SlideShare a Scribd company logo
1 of 6
Download to read offline
Page 1 of 6
CURRICULUM VITAE AUGUST, 2015
Personal Data:
Name : Uğur Bekir
Family Name : COŞKUNER
Profession : Mechanical Engineer
Born : March 27, 1951
Dependants : Son (age 30, MSc Chemical Engineer), Daughter (age 21, in university)
Foreign Language : English (Fluent written and spoken)
Nationality : Turkish
Home-Office : Mutlukent Mah. 1972. sk Melis C Blk No:5/25
Çankaya/ANKARA/TURKIYE
Phone : + 90 (312) 236 46 65
Mobile Phone : + 90 532 525 87 97
E-mail : ubc@ubcmuhendislik.com
ubcoskuner@superonline.com
Web : http://www.ubc-engineering.com
Work experience and references:
March, 2009- Currently: UBC Engineering, Consulting, Project Trade Co. Ltd.
As Founder and Company Manager
The Company UBC was established in march, 2009 to provide out source consulting and engineering
services as Consultant, Owner's Engineer and Lander's engineer for the supply, installation, test and
commissioning of the electromechanical equipment of hydro-power plants.
The scope of services to be supplied by UBC for the electro-mechanical equipment of the Hydro
Power Plants are as follows ;
− Plant optimization, defining of the equipment data and characteristics,
− Preparing of the technical specification for E-M equipment,
− Bidding negotiations,
− Preparing of contract document,
− Engineering, design and project works,
− Manufacturing of the equipment,
− FAT factory acceptance tests,
− Erection and installation of E-M equipment,
− Field tests and commissioning works,
Page 2 of 6
− Field ministry acceptance and performance tests,
− Due diligence reports for all investment and operational stages of the hydro-power plants,
− Maintenance and repair works for the plants in operation,
The reference hydro-power plants are given in below tables ;
No NAME OF HEPP UNIT
OUTPUTS
INSTALLED
OUTPUT
LOCATION
OF THE
PROJECT
OWNER PHASE ELECTROMECHANICAL
CONTRACTOR
1. BOYABAT
DAM AND HEPP 3 X 170 MW 510 MW TURKIYE
BOYABAT ENERJİ
DOĞAN /DOĞUŞ/UNIT
IN OPERATION ANDRITZ/AUSTRIA
2. YEDIGOZE
DAM AND HEPP 2 X 159 MW 318 MW TURKIYE SANKO HOLDING UNDER OPERATION ALSTOM-FRANCE
SIEMENS TURKIYE
3. CEVİZLİ HEPP 2 X 50 MW 100 MW TURKIYE SANKO HOLDING UNDER OPERATION ALSTOM-FRANCE
SIEMENS TURKIYE
4. KALKANDERE 2 X 22 MW 44 MW TURKIYE SANKO HOLDING UNDER OPERATION VOITH-AUSTRIA
SIEMENS TURKIYE
5. ALPASLAN-2
DAM and HEPP
2X 116.7 MW
+
2 X 31,3 MW 296.12 MW TURKIYE ENERJİSA IN OPERATION ALSTOM-FRANCE
6. ASLANCIK
DAM AND HEPP 2 x 60 MW 120 MW TURKIYE
ASLANCIK ELEKTRİK
DOĞAN/DOĞUŞ/
ANADOLU GRUP
IN OPERATION RAINPOWER NORWAY
7. ULUABAT
DAM AND HEPP 2 X 50 MW 100 MW TURKIYE AK ENERJİ IN OPERATION VOITH-AUSTRIA
SIEMENS TURKIYE
8. DARICA HEPP 2 X 49 MW 98 MW TURKIYE BİLGİN ELEKTRİK IN OPERATION VOITH-AUSTRIA
SIEMENS TURKIYE
9. BUCAKKIŞLA 2 X 26 MW 52 MW TURKIYE BİLGİN ELEKTRİK IN OPERATION ANDRITZ / FRANCE
10. PARAVANI
(GÜRCİSTAN) 2X47 MW 94 MW GEORGIA
GEORGIAN URBAN
ENERGY
ANADOLU GROUP
IN OPERATION ALSTOM/ SPAIN
11. AKOCAK HEPP 2 X 40 MW 80 MW TURKIYE AKENERJI UNDER OPERATION VOITH-AUSTRIA
SIEMENS TURKIYE
12. FEKE-1 HEPP 2 X16,5 MW 33 MW TURKIYE AKENERJI IN OPERATION ECIDI-ZEFU CHINA
13. FEKE-2 HEPP 2 X 35.5 MW 70 MW TURKIYE AKENERJI IN OPERATION ECIDI-ZEFU CHINA
14. BURÇ BENDI HEPP 3 X 9,3 MW 27,9 MW TURKIYE AKENERJI IN OPERATION ECIDI-ZEFU CHINA
15. HIMMETLI HEPP 2 X 16 MW 32 MW TURKIYE AKENERJI IN OPERATION ORIENT
CHINA
16. GÖKKAYA HEPP 2 X 17 MW 34 MW TURKIYE AKENERJI IN OPERATION ORIENT
CHINA
17. BULAM HEPP 2 X 3.5 MW 7 MW TURKIYE AKENERJI IN OPERATION KÖSSLER AUSTRIA
18.
ERIC-1 DAM
and
MAIN HEPP
+
ECO HPP
2 X74,25 MW
+
1 X 3.88 MW
152.38 MW TURKIYE PALMET
ENERJI
E&m CONTRACT WAS
SIGNED ZEFU / CHINA
19.
ERIC-2
MAIN HEPP
+
ECO HEPP
2 X 25.7 MW
+
1 X 1.87 MW
53.27 MW TURKIYE PALMET
ENERJI Bidding Negotiations
Page 3 of 6
No NAME OF HEPP UNIT
OUTPUTS
INSTALLED
OUTPUT
LOCATION
OF THE
PROJECT
OWNER PHASE ELECTROMECHANICAL
CONTRACTOR
20.
ERIC-3
MAIN HEPP
+
ECO HEPP
2 X 22.86 MW
+
1 X 1.86 MW 47,58 MW TURKIYE PALMET
ENERJI Bidding Negotiations
21.
ERIC-4
MAIN HEPP
+
ECO HEPP
2 X 29.37 MW
+
1 X 1.61 MW 60,35 MW TURKIYE PALMET
ENERJI
E&m CONTRACT WAS
SIGNED ZEFU / CHINA
22. SAMİ SOYDAM
DAM and HEPP 2X 66,1 MW 132.2 MW TURKIYE ZORLU
HOLDING Bidding Negotiations
23. TEPEKIŞLA
DAM and HEPP
2 x 34 MW
+
12 MW
80 MW TURKIYE SANKO
HOLDING UNDER INSTALLATION ALSTOM
SIEMENS TURKIYE
24. ARAKALI HEPP 2 x 4.7 MW 24 MW
GEORGIA
GEORGIAN URBAN
ENERGY
AĞAOĞLU HOLDING
BIDDING
NEGOTIATIONS25. ABULI HEPP 2 X12 MW 9,4 MW
26. BUCAKKIŞLA 2 x 20.3 MW 40,6 MW TURKIYE BİLGİN ELEKTRİK UNDER INSTALLATION ANDRITZ
FRANCE
27. ERENLER 2 x 23.4 MW 46,8 MMW TURKIYE ENERJİSA IN OPERATION DONGFANG
CHINA
28. KUMKÖY 2 x 5.98 MW 11,96 MW TURKIYE AES/USA & ENTEK IN OPERATION HARBİN (KEM)
CHINA
29. KIRIKDAĞ HES 2X 8.9 MW 17,8 MW TURKIYE ÖZENİR ENERJİ IN OPERATION ANDRITZ
FRANCE
30. BAYRA HEPP 2X 4,6 MW 9,2 MW
TURKIYE ARSAN GROUP
IN INSTALLATION GEBBERT / AUSTRIA
31. KAYAKÖPRÜ-1 HEPP 2X16,2 W 33,4 MW
IN OPERATION
CCOEC CHINA
AYKEN TURKIYE
ATES TURKIYE
32. KAYAKÖPRÜ-2 HEPP 2X 5,3 MW 10,6 MW
33. KIRAN HEPP 2X 4,9 MW 9,8 MW
34. KÖPRÜBAŞI HEPP 2X 7,7 MW 15,4 MW
35. HORYAN HEPP 2X 2,8 MW 5,6 MW
36. KIY HEPP 2 X 12 MW 24 MW ANDRITZ / FRANCE
ANDRITZ / TURKIYE
37. ÇAĞLAYAN HEPP 2X3,5 MW 7 MW TURKIYE IN OPERATION GHE / AUSTRIA
38. SIRAKONAKLAR HES 2X 6.2 MW 12,4 MW TURKIYE 2M ENERJI IN OPERATION
ANDRITZ FRANCE
ANDRITZ TURKIYE
39. ÇAMBAŞI 3x16.5 W 49,5 MW TURKIYE ENERJISA IN OPERATION VOITH-SIEMENS
40. KUŞAKLI 2 X 11 MW 22 MW TURKIYE ENERJISA IN OPERATION ANDRITZ FRANCE
41. KIZILAĞAC 2x 3.5 MW 7 MW TURKIYE SANKO HOLDİNG IN OPERATION
CWTW- CHINA
KESIR-TURKIYE
42. KOÇLU 2 x 19 MW 38 MW TURKIYE SANKO HOLDİNG IN OPERATION ALSTOM-SPAIN
SIEMENS-TURKIYE
43. EBRU 2X15.5 W 31 MW TURKIYE AES – USA & ENTEK IN OPERATION YUNG-HE
44. HAMZALI 2 X 8.5 MW 17 MW
TURKIYE ENSO
AVUSTRIA IN OPERATION VOITH-INDAR
45. REŞADIYE 1 2 X 8 MW 16 MW
46. REŞADIYE 2 2 X 13.5 W 27 MW
47. REŞADIYE 3 2 X 11.5 MW 23 MW
48. KEPEZKAYA 2 x 14.8 MW 29,6 MW
TURKIYE
AES - USA
&
ENTEK
IN OPERATION HARBIN (KEM)
49. DAMLAPINAR 2 x 8.6 MW 17,2 MW
50. KULP-IV 2 X 8,6 MW 17,2 MW
Page 4 of 6
May,2005 – March,2009 As Free Lancer and Solution Partner of HD - Hidrodizayn
Engineering, Consultancy and Civil Works Ltd.
Providing the consultancy and engineering services for the electromechanical equipment of
hydropower plants including the preparation of technical specifications, Bidding documents, technical
negotiations, evaluation of the Bid and Owner’s engineering services for basic design & drawings,
manufacturing, erection and commissioning works, for the following Owners and Hydro Power
Plants;
POWER PLANT OUTPUT (MW) CLIENT PROGRESS STAGE CONTRACTOR
YEDİGÖZE 2 X 158 SANKO HOLDING In operation ALSTOM-SIEMENS TR
CEVİZLİK 2 X 50 SANKO HOLDING In operation ALSTOM-SIEMENS TR
KALKANDERE 2 x 22 SANKO HOLDING In operation
KAYALAR 2 x 16.5 SANKO HOLDING Bidding
SELİN -1 2 x 3.5 SANKO HOLDING Bidding
ULUABAT 2 X 50 AK ENERJİ In operation VOITH-SIEMENS TR
AKOCAK 2 X 40 AK ENERJİ In operation VOITH-SIEMENS TR
FEKE - 1 2 x 16.5 AK ENERJİ Manufacturing ECIDI- ZEFU/CHINA
FEKE -2 2 X 35.5 AK ENERJİ In operation ECIDI- ZEFU/CHINA
BURÇ 3 X 9.3 AK ENERJİ In operation ECIDI- ZEFU/CHINA
BULAM 2 X 3.5 AK ENERJİ In operation KÖSSLER
HIMMETLI 2 X16 AK ENERJİ In erection
GÖKKAYA 2 x 17 AK ENERJİ In erection
GÜNDER 2 X 15.5 AKKANAT HOLDING In erection ANDRITZ (VATECH)
DAMLA - 2 AKKANAT HOLDING Bidding
KAYAKOPRU -1 2 X 16.2 ARSAN İNŞ. In erection CCOEC-KEM /CHINA
KAYAKOPRU -2 2 X 5.3 ARSAN İNŞ. In erection CCOEC-KEM /CHINA
KIRAN 2 X 4.9 ARSAN İNŞ. In erection CCOEC-KEM /CHINA
CEVİZ 2 X 3.9 ARSAN İNŞ. In erection CCOEC-KEM /CHINA
KÖPRÜBAŞI 2 X 7.7 ARSAN İNŞ. In erection CCOEC-KEM /CHINA
HORYAN 2 X 2.8 ARSAN İNŞ. In erection CCOEC-KEM /CHINA
2003, october-2005, may - As Free Lancer
2002 – 2003, October - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC
As Consultant of General Manager
1988 – 2002
Head of Project Department - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC
Responsible for the technical coordination and scheduling of the works, engineering, design, project,
manufacturing, erection and commissioning works of Power Plants undertaken and realized by
TEMSAN as given below,
Page 5 of 6
POWER PLANT OUTPUT (MW) OWNER
PROGRESS
STAGE
CONTRACTOR
BATMAN 3 X 62+5.7 DSİ In Operation TEMSAN-NOELL
DİCLE 2 X 55 DSİ In Operation TEMSAN-VOITH-RESITA
KRALKIZI 2 X 46 DSİ In Operation TEMSAN-ELIN-VOITH
KÜRTÜN 2 X 40 DSİ In Operation TEMSAN-ELIN-VOITH
SUATUĞURLU 1 X 25 DSİ In Operation TEMSAN-VOITH-RESITA
ÇAMLIGÖZE 2 X 16 DSİ In Operation TEMSAN-VOITH-RESITA
KUZGUN 3 X 6.8 +2.2 DSİ In Operation TEMSAN-NEYRPIC-JEUMONT
TERCAN 3 X 5 DSİ In Operation TEMSAN-ALSTOM-JEUMONT
BEYKÖY 3 X 6.2 DSİ In Operation TEMSAN-ELIN-VOITH
MERCAN 3 X 6 DSİ In Operation TEMSAN-ALSTOM-JEUMONT
KEPEZ II 3 X 3.5 DSİ In Operation TEMSAN-NEYRPIC-JEUMONT
IVRIZ 2 X 0.5 DSİ In Operation TEMSAN-HITZINGER
HOŞAP 2 X 2 DSİ In Operation TEMSAN-NEYRPIC-JEUMONT
KOÇKÖPRÜ 2 X 2.2 DSİ In Operation TEMSAN-JEUMONT
1987 - 1988 - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC
As Project Manager
1983 - 1987 - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC
As Design Manager
- Hydraulic design works for francis turbines
- Preparation of the general layout and the technical specification
for electromechanical equipment of HEPP.
1979 - 1983 - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC
As Chief Engineer
- Preparation of the feasibility report of the Steam Boilers Factory
(for thermal power plants) and the documents for license
agreement and general layout of the machinery and equipment.
1978 - 1979 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ)
As Chief engineer
For site erection of Soma B Thermal Power Plant 2 x 165 MW
1977 - 1978 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ)
Technical training on manufacturing, erection and maintenance of the equipment of Thermal Power
Plant in Finland and Czechoslovakia ( current name is Republic of Slovakia)
Page 6 of 6
1976 -1979 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ)
As Responsible engineer
Operational and maintenance works for Soma A Thermal Power Plant.
1974 - 1976 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ)
As Maintenance engineer
Soma A Thermal Power Plant.
THE FIELD OF EXPERTISE FOR HEPP:
For the hydro-power plants;
− Plant optimization, defining of data and characteristics,
− Preparing of the technical specification for e-m equipment,
− Bidding negotiations,
− Preparing of contract document
− Engineering, design and project works
− Manufacturing of the equipment
− FAT factory acceptance tests
− Erection of equipment
− Field tests and commissioning works
− Field ministry acceptance and performance tests
− Operation, maintenance and repair works for the plants
EDUCATION:
UNIVERSITY OF GAZI
1973 A.D.M.M.A Mechanical Engineering
ADDITIONAL INFORMATION:
- License for motor vehicle.
- Free for Traveling
- Free for office,workshop and site works
HOBBIES AND INTERESTS:
- Music : Classics and Contemporary
- Reading : Philosophy, Science Fiction
- Fresh Water Aquarium : Discus care

More Related Content

Similar to CV_UBCOSKUNER AUGUST-2015

Visite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windVisite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windCCILVN
 
IKL-Reference List_ Latest Des 11 for PDF
IKL-Reference List_ Latest Des 11 for PDFIKL-Reference List_ Latest Des 11 for PDF
IKL-Reference List_ Latest Des 11 for PDFStephane Sene
 
MIDTERM-EXAM-ANSWER-EE443.pptx
MIDTERM-EXAM-ANSWER-EE443.pptxMIDTERM-EXAM-ANSWER-EE443.pptx
MIDTERM-EXAM-ANSWER-EE443.pptxgreensun
 
Equipment Arrival Status.pptx
Equipment Arrival Status.pptxEquipment Arrival Status.pptx
Equipment Arrival Status.pptxMehmanNasibov1
 
Green Factory Layout.pptx
Green Factory Layout.pptxGreen Factory Layout.pptx
Green Factory Layout.pptxSWAPNILKRISHNA3
 
289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOAD
289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOAD289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOAD
289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOADManual Labs
 
jcb parts from mh machinery ltd.
jcb parts from mh machinery ltd.jcb parts from mh machinery ltd.
jcb parts from mh machinery ltd.MH Machinery Ltd.
 

Similar to CV_UBCOSKUNER AUGUST-2015 (20)

Damian new CV
Damian new CVDamian new CV
Damian new CV
 
Visite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windVisite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore wind
 
IKL-Reference List_ Latest Des 11 for PDF
IKL-Reference List_ Latest Des 11 for PDFIKL-Reference List_ Latest Des 11 for PDF
IKL-Reference List_ Latest Des 11 for PDF
 
MIDTERM-EXAM-ANSWER-EE443.pptx
MIDTERM-EXAM-ANSWER-EE443.pptxMIDTERM-EXAM-ANSWER-EE443.pptx
MIDTERM-EXAM-ANSWER-EE443.pptx
 
GROUP 8 (1).pdf
GROUP 8 (1).pdfGROUP 8 (1).pdf
GROUP 8 (1).pdf
 
jcb spare parts
jcb spare partsjcb spare parts
jcb spare parts
 
Stop ripping money - Select the right generator
Stop ripping money - Select the right generatorStop ripping money - Select the right generator
Stop ripping money - Select the right generator
 
CV
CVCV
CV
 
Equipment Arrival Status.pptx
Equipment Arrival Status.pptxEquipment Arrival Status.pptx
Equipment Arrival Status.pptx
 
Wind power plant
Wind power plantWind power plant
Wind power plant
 
combinepdf (18).pdf
combinepdf (18).pdfcombinepdf (18).pdf
combinepdf (18).pdf
 
Green Factory Layout.pptx
Green Factory Layout.pptxGreen Factory Layout.pptx
Green Factory Layout.pptx
 
Presentation1
Presentation1Presentation1
Presentation1
 
289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOAD
289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOAD289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOAD
289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOAD
 
jcb replacements
jcb replacementsjcb replacements
jcb replacements
 
jcb replacement
jcb replacementjcb replacement
jcb replacement
 
jcb spare parts
jcb spare partsjcb spare parts
jcb spare parts
 
jcb backhoes parts
jcb backhoes partsjcb backhoes parts
jcb backhoes parts
 
jcb parts from mh machinery ltd.
jcb parts from mh machinery ltd.jcb parts from mh machinery ltd.
jcb parts from mh machinery ltd.
 
JCB SPARE PARTS
JCB SPARE PARTSJCB SPARE PARTS
JCB SPARE PARTS
 

CV_UBCOSKUNER AUGUST-2015

  • 1. Page 1 of 6 CURRICULUM VITAE AUGUST, 2015 Personal Data: Name : Uğur Bekir Family Name : COŞKUNER Profession : Mechanical Engineer Born : March 27, 1951 Dependants : Son (age 30, MSc Chemical Engineer), Daughter (age 21, in university) Foreign Language : English (Fluent written and spoken) Nationality : Turkish Home-Office : Mutlukent Mah. 1972. sk Melis C Blk No:5/25 Çankaya/ANKARA/TURKIYE Phone : + 90 (312) 236 46 65 Mobile Phone : + 90 532 525 87 97 E-mail : ubc@ubcmuhendislik.com ubcoskuner@superonline.com Web : http://www.ubc-engineering.com Work experience and references: March, 2009- Currently: UBC Engineering, Consulting, Project Trade Co. Ltd. As Founder and Company Manager The Company UBC was established in march, 2009 to provide out source consulting and engineering services as Consultant, Owner's Engineer and Lander's engineer for the supply, installation, test and commissioning of the electromechanical equipment of hydro-power plants. The scope of services to be supplied by UBC for the electro-mechanical equipment of the Hydro Power Plants are as follows ; − Plant optimization, defining of the equipment data and characteristics, − Preparing of the technical specification for E-M equipment, − Bidding negotiations, − Preparing of contract document, − Engineering, design and project works, − Manufacturing of the equipment, − FAT factory acceptance tests, − Erection and installation of E-M equipment, − Field tests and commissioning works,
  • 2. Page 2 of 6 − Field ministry acceptance and performance tests, − Due diligence reports for all investment and operational stages of the hydro-power plants, − Maintenance and repair works for the plants in operation, The reference hydro-power plants are given in below tables ; No NAME OF HEPP UNIT OUTPUTS INSTALLED OUTPUT LOCATION OF THE PROJECT OWNER PHASE ELECTROMECHANICAL CONTRACTOR 1. BOYABAT DAM AND HEPP 3 X 170 MW 510 MW TURKIYE BOYABAT ENERJİ DOĞAN /DOĞUŞ/UNIT IN OPERATION ANDRITZ/AUSTRIA 2. YEDIGOZE DAM AND HEPP 2 X 159 MW 318 MW TURKIYE SANKO HOLDING UNDER OPERATION ALSTOM-FRANCE SIEMENS TURKIYE 3. CEVİZLİ HEPP 2 X 50 MW 100 MW TURKIYE SANKO HOLDING UNDER OPERATION ALSTOM-FRANCE SIEMENS TURKIYE 4. KALKANDERE 2 X 22 MW 44 MW TURKIYE SANKO HOLDING UNDER OPERATION VOITH-AUSTRIA SIEMENS TURKIYE 5. ALPASLAN-2 DAM and HEPP 2X 116.7 MW + 2 X 31,3 MW 296.12 MW TURKIYE ENERJİSA IN OPERATION ALSTOM-FRANCE 6. ASLANCIK DAM AND HEPP 2 x 60 MW 120 MW TURKIYE ASLANCIK ELEKTRİK DOĞAN/DOĞUŞ/ ANADOLU GRUP IN OPERATION RAINPOWER NORWAY 7. ULUABAT DAM AND HEPP 2 X 50 MW 100 MW TURKIYE AK ENERJİ IN OPERATION VOITH-AUSTRIA SIEMENS TURKIYE 8. DARICA HEPP 2 X 49 MW 98 MW TURKIYE BİLGİN ELEKTRİK IN OPERATION VOITH-AUSTRIA SIEMENS TURKIYE 9. BUCAKKIŞLA 2 X 26 MW 52 MW TURKIYE BİLGİN ELEKTRİK IN OPERATION ANDRITZ / FRANCE 10. PARAVANI (GÜRCİSTAN) 2X47 MW 94 MW GEORGIA GEORGIAN URBAN ENERGY ANADOLU GROUP IN OPERATION ALSTOM/ SPAIN 11. AKOCAK HEPP 2 X 40 MW 80 MW TURKIYE AKENERJI UNDER OPERATION VOITH-AUSTRIA SIEMENS TURKIYE 12. FEKE-1 HEPP 2 X16,5 MW 33 MW TURKIYE AKENERJI IN OPERATION ECIDI-ZEFU CHINA 13. FEKE-2 HEPP 2 X 35.5 MW 70 MW TURKIYE AKENERJI IN OPERATION ECIDI-ZEFU CHINA 14. BURÇ BENDI HEPP 3 X 9,3 MW 27,9 MW TURKIYE AKENERJI IN OPERATION ECIDI-ZEFU CHINA 15. HIMMETLI HEPP 2 X 16 MW 32 MW TURKIYE AKENERJI IN OPERATION ORIENT CHINA 16. GÖKKAYA HEPP 2 X 17 MW 34 MW TURKIYE AKENERJI IN OPERATION ORIENT CHINA 17. BULAM HEPP 2 X 3.5 MW 7 MW TURKIYE AKENERJI IN OPERATION KÖSSLER AUSTRIA 18. ERIC-1 DAM and MAIN HEPP + ECO HPP 2 X74,25 MW + 1 X 3.88 MW 152.38 MW TURKIYE PALMET ENERJI E&m CONTRACT WAS SIGNED ZEFU / CHINA 19. ERIC-2 MAIN HEPP + ECO HEPP 2 X 25.7 MW + 1 X 1.87 MW 53.27 MW TURKIYE PALMET ENERJI Bidding Negotiations
  • 3. Page 3 of 6 No NAME OF HEPP UNIT OUTPUTS INSTALLED OUTPUT LOCATION OF THE PROJECT OWNER PHASE ELECTROMECHANICAL CONTRACTOR 20. ERIC-3 MAIN HEPP + ECO HEPP 2 X 22.86 MW + 1 X 1.86 MW 47,58 MW TURKIYE PALMET ENERJI Bidding Negotiations 21. ERIC-4 MAIN HEPP + ECO HEPP 2 X 29.37 MW + 1 X 1.61 MW 60,35 MW TURKIYE PALMET ENERJI E&m CONTRACT WAS SIGNED ZEFU / CHINA 22. SAMİ SOYDAM DAM and HEPP 2X 66,1 MW 132.2 MW TURKIYE ZORLU HOLDING Bidding Negotiations 23. TEPEKIŞLA DAM and HEPP 2 x 34 MW + 12 MW 80 MW TURKIYE SANKO HOLDING UNDER INSTALLATION ALSTOM SIEMENS TURKIYE 24. ARAKALI HEPP 2 x 4.7 MW 24 MW GEORGIA GEORGIAN URBAN ENERGY AĞAOĞLU HOLDING BIDDING NEGOTIATIONS25. ABULI HEPP 2 X12 MW 9,4 MW 26. BUCAKKIŞLA 2 x 20.3 MW 40,6 MW TURKIYE BİLGİN ELEKTRİK UNDER INSTALLATION ANDRITZ FRANCE 27. ERENLER 2 x 23.4 MW 46,8 MMW TURKIYE ENERJİSA IN OPERATION DONGFANG CHINA 28. KUMKÖY 2 x 5.98 MW 11,96 MW TURKIYE AES/USA & ENTEK IN OPERATION HARBİN (KEM) CHINA 29. KIRIKDAĞ HES 2X 8.9 MW 17,8 MW TURKIYE ÖZENİR ENERJİ IN OPERATION ANDRITZ FRANCE 30. BAYRA HEPP 2X 4,6 MW 9,2 MW TURKIYE ARSAN GROUP IN INSTALLATION GEBBERT / AUSTRIA 31. KAYAKÖPRÜ-1 HEPP 2X16,2 W 33,4 MW IN OPERATION CCOEC CHINA AYKEN TURKIYE ATES TURKIYE 32. KAYAKÖPRÜ-2 HEPP 2X 5,3 MW 10,6 MW 33. KIRAN HEPP 2X 4,9 MW 9,8 MW 34. KÖPRÜBAŞI HEPP 2X 7,7 MW 15,4 MW 35. HORYAN HEPP 2X 2,8 MW 5,6 MW 36. KIY HEPP 2 X 12 MW 24 MW ANDRITZ / FRANCE ANDRITZ / TURKIYE 37. ÇAĞLAYAN HEPP 2X3,5 MW 7 MW TURKIYE IN OPERATION GHE / AUSTRIA 38. SIRAKONAKLAR HES 2X 6.2 MW 12,4 MW TURKIYE 2M ENERJI IN OPERATION ANDRITZ FRANCE ANDRITZ TURKIYE 39. ÇAMBAŞI 3x16.5 W 49,5 MW TURKIYE ENERJISA IN OPERATION VOITH-SIEMENS 40. KUŞAKLI 2 X 11 MW 22 MW TURKIYE ENERJISA IN OPERATION ANDRITZ FRANCE 41. KIZILAĞAC 2x 3.5 MW 7 MW TURKIYE SANKO HOLDİNG IN OPERATION CWTW- CHINA KESIR-TURKIYE 42. KOÇLU 2 x 19 MW 38 MW TURKIYE SANKO HOLDİNG IN OPERATION ALSTOM-SPAIN SIEMENS-TURKIYE 43. EBRU 2X15.5 W 31 MW TURKIYE AES – USA & ENTEK IN OPERATION YUNG-HE 44. HAMZALI 2 X 8.5 MW 17 MW TURKIYE ENSO AVUSTRIA IN OPERATION VOITH-INDAR 45. REŞADIYE 1 2 X 8 MW 16 MW 46. REŞADIYE 2 2 X 13.5 W 27 MW 47. REŞADIYE 3 2 X 11.5 MW 23 MW 48. KEPEZKAYA 2 x 14.8 MW 29,6 MW TURKIYE AES - USA & ENTEK IN OPERATION HARBIN (KEM) 49. DAMLAPINAR 2 x 8.6 MW 17,2 MW 50. KULP-IV 2 X 8,6 MW 17,2 MW
  • 4. Page 4 of 6 May,2005 – March,2009 As Free Lancer and Solution Partner of HD - Hidrodizayn Engineering, Consultancy and Civil Works Ltd. Providing the consultancy and engineering services for the electromechanical equipment of hydropower plants including the preparation of technical specifications, Bidding documents, technical negotiations, evaluation of the Bid and Owner’s engineering services for basic design & drawings, manufacturing, erection and commissioning works, for the following Owners and Hydro Power Plants; POWER PLANT OUTPUT (MW) CLIENT PROGRESS STAGE CONTRACTOR YEDİGÖZE 2 X 158 SANKO HOLDING In operation ALSTOM-SIEMENS TR CEVİZLİK 2 X 50 SANKO HOLDING In operation ALSTOM-SIEMENS TR KALKANDERE 2 x 22 SANKO HOLDING In operation KAYALAR 2 x 16.5 SANKO HOLDING Bidding SELİN -1 2 x 3.5 SANKO HOLDING Bidding ULUABAT 2 X 50 AK ENERJİ In operation VOITH-SIEMENS TR AKOCAK 2 X 40 AK ENERJİ In operation VOITH-SIEMENS TR FEKE - 1 2 x 16.5 AK ENERJİ Manufacturing ECIDI- ZEFU/CHINA FEKE -2 2 X 35.5 AK ENERJİ In operation ECIDI- ZEFU/CHINA BURÇ 3 X 9.3 AK ENERJİ In operation ECIDI- ZEFU/CHINA BULAM 2 X 3.5 AK ENERJİ In operation KÖSSLER HIMMETLI 2 X16 AK ENERJİ In erection GÖKKAYA 2 x 17 AK ENERJİ In erection GÜNDER 2 X 15.5 AKKANAT HOLDING In erection ANDRITZ (VATECH) DAMLA - 2 AKKANAT HOLDING Bidding KAYAKOPRU -1 2 X 16.2 ARSAN İNŞ. In erection CCOEC-KEM /CHINA KAYAKOPRU -2 2 X 5.3 ARSAN İNŞ. In erection CCOEC-KEM /CHINA KIRAN 2 X 4.9 ARSAN İNŞ. In erection CCOEC-KEM /CHINA CEVİZ 2 X 3.9 ARSAN İNŞ. In erection CCOEC-KEM /CHINA KÖPRÜBAŞI 2 X 7.7 ARSAN İNŞ. In erection CCOEC-KEM /CHINA HORYAN 2 X 2.8 ARSAN İNŞ. In erection CCOEC-KEM /CHINA 2003, october-2005, may - As Free Lancer 2002 – 2003, October - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC As Consultant of General Manager 1988 – 2002 Head of Project Department - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC Responsible for the technical coordination and scheduling of the works, engineering, design, project, manufacturing, erection and commissioning works of Power Plants undertaken and realized by TEMSAN as given below,
  • 5. Page 5 of 6 POWER PLANT OUTPUT (MW) OWNER PROGRESS STAGE CONTRACTOR BATMAN 3 X 62+5.7 DSİ In Operation TEMSAN-NOELL DİCLE 2 X 55 DSİ In Operation TEMSAN-VOITH-RESITA KRALKIZI 2 X 46 DSİ In Operation TEMSAN-ELIN-VOITH KÜRTÜN 2 X 40 DSİ In Operation TEMSAN-ELIN-VOITH SUATUĞURLU 1 X 25 DSİ In Operation TEMSAN-VOITH-RESITA ÇAMLIGÖZE 2 X 16 DSİ In Operation TEMSAN-VOITH-RESITA KUZGUN 3 X 6.8 +2.2 DSİ In Operation TEMSAN-NEYRPIC-JEUMONT TERCAN 3 X 5 DSİ In Operation TEMSAN-ALSTOM-JEUMONT BEYKÖY 3 X 6.2 DSİ In Operation TEMSAN-ELIN-VOITH MERCAN 3 X 6 DSİ In Operation TEMSAN-ALSTOM-JEUMONT KEPEZ II 3 X 3.5 DSİ In Operation TEMSAN-NEYRPIC-JEUMONT IVRIZ 2 X 0.5 DSİ In Operation TEMSAN-HITZINGER HOŞAP 2 X 2 DSİ In Operation TEMSAN-NEYRPIC-JEUMONT KOÇKÖPRÜ 2 X 2.2 DSİ In Operation TEMSAN-JEUMONT 1987 - 1988 - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC As Project Manager 1983 - 1987 - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC As Design Manager - Hydraulic design works for francis turbines - Preparation of the general layout and the technical specification for electromechanical equipment of HEPP. 1979 - 1983 - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC As Chief Engineer - Preparation of the feasibility report of the Steam Boilers Factory (for thermal power plants) and the documents for license agreement and general layout of the machinery and equipment. 1978 - 1979 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ) As Chief engineer For site erection of Soma B Thermal Power Plant 2 x 165 MW 1977 - 1978 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ) Technical training on manufacturing, erection and maintenance of the equipment of Thermal Power Plant in Finland and Czechoslovakia ( current name is Republic of Slovakia)
  • 6. Page 6 of 6 1976 -1979 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ) As Responsible engineer Operational and maintenance works for Soma A Thermal Power Plant. 1974 - 1976 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ) As Maintenance engineer Soma A Thermal Power Plant. THE FIELD OF EXPERTISE FOR HEPP: For the hydro-power plants; − Plant optimization, defining of data and characteristics, − Preparing of the technical specification for e-m equipment, − Bidding negotiations, − Preparing of contract document − Engineering, design and project works − Manufacturing of the equipment − FAT factory acceptance tests − Erection of equipment − Field tests and commissioning works − Field ministry acceptance and performance tests − Operation, maintenance and repair works for the plants EDUCATION: UNIVERSITY OF GAZI 1973 A.D.M.M.A Mechanical Engineering ADDITIONAL INFORMATION: - License for motor vehicle. - Free for Traveling - Free for office,workshop and site works HOBBIES AND INTERESTS: - Music : Classics and Contemporary - Reading : Philosophy, Science Fiction - Fresh Water Aquarium : Discus care