4. 1. Space the cables with a 3” opening between cables
2. Support cables vertically every 42”
3. Tension the cables to 300-400 lbs
4” Sphere Code Guidelines
1013.3 Opening limitations. Required guards shall not have openings
which allow passage of a sphere 4 inches (102 mm) in diameter from
the walking surface to the required guard height.
International Building Code 2009 (Sixth Printing)
7. Kit 262 Series Outside Post to Outside Post
This kit can go through one corner with
posts offset on the corner.
8. Factory Installed Tensioning Hardware
Invisiware Receiver
This Stud is Swaged onto one end of the cable
and it threads into the Invisiware Receiver to
tension the cable.