SMS EQUIPMENT ERECTION
1) LIFTING OF UPPER COOLING STACK OF CONV-2 OF HIGH RISE BUILDING BY
DEMAG-600T CRANE.
2) AFTER POSITIONING OF UPPER COOLING STACK PART-6 OF CONV-2 BY
DEMAG-600T CRANE.
3) ERECTION OF MOVABLE GUIDE OF LANCE SYSTEM OF CONVERTER-1 BY
LANCE 80T CRANE.
4) AT THE TIME UP PIN UP OF MOVABLE GUIDE WITH LANCE TROLLY.
5) SHIFTING OF LANCE WATER HOSE OF CONV-1 BY 500T EOT CRANE & LANCE
80T CRANE.
6) ERECTION OF LANCE WATER HOSE OF CONVERTER-1 BY LANCE 80T CRANE.
7) AFTER POSITIONING OF LANCE WATER HOSE OF CONVERTER-1.
8) LIFTING OF LANCE OXYGEN HOSE BY LANCE 80T CRANE & TRAILING BY EOT
500T CRANE IN E-F BAY OF HIGH RISE BUILDING.
9) AT THE TIME OF LIFTING OF LANCE OXYGEN HOSE OF CONV-1 BY LANCE 80T
CRANE.
10) AFTER POSITIONING OF LANCE OXYGEN HOSE ON FIXED SUPPORT OF
CONV-1.
PREPARED BY: - UMAKANTA ROUT
SMS L&T KPO

More Related Content

Viewers also liked

Building present
Building presentBuilding present
Building present
Nur Murni
 
TRANSPORTATION SYSTEM IN HIGH RISE BUILDINGS
TRANSPORTATION SYSTEM IN HIGH RISE BUILDINGSTRANSPORTATION SYSTEM IN HIGH RISE BUILDINGS
TRANSPORTATION SYSTEM IN HIGH RISE BUILDINGS
Nur Murni
 
Construction Truck Crane 2009
Construction Truck Crane 2009Construction Truck Crane 2009
Construction Truck Crane 2009
vtsiri
 
J.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycleJ.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycle
J.S. Daniel
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building Construction
Hamdija Velagic
 
El percebe feo y el sistema operativo
El percebe feo y el sistema operativoEl percebe feo y el sistema operativo
El percebe feo y el sistema operativo
ericaul123
 

Viewers also liked (19)

Case Study - One Eleven Tower
Case Study - One Eleven TowerCase Study - One Eleven Tower
Case Study - One Eleven Tower
 
Mobile crane safety rules
Mobile crane safety rulesMobile crane safety rules
Mobile crane safety rules
 
Building present
Building presentBuilding present
Building present
 
Safety Tip: 10 Steps to Safer Crane Operation
Safety Tip: 10 Steps to Safer Crane OperationSafety Tip: 10 Steps to Safer Crane Operation
Safety Tip: 10 Steps to Safer Crane Operation
 
TRANSPORTATION SYSTEM IN HIGH RISE BUILDINGS
TRANSPORTATION SYSTEM IN HIGH RISE BUILDINGSTRANSPORTATION SYSTEM IN HIGH RISE BUILDINGS
TRANSPORTATION SYSTEM IN HIGH RISE BUILDINGS
 
Crane safety technical
Crane safety   technicalCrane safety   technical
Crane safety technical
 
Construction Truck Crane 2009
Construction Truck Crane 2009Construction Truck Crane 2009
Construction Truck Crane 2009
 
5 Essential Tips for Safe Mobile Crane Operations
5 Essential Tips for Safe Mobile Crane Operations5 Essential Tips for Safe Mobile Crane Operations
5 Essential Tips for Safe Mobile Crane Operations
 
High rise construction
High rise constructionHigh rise construction
High rise construction
 
J.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycleJ.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycle
 
Transportation Systems In Buildings
Transportation Systems In BuildingsTransportation Systems In Buildings
Transportation Systems In Buildings
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and Classification
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building Construction
 
Adelaide with Fullerton Health Care Race around - Beyond the Boardroom
Adelaide with Fullerton Health Care Race around - Beyond the BoardroomAdelaide with Fullerton Health Care Race around - Beyond the Boardroom
Adelaide with Fullerton Health Care Race around - Beyond the Boardroom
 
22 10 - painel reflexões e práticas de gestão por competências limites e poss...
22 10 - painel reflexões e práticas de gestão por competências limites e poss...22 10 - painel reflexões e práticas de gestão por competências limites e poss...
22 10 - painel reflexões e práticas de gestão por competências limites e poss...
 
O livro dos sábios eliphas levi
O livro dos sábios   eliphas leviO livro dos sábios   eliphas levi
O livro dos sábios eliphas levi
 
O livro das bestas
O livro das bestasO livro das bestas
O livro das bestas
 
El percebe feo y el sistema operativo
El percebe feo y el sistema operativoEl percebe feo y el sistema operativo
El percebe feo y el sistema operativo
 
Universidad autonoma de los andes vini
Universidad autonoma de los andes viniUniversidad autonoma de los andes vini
Universidad autonoma de los andes vini
 

Similar to SMS EQUIPMENT ERECT

Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project Overview
Vladimir Popovic
 
Rion antirion - yerevan - oct 2003
Rion antirion - yerevan  - oct 2003Rion antirion - yerevan  - oct 2003
Rion antirion - yerevan - oct 2003
gefyra-rion
 
Capping-Stack-Fact-Sheet_FINAL-AND-APPROVED
Capping-Stack-Fact-Sheet_FINAL-AND-APPROVEDCapping-Stack-Fact-Sheet_FINAL-AND-APPROVED
Capping-Stack-Fact-Sheet_FINAL-AND-APPROVED
Jerry Levine
 
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel ReplacementReport on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
Sujit Tharakan
 
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
Chad Kurdi, P.E.
 

Similar to SMS EQUIPMENT ERECT (20)

Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling Plant
 
Nbc cso apwa expo july 8 t12
Nbc cso apwa expo july 8 t12Nbc cso apwa expo july 8 t12
Nbc cso apwa expo july 8 t12
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project Overview
 
Rion antirion - yerevan - oct 2003
Rion antirion - yerevan  - oct 2003Rion antirion - yerevan  - oct 2003
Rion antirion - yerevan - oct 2003
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgia
 
Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station
 
Presentation 6th mining congress MGMI, by S.K.Bag
Presentation 6th mining congress MGMI, by S.K.BagPresentation 6th mining congress MGMI, by S.K.Bag
Presentation 6th mining congress MGMI, by S.K.Bag
 
220kv substation
220kv substation220kv substation
220kv substation
 
Transocean offshore operation 2
Transocean   offshore operation 2Transocean   offshore operation 2
Transocean offshore operation 2
 
220 66 kv nrs sub report
220 66 kv nrs sub report220 66 kv nrs sub report
220 66 kv nrs sub report
 
O-3
O-3O-3
O-3
 
Capping-Stack-Fact-Sheet_FINAL-AND-APPROVED
Capping-Stack-Fact-Sheet_FINAL-AND-APPROVEDCapping-Stack-Fact-Sheet_FINAL-AND-APPROVED
Capping-Stack-Fact-Sheet_FINAL-AND-APPROVED
 
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel ReplacementReport on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
 
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
 
Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgia
 
Ozurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectOzurgeti City / Water Supply Project
Ozurgeti City / Water Supply Project
 
Ed1 r4 product specification
Ed1 r4 product specificationEd1 r4 product specification
Ed1 r4 product specification
 
Presenting AUGIER Energy
Presenting AUGIER EnergyPresenting AUGIER Energy
Presenting AUGIER Energy
 
Chalmer G. Galido powerpoint present pptx
Chalmer G. Galido powerpoint present pptxChalmer G. Galido powerpoint present pptx
Chalmer G. Galido powerpoint present pptx
 
Rehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgiaRehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgia
 

SMS EQUIPMENT ERECT

  • 1. SMS EQUIPMENT ERECTION 1) LIFTING OF UPPER COOLING STACK OF CONV-2 OF HIGH RISE BUILDING BY DEMAG-600T CRANE.
  • 2. 2) AFTER POSITIONING OF UPPER COOLING STACK PART-6 OF CONV-2 BY DEMAG-600T CRANE.
  • 3. 3) ERECTION OF MOVABLE GUIDE OF LANCE SYSTEM OF CONVERTER-1 BY LANCE 80T CRANE.
  • 4. 4) AT THE TIME UP PIN UP OF MOVABLE GUIDE WITH LANCE TROLLY.
  • 5. 5) SHIFTING OF LANCE WATER HOSE OF CONV-1 BY 500T EOT CRANE & LANCE 80T CRANE.
  • 6. 6) ERECTION OF LANCE WATER HOSE OF CONVERTER-1 BY LANCE 80T CRANE.
  • 7. 7) AFTER POSITIONING OF LANCE WATER HOSE OF CONVERTER-1.
  • 8. 8) LIFTING OF LANCE OXYGEN HOSE BY LANCE 80T CRANE & TRAILING BY EOT 500T CRANE IN E-F BAY OF HIGH RISE BUILDING.
  • 9. 9) AT THE TIME OF LIFTING OF LANCE OXYGEN HOSE OF CONV-1 BY LANCE 80T CRANE.
  • 10. 10) AFTER POSITIONING OF LANCE OXYGEN HOSE ON FIXED SUPPORT OF CONV-1. PREPARED BY: - UMAKANTA ROUT SMS L&T KPO