 
Management & mitigation of groundwater infiltration within underground excava...
Management & mitigation of groundwater infiltration within underground excava...Management & mitigation of groundwater infiltration within underground excava...
Management & mitigation of groundwater infiltration within underground excava...Angelo Indelicato
 
Flow phenomena of a siphonic roof outlet anqip format
Flow phenomena of a siphonic roof outlet anqip formatFlow phenomena of a siphonic roof outlet anqip format
Flow phenomena of a siphonic roof outlet anqip formatMarc Buitenhuis
 
Traps and manhole aditya kumar barn1 ar14002
Traps and manhole aditya kumar barn1 ar14002Traps and manhole aditya kumar barn1 ar14002
Traps and manhole aditya kumar barn1 ar14002Aditya kumar
 

Similar to The High Velocity Hurricane Zone Roof Drainage Requirements (20)

Chapter Five-CANAL APPURTENANT STRUCTURES.pdf
Chapter Five-CANAL APPURTENANT STRUCTURES.pdfChapter Five-CANAL APPURTENANT STRUCTURES.pdf
Chapter Five-CANAL APPURTENANT STRUCTURES.pdf
 
Basement construction report
Basement construction reportBasement construction report
Basement construction report
 
Well Hydraulics
Well HydraulicsWell Hydraulics
Well Hydraulics
 
3 damp proofing
3 damp proofing3 damp proofing
3 damp proofing
 
EARTHERN DAM
EARTHERN DAMEARTHERN DAM
EARTHERN DAM
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
 
Case studies of failures of earthen dams
Case studies of failures of earthen dams Case studies of failures of earthen dams
Case studies of failures of earthen dams
 
perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point system
 
Virginia Constructed Wetlands Design Spec
Virginia Constructed Wetlands Design SpecVirginia Constructed Wetlands Design Spec
Virginia Constructed Wetlands Design Spec
 
L14 - ONSITE SANITATION.pptx
L14 - ONSITE SANITATION.pptxL14 - ONSITE SANITATION.pptx
L14 - ONSITE SANITATION.pptx
 
9429
94299429
9429
 
Hydel Generation and Types Of Turbines
Hydel Generation and Types Of TurbinesHydel Generation and Types Of Turbines
Hydel Generation and Types Of Turbines
 
IBC Seminar 091112, R1
IBC Seminar 091112, R1IBC Seminar 091112, R1
IBC Seminar 091112, R1
 
The Fuse gate System
The Fuse gate SystemThe Fuse gate System
The Fuse gate System
 
Management & mitigation of groundwater infiltration within underground excava...
Management & mitigation of groundwater infiltration within underground excava...Management & mitigation of groundwater infiltration within underground excava...
Management & mitigation of groundwater infiltration within underground excava...
 
Vacuum dewatering
Vacuum dewateringVacuum dewatering
Vacuum dewatering
 
Waterproofing dublin09 1
Waterproofing dublin09 1Waterproofing dublin09 1
Waterproofing dublin09 1
 
Flow phenomena of a siphonic roof outlet anqip format
Flow phenomena of a siphonic roof outlet anqip formatFlow phenomena of a siphonic roof outlet anqip format
Flow phenomena of a siphonic roof outlet anqip format
 
Traps and manhole aditya kumar barn1 ar14002
Traps and manhole aditya kumar barn1 ar14002Traps and manhole aditya kumar barn1 ar14002
Traps and manhole aditya kumar barn1 ar14002
 

More from Morris Group International

Murdock Mfg. Water Coolers and Drinking Fountains Overview
Murdock Mfg. Water Coolers and Drinking Fountains OverviewMurdock Mfg. Water Coolers and Drinking Fountains Overview
Murdock Mfg. Water Coolers and Drinking Fountains OverviewMorris Group International
 
Potter Roemer Fire Pro Nozzle/Monitor Presentation
Potter Roemer Fire Pro Nozzle/Monitor PresentationPotter Roemer Fire Pro Nozzle/Monitor Presentation
Potter Roemer Fire Pro Nozzle/Monitor PresentationMorris Group International
 
Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.
Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.
Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.Morris Group International
 
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof DrainsJay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof DrainsMorris Group International
 
Ultracept Presentation by Jay R. Smith Mfg. Co.
Ultracept Presentation by Jay R. Smith Mfg. Co.Ultracept Presentation by Jay R. Smith Mfg. Co.
Ultracept Presentation by Jay R. Smith Mfg. Co.Morris Group International
 
Extreme Water Savings - The Next Frontier in Drainage and Plumbing Systems
Extreme Water Savings - The Next Frontier in Drainage and Plumbing SystemsExtreme Water Savings - The Next Frontier in Drainage and Plumbing Systems
Extreme Water Savings - The Next Frontier in Drainage and Plumbing SystemsMorris Group International
 
Vacuum Plumbing Systems - Future Frontiers for Plumbing Design
Vacuum Plumbing Systems - Future Frontiers for Plumbing DesignVacuum Plumbing Systems - Future Frontiers for Plumbing Design
Vacuum Plumbing Systems - Future Frontiers for Plumbing DesignMorris Group International
 
Grease+Gard Retrofit Skimmer and Grease Recovery Device Overview
Grease+Gard Retrofit Skimmer and Grease Recovery Device OverviewGrease+Gard Retrofit Skimmer and Grease Recovery Device Overview
Grease+Gard Retrofit Skimmer and Grease Recovery Device OverviewMorris Group International
 
Murdock Mfg. Potable Sanitary Hydrants & Drinking Fountains
Murdock Mfg. Potable Sanitary Hydrants & Drinking FountainsMurdock Mfg. Potable Sanitary Hydrants & Drinking Fountains
Murdock Mfg. Potable Sanitary Hydrants & Drinking FountainsMorris Group International
 
Vacuum Plumbing and a Sustainable Future by AcornVac
Vacuum Plumbing and a Sustainable Future by AcornVacVacuum Plumbing and a Sustainable Future by AcornVac
Vacuum Plumbing and a Sustainable Future by AcornVacMorris Group International
 

More from Morris Group International (20)

Murdock Mfg. Water Coolers and Drinking Fountains Overview
Murdock Mfg. Water Coolers and Drinking Fountains OverviewMurdock Mfg. Water Coolers and Drinking Fountains Overview
Murdock Mfg. Water Coolers and Drinking Fountains Overview
 
Potter Roemer Fire Pro Nozzle/Monitor Presentation
Potter Roemer Fire Pro Nozzle/Monitor PresentationPotter Roemer Fire Pro Nozzle/Monitor Presentation
Potter Roemer Fire Pro Nozzle/Monitor Presentation
 
Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.
Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.
Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.
 
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof DrainsJay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
 
Whitehall BestCare Presentation
Whitehall BestCare PresentationWhitehall BestCare Presentation
Whitehall BestCare Presentation
 
Ultracept Presentation by Jay R. Smith Mfg. Co.
Ultracept Presentation by Jay R. Smith Mfg. Co.Ultracept Presentation by Jay R. Smith Mfg. Co.
Ultracept Presentation by Jay R. Smith Mfg. Co.
 
Extreme Water Savings - The Next Frontier in Drainage and Plumbing Systems
Extreme Water Savings - The Next Frontier in Drainage and Plumbing SystemsExtreme Water Savings - The Next Frontier in Drainage and Plumbing Systems
Extreme Water Savings - The Next Frontier in Drainage and Plumbing Systems
 
Vacuum Plumbing Systems - Future Frontiers for Plumbing Design
Vacuum Plumbing Systems - Future Frontiers for Plumbing DesignVacuum Plumbing Systems - Future Frontiers for Plumbing Design
Vacuum Plumbing Systems - Future Frontiers for Plumbing Design
 
Jay R. Smith Mfg. Co. Grease Gard II
Jay R. Smith Mfg. Co. Grease Gard IIJay R. Smith Mfg. Co. Grease Gard II
Jay R. Smith Mfg. Co. Grease Gard II
 
AcornVac Presents "Vacuum Plumbing 101"
AcornVac Presents "Vacuum Plumbing 101"AcornVac Presents "Vacuum Plumbing 101"
AcornVac Presents "Vacuum Plumbing 101"
 
Morris Group International at a Glance
Morris Group International at a GlanceMorris Group International at a Glance
Morris Group International at a Glance
 
Grease+Gard Retrofit Skimmer and Grease Recovery Device Overview
Grease+Gard Retrofit Skimmer and Grease Recovery Device OverviewGrease+Gard Retrofit Skimmer and Grease Recovery Device Overview
Grease+Gard Retrofit Skimmer and Grease Recovery Device Overview
 
Acorn Water Coolers & Drinking Fountains
Acorn Water Coolers & Drinking FountainsAcorn Water Coolers & Drinking Fountains
Acorn Water Coolers & Drinking Fountains
 
Jay R. Smith Mfg. Co. Product Line Overview
Jay R. Smith Mfg. Co. Product Line OverviewJay R. Smith Mfg. Co. Product Line Overview
Jay R. Smith Mfg. Co. Product Line Overview
 
Grease Myths & Facts by PDI
Grease Myths & Facts by PDIGrease Myths & Facts by PDI
Grease Myths & Facts by PDI
 
Murdock Mfg. Potable Sanitary Hydrants & Drinking Fountains
Murdock Mfg. Potable Sanitary Hydrants & Drinking FountainsMurdock Mfg. Potable Sanitary Hydrants & Drinking Fountains
Murdock Mfg. Potable Sanitary Hydrants & Drinking Fountains
 
Murdock Mfg Building Installation
Murdock Mfg Building InstallationMurdock Mfg Building Installation
Murdock Mfg Building Installation
 
Morris Group International Company Profile
Morris Group International Company ProfileMorris Group International Company Profile
Morris Group International Company Profile
 
Vacuum Plumbing and a Sustainable Future by AcornVac
Vacuum Plumbing and a Sustainable Future by AcornVacVacuum Plumbing and a Sustainable Future by AcornVac
Vacuum Plumbing and a Sustainable Future by AcornVac
 
Morris Group International Overview
Morris Group International OverviewMorris Group International Overview
Morris Group International Overview
 

Recently uploaded

Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 

Recently uploaded (20)

Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 

The High Velocity Hurricane Zone Roof Drainage Requirements

  • 1. The High Velocity Hurricane Zone Roof Drainage Requirements PRESENTED BY THE OFFICE OF BUILDING CODE COMPLIANCE
  • 2. Why is roof drainage so important?  Roofs are typically designed for a 30 psf. live load.*  One square foot of water, one inch deep, weighs 5.2 lbs.  The maximum depth of water allowed by Code is 5”, weighing 26 lbs./ft.2.  It would take only one hour at the design rainfall rate for 5” to accumulate.  There are 3000 roof collapses a year in the USA, many because of inadequate drainage. 2 1/13/2005
  • 3. Roof Slopes  A roof with a slope of 1:240 is considered the same as a dead-level roof for a roof to be considered to have a positive slope it must have a slope of more than 1:240.  The Florida Building Code Requires a slope of 1:48 or a ¼” per foot.*  This is done to preclude ponding instability. 3 1/13/2005
  • 4. SECTION 1515 HIGH VELOCITY HURRICANE ZONES - PERFORMANCE REQUIREMENTS  §1515.2.2.1 All roofing systems must be installed to assure drainage.  In new construction the minimum deck slope shall be not less than  1/4:12. 4 1/13/2005
  • 5. Ponding Instability  Ponding instability is a phenomenon that occurs anytime that water accumulates on a roof. When water accumulates on a roof the roof deflects under the weight of the water consequently, more water ponds and the more water that ponds the more it deflects and continues to compound itself until failure occurs or the situation is remedied. 5 1/13/2005
  • 6.
  • 7. Primary scupper could be easily blocked. Primary scupper could be easily blocked. Overflow provisions are not provided. Overflow provisions are not provided. 7 1/13/2005
  • 8. All three roof drains on this section are blocked. No All three roof drains on this section are blocked. No overflow provisions were provided. overflow provisions were provided. 8 1/13/2005
  • 9. Debris blocked scupper. Debris blocked scupper. No overflow provisions. 9 No overflow provisions. 1/13/2005
  • 10. Strainer is blocked with debris, but flow through the top Strainer is blocked with debris, but flow through the top of the strainer is still possible. of the strainer is still possible. 10 1/13/2005
  • 12. Properties of water  Water weighs 8.33 lbs./gal.  There are 231 in.3 in one gallon.  There are 7.48 gallons in a cubic foot.  A cubic foot of water weighs 62.4 lbs.  A rainfall of 1 gpm = 8.02 ft.3/hr 12 1/13/2005
  • 13. Where do we find drainage information in the FBC?  Chapter 15, Building Volume HVHZ 1514.4*  Chapter 16, Building Volume HVHZ 1614.1  Chapter 11, Plumbing Volume P1102.3  ASCE 7-98  Chapter 8 Code of Miami-Dade County  Drainage design requires the coordination of the Architect, Structural Engineer and Plumbing Engineer. 13 1/13/2005
  • 14. Building (Changed)  HIGH VELOCITY HURRICANE ZONES - GENERAL §1611.1.7 In any conflict between ASCE 7 with commentary and this code, the more stringent requirement shall apply. 1612.1.3 No building structure or part thereof shall be designed for live loads less than those specified in this chapter or ASCE-7 with commentary, except as otherwise noted in this code. 14 1/13/2005
  • 15. HVHZ  §1514.4.2 Overflow drains and scuppers. Where roof drains are required, overflow drains having the same size as the roof drains shall be installed with the inlet flow line located 2 inches (51 mm) above the low point of the roof, overflow scuppers shall be a minimum of 4 inches (102mm) in height and shall be placed in walls or parapets with the inlet flow line not less than 2 inches (51mm) above the roof surface, excluding sumps, or more than 4 inches (102 mm) above the roof surface and shall be located as close as practical to required vertical leaders or downspouts or wall and parapet scuppers . Overflow drains and scuppers shall also comply with the Florida Building Code, Plumbing, and §1616 of this code.* 15 1/13/2005
  • 16. Florida Building Code Plumbing  P1107.3 Sizing of secondary drains. Secondary (emergency) roof drain systems shall be sized in accordance with §P1106 based on the rainfall rate but with the sizing for which the primary system is sized adjusted by dividing the values for horizontally projected roof area in Table P1106.2, Table P1106.3 and Table P1106.6 by two. The minimum cross-sectional area of an overflow scupper shall be three times the cross- sectional area of the primary roof drain and the scupper shall have a minimum opening dimension of 4 inches (102 mm). The flow through the primary system shall not be considered when sizing the secondary roof drain system. 16 1/13/2005
  • 17. Florida Building Code Plumbing (new)  1107.3 Sizing of secondary drains. Secondary (emergency) roof drain systems shall be sized in accordance with Section 1106 based on the rainfall rate for which the primary system is sized in Tables 1106.2, 1106.3 and 1106.6. Scuppers shall be sized to prevent the depth of ponding water from exceeding that for which the roof was designed as determined by Section 1101.7. Scuppers shall not have an opening dimension of less than 4 inches (102 mm). The flow through the primary system shall not be considered when sizing the secondary roof drain system. 17 1/13/2005
  • 18. When are roof drains required?  Unless roofs are sloped to drain over roof edges, roof drains shall be installed at each low point of the roof. (HVHZ 1514.4)  “Drains or scuppers installed to provide overflow drainage shall be not less in aggregate area than as shown in Figure 1616.3, but not less than 4 inches (102 mm) dimension in any direction and shall be placed in parapets not less than 2 inches (51 mm) nor more than 4 inches (102 mm) above the roof deck” (HVHZ 1616.3)*  All roof systems must be installed to assure drainage. (HVHZ 1515.2.2.1)  In new construction the minimum deck slope shall be ¼ : 12. (HVHZ 1515.2.2.1)  Primary drains are to be sized per Table P1106.2. 18 1/13/2005
  • 19. Could a Scupper be Used as a Primary Roof Drain?  Where required for roof drainage, scuppers shall be placed level with the roof surface in a wall or parapet. (HVHZ 1514.4)*  The scupper shall be located as determined by the roof slope and contributing roof area. (HVHZ 1514.4)  Parapet wall roof drainage scupper location shall comply with the FBC Building Volume. Plumbing (1106.5) 19 1/13/2005
  • 20. Using a Scupper as a Primary Drain  When using a scupper as a primary means of roof drainage care must be exercised to direct the water away from the building.  The Code does not allow water to be drained less than a foot from the wall of the building. 20 1/13/2005
  • 21. When is secondary or overflow drainage required?  When roof drains are required. (HVHZ 1514.4.2)  When roof perimeter construction extends above the roof, where water would be trapped if the primary drains allow build-up for any reason. (P1107.1)  When parapets or curbs are constructed, water build- up in excess of that considered in the design shall be prevented. (HVHZ 1616.1) 21 1/13/2005
  • 22. Structural Concerns  No accumulation in excess of that considered in the design. (HVHZ 1616.1)  No more than 5” of water accumulation when not designed per 1616.1. (HVHZ 1616.2)  Depth caused by hydraulic head needed to cause flow through the secondary drain shall be included in determining the load. (HVHZ 1616.2)  All roofs shall be designed with sufficient slope or camber. (HVHZ 1614.4) 22 1/13/2005
  • 23. What is Hydraulic Head?  Is the amount of head needed to cause water to flow out of a drain or a scupper at a set rate.  Example for a 4” roof drain to be able to drain 170 Gals. Per minute it must have 2” of head over the drain. With 1” of head it will only drain 80 G.P.M 23 1/13/2005
  • 24. How do you size a primary drain  First establish the projected horizontal area of the roof (square footage) including any vertical wall that drains unto the roof (do not include parapets)  Next establish the rate of rainfall. 4.7” for Miami-Dade.  Size as per Table 1106.2 of the Plumbing Code. 24 1/13/2005
  • 25. TABLE 1106.2 Only section of table that may be 25 used for Miami-Dade County 1/13/2005
  • 26. Example #1 2500 sq. ft. of roof area. Minimum roof pitch is ¼” per foot. Job is located in Miami-Dade County
  • 27. Example #1  With this information go to Figure 1106.1 Chapter 11 of the Plumbing Code. Or go to Appendix “B” Rates of rainfall for various cities . Here you will determine that the rate for Miami –Dade is 4.7”. The commentary tells us that we should go to the next higher number in the table, in this case 5” 27 1/13/2005
  • 29. APPENDIX PB RATES OF RAINFALL FOR VARIOUS CITIES Florida: Jacksonville 4.3” Key West 4.3” Miami-Dade 4.7” Tampa 4.5” Next you go to table table 1106.2 29 1/13/2005
  • 30. Zoom version of figure 1106.1 Miami-Dade 30 1/13/2005
  • 31. Diameter HORIZONTALLY PROJECTED ROOF AREA (square feet) of Leader Inches Rainfall rate (inches per hour) 1 2 3 4 5 6 7 2” 2880 1440 960 720 575 480 360 3” 8800 4400 2930 2200 1760 1470 4” 18400 3680 5” 34600 6920 6” 54000 10800 8” 116000 23200
  • 32. If you work your way down the 5” column until you get to a number that is higher than 2500 in this case 3680 and follow that across to the left it establishes a 4” leader.
  • 33. It has been established that a 4” roof drain is required. There is 144 cubic inches of water in a 12” x 12” x 1” deep section and there are 231cu. in. of water in a gallon of water . 144 ÷ 231 ÷ 60 = .0104 gals per minute per square foot. .0104 is the gallons per minute that fall on one square foot of roof at a design rainfall rate of 1”. Since the rate of rainfall for Miami-Dade is 5” per hour the square footage of the roof is multiplied by 5 then by .0104. In this case 2500 x 5 x .0104 = 130 gals. per minute is the amount of rain falling on that roof.
  • 34. This is a 2500 sq.ft. roof that according to table P1106.2 requires a 4” roof drain After establishing the 130 gals per min. go to table C8-1 in ASCE 7-98 and find the hydraulic head 34 1/13/2005
  • 35. This table comes from ASCE 7-98. ASCE 7- 98 is a Standard adopted by the Florida Building Code This is the table that is used to establish the hydraulic head of drains and scuppers.
  • 36. This table is found in the commentary to the IPC and it is almost identical to the one in ASCE 7-98
  • 37. Roof Drainage  130 gals per minute on a 4” drain you may interpolate and obtain about 1 ¾” hydraulic head.  This means that at its design capacity there is going to be 1 ¾” of water over the drain, this is fine since the code requires the roof to be designed in a way that the maximum amount of water that can accumulate is less than 5”.  This means that the secondary drain has to be placed a minimum of 1 ¾” above the roof. * 37 1/13/2005
  • 38. Why the concern with hydraulic head?  §1616.2 Where roofs are not designed in accordance with §1616.1, overflow drains or scuppers shall be placed to prevent an accumulation of more than 5 inches (927 mm) of water on any portion of the roof. In determining the load that could result should the primary drainage system be blocked, the loads caused by the depth of water (i.e., head) needed to cause the water to flow out the scuppers or secondary drainage system shall be included.* 38 1/13/2005
  • 39. When is secondary or overflow drainage required?  When roof drains are required. (1514.4.2)  When roof perimeter construction extends above the roof, where water would be trapped if the primary drains allow build-up for any reason. (1107.1)  When parapets or curbs are constructed, water build-up in excess of that considered in the design shall be prevented. (1616.1) 39 1/13/2005
  • 40. Roof Drainage  The code requires that the secondary drainage has to be sized using table 1106.2 and dividing the values by two.*  1107.3 Sizing of secondary drains. Secondary (emergency) roof drain systems shall be sized in accordance with Section 1106 based on the rainfall rate for which the primary system is sized but with the sizing adjusted by dividing the values for horizontally projected roof area in Tables 1106.2, 1106.3 and 1106.6 by two. The minimum cross-sectional area of an over-flow scupper shall be three times the cross-sectional area of the primary roof drain and the scupper shall have a minimum opening dimension of 4 inches (102 mm). The flow through the primary system shall not be considered when sizing the secondary roof drain system. 40 1/13/2005
  • 41. As per the requirements of 1107.3 we have created a table to accomplish this. Diameter of Leader 4” 5” If you compare this table with 2” 360 288 1106.2 you will notice that we 3” 1100 880 have taken those values and 4” 2300 1840 divided them by two. 5” 4325 3460 6” 6750 5400 8” 14500 11600 Consequently we are required a 5” secondary drain.
  • 42. Roof Drainage The head over the primary has been established at 1 ¾”, 130 gals per min on a 5” drain would give us 1 ½” of hydraulic head. Place the secondary at 2” above the deck with 1 ½” of hydraulic head this would give us a maximum of 3 ½” of water on the roof even if the primary were to become clogged. There are drains that have a dam built in, or the drain can placed at a location were the 2” above the low point in the deck happens to be on deck. 42 1/13/2005
  • 43.
  • 44. Example #2, roof slopes at ¼ in./ft. to a single interior drain. 90” 85’ 3’ High Continuous Parapet
  • 45. Size the primary drain for example roof #2.  Roof area 90’ x 85’ = 7650 ft.2  Rainfall rate for Miami =5”  Read down the 5” rainfall column of Table 1106.2 until a projected roof area figure that is equal to or greater than the sample roof area is found. Then read across the Table to find the required drain size.  A 6” drain is found to be required. 45 1/13/2005
  • 46.
  • 47. Establish the hydraulic head at the primary drain for example roof #2  To establish rainfall in gallons per minute. Multiply square footage, times the Miami rainfall rate, then multiply times the conversion factor.  7650 x 5 x 0.0104 = 398 gal/min.  Refer to ASCE 7-98 Table C8-1.  Hydraulic head for a 6” drain, that must drain 398 gal/min., falls between 3” and 3.5”.  Interpolation is necessary to establish an exact hydraulic head. 47 1/13/2005
  • 48. Establishing hydraulic head above the primary drain 540 – 380 = 160 -- 3.5 – 3 = .5 -- .5 ÷ 160 = .003125 398 – 380 = 18 18 x .003125 = .05625 3 + .05625 = 3.056” In this case is it worth the trouble to do interpolation? .0625 = 1/16” Round it off to 31/16”?
  • 49. Could overflow scuppers be used to provide secondary drainage? The easy way to figure this is to just divide the distance from the primary to the parapet by 4 to obtain the height of water at the primary. In this case divide 42.5’ ÷ 4 = 10.6” consequently you could not use a scupper as a means of secondary drainage. You would have 10.6” of water on the roof before it reached the scupper. 49 1/13/2005
  • 50. Secondary Drain  Piping must be separate. Why? (1107.2)*  Secondary must discharge above grade. Why? (1107.2)  Discharge must be in a location where it would be normally observed. Why? (1107.2)  Height placement of the invert of the secondary drain must be above the depth of water of the primary drain at its design flow. This requirement seems to be implied by the Code, though not 50 1/13/2005 explicit.
  • 51. A secondary drain will be required, how is it sized?  The projected roof areas shown in Table 1106.2 must be divided by two.  Then read down the 5” rainfall column until a figure equal to or greater than the projected roof area is found.  Projected roof area 7650 ft.2 51 1/13/2005
  • 52. Table 1106.2 with sizing adjusted by dividing values by two Projected roof area 7650 ft.2 Diameter of Leader 4” 5” 5” 2” 360 288 575 3” 1100 880 1760 4” 2300 1840 3680 5” 4325 3460 6920 6” 6750 5400 10800 8” 14500 11600 23200 Overflow drain size – 8” diameter
  • 53. Establish the hydraulic head above the secondary drain  For an 8” secondary drain the head falls between 2.5”- 3”.  2.5” +[( 398-340 ÷ 560-340) x .5] = hd  2.5” + [(58 ÷ 220) x .5] = hd  2.5” + 0.1318 = 2.63”  If the primary drain could not handle the peak flow for any reason, the secondary would accommodate the design flow.  At the design rainfall rate, there would be a depth of water 2.6” above the secondary drain. 53 1/13/2005
  • 54. This table comes from ASCE 7-98. ASCE 7- 98 is a Standard adopted by the Florida Building Code This is the table that is used to establish the hydraulic head of drains and scuppers. In this case the Hydraulic head will be 2.6” Roughly 2 ½”?
  • 55. Alternate method The GPM remains at 398. Subtract 340 from 398 = 58. Subtract 340 on the table from the 560 on the table = 220. Subtract 2.5” from the 3” of hydraulic head on the table = .5. Divide .5 into 220 = .002272. Multiply 58 x .002272 = .1318. Add .1318 to 2.5 = 2.6318 round off to 2.6”.
  • 56. Are the structural rain load requirements of the Code met?  Depth above the primary = 3.06”  Placement of the invert of the secondary = 4” above the low point.  Depth above the secondary = 2.6”  3.06” + .94” + 2.6” = 6.6”  This depth of water exceeds maximum 5” load allowed by the Code.  Even if the secondary was placed with the invert at the point of the hydraulic head of the primary you still have 5.66” of water on the roof.  Even though the plumbing requirements are met, the 56 1/13/2005 structural requirements are not.
  • 57. Secondary drain Primary drain The max allowed by the code is 5”
  • 58. Options  Go to a bigger primary.  Go to a bigger secondary.  Or both.  Or design the structure to withstand this rain load. 58 1/13/2005
  • 59. TABLE 1106.7 SIZING SCUPPERS FOR A 5” PER HOUR RATE OF RAINFALL HORIZONTALLY PROJECTED ROOF AREA (SQUARE FEET) HEAD IN LENGTH OF WEIR IN INCHES INCHES 4 6 8 12 16 20 24 1 230 346 461 692 923 1153 1384 2 641 961 1282 1923 2564 3205 3846 3 1153 1730 2307 3461 4615 5769 6923 4 1794 2692 3589 5384 7179 8974 10769 Note: to adjust this table for other than a 5” design rain fall rate multiply the square footage on the table by 5 then divide by the local design rain fall rate. Example: For 4” of design rainfall rate a 4” long scupper with a 1” head would accommodate 287 square feet. 230 x 5 /4 = 287
  • 60. Flow in gallons per minute Drainage system Depth of water over drain inlet or hydraulic head 1 2 2.5 3 3.5 4 4.5 5 4 inch roof drain 80 170 180 6 inch roof drain 100 190 270 380 540 8 inch roof drain 125 230 340 560 850 1,100 1,170 6 inch wide open scupper 18 50 90 140 194 24 inch wide open scupper 72 200 360 560 776 6 inch wide 4 inch high closed scupper 18 50 90 140 177 24 inch wide 4 inch high closed scupper 72 200 360 560 708 6 inch wide 6-inch high closed scupper 18 50 90 140 164 24 inch wide 6-inch high closed scupper 72 200 360 560 776 This table is similar to the ones found in ASCE 7 98 and in the Plumbing Commentary. EXAMPLE: for a 24” long scupper with a 1” head take the 72 ÷.0104 ÷ 5 = 1385
  • 61. Formulas  To obtain the gallons per minute that fall on a given roof at the rate for Miami-Dade County (5” per hour).  There is 144 cubic inches in a section of roof 12” x 12” x 1”.  There is 231 cubic inches in a gallon.  If you divide 144 by 231 you obtain accumulation of rainfall in gals. per hour per sq. ft.  To obtain gals. Per minute divide the result by 60  144 ÷ 231 ÷ 60 =.0104  Square feet of roof x 5” x .0104 = gpm falling on the 61 1/13/2005 roof.
  • 62. Formulas  Formula to calculate amount ponding water on the roof: V = 4p x W x L x D  3 2 2 2  V= Cubic Feet  W= Width  L= Length  D= Depth  Depth must be expressed in feet or 62 1/13/2005 decimal of feet
  • 63. Formulas  Francis Formula:  Q =3.33 (b-0.2H)H1.5  b = scupper with in feet  Q = Flow in Cu. Ft. per Sec.  H = Hydraulic head in feet (or height of scupper) 63 1/13/2005
  • 64. Formulas  Factory Mutual Formula for Flow:  Q = 2.9 b(H)1.5  Q = Flow in gallons per minute  b = Base or in this case width of scupper  H = Hydraulic head or height of scupper 64 1/13/2005
  • 65. Estimating Weight of Ponded Roof Water  V = 4p x W x L x D 3 2 2 2 Example; A pond 70’ long by 40’ wide and 7/8”deep at the center: V= 4 x 3.14 ¸ 3 x 40 ¸ 2 x 70 ¸ 2 x (7/8” ¸12) = 2 4.18 x 20 x 35 x .0364 = 106.67 Cu. Ft. = V V= 106.67 Cu. Ft. x 62.4 = 6656.65 lbs ¸ 2000 = 3.3 65 1/13/2005 Tons
  • 66. Flow in gallons per minute Drainage system Depth of water over drain inlet or hydraulic head 1 2 2.5 3 3.5 4 4.5 5 4 inch roof drain 80 170 180 6 inch roof drain 100 190 270 380 540 8 inch roof drain 125 230 340 560 850 1,100 1,170 6 inch wide open scupper 18 50 90 140 194 24 inch wide open scupper 72 200 360 560 776 6 inch wide 4 inch high closed scupper 18 50 90 140 177 24 inch wide 4 inch high closed scupper 72 200 360 560 708 6 inch wide 6-inch high closed scupper 18 50 90 140 164 24 inch wide 6-inch high closed scupper 72 200 360 560 776 This table is similar to the ones found in ASCE 7 98 and in the Plumbing Commentary.
  • 67. 11 ' 0 " A s p e r A S C E 7 9 8 T a b le C 8 - 1 a 1 2 " w id e s c u p p e r w ith 2 " o f h e a d w ill a c c e p t 1 0 0 g p m , a n d 2 1 /4 " w ill accept 140gpm . . 4 " r o o f d r a in 0'4" W it h 1 3 / 4 " o f h e a d n e e d e d t o m a k e t h e a 4 " r o o f d r a in a c c e p t t h e 1 3 0 g p m a n d 1 " o f s e p a r a t io n , t h e m a x im u m d is t a n c e f r o m t h e l o w p o in t t o t h e s c u p p e r is 1 1 ' 2 5 0 0 S q . F t. ro o f a n d t h is o n ly le a v e s 2 1 / 4 " f o r t h e s c u p p e r S lo p e 1 /4 " p e r fo o t 130 G pm . t o d o it s w o r k o r i t w ill e x c e e d t h e 5 " H e a d R q d . 1 3 /4 " m a x im u m a llo w e d o n r o o f . 0' 4"
  • 68. THE END 68 1/13/2005

Editor's Notes

  1. HVHZ.1615.1 Minimum roof live loads. Roofs shall be designed for a live load of not less than 30 pounds per square foot (1436 Pa), except as set forth herein. EXCEPTIONS. 1. Glass areas of greenhouse roofs shall be designed for a live load of not less than 15 pounds per square foot (718 Pa). 2. Ordinary pitched and curved roofs, with a slope of 1-1/2:12, or greater, where water is not directed to the interior of the roof, without parapet or other edge of roof drainage obstructions, may be designed for an allowable live load of not less than 20 pounds per square foot (958 Pa).
  2. The following section of the code does not apply to Miami-Dade or Broward Counties. Sections 1501 thru 1510 do not apply to Miami Dade or Broward only Sections 1511 thru 1525 Apply to the High Velocity Hurricane Zone. §1508.3.1 Slope. Built-up roofs shall have a design slope of a minimum of 1/4:12 for drainage, except for coal-tar built-up roofs that shall have a design slope of a minimum of 1/8:12. It has been quoted by some persons in presentations in Miami-Dade County 1:240 is about 3/64” per foot
  3. 8.33 x 7.48 =62.3084
  4. §1514.4 Roof Drainage. Unless roofs are sloped to drain over roof edges, roof drains shall be installed at each low point of the roof. Where required for roof drainage, scuppers shall be placed level with the roof surface in a wall or parapet. The scupper shall be located as determined by the roof slope and contributing roof area. §1614.1 Live loads. Minimum uniformly distributed live loads shall not be less than as set forth in and Table 4-1 of ASCE 7 with Commentary, except as otherwise noted in this code. Chapter 8 of Miami-Dade County requires drawings to be submitted for roofing.
  5. ASCE-7 1998 is where the table that establishes how much head of water is required to make a drain or pipe drain a certain amount of water. Because water when trickling over the edge of a roof drain does not drain at the same rate as water which has risen to 2” above the edge of the drain. Gravity and head have an effect on how much water a given roof drain will drain.
  6. This is in direct conflict with 1107.3 Plumbing which tells you that scuppers have to be 3 times the area of the primary drains and that overflow drains have to be sized by table 1106.3 but with the values divided by two. Consequently this results in a larger drain. See next slide. This section also tells us that the overflow scupper has to be installed with the inlet flow line 2 inches above the low point of the roof. This is also in error. The overflow scupper has to be installed at a point were it is above the hydraulic head necessary to make the drain accept the gpm. In question. For instance a roof 3000 sq. ft may be accommodated with a single 4” drain but said drain will need will produce 156 gpm. This will require approximately 1 ¾” of head. With this in mind you have to provide some separation between the primary and the secondary if you make that one inch you have now used 2 ¾” of the given 5” max that you are allow to accumulate on the roof. Meaning the scupper has to be locate 2 3/4” of the deck and it has to do its work in the 2 ¼” left from the give 5”.
  7. How can you install a drain 2” above the roof deck this should only apply to scuppers
  8. HVHZ Roof Drainage     The 2005 version of the FBC is going to have a table to size scuppers for primary drainage in Chapter 11 of the Plumbing Code. (Table 1106.7)
  9. §1503.4.4 Protection against decay and termites. Condensate lines and roof downspouts shall discharge at least 1 foot (305 mm) away from the structure sidewall, whether by underground piping, tail extensions, or splash blocks. Gutters with downspouts are required on all buildings with eaves of less than 6 inches (152 mm) horizontal projection except for gable end rakes or on a roof above another roof.
  10. It is also acceptable to design the roof for a higher load. For instance there are local engineers that routinely design for 100 pounds per square foot.
  11. We will show you how to find the amount of water that falls on a roof in gallons per minute and will show you how to find the hydraulic head needed to make a roof drain get rid of the required gpm.
  12. In my opinion 1” above the amount of head required to cause the drain to drain the 130 gals. per minute would adequate but the code may require 2” (look at 1514.4.2). In this case if the secondary is placed at 2”. The reason for placing the secondary at this height is to avoid the secondary working during a normal design rainfall. The secondary is required to act as an alarm when water is seen coming out of the secondary system its saying “THERE IS A PROBLEM ON THE ROOF” §1514.4.2 Overflow drains and scuppers. Where roof drains are required, overflow drains having the same size as the roof drains shall be installed with the inlet flow line located 2 inches (51 mm) above the low point of the roof, overflow scuppers shall be a minimum of 4 inches (102mm) in height and shall be placed in walls or parapets with the inlet flow line not less than 2 inches (51mm) above the roof surface, excluding sumps, or more than 4 inches (102 mm) above the roof surface and shall be located as close as practical to required vertical leaders or downspouts or wall and parapet scuppers . Overflow drains and scuppers shall also comply with the Florida Building Code, Plumbing, and §1616 of this code.*
  13. This is hydraulic head. The loads caused by the depth of water needed to cause water to flow out the scuppers or secondary drainage system shall be included. This means that the hydraulic head has got to be taken into consideration when designing the roofs and drainage systems.
  14. Don’t forget that to use scuppers as a means of secondary drainage on a roof that has roof drains as the means for primary drainage you are limited in distance from low point in roof to scupper. About 12 feet on account of the ¼” per foot.
  15. In the new code coming out n July 2005 this requirement is taken out. But since the rest of the code remains unchanged all is going to do is create confusion. Even under the present code there are instances when you size the secondary by dividing the values in the table by two and you end up with more than 5” of water on the roof. This is why is so important to always do calculations and not follow the tables blindly.
  16. §P1107.2 Separate systems required. Secondary roof drain systems shall have piping and point of discharge separate from the primary system. Discharge shall be above grade in a location which would normally be observed by the building occupants or maintenance personnel.