INTRODUCTION
Accumech Building System P. Ltd. provides best quality profiled Roofing, Ceiling and Pre-engineered Building System. The
demand in the market and due to our services and goodwill in the market, we have a never ending expansion program to
increase our production capacity by incorporating latest technology, Hi speed machinery to yield high quality and zero
defect products.
ABS Pre-Fab Building S ystem
ABS Pre-Fab B uilding S ystem is custom designed to meet client
requirement. The basic building parameters are:-
Building Length:
The distance between the outside flanges of end wall columns in opposite
end wall is considered the building length.
End bay length is the distance from outside of the outer flange of end wall
columns of center line of the first interior frame columns.
Interior bay length is the distance between the center lines of two adjacent
interior main frame columns.
The most economical bay length is 6m or 7.5m. However bay length up-to
15m is possible.
Building Height:
Building height is the Eave height which usually is the distance from the bottom of the main frame column base plate to the
top outer point of the eave strut. Eave heights up-to 30m are possible. When columns are recessed or elevated from
finished floor, eave height is the distance from finished floor to top of eave strut.
Roof Slope (x/10):
This is the angle of the roof with respect to the horizontal. The
most common roof slopes are 1/10 and 1/20, though any practical
roof slope is possible as per customers requirement.
Design Load:
Unless otherwise specified Ambient Building Systems Pre-Fab
building system are designed for the following minimum loads.
Roof Live Loads:
0.75 kN/m2 Design for snow loads, seismic loads, collateral loads, or any other local climatic condition (if required) must
be specified at time of quotation.
Loads are applied in accordance with the latest American codes and standards applicable to pre-engineered buildings
unless
otherwise requested at the time of quotation.
8
Design Wind Speed:
As per IS : 875 for location
STEMS
PRIMARY FRAMING SYSTEMS
The most common primary framing systems are shown below. All are shown symmetrical about the ridge line. Framing
systems unsymmetrical about the ridge line and multi span framing system with unequal width modules are possible but
may require more engineering time and probably longer deliveries. Practically any frame geometry is possible. Consult us
for your specific
Requirements.
PRIMARY FRAMING CONSISTS OF ALL STRUCTURAL ELEMENTS TRANSFERRING LOAD TO THE FOUNDATIONS.
PRIMARY FRAMING MAINLY CONSISTS OF:
Intermediate frames
Endwall frames
Wind Bracings
Crane brackets
Mezzanine beams
9
INTERMEDIATE FRAMES CHARACTERISTICS:
Intermediate frames consist of built up welded primary framing members. These are either C.R.S.sections, hot-rolled
profiles, or built-up welded profiles.
Frames are complemented by flange bracing, connection bolts and anchor bolts. Generally, the base of the intermediate
frame
is pinned. Certain circumstances demand a fixed base approach.
PROTECTION:
All efforts for protection during transportation and erection are made. All profiles receive a shop primer coat of either red or
gray color.
Optionally, a finished coat also can be provided, on request.
WIND BRACING:
Wind bracing provides longitudinal stability for the building. It consists of cross bracing located in the roof and side walls in
one or more days depending on loadings and the length of the building. When required, cross bracings can be replaced by
wind portal frames or by fixed base wind columns located adjacent and connected to the main frame columns.
Secondary framing Systems
Secondary framing consists of the elements which support the roof wall sheeting and which transfers loads to the primary
frames.
PRIMARY FRAMING MAINLY CONSISTS
OF: Intermediate frames
Endwall frames
ABS Z- purlins are cold roll framed Z Profiles of
100mm – 300 mm deep formed out of 1mm – 3mm thick steel
(245MPa/345MPa); fixed to the rafters of the primary structures.
The purlins are usually joined by means of galvanized bolts as per
the jointing details mentioned.
ABS Wall grits are cold roll framed in “C” & “Z”
shape profiles of 100mm-300mm deep formed out of 1mm-3mm
thick steel and connected as per details.
10
Surface Treatment of “C” & “Z”
Profiles:
ABS “C” & “Z” profiles are cold roll formed out of steel coils. They
are first degreased, phosphated and then primer finished with Zinc
Chromate Red Oxide paint matching test requirement of IS :
4777 and IS :
2074
For adverse climatic conditions, special corrosion treatment is
offered as and when needed.
ABS “C” & “Z” profiles offers galvanized coated steel in 120
GSM/ 175 GSM and 275 GSM coating as per requirement.
MATERIALS
The materials that we use for manufacturing are of high quality Galvalume, PPGI, G.I., CR and high tensil steel for Pre-Fab
structures and are sourced from the best manufacturer.
Technical specification of Ambient Building Systems Pre-coated G.I. Steel
Substrate IS 513 Cold Rolled Steel
Coils Tensile Strength 240 Mpa-550 Mpa
Galvanizing As per IS 277
Zinc Coating 120 GSM – 150
GSM Pre-painting IS 14246
Type of Coating RMP/SMP
Total Coated Thickness (TCT) 0.50mm – 0.80mm
Technical Specification of Galvalume
Substrate 55% Aluminum, 43.4% Zinc & 1.6% Silicon
Tensile Strength 550Mpa
Coating Standard As per AS 1397-1993
Coating Mass AZ 150
Base Metal High Tensile Steel
Total Coated Thickness (TCT) 0.47mm- 0.60mm
AMBIENT BUILDING SYSTEMS HI-HI RIB ROOFING SYSTEM
ABS Hi Rib Roofing Systems
ABS Hi Rib roofing profile is manufactured from Pre-painted galvanized steel (PPGI)/Al-Zn alloy coated steel (Bare
Galvalume) and color coated Al-Zn alloy coated steel (Color Coated Galvalume) with a cover width of 1010mm, overall
width of
11
1050mm, pitch of 200mm and a crest height of 30mm with two stiffening Hi Ribs in between. ABS Hi Rib roofing can be
fixed on both roof and wall cladding and any slope and height as per the designer’s choice.
12
DATA TABLE Thickness of
Base Metal
(mm)
Thickness of
Total Coated
(mm)
Mass Per
Unit Area
(Kg./m2)
Galvalume – AZ 150, 550Mpa (Bare) 0.42 0.47 4.28
Color Coated Galvalume –AZ 150, 550 Mpa 0.45 0.50 4.40
Color Coated Galvanized Steel-
AZ-120 GSM, 240 Mpa
0.45 0.50 4.50
ABSPMEX CLIP-CLIP LOCK SYSTEM
ABS Clip Clip Lock Roofing System:
This profile is designed to be fixed to roof purlins or wall cladding in order to have a puncture free roof with concealed fastening. This
system is manufactured from Galvalume- Bare and Color Coated and PPGI. The profile is formed in the standard width of
435mm with a pitch if 217.50mm and crest height of 41mm. ABS Clip-Clip Lock system is available up-to any length depending
upon the requirement of the size.
ABS roofing sheet is available in the following base materials in standard execution.
Description Total Coated
Thickness
(mm)
Approx. mass
per unit area
Kg/m2
Approx. mass
coverage
m2/mT
Bare Galvalume 0.47mm 5.16 193.79
Color Coated Galvalume 0.50mm 5.50 181.80
Color Coated Galvalume 0.55mm 6.04 165.56
Color Coated Galvalume 0.58mm 6.40 156.25
FIXING PROCEDURE
ABS Clip Lock roofing profile is fixed using specially designed clips, for strongly holding the roofing panels. While using these clips,
the lap is placed just clear of and on the high side of the clip. These clips provide allowance for expansion.
13
ABS Crimp
ABS Crimp Profile – ABS Hi Rib profiles are available in concave and convex curved sheets to give architectural aesthetic to the
building. The minimum recommended radius is 500mm.
EX HI-HI RIB ROOFING SYSTEM
ABS Deck
ABS Deck can be used as composite floor system or as a permanent form work. The fast and simple installation of this high strength
platform gives immediate access to a walking platform. It save considerable construction time which in turn saves in overall cost,
safety and accessibility of the project.
ABS Deck is cold formed in 44mm depth, 130mm pitch, cover width of 910mm and overall width of 960mm out of galvanized and HR
Coils in the thickness of 0.80mm to 2.5mm.
14
Used in composite design, Accumech Building System P. Ltd.
Decking System which performs as positive reinforcement and
a permanent from support providing saving in concrete and
reinforcement.
1 0.60 6.37 5.80
2 0.80 8.50 7.74
3 1.00 12.29 10.20
4 1.20 12.43 11.56
5 1.60 16.57 15.37
6 2.00 20.71 19.14
7 2.50 25.89 23.94
Material
Thickness
Coating
Length
Color
Strength
Galvalume Pre-Coated Galvanized
0.47 – 1.6 0.5 – 1.6 0.45 – 1.6
Alu-Zin 150GSM Zinc 120GSM Zinc 120GSM
Upto 12 Mtr Upto 12 Mtr Upto 12 Mtr
As per Color Shed As per Color Shed As per Color Shed
340 240 – 340 240 - 700
LOAD BEARING CAPICITY OF DECK
SPAN in Meter
S. No. Thickness 1 1.2 1.4 1.5 1.6 1.7
1 0.45 500.0 370.0 270.0 235.0 205.0 185.0
2 0.50 590.0 410.0 300.0 260.0 230.0 205.0
3 0.55 645.0 445.0 329.0 285.0 250.0 220.0
4 0.60 700.0 485.0 355.0 310.0 275.0 240.0
5 0.65 760.0 525.0 385.0 335.0 295.0 260.0
6 0.80 930.0 640.0 475.0 410.0 360.0 320.0
15
ABS Louvers
ABS Louvers are designed and applied in custom lengths ready for quick installation. The special designs allow free flow of
air, restricting entry of water and dust. They are light in weight and ready to install with a long and are maintenance free
and
can be supplied in various colors and formed using Galvalume and Color Coated Steel.
ABS Vents
ABS Vents are designed to run without electricity maintenance. It generates fresh air inside round the cClip Lock. It
improves work efficiency and increase productivity. It is silent, economical and ecological.
16
ABS Vents required for particular area:-
1. No. of Ventilators required
=
Ventilation Rate (Q)
Exhaust Capacity
2.Required Ventilation rate ventilated (H3) =
Volume x Air Charge Rate
600
3.Volume of space to be ventilated (H3) = LxWxH
4.Select Air Change Rate from Table A
5.Select Exhaust Capacity from Table B as per your requirement
6.Temperature differences (OC) and wired velocity
TABLE A : REQUIRED AIR CHANGE RATES
Type of Building Air Change @per hour Type of Building
Air Change
@per hour
Ware House 4 – 6 Engine room /Laundary & Plastic
Fatory 10 - 30
Textile Mill / Auditorium 8 – 15
Heavy Factory / Transformer Room 15 - 40Factories(Light) / Hall 6 – 12
Paper Mill / Brewery
Oil Mill / Packing Room 8 – 30
Paper Mill / Brewery Oil Mill /
Packing Room 15 - 60
TABLE A : REQUIRED AIR CHANGE RATES
WIND Velocity (mph) 5 8 10
Temp Diff. OC 3 5 10 3 5 10 3 5 10
Model
No.
STACK
(Height (Ft.)
Exhaust Capacity in CPM
HAV.
500
10 939 1000 1102 1436 1498 1600 1792 1858 1958
20 1005 1084 1216 1503 1582 1714 1859 1938 2070
30 1058 1154 1314 1556 1652 1812 1916 2010 2168
40 1107 1216 1394 1605 1714 1896 1961 2070 2252
14

More Related Content

What's hot

Strength and Ductility of TMT Bars
Strength and Ductility of TMT BarsStrength and Ductility of TMT Bars
Strength and Ductility of TMT BarsShyam Steel TMT Bar
 
Peb 1234330943765774 1
Peb 1234330943765774 1Peb 1234330943765774 1
Peb 1234330943765774 1anubhav02
 
Profiled deck composite floors
Profiled deck composite floorsProfiled deck composite floors
Profiled deck composite floorsElamathy Murugan
 
Contruction Technology Report (Scaffolding)
Contruction Technology Report (Scaffolding)Contruction Technology Report (Scaffolding)
Contruction Technology Report (Scaffolding)ZIyeeTan
 
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...Guidelines on technical_specifications_for_the_installation_of_telecommunicat...
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...Patrice Adjei
 
009 strucutre parts
009 strucutre parts009 strucutre parts
009 strucutre partsnobleglass
 
Post tensioning in building structures
Post tensioning in building structuresPost tensioning in building structures
Post tensioning in building structuresLuan Truong Van
 
Peb structures
Peb structuresPeb structures
Peb structureshlksd
 
Pt slab design philosophy with slides and pictures showing benefit
Pt slab design philosophy  with slides and pictures showing benefitPt slab design philosophy  with slides and pictures showing benefit
Pt slab design philosophy with slides and pictures showing benefitPerwez Ahmad
 
CCL Post Tensioned Concrete Slab Brochure
CCL Post Tensioned Concrete Slab BrochureCCL Post Tensioned Concrete Slab Brochure
CCL Post Tensioned Concrete Slab BrochureCCL Concrete
 
Detailed design of portal frames
Detailed design of portal framesDetailed design of portal frames
Detailed design of portal frameskaran prabhakar
 

What's hot (19)

Strength and Ductility of TMT Bars
Strength and Ductility of TMT BarsStrength and Ductility of TMT Bars
Strength and Ductility of TMT Bars
 
Peb 1234330943765774 1
Peb 1234330943765774 1Peb 1234330943765774 1
Peb 1234330943765774 1
 
Trulift presentation
Trulift presentationTrulift presentation
Trulift presentation
 
Structural Steel Work
 Structural Steel  Work Structural Steel  Work
Structural Steel Work
 
Profiled deck composite floors
Profiled deck composite floorsProfiled deck composite floors
Profiled deck composite floors
 
Contruction Technology Report (Scaffolding)
Contruction Technology Report (Scaffolding)Contruction Technology Report (Scaffolding)
Contruction Technology Report (Scaffolding)
 
Column formwork
Column formworkColumn formwork
Column formwork
 
Posttension vs flat slab
Posttension vs flat slabPosttension vs flat slab
Posttension vs flat slab
 
Ashwall
AshwallAshwall
Ashwall
 
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...Guidelines on technical_specifications_for_the_installation_of_telecommunicat...
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...
 
009 strucutre parts
009 strucutre parts009 strucutre parts
009 strucutre parts
 
Post tensioning in building structures
Post tensioning in building structuresPost tensioning in building structures
Post tensioning in building structures
 
Reinforcement bar
Reinforcement barReinforcement bar
Reinforcement bar
 
Steel design ce 408
Steel design ce 408Steel design ce 408
Steel design ce 408
 
Peb structures
Peb structuresPeb structures
Peb structures
 
Bracing connections
Bracing connectionsBracing connections
Bracing connections
 
Pt slab design philosophy with slides and pictures showing benefit
Pt slab design philosophy  with slides and pictures showing benefitPt slab design philosophy  with slides and pictures showing benefit
Pt slab design philosophy with slides and pictures showing benefit
 
CCL Post Tensioned Concrete Slab Brochure
CCL Post Tensioned Concrete Slab BrochureCCL Post Tensioned Concrete Slab Brochure
CCL Post Tensioned Concrete Slab Brochure
 
Detailed design of portal frames
Detailed design of portal framesDetailed design of portal frames
Detailed design of portal frames
 

Similar to Steel shed manufacturer noida

Assignment 2 (techniqes construction of mass building)
Assignment  2 (techniqes construction of mass building)Assignment  2 (techniqes construction of mass building)
Assignment 2 (techniqes construction of mass building)rajitk97
 
New Life Steel Structures, Mumbai, Sheds and Steel Structures
 New Life Steel Structures, Mumbai, Sheds and Steel Structures New Life Steel Structures, Mumbai, Sheds and Steel Structures
New Life Steel Structures, Mumbai, Sheds and Steel StructuresIndiaMART InterMESH Limited
 
R-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glanceR-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glanceDaniel Simpson
 
R-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glanceR-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glanceDale Thomas
 
Indiawarehousing pre engineered-buildings-peb
Indiawarehousing  pre engineered-buildings-pebIndiawarehousing  pre engineered-buildings-peb
Indiawarehousing pre engineered-buildings-pebIndia Warehousing
 
PEB - Standard Product Specifications
PEB - Standard Product SpecificationsPEB - Standard Product Specifications
PEB - Standard Product SpecificationsAjay Kathuria
 
Ashfix Fastener Range
Ashfix Fastener RangeAshfix Fastener Range
Ashfix Fastener RangeDion Marsh
 
SPIROL Compression Limiters Design Guide
SPIROL Compression Limiters Design GuideSPIROL Compression Limiters Design Guide
SPIROL Compression Limiters Design GuideSPIROL
 
KITSEN Top-rated Slab Formwork (Fastform)
KITSEN Top-rated Slab Formwork (Fastform)KITSEN Top-rated Slab Formwork (Fastform)
KITSEN Top-rated Slab Formwork (Fastform)Jancy Lam KITSEN
 
Pre Engineered Building Manufacturers Bangalore India
Pre Engineered Building Manufacturers Bangalore IndiaPre Engineered Building Manufacturers Bangalore India
Pre Engineered Building Manufacturers Bangalore IndiaAlfa PEB Limited
 
Standing Seam Sheets Manufacturers in Bangalore, Chennai, Pune, Hyderabad, Ko...
Standing Seam Sheets Manufacturers in Bangalore, Chennai, Pune, Hyderabad, Ko...Standing Seam Sheets Manufacturers in Bangalore, Chennai, Pune, Hyderabad, Ko...
Standing Seam Sheets Manufacturers in Bangalore, Chennai, Pune, Hyderabad, Ko...ALFA PEB LTD
 
Color Coated Galvalume/Galvanized Sheet Manufacturers in Bangalore, Chennai, ...
Color Coated Galvalume/Galvanized Sheet Manufacturers in Bangalore, Chennai, ...Color Coated Galvalume/Galvanized Sheet Manufacturers in Bangalore, Chennai, ...
Color Coated Galvalume/Galvanized Sheet Manufacturers in Bangalore, Chennai, ...ALFA PEB LTD
 

Similar to Steel shed manufacturer noida (20)

Assignment 2 (techniqes construction of mass building)
Assignment  2 (techniqes construction of mass building)Assignment  2 (techniqes construction of mass building)
Assignment 2 (techniqes construction of mass building)
 
Pre Bid Conference
Pre Bid ConferencePre Bid Conference
Pre Bid Conference
 
Catlogue
CatlogueCatlogue
Catlogue
 
New Life Steel Structures, Mumbai, Sheds and Steel Structures
 New Life Steel Structures, Mumbai, Sheds and Steel Structures New Life Steel Structures, Mumbai, Sheds and Steel Structures
New Life Steel Structures, Mumbai, Sheds and Steel Structures
 
Cl newlifesteel
Cl newlifesteelCl newlifesteel
Cl newlifesteel
 
R-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glanceR-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glance
 
R-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glanceR-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glance
 
Indiawarehousing pre engineered-buildings-peb
Indiawarehousing  pre engineered-buildings-pebIndiawarehousing  pre engineered-buildings-peb
Indiawarehousing pre engineered-buildings-peb
 
PEB - Standard Product Specifications
PEB - Standard Product SpecificationsPEB - Standard Product Specifications
PEB - Standard Product Specifications
 
Brochure eb 2017
Brochure eb 2017Brochure eb 2017
Brochure eb 2017
 
Ashfix Fastener Range
Ashfix Fastener RangeAshfix Fastener Range
Ashfix Fastener Range
 
ASHFIX
ASHFIXASHFIX
ASHFIX
 
Steel Roof Truss
Steel Roof TrussSteel Roof Truss
Steel Roof Truss
 
IDS Cable Ducting, Cable Chambers & Vaults
IDS Cable Ducting, Cable Chambers & VaultsIDS Cable Ducting, Cable Chambers & Vaults
IDS Cable Ducting, Cable Chambers & Vaults
 
SPIROL Compression Limiters Design Guide
SPIROL Compression Limiters Design GuideSPIROL Compression Limiters Design Guide
SPIROL Compression Limiters Design Guide
 
ASHFAB
ASHFABASHFAB
ASHFAB
 
KITSEN Top-rated Slab Formwork (Fastform)
KITSEN Top-rated Slab Formwork (Fastform)KITSEN Top-rated Slab Formwork (Fastform)
KITSEN Top-rated Slab Formwork (Fastform)
 
Pre Engineered Building Manufacturers Bangalore India
Pre Engineered Building Manufacturers Bangalore IndiaPre Engineered Building Manufacturers Bangalore India
Pre Engineered Building Manufacturers Bangalore India
 
Standing Seam Sheets Manufacturers in Bangalore, Chennai, Pune, Hyderabad, Ko...
Standing Seam Sheets Manufacturers in Bangalore, Chennai, Pune, Hyderabad, Ko...Standing Seam Sheets Manufacturers in Bangalore, Chennai, Pune, Hyderabad, Ko...
Standing Seam Sheets Manufacturers in Bangalore, Chennai, Pune, Hyderabad, Ko...
 
Color Coated Galvalume/Galvanized Sheet Manufacturers in Bangalore, Chennai, ...
Color Coated Galvalume/Galvanized Sheet Manufacturers in Bangalore, Chennai, ...Color Coated Galvalume/Galvanized Sheet Manufacturers in Bangalore, Chennai, ...
Color Coated Galvalume/Galvanized Sheet Manufacturers in Bangalore, Chennai, ...
 

Recently uploaded

BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 

Recently uploaded (20)

BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 

Steel shed manufacturer noida

  • 1. 7 INTRODUCTION Accumech Building System P. Ltd. provides best quality profiled Roofing, Ceiling and Pre-engineered Building System. The demand in the market and due to our services and goodwill in the market, we have a never ending expansion program to increase our production capacity by incorporating latest technology, Hi speed machinery to yield high quality and zero defect products. ABS Pre-Fab Building S ystem ABS Pre-Fab B uilding S ystem is custom designed to meet client requirement. The basic building parameters are:- Building Length: The distance between the outside flanges of end wall columns in opposite end wall is considered the building length. End bay length is the distance from outside of the outer flange of end wall columns of center line of the first interior frame columns. Interior bay length is the distance between the center lines of two adjacent interior main frame columns. The most economical bay length is 6m or 7.5m. However bay length up-to 15m is possible. Building Height: Building height is the Eave height which usually is the distance from the bottom of the main frame column base plate to the top outer point of the eave strut. Eave heights up-to 30m are possible. When columns are recessed or elevated from finished floor, eave height is the distance from finished floor to top of eave strut. Roof Slope (x/10): This is the angle of the roof with respect to the horizontal. The most common roof slopes are 1/10 and 1/20, though any practical roof slope is possible as per customers requirement. Design Load: Unless otherwise specified Ambient Building Systems Pre-Fab building system are designed for the following minimum loads. Roof Live Loads: 0.75 kN/m2 Design for snow loads, seismic loads, collateral loads, or any other local climatic condition (if required) must be specified at time of quotation. Loads are applied in accordance with the latest American codes and standards applicable to pre-engineered buildings unless otherwise requested at the time of quotation.
  • 2. 8 Design Wind Speed: As per IS : 875 for location STEMS PRIMARY FRAMING SYSTEMS The most common primary framing systems are shown below. All are shown symmetrical about the ridge line. Framing systems unsymmetrical about the ridge line and multi span framing system with unequal width modules are possible but may require more engineering time and probably longer deliveries. Practically any frame geometry is possible. Consult us for your specific Requirements. PRIMARY FRAMING CONSISTS OF ALL STRUCTURAL ELEMENTS TRANSFERRING LOAD TO THE FOUNDATIONS. PRIMARY FRAMING MAINLY CONSISTS OF: Intermediate frames Endwall frames Wind Bracings Crane brackets Mezzanine beams
  • 3. 9 INTERMEDIATE FRAMES CHARACTERISTICS: Intermediate frames consist of built up welded primary framing members. These are either C.R.S.sections, hot-rolled profiles, or built-up welded profiles. Frames are complemented by flange bracing, connection bolts and anchor bolts. Generally, the base of the intermediate frame is pinned. Certain circumstances demand a fixed base approach. PROTECTION: All efforts for protection during transportation and erection are made. All profiles receive a shop primer coat of either red or gray color. Optionally, a finished coat also can be provided, on request. WIND BRACING: Wind bracing provides longitudinal stability for the building. It consists of cross bracing located in the roof and side walls in one or more days depending on loadings and the length of the building. When required, cross bracings can be replaced by wind portal frames or by fixed base wind columns located adjacent and connected to the main frame columns. Secondary framing Systems Secondary framing consists of the elements which support the roof wall sheeting and which transfers loads to the primary frames. PRIMARY FRAMING MAINLY CONSISTS OF: Intermediate frames Endwall frames ABS Z- purlins are cold roll framed Z Profiles of 100mm – 300 mm deep formed out of 1mm – 3mm thick steel (245MPa/345MPa); fixed to the rafters of the primary structures. The purlins are usually joined by means of galvanized bolts as per the jointing details mentioned. ABS Wall grits are cold roll framed in “C” & “Z” shape profiles of 100mm-300mm deep formed out of 1mm-3mm thick steel and connected as per details.
  • 4. 10 Surface Treatment of “C” & “Z” Profiles: ABS “C” & “Z” profiles are cold roll formed out of steel coils. They are first degreased, phosphated and then primer finished with Zinc Chromate Red Oxide paint matching test requirement of IS : 4777 and IS : 2074 For adverse climatic conditions, special corrosion treatment is offered as and when needed. ABS “C” & “Z” profiles offers galvanized coated steel in 120 GSM/ 175 GSM and 275 GSM coating as per requirement. MATERIALS The materials that we use for manufacturing are of high quality Galvalume, PPGI, G.I., CR and high tensil steel for Pre-Fab structures and are sourced from the best manufacturer. Technical specification of Ambient Building Systems Pre-coated G.I. Steel Substrate IS 513 Cold Rolled Steel Coils Tensile Strength 240 Mpa-550 Mpa Galvanizing As per IS 277 Zinc Coating 120 GSM – 150 GSM Pre-painting IS 14246 Type of Coating RMP/SMP Total Coated Thickness (TCT) 0.50mm – 0.80mm Technical Specification of Galvalume Substrate 55% Aluminum, 43.4% Zinc & 1.6% Silicon Tensile Strength 550Mpa Coating Standard As per AS 1397-1993 Coating Mass AZ 150 Base Metal High Tensile Steel Total Coated Thickness (TCT) 0.47mm- 0.60mm AMBIENT BUILDING SYSTEMS HI-HI RIB ROOFING SYSTEM ABS Hi Rib Roofing Systems ABS Hi Rib roofing profile is manufactured from Pre-painted galvanized steel (PPGI)/Al-Zn alloy coated steel (Bare Galvalume) and color coated Al-Zn alloy coated steel (Color Coated Galvalume) with a cover width of 1010mm, overall width of
  • 5. 11 1050mm, pitch of 200mm and a crest height of 30mm with two stiffening Hi Ribs in between. ABS Hi Rib roofing can be fixed on both roof and wall cladding and any slope and height as per the designer’s choice.
  • 6. 12 DATA TABLE Thickness of Base Metal (mm) Thickness of Total Coated (mm) Mass Per Unit Area (Kg./m2) Galvalume – AZ 150, 550Mpa (Bare) 0.42 0.47 4.28 Color Coated Galvalume –AZ 150, 550 Mpa 0.45 0.50 4.40 Color Coated Galvanized Steel- AZ-120 GSM, 240 Mpa 0.45 0.50 4.50 ABSPMEX CLIP-CLIP LOCK SYSTEM ABS Clip Clip Lock Roofing System: This profile is designed to be fixed to roof purlins or wall cladding in order to have a puncture free roof with concealed fastening. This system is manufactured from Galvalume- Bare and Color Coated and PPGI. The profile is formed in the standard width of 435mm with a pitch if 217.50mm and crest height of 41mm. ABS Clip-Clip Lock system is available up-to any length depending upon the requirement of the size. ABS roofing sheet is available in the following base materials in standard execution. Description Total Coated Thickness (mm) Approx. mass per unit area Kg/m2 Approx. mass coverage m2/mT Bare Galvalume 0.47mm 5.16 193.79 Color Coated Galvalume 0.50mm 5.50 181.80 Color Coated Galvalume 0.55mm 6.04 165.56 Color Coated Galvalume 0.58mm 6.40 156.25 FIXING PROCEDURE ABS Clip Lock roofing profile is fixed using specially designed clips, for strongly holding the roofing panels. While using these clips, the lap is placed just clear of and on the high side of the clip. These clips provide allowance for expansion.
  • 7. 13 ABS Crimp ABS Crimp Profile – ABS Hi Rib profiles are available in concave and convex curved sheets to give architectural aesthetic to the building. The minimum recommended radius is 500mm. EX HI-HI RIB ROOFING SYSTEM ABS Deck ABS Deck can be used as composite floor system or as a permanent form work. The fast and simple installation of this high strength platform gives immediate access to a walking platform. It save considerable construction time which in turn saves in overall cost, safety and accessibility of the project. ABS Deck is cold formed in 44mm depth, 130mm pitch, cover width of 910mm and overall width of 960mm out of galvanized and HR Coils in the thickness of 0.80mm to 2.5mm.
  • 8. 14 Used in composite design, Accumech Building System P. Ltd. Decking System which performs as positive reinforcement and a permanent from support providing saving in concrete and reinforcement. 1 0.60 6.37 5.80 2 0.80 8.50 7.74 3 1.00 12.29 10.20 4 1.20 12.43 11.56 5 1.60 16.57 15.37 6 2.00 20.71 19.14 7 2.50 25.89 23.94 Material Thickness Coating Length Color Strength Galvalume Pre-Coated Galvanized 0.47 – 1.6 0.5 – 1.6 0.45 – 1.6 Alu-Zin 150GSM Zinc 120GSM Zinc 120GSM Upto 12 Mtr Upto 12 Mtr Upto 12 Mtr As per Color Shed As per Color Shed As per Color Shed 340 240 – 340 240 - 700 LOAD BEARING CAPICITY OF DECK SPAN in Meter S. No. Thickness 1 1.2 1.4 1.5 1.6 1.7 1 0.45 500.0 370.0 270.0 235.0 205.0 185.0 2 0.50 590.0 410.0 300.0 260.0 230.0 205.0 3 0.55 645.0 445.0 329.0 285.0 250.0 220.0 4 0.60 700.0 485.0 355.0 310.0 275.0 240.0 5 0.65 760.0 525.0 385.0 335.0 295.0 260.0 6 0.80 930.0 640.0 475.0 410.0 360.0 320.0
  • 9. 15 ABS Louvers ABS Louvers are designed and applied in custom lengths ready for quick installation. The special designs allow free flow of air, restricting entry of water and dust. They are light in weight and ready to install with a long and are maintenance free and can be supplied in various colors and formed using Galvalume and Color Coated Steel. ABS Vents ABS Vents are designed to run without electricity maintenance. It generates fresh air inside round the cClip Lock. It improves work efficiency and increase productivity. It is silent, economical and ecological.
  • 10. 16 ABS Vents required for particular area:- 1. No. of Ventilators required = Ventilation Rate (Q) Exhaust Capacity
  • 11. 2.Required Ventilation rate ventilated (H3) = Volume x Air Charge Rate 600 3.Volume of space to be ventilated (H3) = LxWxH 4.Select Air Change Rate from Table A 5.Select Exhaust Capacity from Table B as per your requirement 6.Temperature differences (OC) and wired velocity TABLE A : REQUIRED AIR CHANGE RATES Type of Building Air Change @per hour Type of Building Air Change @per hour Ware House 4 – 6 Engine room /Laundary & Plastic Fatory 10 - 30 Textile Mill / Auditorium 8 – 15 Heavy Factory / Transformer Room 15 - 40Factories(Light) / Hall 6 – 12 Paper Mill / Brewery Oil Mill / Packing Room 8 – 30 Paper Mill / Brewery Oil Mill / Packing Room 15 - 60 TABLE A : REQUIRED AIR CHANGE RATES WIND Velocity (mph) 5 8 10 Temp Diff. OC 3 5 10 3 5 10 3 5 10 Model No. STACK (Height (Ft.) Exhaust Capacity in CPM HAV. 500 10 939 1000 1102 1436 1498 1600 1792 1858 1958 20 1005 1084 1216 1503 1582 1714 1859 1938 2070 30 1058 1154 1314 1556 1652 1812 1916 2010 2168 40 1107 1216 1394 1605 1714 1896 1961 2070 2252 14