1. Birendra Kumar Sinha
Garikhana, Cantt. Road, Khagaul, Patna, Bihar, Pin-801105.
Mobile No. 9199442028, Email: contactbirendra@gmail.com
OBJECTIVE:
To make significant contributions in any challenging position in a dynamic and
thriving organization and to learn from the process. Self-motivated and always
keep positive attitude to serve the organization through the best possible way to
increase the productivity and benefit.
CURRENTSTATUS:
Working as DGM Project with KRRTPPL, Hyderabad. On 1st
Feb 2016 handed over
765 kV S/C Kurnool Raichur T/L Ckt-I to PGCIL after successfully completion before
scheduled (Completed 3 months before schedule which includes one pile
foundation in Tungabhadra River). Presently awaiting for new projects.
JOB PROFILE:
POST BID ALL THE WORKS TILL COMPLETION OF PROJECT VIZ. PLANNING AND
MANAGEMENT OF SURVEY, FOUNDATION, ERECTION, STRINGING, TESTING &
COMMISSIONING WORK OF UP TO 765kV TRANSMISSION LINE, BILLING &
REALISATIONand CO-ORDINATIONWITH CLIENT.
PREVIOUS EXPERIENCE:
• Worked in Indian Air Force for 20 Year as a Maintenance Engineer which
includes maintenance of different LT/HT Electrical Installation, Electrical
Equipment & Electrical Switch Yard and also includes Inventory & Resource
Mgt.and Human ResourceMgt.(Feb 1986 to Feb 2006).
• Worked in Aster Teleservices Pvt Ltd Transmission & Distribution Division
as Project Manager for Transmission Line Construction (132kV, 220kV and
400 kV). (Mar 06 to Feb 09)
2. • Worked in SEW Infrastructure Limited, Hyderabad as Project Manager at
Panipat, Haryana and as Regional Manager at Lucknow (FROM Mar 09 TO
Mar 14) for Transmission LineConstruction Works.
PREVIOUS PROJECTS:
ASTER TELESERVICES (P) LTD:
• NIMRANI To JULWANIA 132 KV DCSS LINE(41.824 Km).
• NIMRANI To BARWANI 132 KV DCSS LINE(59.444Km).
• NIMRANI To KASRAWAD 132 KV DCSS LINE(12.248 Km).
SEW INFRASTRUCTURELIMITED
• SAMALKHA TO BEHOLI 132 kV DCSS Line ( 12.51 Km).
• SAMALKHA TO NAULTHA 132 kV DCSS Line (15.89 Km).
• SAMALKHA TO BEGA 132 kV DCSS Line (11.98 Km).
• BEHOLI TO CHHAJPUR132 kV DCSS Line (13.31 Km).
• LILO of 400 KV SEWA-ISHRANA ATNAULTHA S/S (0.735 Km).
• 400 kV DC Quad MooseLILO Line at Lucknow 765 kV S/S.
PROFESSIONAL QUALIFICATION:
• Diploma in ELECTRICAL ENGINEERING from ELECTRICAL INSTRUMENT
TRAINING INSTITUTEAIRFORCE, Bangalore(pass out1988).
• Diploma in COMPUTER APPLICATION from SEVEN SOFT INFORMATION
TECHNOLOGIES, Secunderabad.
• MBA Executive inPROJECTMANAGEMENT(2014).
ACADEMIC QUALIFICATION:
• HIGH SCHOOL 1982 Bihar SchoolBOARD (1982).
3. • Intermediate of Science fromBihar Inter Council (1984).
• BA from Devgarh University (2001).
LANGUAGES: HINDI and ENGLISH.
PERSONAL DETAILS:
DATEOF BIRTH: 25 OCT1967
NATIONALITY: INDIAN
MARTIAL STATUS: MARRIED
Work Experience: 29 Yrs.
PassportNo: N8622247 Valid till 07.03.2026.
COMPENSATION: CURRENT CTC Rs 16.00 Lakhs.
Reference:
MPPTCL : Sri Rout( MD,MPPTCL).
HVPNL : Sri Raghubeer Saran (Director Project)
: Sri A K Saini (Director Technical).
UPPTCL : Sri P K Sharma SE.
PGCIL : Md Kalim Akhtar, DGM
: Sri Upendra Singh, DGM
: Sri L R Bansal. GM, Meerut
: Sri KishoreKumar DGM, Kurnool
: Sri AVLNRao, DGM, Hyderabad
Date: 19 Mar’ 16 BIRENDRA KUMAR SINHA