Uğur Bekir Coşkuner has over 35 years of experience in mechanical engineering and hydroelectric power projects. He currently works as the founder and manager of UBC Engineering, Consulting, Project Trade Co. Ltd., which provides engineering services for hydroelectric power plants. Prior to founding UBC, he held several engineering roles on hydroelectric power projects in Turkey.
Sukhvinder Singh Makode is a Superintendent Head - Electrical with over 23 years of experience in electrical maintenance and projects in pulp and paper mills. He is currently working at AV Terrace Bay in Canada, maintaining a 25MW power plant and 1200 TPD pulp mill. He is seeking a challenging and result-oriented position utilizing his technical and leadership skills.
This curriculum vitae outlines Fikret AKSU's professional experience and education history. He has over 25 years of experience in mechanical maintenance and operations roles at various power plants in Turkey and Georgia. He has extensive training in gas turbines, steam turbines, water treatment systems, valves, pumps and other power plant equipment. His most recent role since 2015 has been as a Mechanical Operations Advisor at a 230 MW natural gas combined cycle power plant in Georgia.
This document is a 4-page curriculum vitae for Medhat Hamed Abdel Gawwad Haggag that outlines his 31 years of experience managing electrical substation and power plant construction projects around the Middle East and North Africa. It details his roles as Projects Manager and Site Manager on over 50 projects in countries such as Qatar, Saudi Arabia, Libya, Egypt, Gaza, and Jordan. The CV provides information on Medhat's education and previous employers.
Ekomak has established at 1992 as an Oil Injected Screw Compressor manufacturer and today, became the biggest company in this field in Turkey and one of the biggest players in the World.
Ekomak’s head office and the first factory are located in Istanbul and owns second factory in Edirne/Turkey with 4 branches in Asia, Europe and Far East. Ekomak is committed to produce and serve high quality products in all around the world with a wide network of more than 100 distributors in 58 different countries.
Even though the global crises at 2009, we built up our second factory in Edirne, where near to Bulgarian and Greece boarder. Our motto is zero error and 100% perfection, our goal is “success through quality”. All of the production process is being followed by cameras in our new plant at Edirne.
By this way, all of our distributors are able to monitor the production processes, and their own compressor in production line as well. This system allows us to serve our distributors and customers with reliable standards.
This 10.000 m2 plant, which is the first stage of our Edirne facility, has been designed to produce 8.000 screw compressors each year. The smart compressors that are being produced in this plant have been designed to have high technological capacity and efficiency, be environmentally friendly and meet the international standards. All our staff has completed their training on Quality control, ISO 9000, ERP, CE, Machinery Directives and security regulations.
As a result of our sustainable growth strategy in all around the world, Ekomak has known as the fastest growing compressor manufacturer in Germany and Russia in the last 2 years.
These developments in such a short time would not have been possible without our highly qualified and reliable partners all over the World with top quality products which have been designed and manufactured in accordance with European standards. Our high efficient compressors provide exceptional performance and competitive price.
EKOMAK is the biggest Screw Compressor exporter in Turkey and exports 60% of the production to European Countries and all over the World.
If you are looking for a competitive, strong and reliable product, which has been designed as a “heavy duty compressor for 24 hours service then EKOMAK is the right choice.
If you are looking for the company who will consider your problems as his own problem, then Ekomak is the right choice.
If you are intend to be the part of this big family as a valuable partner like the others are, Ekomak is the right choice.
If you are looking a long term and profitable partnership, we invite you to consider the details of our corporation.
* Enclosed document includes our references if you can not open it please contact with us also for pdf version.
Yours sincereley,
Beler Bekdogan
Area Sales Manager
Tel : 0090 216 540 11 33/133
Fax : 0090 216 415 41 39
Email : bbekdogan@ekomak.com.tr
Skype : beler.bekdogan
This document provides the design of a security room structure. It includes calculations for loads on the structure from dead loads, live loads, and earthquake loads. It also includes modeling of the structure in STAAD Pro software, showing the joints, members, material properties, and load cases analyzed. Reinforced concrete design is performed for structural elements including the roof slab, foundation, and main structural members.
Savonious Wind Turbine with new blade (scoop) designSaiApuroop
This was the new blade design where these blades are used for opening and closing of blades acc to the heavy wind speeds, where these overcomes the damage of blades at heavier wind speeds.
Sukhvinder Singh Makode is a Superintendent Head - Electrical with over 23 years of experience in electrical maintenance and projects in pulp and paper mills. He is currently working at AV Terrace Bay in Canada, maintaining a 25MW power plant and 1200 TPD pulp mill. He is seeking a challenging and result-oriented position utilizing his technical and leadership skills.
This curriculum vitae outlines Fikret AKSU's professional experience and education history. He has over 25 years of experience in mechanical maintenance and operations roles at various power plants in Turkey and Georgia. He has extensive training in gas turbines, steam turbines, water treatment systems, valves, pumps and other power plant equipment. His most recent role since 2015 has been as a Mechanical Operations Advisor at a 230 MW natural gas combined cycle power plant in Georgia.
This document is a 4-page curriculum vitae for Medhat Hamed Abdel Gawwad Haggag that outlines his 31 years of experience managing electrical substation and power plant construction projects around the Middle East and North Africa. It details his roles as Projects Manager and Site Manager on over 50 projects in countries such as Qatar, Saudi Arabia, Libya, Egypt, Gaza, and Jordan. The CV provides information on Medhat's education and previous employers.
Ekomak has established at 1992 as an Oil Injected Screw Compressor manufacturer and today, became the biggest company in this field in Turkey and one of the biggest players in the World.
Ekomak’s head office and the first factory are located in Istanbul and owns second factory in Edirne/Turkey with 4 branches in Asia, Europe and Far East. Ekomak is committed to produce and serve high quality products in all around the world with a wide network of more than 100 distributors in 58 different countries.
Even though the global crises at 2009, we built up our second factory in Edirne, where near to Bulgarian and Greece boarder. Our motto is zero error and 100% perfection, our goal is “success through quality”. All of the production process is being followed by cameras in our new plant at Edirne.
By this way, all of our distributors are able to monitor the production processes, and their own compressor in production line as well. This system allows us to serve our distributors and customers with reliable standards.
This 10.000 m2 plant, which is the first stage of our Edirne facility, has been designed to produce 8.000 screw compressors each year. The smart compressors that are being produced in this plant have been designed to have high technological capacity and efficiency, be environmentally friendly and meet the international standards. All our staff has completed their training on Quality control, ISO 9000, ERP, CE, Machinery Directives and security regulations.
As a result of our sustainable growth strategy in all around the world, Ekomak has known as the fastest growing compressor manufacturer in Germany and Russia in the last 2 years.
These developments in such a short time would not have been possible without our highly qualified and reliable partners all over the World with top quality products which have been designed and manufactured in accordance with European standards. Our high efficient compressors provide exceptional performance and competitive price.
EKOMAK is the biggest Screw Compressor exporter in Turkey and exports 60% of the production to European Countries and all over the World.
If you are looking for a competitive, strong and reliable product, which has been designed as a “heavy duty compressor for 24 hours service then EKOMAK is the right choice.
If you are looking for the company who will consider your problems as his own problem, then Ekomak is the right choice.
If you are intend to be the part of this big family as a valuable partner like the others are, Ekomak is the right choice.
If you are looking a long term and profitable partnership, we invite you to consider the details of our corporation.
* Enclosed document includes our references if you can not open it please contact with us also for pdf version.
Yours sincereley,
Beler Bekdogan
Area Sales Manager
Tel : 0090 216 540 11 33/133
Fax : 0090 216 415 41 39
Email : bbekdogan@ekomak.com.tr
Skype : beler.bekdogan
This document provides the design of a security room structure. It includes calculations for loads on the structure from dead loads, live loads, and earthquake loads. It also includes modeling of the structure in STAAD Pro software, showing the joints, members, material properties, and load cases analyzed. Reinforced concrete design is performed for structural elements including the roof slab, foundation, and main structural members.
Savonious Wind Turbine with new blade (scoop) designSaiApuroop
This was the new blade design where these blades are used for opening and closing of blades acc to the heavy wind speeds, where these overcomes the damage of blades at heavier wind speeds.
Damián Udo Nwaeze is a senior service supervisor and project engineer with over 14 years of experience in pipeline pre-commissioning projects for several oil and gas companies in Nigeria. He holds a Bachelor of Technology degree in Maritime Management Technology. His experience includes projects involving flooding, flushing, chemical cleaning, gauging, intelligent pigging, hydrotesting, dewatering, drying, nitrogen purging, and pipeline commissioning. He is skilled in project execution and relationship management.
Visite du parc éolien Thorntonbank - Introduction to offshore windCCILVN
This document discusses offshore wind and ENGIE's experience in the industry. It provides an overview of offshore wind market trends, technology such as turbine types and foundations, and ENGIE's offshore wind projects and capabilities. ENGIE has 18 years of experience in offshore wind development and provides engineering and construction support. It is developing several offshore wind projects in Europe and has experience operating offshore substations.
IKL-Reference List_ Latest Des 11 for PDFStephane Sene
The document is a reference list containing details of offshore plant projects completed by PT. Istana Karang Laut between 1982-2013. It lists 27 offshore plant projects in Indonesia, Myanmar, Cambodia, Georgia, Bangladesh, and Turkmenistan. The projects involved engineering, procurement, construction, and commissioning of offshore oil and gas facilities such as pipelines, platforms, gathering testing satellites, mooring buoys, and modification works.
This document provides the calculations and analysis for the electrical loads and system design for a 3-floor commercial building and a 2-story residential house.
For the commercial building, the document calculates the lighting, appliance, and HVAC loads for each floor. It then sizes the feeder conductors and protection for each floor based on the calculated loads and largest motor. Finally, it calculates the overall main feeder size and protection based on the total connected load for the building.
For the residential house, the document provides the load calculations for each circuit based on appliances and fixtures. It includes a schedule of circuits and loads as well as a riser diagram. It then sizes the main feeder conductor and protection based on
The SunEdison Outdoor Microstation is a standalone power generation unit that provides renewable and reliable electricity for off-grid applications. It features durable, weatherproof components to ensure continuous operation in any conditions. A single 3,500 unit can power up to 25 households for 5 hours each night during 3 days of autonomy. It has multiple off-grid uses including powering households, clinics, schools, irrigation pumps, and more.
This document is a report from a group of engineering students at Valley University on their project about PV solar energy. It includes:
1. An introduction to solar energy and how it can be harnessed using technologies like solar panels and solar heating.
2. Sections on different applications of solar energy including electricity generation, water heating, heating, lighting, transportation, and portable power.
3. Descriptions of passive solar energy which uses natural processes and active solar which uses mechanical devices to convert sunlight.
4. Details of the components needed for their PV solar energy station including solar panels, inverters, batteries, and wiring calculations to determine the necessary equipment.
5. Information on the proposed
We produce many parts of JCB 3CX , 4CX and export high quality JCB 3CX AND 4CX
BACKHOE LOADERS alternative spare parts and buckets .
We export our products over 40 countries.
We produce all kinds of JCB rear and front fenders,mudguards, for all
models in any colours and many JCB rubber and plastic parts like wear pads, engine side panels...
We supply all kinds of JCB filters, cables,seal kits,switches,oil coolers and JCB bushes...
We produce and supply more than 800 JCB 3CX AND 4CX BACKHOE
LOADERS alternative parts
This document provides a 3-month forecast for equipment erection from August to October 2016 for the SOCAR Polymer PP-U&O Project in Sumgayit, Azerbaijan. It includes:
- A summary of the total number of equipment by area and month, with the largest quantities in September (24 pieces) and October (24 pieces).
- Details of 5 pieces of equipment arriving in August, including constructability notes for each.
- An equipment arrival list for September with 1 piece of equipment and notes on its installation.
- An equipment arrival list for October with 24 pieces of equipment and notes on the installation for each, noting requirements for civil works and structures to be completed before several
The document provides details about the author's 1 month industrial training at DSCL Kota from June 1-30, 2013. It summarizes the power generation, distribution and protection systems at DSCL. The author expresses gratitude to various managers for guiding them. DSCL has a 125 MW captive thermal power plant to meet 93% of its electricity needs. The plant includes various equipment like boilers, turbines, alternators and protection systems. The author learned about the complex power systems during their training.
The document provides a single line diagram for Tusuka Processing Ltd. Unit-02. It includes 16 diagrams covering the electrical distribution from the main incoming supply down to individual equipment. Key information shown on the diagrams includes the main incoming feeder from another Tusuka facility, distribution switchgear and busbars, sub-distribution boards, and individual circuit breakers feeding equipment loads. Engineering staff who designed and approved the diagram are also listed.
Wood energy mainly consumed domestically, accounting for 30% of India's total energy consumption in 1994. Hydroelectric power projects larger than 20% of world power generation. Thermal power plants contribute 65% of India's energy but have a 10-14% deficit. Solar energy can be used to generate electricity and for applications like solar heaters. There are 297 renewable energy product shops across 28 states and 20 energy parks in 18 districts to increase awareness of new technologies. Geothermal power uses underground steam to generate electricity with economic, environmental, and space benefits. Wind and nuclear power capacity is increasing to meet rising demand and reduce the energy deficit. Natural gas is also a source of energy.
289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOADManual Labs
This 289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOAD offers extensive repair and troubleshooting information needed to keep your Caterpillar loader running like new. It includes detailed instructions and illustrations to explore service and maintenance procedures. Keep your Caterpillar Compact Track Loader running efficiently and reliably with this comprehensive guide.
We produce many parts of JCB 3CX , 4CX and export high quality JCB 3CX AND 4CX
BACKHOE LOADERS alternative spare parts and buckets .
We export our products over 40 countries.
We produce all kinds of JCB rear and front fenders,mudguards, for all
models in any colours and many JCB rubber and plastic parts like wear pads, engine side panels...
We supply all kinds of JCB filters, cables,seal kits,switches,oil coolers and JCB bushes...
We produce and supply more than 800 JCB 3CX AND 4CX BACKHOE
LOADERS alternative parts.
JCB WHEEL RIMS
JCB FENDERS , MUDGUARDS,
JCB WEAR PADS,
JCB O RINGS,
JCB THROTTLE CABLES,
JCB FILTERS,
JCB OIL COOLERS,
JCB GASKETS,
JCB GEARS,
JCB LAMPS,
JCB ENGINE PARTS,
JCB SEALS ,
JCB SEAL KITS,
JCB BUCKETS ,
JCB STRUTS,
JCB SILENCERS ,
JCB BUSHES,
JCB PINS,
JCB FUEL LIFT PUMPS ,
PERKINS ENGINE PARTS,
JCB SILENCER PIPES,
JCB PINS,
We produce many parts of JCB 3CX , 4CX and export high quality JCB 3CX AND 4CX
BACKHOE LOADERS alternative spare parts and buckets .
We export our products over 40 countries.
We produce all kinds of JCB rear and front fenders,mudguards, for all
models in any colours and many JCB rubber and plastic parts like wear pads, engine side panels...
We supply all kinds of JCB filters, cables,seal kits,switches,oil coolers and JCB bushes...
We produce and supply more than 800 JCB 3CX AND 4CX BACKHOE
LOADERS alternative parts
We produce many parts of JCB 3CX , 4CX and export high quality JCB 3CX AND 4CX
BACKHOE LOADERS alternative spare parts and buckets .
We export our products over 40 countries.
We produce all kinds of JCB rear and front fenders,mudguards, for all
models in any colours and many JCB rubber and plastic parts like wear pads, engine side panels...
We supply all kinds of JCB filters, cables,seal kits,switches,oil coolers and JCB bushes...
We produce and supply more than 800 JCB 3CX AND 4CX BACKHOE
LOADERS alternative parts.
JCB WHEEL RIMS
JCB FENDERS , MUDGUARDS,
JCB WEAR PADS,
JCB O RINGS,
JCB THROTTLE CABLES,
JCB FILTERS,
JCB OIL COOLERS,
JCB GASKETS,
JCB GEARS,
JCB LAMPS,
JCB ENGINE PARTS,
JCB SEALS ,
JCB SEAL KITS,
JCB BUCKETS ,
JCB STRUTS,
JCB SILENCERS ,
JCB BUSHES,
JCB PINS,
JCB FUEL LIFT PUMPS ,
We produce many parts of JCB 3CX , 4CX and export high quality JCB 3CX AND 4CX
BACKHOE LOADERS alternative spare parts and buckets .
We export our products over 40 countries.
We produce all kinds of JCB rear and front fenders,mudguards, for all
models in any colours and many JCB rubber and plastic parts like wear pads, engine side panels...
We supply all kinds of JCB filters, cables,seal kits,switches,oil coolers and JCB bushes...
We produce and supply more than 800 JCB 3CX AND 4CX BACKHOE
LOADERS alternative parts.
JCB WHEEL RIMS
JCB FENDERS , MUDGUARDS,
JCB WEAR PADS,
JCB O RINGS,
JCB THROTTLE CABLES,
JCB FILTERS,
JCB OIL COOLERS,
JCB GASKETS,
JCB GEARS,
JCB LAMPS,
JCB ENGINE PARTS,
JCB SEALS ,
JCB SEAL KITS,
JCB BUCKETS ,
JCB STRUTS,
JCB SILENCERS ,
JCB BUSHES,
JCB PINS,
JCB FUEL LIFT PUMPS ,
PERKINS ENGINE PARTS,
JCB SILENCER PIPES,
JCB PINS,
MH Machinery Ltd. is a Turkish company that produces and exports over 800 alternative spare parts for JCB 3CX and 4CX backhoe loaders. They are a producer, supplier, and exporter of JCB parts and offer parts like alternators, starters, pins, switches, wear pads, seals, and more. Contact information and part numbers are provided.
We produce many parts of JCB 3CX , 4CX and export high quality JCB 3CX AND 4CX
BACKHOE LOADERS alternative spare parts and buckets .
We export our products over 40 countries.
We produce all kinds of JCB rear and front fenders,mudguards, for all
models in any colours and many JCB rubber and plastic parts like wear pads, engine side panels...
We supply all kinds of JCB filters, cables,seal kits,switches,oil coolers and JCB bushes...
We produce and supply more than 800 JCB 3CX AND 4CX BACKHOE
LOADERS alternative parts.
JCB WHEEL RIMS
JCB FENDERS , MUDGUARDS,
JCB WEAR PADS,
JCB O RINGS,
JCB THROTTLE CABLES,
JCB FILTERS,
JCB OIL COOLERS,
JCB GASKETS,
JCB GEARS,
JCB LAMPS,
JCB ENGINE PARTS,
JCB SEALS ,
JCB SEAL KITS,
JCB BUCKETS ,
JCB STRUTS,
JCB SILENCERS ,
JCB BUSHES,
JCB PINS,
JCB FUEL LIFT PUMPS ,
PERKINS ENGINE PARTS,
JCB SILENCER PIPES,
JCB PINS,
We produce many parts of JCB 3CX , 4CX and export high quality JCB 3CX AND 4CX
BACKHOE LOADERS alternative spare parts and buckets .
We export our products over 40 countries.
We produce all kinds of JCB rear and front fenders,mudguards, for all
models in any colours and many JCB rubber and plastic parts like wear pads, engine side panels...
We supply all kinds of JCB filters, cables,seal kits,switches,oil coolers and JCB bushes...
We produce and supply more than 800 JCB 3CX AND 4CX BACKHOE
LOADERS alternative parts
Damián Udo Nwaeze is a senior service supervisor and project engineer with over 14 years of experience in pipeline pre-commissioning projects for several oil and gas companies in Nigeria. He holds a Bachelor of Technology degree in Maritime Management Technology. His experience includes projects involving flooding, flushing, chemical cleaning, gauging, intelligent pigging, hydrotesting, dewatering, drying, nitrogen purging, and pipeline commissioning. He is skilled in project execution and relationship management.
Visite du parc éolien Thorntonbank - Introduction to offshore windCCILVN
This document discusses offshore wind and ENGIE's experience in the industry. It provides an overview of offshore wind market trends, technology such as turbine types and foundations, and ENGIE's offshore wind projects and capabilities. ENGIE has 18 years of experience in offshore wind development and provides engineering and construction support. It is developing several offshore wind projects in Europe and has experience operating offshore substations.
IKL-Reference List_ Latest Des 11 for PDFStephane Sene
The document is a reference list containing details of offshore plant projects completed by PT. Istana Karang Laut between 1982-2013. It lists 27 offshore plant projects in Indonesia, Myanmar, Cambodia, Georgia, Bangladesh, and Turkmenistan. The projects involved engineering, procurement, construction, and commissioning of offshore oil and gas facilities such as pipelines, platforms, gathering testing satellites, mooring buoys, and modification works.
This document provides the calculations and analysis for the electrical loads and system design for a 3-floor commercial building and a 2-story residential house.
For the commercial building, the document calculates the lighting, appliance, and HVAC loads for each floor. It then sizes the feeder conductors and protection for each floor based on the calculated loads and largest motor. Finally, it calculates the overall main feeder size and protection based on the total connected load for the building.
For the residential house, the document provides the load calculations for each circuit based on appliances and fixtures. It includes a schedule of circuits and loads as well as a riser diagram. It then sizes the main feeder conductor and protection based on
The SunEdison Outdoor Microstation is a standalone power generation unit that provides renewable and reliable electricity for off-grid applications. It features durable, weatherproof components to ensure continuous operation in any conditions. A single 3,500 unit can power up to 25 households for 5 hours each night during 3 days of autonomy. It has multiple off-grid uses including powering households, clinics, schools, irrigation pumps, and more.
This document is a report from a group of engineering students at Valley University on their project about PV solar energy. It includes:
1. An introduction to solar energy and how it can be harnessed using technologies like solar panels and solar heating.
2. Sections on different applications of solar energy including electricity generation, water heating, heating, lighting, transportation, and portable power.
3. Descriptions of passive solar energy which uses natural processes and active solar which uses mechanical devices to convert sunlight.
4. Details of the components needed for their PV solar energy station including solar panels, inverters, batteries, and wiring calculations to determine the necessary equipment.
5. Information on the proposed
We produce many parts of JCB 3CX , 4CX and export high quality JCB 3CX AND 4CX
BACKHOE LOADERS alternative spare parts and buckets .
We export our products over 40 countries.
We produce all kinds of JCB rear and front fenders,mudguards, for all
models in any colours and many JCB rubber and plastic parts like wear pads, engine side panels...
We supply all kinds of JCB filters, cables,seal kits,switches,oil coolers and JCB bushes...
We produce and supply more than 800 JCB 3CX AND 4CX BACKHOE
LOADERS alternative parts
This document provides a 3-month forecast for equipment erection from August to October 2016 for the SOCAR Polymer PP-U&O Project in Sumgayit, Azerbaijan. It includes:
- A summary of the total number of equipment by area and month, with the largest quantities in September (24 pieces) and October (24 pieces).
- Details of 5 pieces of equipment arriving in August, including constructability notes for each.
- An equipment arrival list for September with 1 piece of equipment and notes on its installation.
- An equipment arrival list for October with 24 pieces of equipment and notes on the installation for each, noting requirements for civil works and structures to be completed before several
The document provides details about the author's 1 month industrial training at DSCL Kota from June 1-30, 2013. It summarizes the power generation, distribution and protection systems at DSCL. The author expresses gratitude to various managers for guiding them. DSCL has a 125 MW captive thermal power plant to meet 93% of its electricity needs. The plant includes various equipment like boilers, turbines, alternators and protection systems. The author learned about the complex power systems during their training.
The document provides a single line diagram for Tusuka Processing Ltd. Unit-02. It includes 16 diagrams covering the electrical distribution from the main incoming supply down to individual equipment. Key information shown on the diagrams includes the main incoming feeder from another Tusuka facility, distribution switchgear and busbars, sub-distribution boards, and individual circuit breakers feeding equipment loads. Engineering staff who designed and approved the diagram are also listed.
Wood energy mainly consumed domestically, accounting for 30% of India's total energy consumption in 1994. Hydroelectric power projects larger than 20% of world power generation. Thermal power plants contribute 65% of India's energy but have a 10-14% deficit. Solar energy can be used to generate electricity and for applications like solar heaters. There are 297 renewable energy product shops across 28 states and 20 energy parks in 18 districts to increase awareness of new technologies. Geothermal power uses underground steam to generate electricity with economic, environmental, and space benefits. Wind and nuclear power capacity is increasing to meet rising demand and reduce the energy deficit. Natural gas is also a source of energy.
289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOADManual Labs
This 289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOAD offers extensive repair and troubleshooting information needed to keep your Caterpillar loader running like new. It includes detailed instructions and illustrations to explore service and maintenance procedures. Keep your Caterpillar Compact Track Loader running efficiently and reliably with this comprehensive guide.
We produce many parts of JCB 3CX , 4CX and export high quality JCB 3CX AND 4CX
BACKHOE LOADERS alternative spare parts and buckets .
We export our products over 40 countries.
We produce all kinds of JCB rear and front fenders,mudguards, for all
models in any colours and many JCB rubber and plastic parts like wear pads, engine side panels...
We supply all kinds of JCB filters, cables,seal kits,switches,oil coolers and JCB bushes...
We produce and supply more than 800 JCB 3CX AND 4CX BACKHOE
LOADERS alternative parts.
JCB WHEEL RIMS
JCB FENDERS , MUDGUARDS,
JCB WEAR PADS,
JCB O RINGS,
JCB THROTTLE CABLES,
JCB FILTERS,
JCB OIL COOLERS,
JCB GASKETS,
JCB GEARS,
JCB LAMPS,
JCB ENGINE PARTS,
JCB SEALS ,
JCB SEAL KITS,
JCB BUCKETS ,
JCB STRUTS,
JCB SILENCERS ,
JCB BUSHES,
JCB PINS,
JCB FUEL LIFT PUMPS ,
PERKINS ENGINE PARTS,
JCB SILENCER PIPES,
JCB PINS,
We produce many parts of JCB 3CX , 4CX and export high quality JCB 3CX AND 4CX
BACKHOE LOADERS alternative spare parts and buckets .
We export our products over 40 countries.
We produce all kinds of JCB rear and front fenders,mudguards, for all
models in any colours and many JCB rubber and plastic parts like wear pads, engine side panels...
We supply all kinds of JCB filters, cables,seal kits,switches,oil coolers and JCB bushes...
We produce and supply more than 800 JCB 3CX AND 4CX BACKHOE
LOADERS alternative parts
We produce many parts of JCB 3CX , 4CX and export high quality JCB 3CX AND 4CX
BACKHOE LOADERS alternative spare parts and buckets .
We export our products over 40 countries.
We produce all kinds of JCB rear and front fenders,mudguards, for all
models in any colours and many JCB rubber and plastic parts like wear pads, engine side panels...
We supply all kinds of JCB filters, cables,seal kits,switches,oil coolers and JCB bushes...
We produce and supply more than 800 JCB 3CX AND 4CX BACKHOE
LOADERS alternative parts.
JCB WHEEL RIMS
JCB FENDERS , MUDGUARDS,
JCB WEAR PADS,
JCB O RINGS,
JCB THROTTLE CABLES,
JCB FILTERS,
JCB OIL COOLERS,
JCB GASKETS,
JCB GEARS,
JCB LAMPS,
JCB ENGINE PARTS,
JCB SEALS ,
JCB SEAL KITS,
JCB BUCKETS ,
JCB STRUTS,
JCB SILENCERS ,
JCB BUSHES,
JCB PINS,
JCB FUEL LIFT PUMPS ,
We produce many parts of JCB 3CX , 4CX and export high quality JCB 3CX AND 4CX
BACKHOE LOADERS alternative spare parts and buckets .
We export our products over 40 countries.
We produce all kinds of JCB rear and front fenders,mudguards, for all
models in any colours and many JCB rubber and plastic parts like wear pads, engine side panels...
We supply all kinds of JCB filters, cables,seal kits,switches,oil coolers and JCB bushes...
We produce and supply more than 800 JCB 3CX AND 4CX BACKHOE
LOADERS alternative parts.
JCB WHEEL RIMS
JCB FENDERS , MUDGUARDS,
JCB WEAR PADS,
JCB O RINGS,
JCB THROTTLE CABLES,
JCB FILTERS,
JCB OIL COOLERS,
JCB GASKETS,
JCB GEARS,
JCB LAMPS,
JCB ENGINE PARTS,
JCB SEALS ,
JCB SEAL KITS,
JCB BUCKETS ,
JCB STRUTS,
JCB SILENCERS ,
JCB BUSHES,
JCB PINS,
JCB FUEL LIFT PUMPS ,
PERKINS ENGINE PARTS,
JCB SILENCER PIPES,
JCB PINS,
MH Machinery Ltd. is a Turkish company that produces and exports over 800 alternative spare parts for JCB 3CX and 4CX backhoe loaders. They are a producer, supplier, and exporter of JCB parts and offer parts like alternators, starters, pins, switches, wear pads, seals, and more. Contact information and part numbers are provided.
We produce many parts of JCB 3CX , 4CX and export high quality JCB 3CX AND 4CX
BACKHOE LOADERS alternative spare parts and buckets .
We export our products over 40 countries.
We produce all kinds of JCB rear and front fenders,mudguards, for all
models in any colours and many JCB rubber and plastic parts like wear pads, engine side panels...
We supply all kinds of JCB filters, cables,seal kits,switches,oil coolers and JCB bushes...
We produce and supply more than 800 JCB 3CX AND 4CX BACKHOE
LOADERS alternative parts.
JCB WHEEL RIMS
JCB FENDERS , MUDGUARDS,
JCB WEAR PADS,
JCB O RINGS,
JCB THROTTLE CABLES,
JCB FILTERS,
JCB OIL COOLERS,
JCB GASKETS,
JCB GEARS,
JCB LAMPS,
JCB ENGINE PARTS,
JCB SEALS ,
JCB SEAL KITS,
JCB BUCKETS ,
JCB STRUTS,
JCB SILENCERS ,
JCB BUSHES,
JCB PINS,
JCB FUEL LIFT PUMPS ,
PERKINS ENGINE PARTS,
JCB SILENCER PIPES,
JCB PINS,
We produce many parts of JCB 3CX , 4CX and export high quality JCB 3CX AND 4CX
BACKHOE LOADERS alternative spare parts and buckets .
We export our products over 40 countries.
We produce all kinds of JCB rear and front fenders,mudguards, for all
models in any colours and many JCB rubber and plastic parts like wear pads, engine side panels...
We supply all kinds of JCB filters, cables,seal kits,switches,oil coolers and JCB bushes...
We produce and supply more than 800 JCB 3CX AND 4CX BACKHOE
LOADERS alternative parts
1. Page 1 of 6
CURRICULUM VITAE AUGUST, 2015
Personal Data:
Name : Uğur Bekir
Family Name : COŞKUNER
Profession : Mechanical Engineer
Born : March 27, 1951
Dependants : Son (age 30, MSc Chemical Engineer), Daughter (age 21, in university)
Foreign Language : English (Fluent written and spoken)
Nationality : Turkish
Home-Office : Mutlukent Mah. 1972. sk Melis C Blk No:5/25
Çankaya/ANKARA/TURKIYE
Phone : + 90 (312) 236 46 65
Mobile Phone : + 90 532 525 87 97
E-mail : ubc@ubcmuhendislik.com
ubcoskuner@superonline.com
Web : http://www.ubc-engineering.com
Work experience and references:
March, 2009- Currently: UBC Engineering, Consulting, Project Trade Co. Ltd.
As Founder and Company Manager
The Company UBC was established in march, 2009 to provide out source consulting and engineering
services as Consultant, Owner's Engineer and Lander's engineer for the supply, installation, test and
commissioning of the electromechanical equipment of hydro-power plants.
The scope of services to be supplied by UBC for the electro-mechanical equipment of the Hydro
Power Plants are as follows ;
− Plant optimization, defining of the equipment data and characteristics,
− Preparing of the technical specification for E-M equipment,
− Bidding negotiations,
− Preparing of contract document,
− Engineering, design and project works,
− Manufacturing of the equipment,
− FAT factory acceptance tests,
− Erection and installation of E-M equipment,
− Field tests and commissioning works,
2. Page 2 of 6
− Field ministry acceptance and performance tests,
− Due diligence reports for all investment and operational stages of the hydro-power plants,
− Maintenance and repair works for the plants in operation,
The reference hydro-power plants are given in below tables ;
No NAME OF HEPP UNIT
OUTPUTS
INSTALLED
OUTPUT
LOCATION
OF THE
PROJECT
OWNER PHASE ELECTROMECHANICAL
CONTRACTOR
1. BOYABAT
DAM AND HEPP 3 X 170 MW 510 MW TURKIYE
BOYABAT ENERJİ
DOĞAN /DOĞUŞ/UNIT
IN OPERATION ANDRITZ/AUSTRIA
2. YEDIGOZE
DAM AND HEPP 2 X 159 MW 318 MW TURKIYE SANKO HOLDING UNDER OPERATION ALSTOM-FRANCE
SIEMENS TURKIYE
3. CEVİZLİ HEPP 2 X 50 MW 100 MW TURKIYE SANKO HOLDING UNDER OPERATION ALSTOM-FRANCE
SIEMENS TURKIYE
4. KALKANDERE 2 X 22 MW 44 MW TURKIYE SANKO HOLDING UNDER OPERATION VOITH-AUSTRIA
SIEMENS TURKIYE
5. ALPASLAN-2
DAM and HEPP
2X 116.7 MW
+
2 X 31,3 MW 296.12 MW TURKIYE ENERJİSA IN OPERATION ALSTOM-FRANCE
6. ASLANCIK
DAM AND HEPP 2 x 60 MW 120 MW TURKIYE
ASLANCIK ELEKTRİK
DOĞAN/DOĞUŞ/
ANADOLU GRUP
IN OPERATION RAINPOWER NORWAY
7. ULUABAT
DAM AND HEPP 2 X 50 MW 100 MW TURKIYE AK ENERJİ IN OPERATION VOITH-AUSTRIA
SIEMENS TURKIYE
8. DARICA HEPP 2 X 49 MW 98 MW TURKIYE BİLGİN ELEKTRİK IN OPERATION VOITH-AUSTRIA
SIEMENS TURKIYE
9. BUCAKKIŞLA 2 X 26 MW 52 MW TURKIYE BİLGİN ELEKTRİK IN OPERATION ANDRITZ / FRANCE
10. PARAVANI
(GÜRCİSTAN) 2X47 MW 94 MW GEORGIA
GEORGIAN URBAN
ENERGY
ANADOLU GROUP
IN OPERATION ALSTOM/ SPAIN
11. AKOCAK HEPP 2 X 40 MW 80 MW TURKIYE AKENERJI UNDER OPERATION VOITH-AUSTRIA
SIEMENS TURKIYE
12. FEKE-1 HEPP 2 X16,5 MW 33 MW TURKIYE AKENERJI IN OPERATION ECIDI-ZEFU CHINA
13. FEKE-2 HEPP 2 X 35.5 MW 70 MW TURKIYE AKENERJI IN OPERATION ECIDI-ZEFU CHINA
14. BURÇ BENDI HEPP 3 X 9,3 MW 27,9 MW TURKIYE AKENERJI IN OPERATION ECIDI-ZEFU CHINA
15. HIMMETLI HEPP 2 X 16 MW 32 MW TURKIYE AKENERJI IN OPERATION ORIENT
CHINA
16. GÖKKAYA HEPP 2 X 17 MW 34 MW TURKIYE AKENERJI IN OPERATION ORIENT
CHINA
17. BULAM HEPP 2 X 3.5 MW 7 MW TURKIYE AKENERJI IN OPERATION KÖSSLER AUSTRIA
18.
ERIC-1 DAM
and
MAIN HEPP
+
ECO HPP
2 X74,25 MW
+
1 X 3.88 MW
152.38 MW TURKIYE PALMET
ENERJI
E&m CONTRACT WAS
SIGNED ZEFU / CHINA
19.
ERIC-2
MAIN HEPP
+
ECO HEPP
2 X 25.7 MW
+
1 X 1.87 MW
53.27 MW TURKIYE PALMET
ENERJI Bidding Negotiations
3. Page 3 of 6
No NAME OF HEPP UNIT
OUTPUTS
INSTALLED
OUTPUT
LOCATION
OF THE
PROJECT
OWNER PHASE ELECTROMECHANICAL
CONTRACTOR
20.
ERIC-3
MAIN HEPP
+
ECO HEPP
2 X 22.86 MW
+
1 X 1.86 MW 47,58 MW TURKIYE PALMET
ENERJI Bidding Negotiations
21.
ERIC-4
MAIN HEPP
+
ECO HEPP
2 X 29.37 MW
+
1 X 1.61 MW 60,35 MW TURKIYE PALMET
ENERJI
E&m CONTRACT WAS
SIGNED ZEFU / CHINA
22. SAMİ SOYDAM
DAM and HEPP 2X 66,1 MW 132.2 MW TURKIYE ZORLU
HOLDING Bidding Negotiations
23. TEPEKIŞLA
DAM and HEPP
2 x 34 MW
+
12 MW
80 MW TURKIYE SANKO
HOLDING UNDER INSTALLATION ALSTOM
SIEMENS TURKIYE
24. ARAKALI HEPP 2 x 4.7 MW 24 MW
GEORGIA
GEORGIAN URBAN
ENERGY
AĞAOĞLU HOLDING
BIDDING
NEGOTIATIONS25. ABULI HEPP 2 X12 MW 9,4 MW
26. BUCAKKIŞLA 2 x 20.3 MW 40,6 MW TURKIYE BİLGİN ELEKTRİK UNDER INSTALLATION ANDRITZ
FRANCE
27. ERENLER 2 x 23.4 MW 46,8 MMW TURKIYE ENERJİSA IN OPERATION DONGFANG
CHINA
28. KUMKÖY 2 x 5.98 MW 11,96 MW TURKIYE AES/USA & ENTEK IN OPERATION HARBİN (KEM)
CHINA
29. KIRIKDAĞ HES 2X 8.9 MW 17,8 MW TURKIYE ÖZENİR ENERJİ IN OPERATION ANDRITZ
FRANCE
30. BAYRA HEPP 2X 4,6 MW 9,2 MW
TURKIYE ARSAN GROUP
IN INSTALLATION GEBBERT / AUSTRIA
31. KAYAKÖPRÜ-1 HEPP 2X16,2 W 33,4 MW
IN OPERATION
CCOEC CHINA
AYKEN TURKIYE
ATES TURKIYE
32. KAYAKÖPRÜ-2 HEPP 2X 5,3 MW 10,6 MW
33. KIRAN HEPP 2X 4,9 MW 9,8 MW
34. KÖPRÜBAŞI HEPP 2X 7,7 MW 15,4 MW
35. HORYAN HEPP 2X 2,8 MW 5,6 MW
36. KIY HEPP 2 X 12 MW 24 MW ANDRITZ / FRANCE
ANDRITZ / TURKIYE
37. ÇAĞLAYAN HEPP 2X3,5 MW 7 MW TURKIYE IN OPERATION GHE / AUSTRIA
38. SIRAKONAKLAR HES 2X 6.2 MW 12,4 MW TURKIYE 2M ENERJI IN OPERATION
ANDRITZ FRANCE
ANDRITZ TURKIYE
39. ÇAMBAŞI 3x16.5 W 49,5 MW TURKIYE ENERJISA IN OPERATION VOITH-SIEMENS
40. KUŞAKLI 2 X 11 MW 22 MW TURKIYE ENERJISA IN OPERATION ANDRITZ FRANCE
41. KIZILAĞAC 2x 3.5 MW 7 MW TURKIYE SANKO HOLDİNG IN OPERATION
CWTW- CHINA
KESIR-TURKIYE
42. KOÇLU 2 x 19 MW 38 MW TURKIYE SANKO HOLDİNG IN OPERATION ALSTOM-SPAIN
SIEMENS-TURKIYE
43. EBRU 2X15.5 W 31 MW TURKIYE AES – USA & ENTEK IN OPERATION YUNG-HE
44. HAMZALI 2 X 8.5 MW 17 MW
TURKIYE ENSO
AVUSTRIA IN OPERATION VOITH-INDAR
45. REŞADIYE 1 2 X 8 MW 16 MW
46. REŞADIYE 2 2 X 13.5 W 27 MW
47. REŞADIYE 3 2 X 11.5 MW 23 MW
48. KEPEZKAYA 2 x 14.8 MW 29,6 MW
TURKIYE
AES - USA
&
ENTEK
IN OPERATION HARBIN (KEM)
49. DAMLAPINAR 2 x 8.6 MW 17,2 MW
50. KULP-IV 2 X 8,6 MW 17,2 MW
4. Page 4 of 6
May,2005 – March,2009 As Free Lancer and Solution Partner of HD - Hidrodizayn
Engineering, Consultancy and Civil Works Ltd.
Providing the consultancy and engineering services for the electromechanical equipment of
hydropower plants including the preparation of technical specifications, Bidding documents, technical
negotiations, evaluation of the Bid and Owner’s engineering services for basic design & drawings,
manufacturing, erection and commissioning works, for the following Owners and Hydro Power
Plants;
POWER PLANT OUTPUT (MW) CLIENT PROGRESS STAGE CONTRACTOR
YEDİGÖZE 2 X 158 SANKO HOLDING In operation ALSTOM-SIEMENS TR
CEVİZLİK 2 X 50 SANKO HOLDING In operation ALSTOM-SIEMENS TR
KALKANDERE 2 x 22 SANKO HOLDING In operation
KAYALAR 2 x 16.5 SANKO HOLDING Bidding
SELİN -1 2 x 3.5 SANKO HOLDING Bidding
ULUABAT 2 X 50 AK ENERJİ In operation VOITH-SIEMENS TR
AKOCAK 2 X 40 AK ENERJİ In operation VOITH-SIEMENS TR
FEKE - 1 2 x 16.5 AK ENERJİ Manufacturing ECIDI- ZEFU/CHINA
FEKE -2 2 X 35.5 AK ENERJİ In operation ECIDI- ZEFU/CHINA
BURÇ 3 X 9.3 AK ENERJİ In operation ECIDI- ZEFU/CHINA
BULAM 2 X 3.5 AK ENERJİ In operation KÖSSLER
HIMMETLI 2 X16 AK ENERJİ In erection
GÖKKAYA 2 x 17 AK ENERJİ In erection
GÜNDER 2 X 15.5 AKKANAT HOLDING In erection ANDRITZ (VATECH)
DAMLA - 2 AKKANAT HOLDING Bidding
KAYAKOPRU -1 2 X 16.2 ARSAN İNŞ. In erection CCOEC-KEM /CHINA
KAYAKOPRU -2 2 X 5.3 ARSAN İNŞ. In erection CCOEC-KEM /CHINA
KIRAN 2 X 4.9 ARSAN İNŞ. In erection CCOEC-KEM /CHINA
CEVİZ 2 X 3.9 ARSAN İNŞ. In erection CCOEC-KEM /CHINA
KÖPRÜBAŞI 2 X 7.7 ARSAN İNŞ. In erection CCOEC-KEM /CHINA
HORYAN 2 X 2.8 ARSAN İNŞ. In erection CCOEC-KEM /CHINA
2003, october-2005, may - As Free Lancer
2002 – 2003, October - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC
As Consultant of General Manager
1988 – 2002
Head of Project Department - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC
Responsible for the technical coordination and scheduling of the works, engineering, design, project,
manufacturing, erection and commissioning works of Power Plants undertaken and realized by
TEMSAN as given below,
5. Page 5 of 6
POWER PLANT OUTPUT (MW) OWNER
PROGRESS
STAGE
CONTRACTOR
BATMAN 3 X 62+5.7 DSİ In Operation TEMSAN-NOELL
DİCLE 2 X 55 DSİ In Operation TEMSAN-VOITH-RESITA
KRALKIZI 2 X 46 DSİ In Operation TEMSAN-ELIN-VOITH
KÜRTÜN 2 X 40 DSİ In Operation TEMSAN-ELIN-VOITH
SUATUĞURLU 1 X 25 DSİ In Operation TEMSAN-VOITH-RESITA
ÇAMLIGÖZE 2 X 16 DSİ In Operation TEMSAN-VOITH-RESITA
KUZGUN 3 X 6.8 +2.2 DSİ In Operation TEMSAN-NEYRPIC-JEUMONT
TERCAN 3 X 5 DSİ In Operation TEMSAN-ALSTOM-JEUMONT
BEYKÖY 3 X 6.2 DSİ In Operation TEMSAN-ELIN-VOITH
MERCAN 3 X 6 DSİ In Operation TEMSAN-ALSTOM-JEUMONT
KEPEZ II 3 X 3.5 DSİ In Operation TEMSAN-NEYRPIC-JEUMONT
IVRIZ 2 X 0.5 DSİ In Operation TEMSAN-HITZINGER
HOŞAP 2 X 2 DSİ In Operation TEMSAN-NEYRPIC-JEUMONT
KOÇKÖPRÜ 2 X 2.2 DSİ In Operation TEMSAN-JEUMONT
1987 - 1988 - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC
As Project Manager
1983 - 1987 - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC
As Design Manager
- Hydraulic design works for francis turbines
- Preparation of the general layout and the technical specification
for electromechanical equipment of HEPP.
1979 - 1983 - TEMSAN TURKISH ELECTROMECHANICAL INDUSTRY CO.INC
As Chief Engineer
- Preparation of the feasibility report of the Steam Boilers Factory
(for thermal power plants) and the documents for license
agreement and general layout of the machinery and equipment.
1978 - 1979 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ)
As Chief engineer
For site erection of Soma B Thermal Power Plant 2 x 165 MW
1977 - 1978 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ)
Technical training on manufacturing, erection and maintenance of the equipment of Thermal Power
Plant in Finland and Czechoslovakia ( current name is Republic of Slovakia)
6. Page 6 of 6
1976 -1979 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ)
As Responsible engineer
Operational and maintenance works for Soma A Thermal Power Plant.
1974 - 1976 TEK TURKISH ELECTRICITY AUTHORITY (current name is EÜAŞ)
As Maintenance engineer
Soma A Thermal Power Plant.
THE FIELD OF EXPERTISE FOR HEPP:
For the hydro-power plants;
− Plant optimization, defining of data and characteristics,
− Preparing of the technical specification for e-m equipment,
− Bidding negotiations,
− Preparing of contract document
− Engineering, design and project works
− Manufacturing of the equipment
− FAT factory acceptance tests
− Erection of equipment
− Field tests and commissioning works
− Field ministry acceptance and performance tests
− Operation, maintenance and repair works for the plants
EDUCATION:
UNIVERSITY OF GAZI
1973 A.D.M.M.A Mechanical Engineering
ADDITIONAL INFORMATION:
- License for motor vehicle.
- Free for Traveling
- Free for office,workshop and site works
HOBBIES AND INTERESTS:
- Music : Classics and Contemporary
- Reading : Philosophy, Science Fiction
- Fresh Water Aquarium : Discus care