1. SUMMER INTERNSHIP
BY
NAME –SURENDRA BABU YALAGALA
MBA CEQS
ENROLMENT NUMBER-A13567116085
SECTION-A
SCHOOL OF CONSTRUCTION
RICS SBE
AMITY UNIVERSITY, NOIDA
2. NAME OF THE PROJECT:- TERRA ELEGANCE
SCOPE OF WORK:- CONSTRUCTION OF RESIDENTIAL APARTMENTS AND A COMMERCIAL BUILDING.
LOCATION:- ALWAR BYPASS, BHIWADI.
CLIENT:- TERRA REALCON PVT LTD.
CONTRACTOR:- ASHCON INFRASTRUCTURE INC.
CONSULTANT:- GLOBAL C
PROCUREMENT TYPE:- ITEM RATE MANAGEMENT CONTRACT.
ARCHITECT AND DESIGN:- RASS RE-FRAMED ARCHITECTUAL SOLUTIONS.
CONTRACT PERIOD:- 36 MONTHS (2013-2016)
PROJECT COST:- 100 CRORES.
TOTAL BUILT UP AREA:- 57722.66 SQM.
TOTAL GREEN BELT AREA:- 2861.10 SQMTS.
DEPUTY GENERAL MANAGER:-MR NAVNEET BANSAL.
ABOUT THE PROJECT
3. BRIEF INTRODUCTION TO PROJECT AND SITE.
CONCRETE CALCULATION FOR TOWERS, UGT AND STP.
BBS CALCULATION OF TOWERS
MATERIAL PROCUREMENT
FINISHING WORKS(TILING, PLASTERING, GROUTING, PAINTING)
LAB TESTS IN SITE
WORK DONE IN THIS PROJECT
4. UNDERSTANDING DRAWINGS
COMPANY PROCEDURES
QUANTITY TAKE OFF
READING DRAWINGS FOR BBS
FORMULAS FOR CALCULATION
ANALYSIS OF RATES
CALCULATION OF CEMENT
LEARNINGS FROM THE INTERNSHIP
5. THE COMPLETION OF PROJECT IS ESTIMATED TO BE 1 YEAR APPROXIMATELY
NEARLY 95% OF STRUCTURAL WORK HAS BEEN COMPLETED
70% PODIUM CASTING HAS BEEN DONE
FOUNDATION WORK FOR PODIUM IS IN PROGRESS
TILING WORK IN THE TOWERS IS GOING ON
PLASTERING WORK OF PODIUM
CONSTRUCTION OF CONCRETE ROAD IS STARTED
.
OBSERVATIONS
6. USE OF SOFTWARE LIKE MSP OR PRIMAVERA SHOULD BE ADOPTED. IT MAKES
THE WORK EASIER AND LESS TIME CONSUMING.
SAFETY MEASURES SHOULD BE FOLLOWED PROPERLY AT SITE. CASTING SHOULD
BE ONLY DONE AFTER THE APPROVAL OF THE AUTHORITIES.
PROPER TESTING ON THE SITE SHOULD BE DONE. REGULAR CHECKS SHOULD BE
DONE BY CONCERNED AUTHORITIES. RECORD OF EACH LOT SHOULD BE
MAINTAINED.
WOOD USED FOR SHUTTERING SHOULD NOT BE USED MORE THAN 3 OR 4 TIMES.
IT GIVES BAD FINISH TO THE CONCRETE WORK. AND CAN SPOIL THE SHAPE OF
MEMBER.
MATERIALS SHOULD BE PROCURED CAREFULLY.
SUGGESTIONS