2. ABOUT
● Ashiana Umang is the largest Kid Centric home in
Jaipur. A project built keeping all the specific
requirements of a family with children in mind makes
Ashiana Umang a perfect address for living.
● Its Kid Centric Homes is located near Mahindra SEZ
adjacent to the employment hub in Jaipur. The locality is
perfect for working parents while their children can stay
home after school and engage in activities that play an
important in their holistic development.
● Ashiana Umang provides a special program for children
as “Live & Learn” where they are engaged with tons of
activities which will inculcate the right upbringing.
3. ● One Main Entry / Exit
● One emergency
pedestrian exit from
kid’s zone
6. For residential Schemes
(More than 2 hectares and
up to 10 hectares).
● Here, For residential
and commercial the
percentage given
according to the
policy is the
maximum limit.
● However, for roads,
amenities and open
spaces, the
percentages
according to the
policy are the
minimum
requirement.
7. LAND USE
● Present Development- 19 Towers (Phase I, II & III)
● BAR : 2.75 [2.5(acc. To ByLaws) + 0.25 (Bought)]
● Present Area for Residential: 109767.89 sqm.
● Present Area for Commercial: 108.76sqm.
● Future Expansion: 9 Towers (Phase IV & V)
● Under construction : 6 Towers
● Proposed Area for Residential : 52778.Sq.m.
● Proposed Area for Commercial : 754.57 Sq.m.
● LIG and EWS : 5% of proposed residential area
= 2676.09 Sq.m.
8.
9. PARKING
Total BAR in approved building (Residential)=109767.89 sqm.
Total BAR in approved building (Commercial)=108.76sqm.
● ECU@115 sqm. required= 109767.89/115=954.50 ECU
● Commercial ECU@75 sqm. required= 108.79/76= 1.45 ECU
Total ECU = 954.50+1.45= 955.96~956 ECU
● 25% visitor parking (96)= 24
● 20% visitor parking (180)= 36
● 15% visitor parking (100)= 15
● 10% visitor parking (636)= 64
Total visitor parking = 139
Therefore total parking ECU = 139+956 = 1095 nos.
PARKING REQUIRED
75% car req.(1095) = 821
25% two wheeler req. (1095) = 274 x 3 = 822
REQUIRED PROVIDED
4-WHEELER 821 1100
2-WHEELER 822 1103
16. BLOCK A
FLOOR G.B.U.A. (sq. mt.)
STILT FLOOR 654.83
TYPICAL (1st to 12th) FLOOR 654.83 x 12 = 7857.96 sq.mt.
TERRACE FLOOR 66.50
TOTAL 8579.29 sq.mt.
TOTAL NO. OF BLOCK A = 2
TOTAL 8579.29 x 2 = 17,158.58 sq.mt.
17. BLOCK B
FLOOR G.B.U.A. (sq. mt.)
STILT FLOOR 483.59
TYPICAL (1st to 12th) FLOOR 483.59 x 12 = 5803.08 sq.mt.
TERRACE FLOOR 58.00
TOTAL 6354.67 sq.mt.
TOTAL NO. OF BLOCK B = 14
TOTAL 6354.67 x 14 = 88,965.38 sq.mt.
18. BLOCK C
FLOOR G.B.U.A. (sq. mt.)
STILT FLOOR 439.65
TYPICAL (1st to 12th) FLOOR 439.65 x 12 = 5275.8 sq.mt.
TERRACE FLOOR 68.38
TOTAL 6354.67 sq.mt.
TOTAL NO. OF BLOCK C = 3
TOTAL 5783.83 x 3 = 17,351.49 sq.mt.
19. BLOCK D
FLOOR G.B.U.A. (sq. mt.)
GROUND FLOOR 1316.67
FIRST FLOOR 532.17
TOTAL 1848.84 sq.mt.
BLOCK E
FLOOR G.B.U.A. (sq. mt.)
GROUND FLOOR 108.76
20. AREA CALCULATIONS OF BLOCK - A,B,C,D,E
FLOOR G.B.U.A. (sq. mt.) B.A.R. (sq.mt)
BLOCK - A 17,158.58 15,207.44
BLOCK - B 88,965.38. 77,823.48
BLOCK - C 17,351.49 15.039.93
BLOCK - D 1555.67 1555.67
BLOCK -E 108.76 108.76
TOTAL 1,25,139.80 1,09,735.18
28. GAS PIPELINE
CNG and gas pipeline is
provided to kitchen of every
flat units.
The figure shows the gas
pipeline at ground floor.
29. LETTER SERVICE
There are letter boxes
allotted to every units of
flats at the ground floor.
Hence, there is no need of
postman knocking the
doors or going inside the
building.
30. FIRE SAFETY
There are some facilities in case of fire incident.
1. Mic for alert/ broadcast
2. Fire extinguisher pipe (one per block)
3. Fire Alarm
4. Emergency button
5. Fire staircase
6. Fire exit stickers
Fire drill happens once in a month.
1
2
3
4
33. GARBAGE CHUTE
There is a garbage chute in each towers. It
has an opening at every floors and can
collected from the ground floor opening.
The garbage collector takes the garbage
from here every morning without
disturbing the residents or intervening
other’s work.
35. Rain Water Harvesting
On rain, no rain water stays on the surface
of the plot. It gets drained to the
underground. The water level was 1,000m
deep in the beginning and now, it is 800m.
Now, water is supplied from outside but in
3-4 years, Ashiana Umang will have its
own water supply system for the residents
and other purpose.