8. Case Study: North Sea Anasuria project
Decommissioning project for a major Operator including recovery, cutting and disposal
of a dynamic umbilical .
Phase 1
• Detailed engineering
• Offshore recovery
procedures
• Disposal management
planning
Phase 2
• Supply of personnel
and equipment
• Offshore recovery of a
6” umbilical
• Transport reel +
product to Wallsend
Disposal Site
Phase 3
• NORM testing
• Flushing and nitrogen
purging
• Off‐spooling of used
product
• Cutting product
• Waste management
control
• Recycling product
9. Phase 2 Offshore Campaign: Dynamic control umbilical
Length 955 ft
OD 6.5“
Material
Polyurethane coating w/
armour wire sheath
Static MBR 6.4 ft
Dynamic MBR 8.1 ft
Nominal Weight in
Air
40.2 lb/ft
End Terminations Static UTA
10. Phase 2 Offshore Campaign: Deck layout
400te Power Reel
Drive with Tracks
15te Tensioner
Lay Ramp
8.5m Reel
12. Phase 3 Onshore Campaign: Contamination and testing
• NORM testing conducted prior to
offloading
• A 33 foot umbilical section was
collected behind the bend
stiffener for product testing
13. Phase 3 Onshore Campaign: Planning
Reel + Product 15te Tensioner150te PRD
Cutting area with
fluid containment
14. Phase 3 Onshore Campaign: Execution
15te tensioner Cutting area with
fluid containment kit
Reel
15. Phase 3 Onshore Campaign: Flushing and purging
• Injection of potable water and gaseous
nitrogen displacing umbilical fluid into
waste tanks
6” Umbilical Contents
Lines 1 to 5 Castrol Brayco SV/3
Lines 6 & 7 Mi‐SWACO Methanol
Line 8 Scale Inhibitor
Lines 9 & 10 Corrosion Inhibitor
E1 & E2 Power Cores
E3 & E4 Signal Cores
16. Phase 3 Onshore Campaign: Cutting and disposal
• Significant safety precautions to ensure no personnel injury or environmental
pollution
• Plastic sheeting is applied at cut ends to capture any remain fluids
17. Results and Value Proposition
• Executed both the offshore and onshore campaigns safely
for our people and the environment
• Developed capability to offer turnkey solution for disposal
with an integrated supply chain
• Capable of managing multiple interfaces on behalf of the
customer
• Received licensing to perform disposal at Peterhead site
for future projects.
18. Case Study: Recovery of bundled systems
• 9 different bundled line types
• Limited deck space
• Full contamination control
500te RDS
w/ tracks
200te RDS
50Te
Tensioner
Control
Umbilical
6” Prod
Riser
2” ID Gas
Lift Riser
200te RDS
Level
Winder
Handling Area
19. • It’s 40 years of accumulated expertise and working together to achieve smarter
solutions
• It’s taking safety seriously and never cutting corners
• It’s a commitment to being the best and a passion for quality
• It’s maintaining a progressive outlook and answering future needs before they
arise
• It’s rapidly delivering dependable solutions and getting the job done, whatever it
takes.