Customer Profile
The American Center is comprised of
a 25-story office tower and an adjoining
retail and convenience center.
The 660,000 square foot property
is located in the thriving business
community of Southfield, Michigan.
Customer Issues
• Attract and retain tenants
• Address aging infrastructure
• Reduce energy costs
• Improve return on investment
Project Objective
Enhance building operations to improve
financial performance of the American
Center property.
Results
$3,200,000 in capital improvements
including:
• Chilled water plant upgrade
• Lighting retrofit
• Gas-fired modular boiler installation
• Variable frequency drive installation
• Air distribution efficiency
improvements
• Direct digital controls (DDC) upgrade
• Energy management system
installation
Performance management and training
$621,000 per year guaranteed savings
over a 10-year term
PACT
™
American Center
Southfield, Michigan
Trane Improves Property’s
Return On Investment
tenants. Electric boilers were replaced
with six gas-fired modular high efficiency
boilers. Extensive piping work was
required to replace the electric baseboard
heat with hot water radiation. Upgrades
were made to the building’s air
distribution system to improve the quality
and efficiency of air delivered to tenants.
The domestic water pumping system
was retrofitted to improve the efficiency
of its operation. ATraneTracer Summit™
building automation system was installed
to provide better environmental control.
Monitoring and scheduling capabilities
reduce equipment run times and,
therefore, energy costs.TheTracer system
provides the facility management at
American Center with a tool to respond
Return on investment is the
name of the game for investment real
estate.The American Center, a
Southfield, Michigan, office tower, is
now a better performing asset thanks
to the Performance Agreement for
Comfort from Trane (PACTTM
) program.
The American Center’s ownership
successfully used the PACT program
to make over $3,200,000 in capital
improvements, while reducing operating
costs and improving tenant comfort.
The project is creating over $621,000 in
annual savings and qualifies the property
to participate in the United States
Environmental Protection Agency’s
Energy Star Building® program.
“TheTrane PACT program has reduced
our electric bill by one third!” comments
Jim Jonas, executive vice president.
“The Trane PACT program has
reduced our electric bill by one third!”
©American Standard Inc. 2001 CASE-SLX036-EN
1 2 3 4 5 6 7 8 9 10 11 12
$120,000
$100,000
$80,000
$60,000
$40,000
$20,000
$ 0
Months
Utility Profile
Pre-PACT Energy Costs
Post-PACT Energy Costs
Variable frequency drives and a multiplexer
system provide more efficient domestic
water booster pumping.
Bill Jansen, property manager; Mike
Fetzer,Trane comprehensive solutions
team leader; and Jim Jonas, executive
vice president
Aging Infrastructure
The American Center property was
built over 25 years ago. Much of the
equipment was nearing the end of its
useful life.The ownership was facing
increasing operating costs resulting from
the aging infrastructure and high utility
costs due to the building’s design. Plans
to address the aging cooling system led
to discussions withTrane to take a more
comprehensive approach to solving
some of the building’s problems.
TraneApplies Its Building Expertise
Trane used its building system expertise
to develop a custom project to lower
operating costs and improve tenant
comfort. Once the project was approved,
Trane assembled an experienced team
to begin the work.
“Trane was selected based on their
demonstrated quality of service,
excellent products, and proposed project
value.We have had experience working
withTrane in a number of properties and
knew they were excellent contractors,”
comments Joe Mendez, vice president
of operations.
The original building design used the
lighting system as a major source of heat.
This design worked well when electricity
was inexpensive. Unfortunately, electrical
rates have increased significantly over the
past 25 years.To reduce the cooling load
in the summer and, therefore, the high
cost of cooling a building, a lighting
retrofit was completed.The reduced
summer load had a direct impact on the
size of the equipment necessary to cool
the building.Two new 640-ton
CenTraVac™ chillers were installed to
provide efficient cooling to building
“TheTrane team was very professional
and managed the project expertly.”
3CASE-SLX036-EN
“The local utility
sent a representative
to check the accuracy
of our property’s
electric meters.
They found the meters
working properly.
The large electrical
savings were a result
of the Trane PACT
program.”
Bill Jansen and DougWilliams, facility
engineer, check building conditions
using theTracer Summit™ system.
more efficiently to tenant calls and
manage the building more proactively.
Energy Star Building Participant
The PACT™ guarantee provides the
building’s ownership with the assurance
of long-term project performance.
Through periodic building inspections,
equipment maintenance, and
monitoring,Trane provides an annual
guarantee of $500,000 in energy savings
and $121,000 in operational savings.The
significant annual energy savings
qualified the American Center Property
as a participant of the U.S. EPA’s Energy
Star Building program. Quite an
accomplishment!
“The local utility sent a representative
to check the accuracy of our property’s
electric meters.They found the meters
working properly.The large electrical
savings were a direct result of theTrane
PACT program,” states Jim Jonas,
executive vice president.
Tenant Satisfaction
A critical component to the installation
was to keep the building’s systems fully
operational while the renovation was
taking place.Through careful planning
and coordination with the owner’s
representatives,Trane experienced
project management personnel were
able to execute the scope with minimal
disruption to the building’s tenants.
“TheTrane team was very professional
and managed the project expertly.We
have received positive feedback from
our tenants on the quality of lighting
and improvement in temperature
control”, states Mendez.
Two new 640-ton high-efficiency chillers
provide cooling to the tenants of
American Center.
Literature Order Number
Date
Supersedes
Stocking Location
Literature Order Number
Date
Supersedes
Stocking Location
SinceTheTrane Company has a policy of continuous product and product data improvement, it reserves the
right to change design and specifications without notice.
TheTrane Company
An American Standard Company
www.trane.com
For more information contact
your local sales office or
e-mail us at comfort@trane.com
CASE-SLX036-EN
March 2001
New
La Crosse
For more information call Trane Asset Management Services
1-800-877-1327.

More Related Content

What's hot

Garricks-Updated Resume-VA15
Garricks-Updated Resume-VA15Garricks-Updated Resume-VA15
Garricks-Updated Resume-VA15
Garrick AUGUSTUS
 
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
IES VE
 
13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding
Tim Rushenberg
 
Standard 90.1-2010 Update
Standard 90.1-2010 UpdateStandard 90.1-2010 Update
Standard 90.1-2010 Update
Illinois ASHRAE
 

What's hot (20)

Think Differently About the Cost of Your Building.
Think Differently About the Cost of Your Building.Think Differently About the Cost of Your Building.
Think Differently About the Cost of Your Building.
 
NZC - Ben Taube
NZC - Ben TaubeNZC - Ben Taube
NZC - Ben Taube
 
Panel 1: DOER Presentation
Panel 1: DOER PresentationPanel 1: DOER Presentation
Panel 1: DOER Presentation
 
Financing High Performance "Green" CRE- NYC, NY 09 10 2008 JFinlay
Financing High Performance "Green" CRE- NYC, NY 09 10 2008 JFinlayFinancing High Performance "Green" CRE- NYC, NY 09 10 2008 JFinlay
Financing High Performance "Green" CRE- NYC, NY 09 10 2008 JFinlay
 
Garricks-Updated Resume-VA15
Garricks-Updated Resume-VA15Garricks-Updated Resume-VA15
Garricks-Updated Resume-VA15
 
Jay Corn - EPAct 179D is an Important Tax Incentive for Architects and Engineers
Jay Corn - EPAct 179D is an Important Tax Incentive for Architects and EngineersJay Corn - EPAct 179D is an Important Tax Incentive for Architects and Engineers
Jay Corn - EPAct 179D is an Important Tax Incentive for Architects and Engineers
 
Energy Upgrade CA for homeowners june 2011
Energy Upgrade CA for homeowners june 2011Energy Upgrade CA for homeowners june 2011
Energy Upgrade CA for homeowners june 2011
 
IES Faculty – Part L, EPC’s & the VE (Part 1)
IES Faculty – Part L, EPC’s & the VE (Part 1)IES Faculty – Part L, EPC’s & the VE (Part 1)
IES Faculty – Part L, EPC’s & the VE (Part 1)
 
What Is a HERS Rating? | Home Efficiency Santa Fe
What Is a HERS Rating? | Home Efficiency Santa FeWhat Is a HERS Rating? | Home Efficiency Santa Fe
What Is a HERS Rating? | Home Efficiency Santa Fe
 
ComEd Retro-Commissioning Program
ComEd Retro-Commissioning ProgramComEd Retro-Commissioning Program
ComEd Retro-Commissioning Program
 
The role of delivered performance june2009
The role of delivered performance june2009The role of delivered performance june2009
The role of delivered performance june2009
 
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
 
13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding13th Annual Chamber Energy Conference - EE Funding
13th Annual Chamber Energy Conference - EE Funding
 
Jenna Ide GCC 2015
Jenna Ide GCC 2015Jenna Ide GCC 2015
Jenna Ide GCC 2015
 
Optimized Operation of Indoor Public Pool Facilities
Optimized Operation of Indoor Public Pool FacilitiesOptimized Operation of Indoor Public Pool Facilities
Optimized Operation of Indoor Public Pool Facilities
 
Southern Energy Efficiency Center Final Report
Southern Energy Efficiency Center Final ReportSouthern Energy Efficiency Center Final Report
Southern Energy Efficiency Center Final Report
 
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
 
Retrocommissioning (RCx) Services to Optimize Building Performance
Retrocommissioning (RCx) Services to Optimize Building PerformanceRetrocommissioning (RCx) Services to Optimize Building Performance
Retrocommissioning (RCx) Services to Optimize Building Performance
 
Building EQ
Building EQBuilding EQ
Building EQ
 
Standard 90.1-2010 Update
Standard 90.1-2010 UpdateStandard 90.1-2010 Update
Standard 90.1-2010 Update
 

Viewers also liked

Gracious Travels Pan India Tariff
Gracious Travels Pan India TariffGracious Travels Pan India Tariff
Gracious Travels Pan India Tariff
Gracious Travels
 
Paris-Research-Paper-2.0
Paris-Research-Paper-2.0Paris-Research-Paper-2.0
Paris-Research-Paper-2.0
Claire Roper
 

Viewers also liked (13)

Uxd corporate presentation
Uxd corporate presentationUxd corporate presentation
Uxd corporate presentation
 
Ysgol Bro Eirwg - Seven Stones To Staf
Ysgol Bro Eirwg - Seven Stones To StafYsgol Bro Eirwg - Seven Stones To Staf
Ysgol Bro Eirwg - Seven Stones To Staf
 
Gracious Travels Pan India Tariff
Gracious Travels Pan India TariffGracious Travels Pan India Tariff
Gracious Travels Pan India Tariff
 
19 desain kartu nama inspiratif ini akan menginspirasi bisnis anda
19 desain kartu nama inspiratif ini akan menginspirasi bisnis anda19 desain kartu nama inspiratif ini akan menginspirasi bisnis anda
19 desain kartu nama inspiratif ini akan menginspirasi bisnis anda
 
Paris-Research-Paper-2.0
Paris-Research-Paper-2.0Paris-Research-Paper-2.0
Paris-Research-Paper-2.0
 
Core campus - teacher dashboard
Core campus - teacher dashboardCore campus - teacher dashboard
Core campus - teacher dashboard
 
Main Report
Main ReportMain Report
Main Report
 
Fruit day
Fruit dayFruit day
Fruit day
 
σχετικά με τη δράση ακαδημία γονεων
σχετικά με τη δράση ακαδημία γονεωνσχετικά με τη δράση ακαδημία γονεων
σχετικά με τη δράση ακαδημία γονεων
 
Cooking recipe Welsh Rarebit
Cooking recipe Welsh RarebitCooking recipe Welsh Rarebit
Cooking recipe Welsh Rarebit
 
Autocontrol
AutocontrolAutocontrol
Autocontrol
 
Acogimiento
AcogimientoAcogimiento
Acogimiento
 
The Healthy Eating Game
The Healthy Eating GameThe Healthy Eating Game
The Healthy Eating Game
 

Similar to americancenter

Edward E calder CV 2014
Edward E calder CV 2014Edward E calder CV 2014
Edward E calder CV 2014
Edward Calder
 
Brochure - Legacy Mechanical & Energy Services, Inc. - 2016
Brochure - Legacy Mechanical & Energy Services, Inc. - 2016Brochure - Legacy Mechanical & Energy Services, Inc. - 2016
Brochure - Legacy Mechanical & Energy Services, Inc. - 2016
Britt Leverton
 
Energy Efficiency Loan Program
Energy Efficiency Loan ProgramEnergy Efficiency Loan Program
Energy Efficiency Loan Program
TNenergy
 

Similar to americancenter (20)

Utilities
UtilitiesUtilities
Utilities
 
Edward E calder CV 2014
Edward E calder CV 2014Edward E calder CV 2014
Edward E calder CV 2014
 
Brochure - Legacy Mechanical & Energy Services, Inc. - 2016
Brochure - Legacy Mechanical & Energy Services, Inc. - 2016Brochure - Legacy Mechanical & Energy Services, Inc. - 2016
Brochure - Legacy Mechanical & Energy Services, Inc. - 2016
 
American Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentAmerican Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the Envrinment
 
Energy Savings for Hotel & Lodging Industry
Energy Savings for Hotel & Lodging IndustryEnergy Savings for Hotel & Lodging Industry
Energy Savings for Hotel & Lodging Industry
 
Energy Efficiency in Multifamily Affordable Housing
Energy Efficiency in Multifamily Affordable HousingEnergy Efficiency in Multifamily Affordable Housing
Energy Efficiency in Multifamily Affordable Housing
 
Commercial Case Studies
Commercial Case StudiesCommercial Case Studies
Commercial Case Studies
 
RCx
RCxRCx
RCx
 
The Changing Electric System and Energy Efficiency’s Promise to Keep Bills Low
The Changing Electric System and Energy Efficiency’s Promise to Keep Bills LowThe Changing Electric System and Energy Efficiency’s Promise to Keep Bills Low
The Changing Electric System and Energy Efficiency’s Promise to Keep Bills Low
 
Property Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) ProgramProperty Assessed Clean Energy (PACE) Program
Property Assessed Clean Energy (PACE) Program
 
AmericInn
AmericInnAmericInn
AmericInn
 
Building Grid Resilience
Building Grid ResilienceBuilding Grid Resilience
Building Grid Resilience
 
Energy Efficiency Loan Program
Energy Efficiency Loan ProgramEnergy Efficiency Loan Program
Energy Efficiency Loan Program
 
Jefferson University Currents
Jefferson University CurrentsJefferson University Currents
Jefferson University Currents
 
Energy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in MalaysiaEnergy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in Malaysia
 
GRESB Greenbuild 2017 PACE Financing
GRESB Greenbuild 2017 PACE Financing GRESB Greenbuild 2017 PACE Financing
GRESB Greenbuild 2017 PACE Financing
 
BEA deck 2.22.13
BEA deck   2.22.13BEA deck   2.22.13
BEA deck 2.22.13
 
Energy Chek Brochure Plus Rev6
Energy Chek Brochure Plus Rev6Energy Chek Brochure Plus Rev6
Energy Chek Brochure Plus Rev6
 
dancookgcc2014
dancookgcc2014dancookgcc2014
dancookgcc2014
 
Greening The O&M Of Buildings
Greening The O&M Of BuildingsGreening The O&M Of Buildings
Greening The O&M Of Buildings
 

americancenter

  • 1. Customer Profile The American Center is comprised of a 25-story office tower and an adjoining retail and convenience center. The 660,000 square foot property is located in the thriving business community of Southfield, Michigan. Customer Issues • Attract and retain tenants • Address aging infrastructure • Reduce energy costs • Improve return on investment Project Objective Enhance building operations to improve financial performance of the American Center property. Results $3,200,000 in capital improvements including: • Chilled water plant upgrade • Lighting retrofit • Gas-fired modular boiler installation • Variable frequency drive installation • Air distribution efficiency improvements • Direct digital controls (DDC) upgrade • Energy management system installation Performance management and training $621,000 per year guaranteed savings over a 10-year term PACT ™ American Center Southfield, Michigan Trane Improves Property’s Return On Investment
  • 2. tenants. Electric boilers were replaced with six gas-fired modular high efficiency boilers. Extensive piping work was required to replace the electric baseboard heat with hot water radiation. Upgrades were made to the building’s air distribution system to improve the quality and efficiency of air delivered to tenants. The domestic water pumping system was retrofitted to improve the efficiency of its operation. ATraneTracer Summit™ building automation system was installed to provide better environmental control. Monitoring and scheduling capabilities reduce equipment run times and, therefore, energy costs.TheTracer system provides the facility management at American Center with a tool to respond Return on investment is the name of the game for investment real estate.The American Center, a Southfield, Michigan, office tower, is now a better performing asset thanks to the Performance Agreement for Comfort from Trane (PACTTM ) program. The American Center’s ownership successfully used the PACT program to make over $3,200,000 in capital improvements, while reducing operating costs and improving tenant comfort. The project is creating over $621,000 in annual savings and qualifies the property to participate in the United States Environmental Protection Agency’s Energy Star Building® program. “TheTrane PACT program has reduced our electric bill by one third!” comments Jim Jonas, executive vice president. “The Trane PACT program has reduced our electric bill by one third!” ©American Standard Inc. 2001 CASE-SLX036-EN 1 2 3 4 5 6 7 8 9 10 11 12 $120,000 $100,000 $80,000 $60,000 $40,000 $20,000 $ 0 Months Utility Profile Pre-PACT Energy Costs Post-PACT Energy Costs Variable frequency drives and a multiplexer system provide more efficient domestic water booster pumping. Bill Jansen, property manager; Mike Fetzer,Trane comprehensive solutions team leader; and Jim Jonas, executive vice president Aging Infrastructure The American Center property was built over 25 years ago. Much of the equipment was nearing the end of its useful life.The ownership was facing increasing operating costs resulting from the aging infrastructure and high utility costs due to the building’s design. Plans to address the aging cooling system led to discussions withTrane to take a more comprehensive approach to solving some of the building’s problems. TraneApplies Its Building Expertise Trane used its building system expertise to develop a custom project to lower operating costs and improve tenant comfort. Once the project was approved, Trane assembled an experienced team to begin the work. “Trane was selected based on their demonstrated quality of service, excellent products, and proposed project value.We have had experience working withTrane in a number of properties and knew they were excellent contractors,” comments Joe Mendez, vice president of operations. The original building design used the lighting system as a major source of heat. This design worked well when electricity was inexpensive. Unfortunately, electrical rates have increased significantly over the past 25 years.To reduce the cooling load in the summer and, therefore, the high cost of cooling a building, a lighting retrofit was completed.The reduced summer load had a direct impact on the size of the equipment necessary to cool the building.Two new 640-ton CenTraVac™ chillers were installed to provide efficient cooling to building
  • 3. “TheTrane team was very professional and managed the project expertly.” 3CASE-SLX036-EN “The local utility sent a representative to check the accuracy of our property’s electric meters. They found the meters working properly. The large electrical savings were a result of the Trane PACT program.” Bill Jansen and DougWilliams, facility engineer, check building conditions using theTracer Summit™ system. more efficiently to tenant calls and manage the building more proactively. Energy Star Building Participant The PACT™ guarantee provides the building’s ownership with the assurance of long-term project performance. Through periodic building inspections, equipment maintenance, and monitoring,Trane provides an annual guarantee of $500,000 in energy savings and $121,000 in operational savings.The significant annual energy savings qualified the American Center Property as a participant of the U.S. EPA’s Energy Star Building program. Quite an accomplishment! “The local utility sent a representative to check the accuracy of our property’s electric meters.They found the meters working properly.The large electrical savings were a direct result of theTrane PACT program,” states Jim Jonas, executive vice president. Tenant Satisfaction A critical component to the installation was to keep the building’s systems fully operational while the renovation was taking place.Through careful planning and coordination with the owner’s representatives,Trane experienced project management personnel were able to execute the scope with minimal disruption to the building’s tenants. “TheTrane team was very professional and managed the project expertly.We have received positive feedback from our tenants on the quality of lighting and improvement in temperature control”, states Mendez. Two new 640-ton high-efficiency chillers provide cooling to the tenants of American Center.
  • 4. Literature Order Number Date Supersedes Stocking Location Literature Order Number Date Supersedes Stocking Location SinceTheTrane Company has a policy of continuous product and product data improvement, it reserves the right to change design and specifications without notice. TheTrane Company An American Standard Company www.trane.com For more information contact your local sales office or e-mail us at comfort@trane.com CASE-SLX036-EN March 2001 New La Crosse For more information call Trane Asset Management Services 1-800-877-1327.