SlideShare a Scribd company logo
1 of 6
RESUME
Name : Vijay Sethuramalingam
Total Work
Experience
: Total 5.4years of experience in Software Testing
Technical
Knowledge
:  Experience in Water fall model, Manual Testing
and Regression testing
 Good exposure to banking domain
 Specialties: Testing approaches (Gray-box, Black-
box, White-box, configuration, compatibility,
usability, localization, dynamic & static, system
testing, SIT and business user coordination for
UAT),
 Experience in Designing Test Plans, Test
Scenarios, Test Cases and Requirement
Traceability Matrix based on business
requirements
 Have very good knowledge in Negative testing,
Acceptance testing, Impact Analysis and Root
Cause analysis for existing defects in the current
system.
 involving all entities such as creating account,
lead, opportunity, jobs, creation of Reports
 Experience in UAT for Customer Risk Rating
System (NORKOM – BAE) and also has End to
End Knowledge on AML Screening and Risk
Rating.
 Best practices implemented as part of continuous
improvement initiatives – Static testing, Reuse of
Test cases across test phases, root cause analysis
of defects etc.
 Familiar with all the stages of Software Test Life
Cycle (STLC), with good exposure towards testing
techniques and methodologies and sound
awareness of all the stages of Defect Tracking Life
Cycle (DTLC).
 Operating System: Windows,
XP/Vista/2000/2003/2007
 Testing Tools: Quality Centre 9.2/11 ALM; Toad for
DB2,
Areas of
Strengths
:  Direct Co-ordination with Asset Team and
Business Team on Regular basis
 Experience in MTP and TSR creation for the
Project
 Experience with planning and coordinating the
activities of test, integration, and project teams
 Extensive experience with test plan, test
procedure, and test script design, and execution
 Develop and maintain an effective working
relationship with customer and third-party
stakeholders
 Ability to adapt quickly, work under pressure.
 Generate various reports - Daily Status report,
weekly status report, Defect reports, Test
Summary reports etc.
 Strong ability to communicate with both technical
(developers) and non-technical (customers,
management).
 Excellent Analytical skills
 People/Project Skills: Creative / Innovative ideas
for problem solving, Team Building, Written and
oral Communication.
Asset Knowledge:
Have immense knowledge and experience on below assets
• e-BOBS
• Siebel
• Internet Banking
• Mobile Internet Banking(MIB)
• Connex
• B2K
• Finsim
• Tibco
• Payments(SWIFT)
• CBP
• CSU
• Customer Central
• Norkom
• Relationship and systems
• U bank
• AUSTRAC
RECENT PROJECT EXPERIENCE:
1. Client: National Australia Bank
Project Duration: Sep - Oct 2016
Location: Australia - Melbourne
Project Description: Coin Deposit Machine Certification
 By late 2016 the current model CDM (CDS830) will reach end of life and
will no longer be supplied by the vendor, Squint quip. In its place will be
model CDS9 which has the same features; however this will have a
different design footprint and will need to be certified by NAB.
Responsibilities: Played the role of Test Lead and Test Analyst
 Requirement analysis, test case preparation and review, execution.
Running triages and engaging in discussions among various stakeholders
 Managing test closure activities
2. Client: National Australia Bank
Project Duration: Mar - Sep 2016
Location: Australia - Melbourne
Project Description: Mobile Payments
 The Mobile Payments Project will change card-present commerce by
enabling new shopping experiences for customers and unprecedented
opportunity for retailers and payment service providers to connect and
interact with customers
Responsibilities: Played the role of Test Lead and Test Analyst
 Requirement analysis, test case preparation and review, execution.
Running triages and engaging in discussions among various stakeholders
3. Client: National Australia Bank
Project Duration: Dec - Mar 2016
Location: Australia - Melbourne
Project Description: ASX-T+2 Settlements
 The settlement period for Australian share market trades will be shortened
by one day. Settlement of the trade will be required to occur two business
days after the day a trade takes place. This settlement period will be
called T+2 (trade date plus 2 business days). The change to T+2
settlements is proposed to take place for trades conducted on or after
Monday 7 March 2016, with the date to be confirmed by ASX.
 This change will affect all financial products traded on a securities market1
in Australia, including shares, units, bonds, hybrids, CDIs, exchange-
traded Australian Government Bonds, exchange-traded products
(including exchange-traded funds), warrants and installments
Responsibilities
 Involved in Integration Testing and acceptance testing for different
banking areas which has undergone settlement changes like NATL ,Nab
connect, Nabtrade ,Antares Equities, Specialized Products such as
creating new account, lead, opportunity, jobs, creation of Reports
 Involved in UAT Testing, interacted with business Team regularly for UAT
Results.
 Involved in Hyper care process meeting and provided the Testing support
for closing the Defects.
4. Client: National Australian Bank
Project Duration: Apr 2015 - Nov 2015
Location: Australia - Melbourne
Project Description: AML Reforms UAT
 Project AML Reforms is the compliance Project which is implemented
across the bank to make sure that all the customers from different source
system is scanned and verified for AML Process.
 The Purpose of this program is to make sure all the customers on boarded
from different upstream system (Redstar, Wholesale & Wealth) have been
Risk Rated accordingly and also verify whether KYC (Review) is
performed for all the customers based on their calculated Risk Levels.
Responsibilities
 Involved in UAT Testing, interacted with business Team regularly
 Co-ordinated with different Streams (Redstar, wholesale and Wealth) so
that the customers are on boarded from all the front end system.
 Co-ordinated with all the intermediate systems (GDW, EDW, ME) to make
sure the files from source is been transferred successfully to the
downstream systems.
 Involved in Functional and Integration Testing for Redstar, Wholesale and
Wealth
 Prepared MTP, Test scripts, Test Data
 Test Script Execution, Defect Management Meeting TSR Preparation.
 Involved in MTP Review and TSR Review Meetings.
5. Client: National Australian Bank
Project Duration: Jan2015 – Mar 2015
Location: Mysore
Project Description: SAM 15.2
 This Project deals with the front end change in the valuation and
cancellation functionality for different types of securities in Siebel
application.
Responsibilities
 Requirement analysis
 Preparing Master Test Plan
 Test Case Preparation
 Test Case Execution (System Integration Testing)
 Defect coordination
 Conducting defect triage session daily
 Daily status Report
 Publish Test Summary Report
6. Client: National Australian Bank
Project Duration: April 2012 – Dec 2014
Location: Mysore
Project Description: Release Management
 RELEASE MANAGEMENT aligns multiple technology initiatives
throughout their lifecycle and provides shared services. This
enables increased volumes of change, improved quality outcomes
and increased efficiency in the build and test of change.
 Under Release Management, Technology will now bundle changes
into packages and assess them as a whole before they deliver the
changes at regular pre- determined intervals known as a ‘release’.
NAB has defined different release types to cater for various
business requirements and change complexity. Under Release
Management, all of the release types involve 'bundling' changes
together for more efficient delivery, although release type
schedules may differ based on their complexity. All projects
generally default to the Enterprise Release.
Responsibilities
Plays the role of member of a governing body/council for the testing
activities carried out by the projects in the release and is also
responsible for the following activities:
 Regression Test Execution during SIT Cycles - Scope of Release
regression testing can be found in release specific Test scoping
document and Enterprise Release level Master Test
Plan. (Offshore driven)
 Defect Triage / governance - This activity involves conducting daily
defect meetings and monitoring project defects against resolution
progress.
 Batch Calendar Creation and Coordination - Collecting batch
requirements from projects participating in release and deriving
batch calendar to fulfil those during SIT/UAT execution. This activity
involves extensive co-ordination between Testing team, Release
Test Manager/Lead and Batch services team.
 Enterprise Status Reporting - This activity involves creation of
release level test execution report. Input for this report comes from
reports of projects participating in Release.
 Communicate/co-ordinate all release updates with testing teams
 Played the role of KM Anchor and CM Anchor for the portfolio
Personal Details:
Date of Birth: 18/10/1989
Passport Number: J0015499
Passport validity: June 2021
VISA Details: UC-457 (Valid until SEP 2018)
Father’s Name: Sethuramalingam
Educational qualifications: Bachelor of Engineering (Electrical and Electronics)

More Related Content

What's hot

What's hot (9)

Abhishek_Banerjee_Functional _Testing
Abhishek_Banerjee_Functional _TestingAbhishek_Banerjee_Functional _Testing
Abhishek_Banerjee_Functional _Testing
 
Resume_Madhu Akkasali
Resume_Madhu AkkasaliResume_Madhu Akkasali
Resume_Madhu Akkasali
 
Munish_Updated Resume
Munish_Updated ResumeMunish_Updated Resume
Munish_Updated Resume
 
Kamalika qa test_lead
Kamalika qa test_leadKamalika qa test_lead
Kamalika qa test_lead
 
T S Kannan
T S KannanT S Kannan
T S Kannan
 
Feasible
FeasibleFeasible
Feasible
 
2.requirements management
2.requirements management2.requirements management
2.requirements management
 
Laxmi_7yrs_Telecom_software_testing
Laxmi_7yrs_Telecom_software_testingLaxmi_7yrs_Telecom_software_testing
Laxmi_7yrs_Telecom_software_testing
 
Mridul_Mandal_Resume_5+yrs_QA
Mridul_Mandal_Resume_5+yrs_QAMridul_Mandal_Resume_5+yrs_QA
Mridul_Mandal_Resume_5+yrs_QA
 

Viewers also liked

Interviewing the Cruschiki King
Interviewing the Cruschiki KingInterviewing the Cruschiki King
Interviewing the Cruschiki KingTSheen123
 
W. Khan DW & WW_CV Dec. 2015
W. Khan DW & WW_CV Dec. 2015W. Khan DW & WW_CV Dec. 2015
W. Khan DW & WW_CV Dec. 2015Waseem Khan, PG
 
Philanthropic Quotes by Matt Kupec
Philanthropic Quotes by Matt KupecPhilanthropic Quotes by Matt Kupec
Philanthropic Quotes by Matt KupecMatt Kupec
 
Sistemas operativos
Sistemas operativosSistemas operativos
Sistemas operativosLuciaMart
 
tuyen-tap-100-bai-he-phuong-trinh-ltdh-nam-hoc-2014-2015-full
tuyen-tap-100-bai-he-phuong-trinh-ltdh-nam-hoc-2014-2015-fulltuyen-tap-100-bai-he-phuong-trinh-ltdh-nam-hoc-2014-2015-full
tuyen-tap-100-bai-he-phuong-trinh-ltdh-nam-hoc-2014-2015-fullnhungoc13061998
 
Hannah Scott article
Hannah Scott articleHannah Scott article
Hannah Scott articleHannah Scott
 
ألبوم صور فوتوغرافية
ألبوم صور فوتوغرافيةألبوم صور فوتوغرافية
ألبوم صور فوتوغرافيةMralmas Almas
 
Sistemas operativos
Sistemas operativosSistemas operativos
Sistemas operativosLuciaMart
 
3 клас природознавство і. грущинська
3 клас природознавство і. грущинська3 клас природознавство і. грущинська
3 клас природознавство і. грущинськаlyaskovsky_oleg
 

Viewers also liked (19)

Interviewing the Cruschiki King
Interviewing the Cruschiki KingInterviewing the Cruschiki King
Interviewing the Cruschiki King
 
Tarea 8 genetica y conducta
Tarea  8 genetica y conductaTarea  8 genetica y conducta
Tarea 8 genetica y conducta
 
W. Khan DW & WW_CV Dec. 2015
W. Khan DW & WW_CV Dec. 2015W. Khan DW & WW_CV Dec. 2015
W. Khan DW & WW_CV Dec. 2015
 
Philanthropic Quotes by Matt Kupec
Philanthropic Quotes by Matt KupecPhilanthropic Quotes by Matt Kupec
Philanthropic Quotes by Matt Kupec
 
Marcos power point
Marcos power pointMarcos power point
Marcos power point
 
Record label
Record labelRecord label
Record label
 
Sistemas operativos
Sistemas operativosSistemas operativos
Sistemas operativos
 
Parc
ParcParc
Parc
 
tuyen-tap-100-bai-he-phuong-trinh-ltdh-nam-hoc-2014-2015-full
tuyen-tap-100-bai-he-phuong-trinh-ltdh-nam-hoc-2014-2015-fulltuyen-tap-100-bai-he-phuong-trinh-ltdh-nam-hoc-2014-2015-full
tuyen-tap-100-bai-he-phuong-trinh-ltdh-nam-hoc-2014-2015-full
 
המסע לפולין 2015
המסע לפולין 2015המסע לפולין 2015
המסע לפולין 2015
 
Hannah Scott article
Hannah Scott articleHannah Scott article
Hannah Scott article
 
Laboratory plastic ware
Laboratory plastic wareLaboratory plastic ware
Laboratory plastic ware
 
ألبوم صور فوتوغرافية
ألبوم صور فوتوغرافيةألبوم صور فوتوغرافية
ألبوم صور فوتوغرافية
 
Sistemas operativos
Sistemas operativosSistemas operativos
Sistemas operativos
 
3 клас природознавство і. грущинська
3 клас природознавство і. грущинська3 клас природознавство і. грущинська
3 клас природознавство і. грущинська
 
Chris Rose Research Paper
Chris Rose Research PaperChris Rose Research Paper
Chris Rose Research Paper
 
CVword 2(1)
CVword 2(1)CVword 2(1)
CVword 2(1)
 
Nota kkqt1
Nota kkqt1Nota kkqt1
Nota kkqt1
 
About Topup Genie
About Topup GenieAbout Topup Genie
About Topup Genie
 

Similar to Vijay Sethuramalingam (20)

Pramoth_R _CV
Pramoth_R _CVPramoth_R _CV
Pramoth_R _CV
 
Janhvi_singh_resume_24-Aug-2016
Janhvi_singh_resume_24-Aug-2016Janhvi_singh_resume_24-Aug-2016
Janhvi_singh_resume_24-Aug-2016
 
D Kalyan Chakravarthy
D Kalyan ChakravarthyD Kalyan Chakravarthy
D Kalyan Chakravarthy
 
BhupenderBhardwaj_Resume
BhupenderBhardwaj_ResumeBhupenderBhardwaj_Resume
BhupenderBhardwaj_Resume
 
M Ravichandran_V2
M Ravichandran_V2M Ravichandran_V2
M Ravichandran_V2
 
Ambika_A_S 2016
Ambika_A_S 2016Ambika_A_S 2016
Ambika_A_S 2016
 
Lily Dzur_resume_c1
Lily Dzur_resume_c1Lily Dzur_resume_c1
Lily Dzur_resume_c1
 
Yogesh Keshaowar_Profile
Yogesh Keshaowar_ProfileYogesh Keshaowar_Profile
Yogesh Keshaowar_Profile
 
Tamillakshmi Manoharan - CAMS
Tamillakshmi Manoharan - CAMSTamillakshmi Manoharan - CAMS
Tamillakshmi Manoharan - CAMS
 
Resume
ResumeResume
Resume
 
Syed Rehmathullah_ATM
Syed Rehmathullah_ATMSyed Rehmathullah_ATM
Syed Rehmathullah_ATM
 
Mathavan_Resume
Mathavan_ResumeMathavan_Resume
Mathavan_Resume
 
Biodata-Aditi V Nayak
Biodata-Aditi V NayakBiodata-Aditi V Nayak
Biodata-Aditi V Nayak
 
Puvvati_Resume
Puvvati_ResumePuvvati_Resume
Puvvati_Resume
 
Vinod_Resume
Vinod_ResumeVinod_Resume
Vinod_Resume
 
Shafi_QA Architect
Shafi_QA ArchitectShafi_QA Architect
Shafi_QA Architect
 
Hemant_Kolhe_Resume.doc
Hemant_Kolhe_Resume.docHemant_Kolhe_Resume.doc
Hemant_Kolhe_Resume.doc
 
Siddharth Raipure_CV_NEW
Siddharth Raipure_CV_NEWSiddharth Raipure_CV_NEW
Siddharth Raipure_CV_NEW
 
Ankita_Bhatnagar_ReleaseManager_05-07-2016
Ankita_Bhatnagar_ReleaseManager_05-07-2016Ankita_Bhatnagar_ReleaseManager_05-07-2016
Ankita_Bhatnagar_ReleaseManager_05-07-2016
 
Ganesh_Gopalakrishnan
Ganesh_GopalakrishnanGanesh_Gopalakrishnan
Ganesh_Gopalakrishnan
 

Vijay Sethuramalingam

  • 1. RESUME Name : Vijay Sethuramalingam Total Work Experience : Total 5.4years of experience in Software Testing Technical Knowledge :  Experience in Water fall model, Manual Testing and Regression testing  Good exposure to banking domain  Specialties: Testing approaches (Gray-box, Black- box, White-box, configuration, compatibility, usability, localization, dynamic & static, system testing, SIT and business user coordination for UAT),  Experience in Designing Test Plans, Test Scenarios, Test Cases and Requirement Traceability Matrix based on business requirements  Have very good knowledge in Negative testing, Acceptance testing, Impact Analysis and Root Cause analysis for existing defects in the current system.  involving all entities such as creating account, lead, opportunity, jobs, creation of Reports  Experience in UAT for Customer Risk Rating System (NORKOM – BAE) and also has End to End Knowledge on AML Screening and Risk Rating.  Best practices implemented as part of continuous improvement initiatives – Static testing, Reuse of Test cases across test phases, root cause analysis of defects etc.  Familiar with all the stages of Software Test Life Cycle (STLC), with good exposure towards testing techniques and methodologies and sound awareness of all the stages of Defect Tracking Life Cycle (DTLC).  Operating System: Windows, XP/Vista/2000/2003/2007  Testing Tools: Quality Centre 9.2/11 ALM; Toad for DB2,
  • 2. Areas of Strengths :  Direct Co-ordination with Asset Team and Business Team on Regular basis  Experience in MTP and TSR creation for the Project  Experience with planning and coordinating the activities of test, integration, and project teams  Extensive experience with test plan, test procedure, and test script design, and execution  Develop and maintain an effective working relationship with customer and third-party stakeholders  Ability to adapt quickly, work under pressure.  Generate various reports - Daily Status report, weekly status report, Defect reports, Test Summary reports etc.  Strong ability to communicate with both technical (developers) and non-technical (customers, management).  Excellent Analytical skills  People/Project Skills: Creative / Innovative ideas for problem solving, Team Building, Written and oral Communication. Asset Knowledge: Have immense knowledge and experience on below assets • e-BOBS • Siebel • Internet Banking • Mobile Internet Banking(MIB) • Connex • B2K • Finsim • Tibco • Payments(SWIFT) • CBP • CSU • Customer Central
  • 3. • Norkom • Relationship and systems • U bank • AUSTRAC RECENT PROJECT EXPERIENCE: 1. Client: National Australia Bank Project Duration: Sep - Oct 2016 Location: Australia - Melbourne Project Description: Coin Deposit Machine Certification  By late 2016 the current model CDM (CDS830) will reach end of life and will no longer be supplied by the vendor, Squint quip. In its place will be model CDS9 which has the same features; however this will have a different design footprint and will need to be certified by NAB. Responsibilities: Played the role of Test Lead and Test Analyst  Requirement analysis, test case preparation and review, execution. Running triages and engaging in discussions among various stakeholders  Managing test closure activities 2. Client: National Australia Bank Project Duration: Mar - Sep 2016 Location: Australia - Melbourne Project Description: Mobile Payments  The Mobile Payments Project will change card-present commerce by enabling new shopping experiences for customers and unprecedented opportunity for retailers and payment service providers to connect and interact with customers Responsibilities: Played the role of Test Lead and Test Analyst  Requirement analysis, test case preparation and review, execution. Running triages and engaging in discussions among various stakeholders 3. Client: National Australia Bank
  • 4. Project Duration: Dec - Mar 2016 Location: Australia - Melbourne Project Description: ASX-T+2 Settlements  The settlement period for Australian share market trades will be shortened by one day. Settlement of the trade will be required to occur two business days after the day a trade takes place. This settlement period will be called T+2 (trade date plus 2 business days). The change to T+2 settlements is proposed to take place for trades conducted on or after Monday 7 March 2016, with the date to be confirmed by ASX.  This change will affect all financial products traded on a securities market1 in Australia, including shares, units, bonds, hybrids, CDIs, exchange- traded Australian Government Bonds, exchange-traded products (including exchange-traded funds), warrants and installments Responsibilities  Involved in Integration Testing and acceptance testing for different banking areas which has undergone settlement changes like NATL ,Nab connect, Nabtrade ,Antares Equities, Specialized Products such as creating new account, lead, opportunity, jobs, creation of Reports  Involved in UAT Testing, interacted with business Team regularly for UAT Results.  Involved in Hyper care process meeting and provided the Testing support for closing the Defects. 4. Client: National Australian Bank Project Duration: Apr 2015 - Nov 2015 Location: Australia - Melbourne Project Description: AML Reforms UAT  Project AML Reforms is the compliance Project which is implemented across the bank to make sure that all the customers from different source system is scanned and verified for AML Process.  The Purpose of this program is to make sure all the customers on boarded from different upstream system (Redstar, Wholesale & Wealth) have been Risk Rated accordingly and also verify whether KYC (Review) is performed for all the customers based on their calculated Risk Levels. Responsibilities  Involved in UAT Testing, interacted with business Team regularly  Co-ordinated with different Streams (Redstar, wholesale and Wealth) so that the customers are on boarded from all the front end system.
  • 5.  Co-ordinated with all the intermediate systems (GDW, EDW, ME) to make sure the files from source is been transferred successfully to the downstream systems.  Involved in Functional and Integration Testing for Redstar, Wholesale and Wealth  Prepared MTP, Test scripts, Test Data  Test Script Execution, Defect Management Meeting TSR Preparation.  Involved in MTP Review and TSR Review Meetings. 5. Client: National Australian Bank Project Duration: Jan2015 – Mar 2015 Location: Mysore Project Description: SAM 15.2  This Project deals with the front end change in the valuation and cancellation functionality for different types of securities in Siebel application. Responsibilities  Requirement analysis  Preparing Master Test Plan  Test Case Preparation  Test Case Execution (System Integration Testing)  Defect coordination  Conducting defect triage session daily  Daily status Report  Publish Test Summary Report 6. Client: National Australian Bank Project Duration: April 2012 – Dec 2014 Location: Mysore Project Description: Release Management  RELEASE MANAGEMENT aligns multiple technology initiatives throughout their lifecycle and provides shared services. This enables increased volumes of change, improved quality outcomes and increased efficiency in the build and test of change.  Under Release Management, Technology will now bundle changes into packages and assess them as a whole before they deliver the changes at regular pre- determined intervals known as a ‘release’.
  • 6. NAB has defined different release types to cater for various business requirements and change complexity. Under Release Management, all of the release types involve 'bundling' changes together for more efficient delivery, although release type schedules may differ based on their complexity. All projects generally default to the Enterprise Release. Responsibilities Plays the role of member of a governing body/council for the testing activities carried out by the projects in the release and is also responsible for the following activities:  Regression Test Execution during SIT Cycles - Scope of Release regression testing can be found in release specific Test scoping document and Enterprise Release level Master Test Plan. (Offshore driven)  Defect Triage / governance - This activity involves conducting daily defect meetings and monitoring project defects against resolution progress.  Batch Calendar Creation and Coordination - Collecting batch requirements from projects participating in release and deriving batch calendar to fulfil those during SIT/UAT execution. This activity involves extensive co-ordination between Testing team, Release Test Manager/Lead and Batch services team.  Enterprise Status Reporting - This activity involves creation of release level test execution report. Input for this report comes from reports of projects participating in Release.  Communicate/co-ordinate all release updates with testing teams  Played the role of KM Anchor and CM Anchor for the portfolio Personal Details: Date of Birth: 18/10/1989 Passport Number: J0015499 Passport validity: June 2021 VISA Details: UC-457 (Valid until SEP 2018) Father’s Name: Sethuramalingam Educational qualifications: Bachelor of Engineering (Electrical and Electronics)