SlideShare a Scribd company logo
1 of 3
Download to read offline
Vinay J. Pathak
678, Shukrawar Peth
Sathe Chambers
Pune - 411002
Cell No. +91 988 110 4438
Email : pathakvinayj@yahoo.co.in
Objective :
Educational Background :
1 Master of Science in Mechatronics, Oct’2000 –Mar’2002
University of Applied Sciences. FH-Ravensburg-Weingarten,
Weingarten, Germany.
Achievement (Average Grade): 2.1 (Good)
2 Master in Computer Management June’1997 – Apr’1999
Prin.N.G.Naralkar Institute, Pune, India.
Achievement: 61% (First Class)
3 Bachelor of Engineering in Mechanical Engineering, Aug’1991 – Oct’1995
Government College of Engineering,
Pune, India.
Achievement: 63% (First Class)
Professional Experience :
1
Responsibilities involved are,
a
I am very much interested to work in the area of Projects including Facility planning, CAPEX
planning, detailed Engineering. Also Automation and Improvements projects on existing facilities.
Seeking challenging work opportunity in above activities.
Associate Vice President (Expansion and Improvement projects) at Bharat Forge Pune.
Detailed Engineering activities for this facility - Design layout of forging equipments, handling
equipments, robots and manpower positions required etc. Make the proposed cycle time diagram
for entire facility.
Make foundation layout, trench layout for the whole forging line.
Handing over facility to Production personnel. Support during ramp up.
Define expected productivity requirements.
Design of New Facility :
Define portfolio of new facility.
Estimate CAPEX required, IRR and make broad project plan.
Freeze equipment specifications and handover to materials for negotiations & PO releasing.
Presentations to Board and seek approval for project.
Provide engineering support during execution and commissioning of the project.
Define Equipment (technical specifications), Manpower required for proposed facility.
Get budgetary quotes of equipments.
Fortnightly / weekly reviews with team for tracking progress.
b
c
d
e
f
Period – 16
th
August 2004 to till date (12 years)
Current Salary CTC: 25 Lacks / Yr.
2
Nov.’2002 – July ’2004 (1 year 9 months)
3
4
5
Improvements on Existing Facility :
Engineering/Design work for innovative projects.
Do engineering for critical failures on equipments under guidance of experts.
Technical Support to Executive Director.
Internship at EP Elektro Projekt GmbH & Co. KG,
Process Automation and Visualization with soft wares WinCC and In Touch.
Weingarten, Germany,
At FH Ravensburg-Weingarten, Germany with Prof.Kastner.
Period – March 2001 to 13
th
August 2001.
Oct’2000 – Mar’2002
Identifying places for implementing automation so as to enhance productivity, quality & reduce
man power cost.
Also working on the forging processing line to improve processing capacity, reduce handling stress
on the operators & inspectors etc.
Worked as a Senior Design Engineer within the field of Engineering / Design involving Turnkey
projects in Pneumatic Conveying systems, Air Pollution Control System and Ventilation Systems.
Work included design of Plant and Piping / ducting layouts and design of Plant specified equipment
like Bag Filters, Silos, Hoppers, and Vessels etc. Also work included fabrication detailing for the
above. I was also involved in preparing Process and Instrumentation diagram, logic block diagram,
operation sequence etc. Also preparing specification of Instruments and bought out items. I had to
visit various consultants / clients for discussions and Approval of above.
Master thesis “Creating library for system elements, global functions and windows with
visualization softwares WinCC and InTouch.”
Scientific Project “Visualization of Electrical Machines Laboratory and controlling motors with
visualization software WinCC.”
Summary
Engineering of 6 new forging facilities. 5000T J&H Forging line, 10000T Wedge press forging line,
12500TMP line, 8000TMP line, Cold Forging Facility, 80 MT Beche Hammer line and Ring Rolling
line.
At E.P.Elekto Projekt GmbH & Co.KG. Weingarten,Germany.
Period – 1
st
October 2001 to 31
st
March 2002.
Engineering of 4 new processing lines (HHP cranks, Front axle beams (2 lines) & passenger car crank
line)
Improvement and Automation projects on 8 existing facilities PZS-1, PSH, LMZ:2500, 5000T Eumuco
line, PZS-2, MAXI and Ajax lines.
Sr. Design Engineer at RIECO Industries Ltd.
6
7
Completed course in Basic Robotics KUKA (4 days) January – 2008.
Project Management (by Symbiosis Pune) 6 months Yr.2007.
Completed course in Robo-Guide (5 days) by FANUC, India. January – 2006.
Completed course in Basics of Pneumatics (5 days), by FESTO, India January – 2005
Completed course in Pro-Engineering (by KNVL, Pune) Oct’2003 – Jan’ 2004
Completed course in CAD / CAM (by College of Engg. Pune) Sep’1995 – Oct’1995
8
9
10 Notice Period : 3 months.
Extra-curricular activities:
Completed German language course “Intensive course for beginners” in Germany
Personal Information:
Design Engineer at RIECO Industries Ltd.
Working in the field of Turnkey projects in Pollution Control Systems, Pneumatic conveying
systems.
Sep’1996 – Sep’2000
Pune,India.
Additional Qualifications:
Hobbies : Reading, singing, stamps and coin collection.
References : furnished upon request.
Date of Birth : 27th December 1973.
Marital Status : Married
Children : 1 son
Languages known : English, Marathi, Hindi, German basic

More Related Content

What's hot (19)

Resume (2)
Resume (2)Resume (2)
Resume (2)
 
Austin_Condra_Resume
Austin_Condra_ResumeAustin_Condra_Resume
Austin_Condra_Resume
 
Er. Shivam (1)
Er. Shivam (1)Er. Shivam (1)
Er. Shivam (1)
 
CV_HVAC_ENGINEER
CV_HVAC_ENGINEERCV_HVAC_ENGINEER
CV_HVAC_ENGINEER
 
Sanchit - Resume
Sanchit - ResumeSanchit - Resume
Sanchit - Resume
 
Jabir CV
Jabir CVJabir CV
Jabir CV
 
Emad Medhat Resume
Emad Medhat ResumeEmad Medhat Resume
Emad Medhat Resume
 
IRFAN PV
IRFAN PVIRFAN PV
IRFAN PV
 
Consultant resume july 2017
Consultant resume july 2017Consultant resume july 2017
Consultant resume july 2017
 
tnsmCV
tnsmCVtnsmCV
tnsmCV
 
Mechanical Engineering CDR Sample (ANZSCO Code: 233512)
Mechanical Engineering CDR Sample (ANZSCO Code: 233512)Mechanical Engineering CDR Sample (ANZSCO Code: 233512)
Mechanical Engineering CDR Sample (ANZSCO Code: 233512)
 
Mohan_Resume
Mohan_ResumeMohan_Resume
Mohan_Resume
 
Industrial_Manufacturing_Engineer_Resume
Industrial_Manufacturing_Engineer_ResumeIndustrial_Manufacturing_Engineer_Resume
Industrial_Manufacturing_Engineer_Resume
 
Industrial_Manufacturing Engineer Resume
Industrial_Manufacturing Engineer ResumeIndustrial_Manufacturing Engineer Resume
Industrial_Manufacturing Engineer Resume
 
CV
CVCV
CV
 
Vijai CV
Vijai CVVijai CV
Vijai CV
 
RESUME
RESUMERESUME
RESUME
 
Resume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-californiaResume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-california
 
syed ahmed mehran
syed ahmed mehransyed ahmed mehran
syed ahmed mehran
 

Viewers also liked (20)

Exhibit_Designs
Exhibit_DesignsExhibit_Designs
Exhibit_Designs
 
P Lauriano Stiehm Press Breed
P Lauriano Stiehm Press BreedP Lauriano Stiehm Press Breed
P Lauriano Stiehm Press Breed
 
Memoria Prosedimental
Memoria ProsedimentalMemoria Prosedimental
Memoria Prosedimental
 
Correlaciones de pearson y spearman
Correlaciones de pearson y spearmanCorrelaciones de pearson y spearman
Correlaciones de pearson y spearman
 
What is Damaging Power
What is Damaging PowerWhat is Damaging Power
What is Damaging Power
 
Smart Protect4
Smart Protect4Smart Protect4
Smart Protect4
 
Year 8 Rock - Squire SQUC
Year 8 Rock - Squire SQUCYear 8 Rock - Squire SQUC
Year 8 Rock - Squire SQUC
 
CityCouncilPresentation
CityCouncilPresentationCityCouncilPresentation
CityCouncilPresentation
 
Perifericos de salida
Perifericos de salidaPerifericos de salida
Perifericos de salida
 
The economist
The economistThe economist
The economist
 
Common Power Protection Myths
Common Power Protection MythsCommon Power Protection Myths
Common Power Protection Myths
 
Proyecto de vida mj 97
Proyecto de vida mj 97Proyecto de vida mj 97
Proyecto de vida mj 97
 
Nidia peña actividad1_2mapac.pdf
Nidia peña actividad1_2mapac.pdfNidia peña actividad1_2mapac.pdf
Nidia peña actividad1_2mapac.pdf
 
Nidia peña actividad1_2mapac.pdf
Nidia peña actividad1_2mapac.pdfNidia peña actividad1_2mapac.pdf
Nidia peña actividad1_2mapac.pdf
 
AOMP_APRIL_2016_S
AOMP_APRIL_2016_SAOMP_APRIL_2016_S
AOMP_APRIL_2016_S
 
Resume bilingual 2016
Resume bilingual 2016Resume bilingual 2016
Resume bilingual 2016
 
Drogas
DrogasDrogas
Drogas
 
Valeria Quinatoa (proyecto de vida)
Valeria Quinatoa (proyecto de vida)Valeria Quinatoa (proyecto de vida)
Valeria Quinatoa (proyecto de vida)
 
Sijo Sunny Portfolio
Sijo Sunny PortfolioSijo Sunny Portfolio
Sijo Sunny Portfolio
 
Software
SoftwareSoftware
Software
 

Similar to Vinay CV

Similar to Vinay CV (20)

Resume of mandar_yadav
Resume of mandar_yadavResume of mandar_yadav
Resume of mandar_yadav
 
张祁_简历
张祁_简历张祁_简历
张祁_简历
 
211113 sushil-uupdated-resume
211113 sushil-uupdated-resume211113 sushil-uupdated-resume
211113 sushil-uupdated-resume
 
Nitin_Technical
Nitin_TechnicalNitin_Technical
Nitin_Technical
 
Paresh Gawade-Manufacturing
Paresh Gawade-ManufacturingParesh Gawade-Manufacturing
Paresh Gawade-Manufacturing
 
Prashant Rayarikar Resume
Prashant Rayarikar ResumePrashant Rayarikar Resume
Prashant Rayarikar Resume
 
Harsimar CV
Harsimar CVHarsimar CV
Harsimar CV
 
sathish_DESIGN_ENGINEER
sathish_DESIGN_ENGINEERsathish_DESIGN_ENGINEER
sathish_DESIGN_ENGINEER
 
Arvinder Singh CV
Arvinder Singh CVArvinder Singh CV
Arvinder Singh CV
 
Standard dme sop
Standard dme sopStandard dme sop
Standard dme sop
 
Gopi resume dtb 1
Gopi resume dtb 1Gopi resume dtb 1
Gopi resume dtb 1
 
Gopi resume dtb 1
Gopi resume dtb 1Gopi resume dtb 1
Gopi resume dtb 1
 
Muhammad mohsin updated resume
Muhammad mohsin updated resumeMuhammad mohsin updated resume
Muhammad mohsin updated resume
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
Mr. Grace Rutsyamuka (MSEE) R&D Induction Motors
Mr. Grace Rutsyamuka (MSEE) R&D Induction MotorsMr. Grace Rutsyamuka (MSEE) R&D Induction Motors
Mr. Grace Rutsyamuka (MSEE) R&D Induction Motors
 
Helder_CV
Helder_CVHelder_CV
Helder_CV
 
Josh Keane Resume Update 11122016
Josh Keane Resume Update 11122016Josh Keane Resume Update 11122016
Josh Keane Resume Update 11122016
 
mars_(1)_(1) (1) (1)
mars_(1)_(1) (1) (1)mars_(1)_(1) (1) (1)
mars_(1)_(1) (1) (1)
 
Mars
Mars Mars
Mars
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 

Vinay CV

  • 1. Vinay J. Pathak 678, Shukrawar Peth Sathe Chambers Pune - 411002 Cell No. +91 988 110 4438 Email : pathakvinayj@yahoo.co.in Objective : Educational Background : 1 Master of Science in Mechatronics, Oct’2000 –Mar’2002 University of Applied Sciences. FH-Ravensburg-Weingarten, Weingarten, Germany. Achievement (Average Grade): 2.1 (Good) 2 Master in Computer Management June’1997 – Apr’1999 Prin.N.G.Naralkar Institute, Pune, India. Achievement: 61% (First Class) 3 Bachelor of Engineering in Mechanical Engineering, Aug’1991 – Oct’1995 Government College of Engineering, Pune, India. Achievement: 63% (First Class) Professional Experience : 1 Responsibilities involved are, a I am very much interested to work in the area of Projects including Facility planning, CAPEX planning, detailed Engineering. Also Automation and Improvements projects on existing facilities. Seeking challenging work opportunity in above activities. Associate Vice President (Expansion and Improvement projects) at Bharat Forge Pune. Detailed Engineering activities for this facility - Design layout of forging equipments, handling equipments, robots and manpower positions required etc. Make the proposed cycle time diagram for entire facility. Make foundation layout, trench layout for the whole forging line. Handing over facility to Production personnel. Support during ramp up. Define expected productivity requirements. Design of New Facility : Define portfolio of new facility. Estimate CAPEX required, IRR and make broad project plan. Freeze equipment specifications and handover to materials for negotiations & PO releasing. Presentations to Board and seek approval for project. Provide engineering support during execution and commissioning of the project. Define Equipment (technical specifications), Manpower required for proposed facility. Get budgetary quotes of equipments. Fortnightly / weekly reviews with team for tracking progress.
  • 2. b c d e f Period – 16 th August 2004 to till date (12 years) Current Salary CTC: 25 Lacks / Yr. 2 Nov.’2002 – July ’2004 (1 year 9 months) 3 4 5 Improvements on Existing Facility : Engineering/Design work for innovative projects. Do engineering for critical failures on equipments under guidance of experts. Technical Support to Executive Director. Internship at EP Elektro Projekt GmbH & Co. KG, Process Automation and Visualization with soft wares WinCC and In Touch. Weingarten, Germany, At FH Ravensburg-Weingarten, Germany with Prof.Kastner. Period – March 2001 to 13 th August 2001. Oct’2000 – Mar’2002 Identifying places for implementing automation so as to enhance productivity, quality & reduce man power cost. Also working on the forging processing line to improve processing capacity, reduce handling stress on the operators & inspectors etc. Worked as a Senior Design Engineer within the field of Engineering / Design involving Turnkey projects in Pneumatic Conveying systems, Air Pollution Control System and Ventilation Systems. Work included design of Plant and Piping / ducting layouts and design of Plant specified equipment like Bag Filters, Silos, Hoppers, and Vessels etc. Also work included fabrication detailing for the above. I was also involved in preparing Process and Instrumentation diagram, logic block diagram, operation sequence etc. Also preparing specification of Instruments and bought out items. I had to visit various consultants / clients for discussions and Approval of above. Master thesis “Creating library for system elements, global functions and windows with visualization softwares WinCC and InTouch.” Scientific Project “Visualization of Electrical Machines Laboratory and controlling motors with visualization software WinCC.” Summary Engineering of 6 new forging facilities. 5000T J&H Forging line, 10000T Wedge press forging line, 12500TMP line, 8000TMP line, Cold Forging Facility, 80 MT Beche Hammer line and Ring Rolling line. At E.P.Elekto Projekt GmbH & Co.KG. Weingarten,Germany. Period – 1 st October 2001 to 31 st March 2002. Engineering of 4 new processing lines (HHP cranks, Front axle beams (2 lines) & passenger car crank line) Improvement and Automation projects on 8 existing facilities PZS-1, PSH, LMZ:2500, 5000T Eumuco line, PZS-2, MAXI and Ajax lines. Sr. Design Engineer at RIECO Industries Ltd.
  • 3. 6 7 Completed course in Basic Robotics KUKA (4 days) January – 2008. Project Management (by Symbiosis Pune) 6 months Yr.2007. Completed course in Robo-Guide (5 days) by FANUC, India. January – 2006. Completed course in Basics of Pneumatics (5 days), by FESTO, India January – 2005 Completed course in Pro-Engineering (by KNVL, Pune) Oct’2003 – Jan’ 2004 Completed course in CAD / CAM (by College of Engg. Pune) Sep’1995 – Oct’1995 8 9 10 Notice Period : 3 months. Extra-curricular activities: Completed German language course “Intensive course for beginners” in Germany Personal Information: Design Engineer at RIECO Industries Ltd. Working in the field of Turnkey projects in Pollution Control Systems, Pneumatic conveying systems. Sep’1996 – Sep’2000 Pune,India. Additional Qualifications: Hobbies : Reading, singing, stamps and coin collection. References : furnished upon request. Date of Birth : 27th December 1973. Marital Status : Married Children : 1 son Languages known : English, Marathi, Hindi, German basic