SlideShare a Scribd company logo
1 of 16
Download to read offline
Introduction
Our commercial building is based on shopping mall called The
Brand new ,named by me and my Brother,Su Bang Xiang.Our
commercial building is about 4 storey,including Ground floor of
basement parking.Our shopping centre have retail
shop,hypermarket,cinema,hawker and etc.Even restaurant also include
in this shopping mall.You can spend your time with your
family,relax,gathering and etc which can help you to reduce stress.You
can find anything you want in this shopping
mall,Vegetable,Clothes,Fruits,Branded shop and etc.This is the best
place to let the buyer shop because you can buy all those thing in 1
shopping mall.
We choose this site because of it’s huge.The site located on
the centre of industry area and resident area.Therefore the worker and
family can go there more easier.
Benefit
-Can buy anything you want in 1 shopping mall.
-easy accessibility to the shopping mall.
-5 min away from the industry area
-People who live at housing area need to use about 8-10 min by using
car
-Weekday,10am-5pm.Weekend and holiday,8am-11pm which can let the
tourisms and family have more time accompany with their family.
Impact
-Traffic jam at working time
-Lack of packing area because we are provide g floor basement parking
area only.
-Air pollution,the shopping mall build on the centre of industry area.
Waterpark
-The waterpark build on the rooftop. Therefore, it will attract more
tourism come to the waterpark.Beside it also build a small waterpark for
4-8 years old children.Thus,they can enjoy with their family
Massage.
-If tourism want to take a rest. Don't worry! We provide the massage
room which locate beside the waterpark.Thus,tourism and family can go
to massage after play at the waterpark.
Rationale basement,ground floor,1st floor,
2rd floor and 3rd floor
Ground floor is basement car park.It allow the car park at there.We will
not decorate the basement car park because ugly basement car park
will not effect the tourism mood.We plan for build on the Ground floor is
because it can save more lane.So that,we can build more building
beside the commercial building.
1st floor have main entrance,information centre,retail shop and etc.A lot
of branded shop open at there too such as Channel,converse,Nike and
etc.Therefore you can buy any branded goods you want as long as you
have money.2rd floor will build the food street which can let them eat
different type of foods.
3rd floor is build on the rooftop and it will have a waterpark and
massage at there.The massage room will provide a well known service
which can let the tourism recover their stamina faster and release stress.
Conceptual Plan
Master Plan
Material used
1st floor tiles,Shopping area.
2rd tiles,food court
Double Loading tiles use at massage centre
floor
Type to enter text
Marble stone
tiles
Build on the rooftop to prevent suicide
action and child care.
The 3rd floor waterpark will use non slippery tiles to prevent slip down.
Wall.
Using brick and cement
Facilities
CONCLUSION
In the nutshell,i learn how to do my work as a team and I try
my best to design the interior building and draw a plan
which can help me to improve the knowledge.
1st floor>Shopping centre
Retail shop Hypermarket
2rd floor>hawker stall
3rd floor>Rooftop Waterpark
Basement Car Park
Scope of work of each
professional
Civil engineer-design, construct, supervise, operate,
and maintain large construction projects and systems,
including roads, buildings, airports, tunnels, dams, bridges,
and systems for water supply and sewage treatment.
Quantity Surveyor-preparing tender and contract
documents, including bills of quantities with the architect
and/or the client,undertaking cost analysis for repair and
maintenance project work,assisting in establishing a client's
requirements and undertaking feasibility studies;
performing risk, value management and cost
control,advising on procurement strategy,identifying,
analysing and developing responses to commercial
risks,preparing and analysing costings for tenders,allocating
work to subcontractors,providing advice on contractual
claims,analysing outcomes and writing detailed progress
reports,valuing completed work and arranging
payments,maintaining awareness of the different building
contracts in current use,understanding the implications of
health and safety regulations.
Electrical engineer-identifying customer
requirements,designing systems and products,reading
design specifications and technical drawings,researching
suitable solutions and estimating costs and
timescales,making models and prototypes of products using
three-dimensional design software,working to British (BS),
European (EN) and other standards,liaising with others in
the design team,liaising with clients and
contractors,attending meetings on site,designing and
conducting tests,recording, analysing and interpreting test
data,proposing modifications and retesting
products,qualifying the final product or system,servicing
and maintaining equipment,preparing product
documentation, writing reports and giving
presentations,monitoring a product in use to improve on
future design.
Architect-attend site meeting or analysis and other problem
which may be critical,Work with other professional such as
engineer and QS,Need to know the full detail of the project and
follow the required and some request by clients,The Architect
has the authority to order inspection or testing of the Work by
contractor,state the clients’ financial limit and request to the
Professional,writing the term of condition of the appointment
and request confirmation,Inform clients other professional
required.
ICI PROJECT
PROPOSAL
BY
SU BANG ZHENG
ICI Development Proposal

More Related Content

Similar to ICI Development Proposal

ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15kellyxc
 
Prasentation on satyasai_tower
Prasentation on satyasai_towerPrasentation on satyasai_tower
Prasentation on satyasai_towerkiranpatiyal
 
Ici proposal combined
Ici proposal combinedIci proposal combined
Ici proposal combinedJanson Chen
 
FNBE 0315: ICI (Final Project)
FNBE 0315: ICI (Final Project)FNBE 0315: ICI (Final Project)
FNBE 0315: ICI (Final Project)haeykceb
 
Commercial Design Project
Commercial Design ProjectCommercial Design Project
Commercial Design Projectdezyneecole
 
ici final project 0w0.docx
ici final project 0w0.docxici final project 0w0.docx
ici final project 0w0.docxrivenhau
 
Ici final project 0w0
Ici final project 0w0Ici final project 0w0
Ici final project 0w0limziahuei
 
Ici final project 0w0
Ici final project 0w0Ici final project 0w0
Ici final project 0w0rivenhau
 
Proposal a pasar desa
Proposal a pasar desaProposal a pasar desa
Proposal a pasar desaLeon Lim
 
Automotive service development program part 03 - module 1
Automotive service development program part 03 - module 1Automotive service development program part 03 - module 1
Automotive service development program part 03 - module 1Mohamed Shehata
 
ICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's ProposalICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's ProposalTamZhaoWei
 
ICI 6. tam zhao wei
ICI 6. tam zhao weiICI 6. tam zhao wei
ICI 6. tam zhao weiashleyyeap
 
City Center, Sheikhupura, Marketing by Fast Marketing Consultants Pvt. Ltd.
City Center, Sheikhupura, Marketing by Fast Marketing Consultants Pvt. Ltd.City Center, Sheikhupura, Marketing by Fast Marketing Consultants Pvt. Ltd.
City Center, Sheikhupura, Marketing by Fast Marketing Consultants Pvt. Ltd.SaremcoGroup
 
City Center, Sheikhupura
City Center, Sheikhupura City Center, Sheikhupura
City Center, Sheikhupura Asghar Goraya
 
Corner protector recreational traffic safety signs
Corner protector   recreational traffic safety signsCorner protector   recreational traffic safety signs
Corner protector recreational traffic safety signssandrajohnsonnz
 

Similar to ICI Development Proposal (20)

ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
ICI FINAL PROJECT (INDIVIDUAL) MARCH'15
 
ICI Final
ICI FinalICI Final
ICI Final
 
Prasentation on satyasai_tower
Prasentation on satyasai_towerPrasentation on satyasai_tower
Prasentation on satyasai_tower
 
Ici proposal combined
Ici proposal combinedIci proposal combined
Ici proposal combined
 
FNBE 0315: ICI (Final Project)
FNBE 0315: ICI (Final Project)FNBE 0315: ICI (Final Project)
FNBE 0315: ICI (Final Project)
 
Commercial Design Project
Commercial Design ProjectCommercial Design Project
Commercial Design Project
 
ici final project 0w0.docx
ici final project 0w0.docxici final project 0w0.docx
ici final project 0w0.docx
 
Ici final project 0w0
Ici final project 0w0Ici final project 0w0
Ici final project 0w0
 
Ici final project 0w0
Ici final project 0w0Ici final project 0w0
Ici final project 0w0
 
Proposal a pasar desa
Proposal a pasar desaProposal a pasar desa
Proposal a pasar desa
 
Estimator. Ali V Paquingan updtd.CV
Estimator. Ali V Paquingan updtd.CVEstimator. Ali V Paquingan updtd.CV
Estimator. Ali V Paquingan updtd.CV
 
Estimator.+Ali+V+Paquingan+updtd.CV
Estimator.+Ali+V+Paquingan+updtd.CVEstimator.+Ali+V+Paquingan+updtd.CV
Estimator.+Ali+V+Paquingan+updtd.CV
 
Automotive service development program part 03 - module 1
Automotive service development program part 03 - module 1Automotive service development program part 03 - module 1
Automotive service development program part 03 - module 1
 
ICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's ProposalICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's Proposal
 
ICI 6. tam zhao wei
ICI 6. tam zhao weiICI 6. tam zhao wei
ICI 6. tam zhao wei
 
City Center, Sheikhupura, Marketing by Fast Marketing Consultants Pvt. Ltd.
City Center, Sheikhupura, Marketing by Fast Marketing Consultants Pvt. Ltd.City Center, Sheikhupura, Marketing by Fast Marketing Consultants Pvt. Ltd.
City Center, Sheikhupura, Marketing by Fast Marketing Consultants Pvt. Ltd.
 
City Center, Sheikhupura
City Center, Sheikhupura City Center, Sheikhupura
City Center, Sheikhupura
 
Corner protector recreational traffic safety signs
Corner protector   recreational traffic safety signsCorner protector   recreational traffic safety signs
Corner protector recreational traffic safety signs
 
Ici
IciIci
Ici
 
Cv abdullatif 2016
Cv abdullatif 2016Cv abdullatif 2016
Cv abdullatif 2016
 

Recently uploaded

80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
Philosophy of china and it's charactistics
Philosophy of china and it's charactisticsPhilosophy of china and it's charactistics
Philosophy of china and it's charactisticshameyhk98
 
Simple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfSimple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfstareducators107
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfPondicherry University
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsNbelano25
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111GangaMaiya1
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17Celine George
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17Celine George
 

Recently uploaded (20)

80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Philosophy of china and it's charactistics
Philosophy of china and it's charactisticsPhilosophy of china and it's charactistics
Philosophy of china and it's charactistics
 
Simple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfSimple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdf
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Call Girls in Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in  Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in  Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17
 

ICI Development Proposal

  • 1. Introduction Our commercial building is based on shopping mall called The Brand new ,named by me and my Brother,Su Bang Xiang.Our commercial building is about 4 storey,including Ground floor of basement parking.Our shopping centre have retail shop,hypermarket,cinema,hawker and etc.Even restaurant also include in this shopping mall.You can spend your time with your family,relax,gathering and etc which can help you to reduce stress.You can find anything you want in this shopping mall,Vegetable,Clothes,Fruits,Branded shop and etc.This is the best place to let the buyer shop because you can buy all those thing in 1 shopping mall. We choose this site because of it’s huge.The site located on the centre of industry area and resident area.Therefore the worker and family can go there more easier.
  • 2. Benefit -Can buy anything you want in 1 shopping mall. -easy accessibility to the shopping mall. -5 min away from the industry area -People who live at housing area need to use about 8-10 min by using car -Weekday,10am-5pm.Weekend and holiday,8am-11pm which can let the tourisms and family have more time accompany with their family. Impact -Traffic jam at working time -Lack of packing area because we are provide g floor basement parking area only. -Air pollution,the shopping mall build on the centre of industry area.
  • 3. Waterpark -The waterpark build on the rooftop. Therefore, it will attract more tourism come to the waterpark.Beside it also build a small waterpark for 4-8 years old children.Thus,they can enjoy with their family Massage. -If tourism want to take a rest. Don't worry! We provide the massage room which locate beside the waterpark.Thus,tourism and family can go to massage after play at the waterpark.
  • 4. Rationale basement,ground floor,1st floor, 2rd floor and 3rd floor Ground floor is basement car park.It allow the car park at there.We will not decorate the basement car park because ugly basement car park will not effect the tourism mood.We plan for build on the Ground floor is because it can save more lane.So that,we can build more building beside the commercial building. 1st floor have main entrance,information centre,retail shop and etc.A lot of branded shop open at there too such as Channel,converse,Nike and etc.Therefore you can buy any branded goods you want as long as you have money.2rd floor will build the food street which can let them eat different type of foods. 3rd floor is build on the rooftop and it will have a waterpark and massage at there.The massage room will provide a well known service which can let the tourism recover their stamina faster and release stress.
  • 6. Material used 1st floor tiles,Shopping area. 2rd tiles,food court Double Loading tiles use at massage centre floor Type to enter text Marble stone tiles
  • 7. Build on the rooftop to prevent suicide action and child care. The 3rd floor waterpark will use non slippery tiles to prevent slip down. Wall. Using brick and cement
  • 8. Facilities CONCLUSION In the nutshell,i learn how to do my work as a team and I try my best to design the interior building and draw a plan which can help me to improve the knowledge.
  • 13. Scope of work of each professional Civil engineer-design, construct, supervise, operate, and maintain large construction projects and systems, including roads, buildings, airports, tunnels, dams, bridges, and systems for water supply and sewage treatment. Quantity Surveyor-preparing tender and contract documents, including bills of quantities with the architect and/or the client,undertaking cost analysis for repair and maintenance project work,assisting in establishing a client's requirements and undertaking feasibility studies; performing risk, value management and cost control,advising on procurement strategy,identifying, analysing and developing responses to commercial risks,preparing and analysing costings for tenders,allocating work to subcontractors,providing advice on contractual claims,analysing outcomes and writing detailed progress reports,valuing completed work and arranging payments,maintaining awareness of the different building contracts in current use,understanding the implications of health and safety regulations.
  • 14. Electrical engineer-identifying customer requirements,designing systems and products,reading design specifications and technical drawings,researching suitable solutions and estimating costs and timescales,making models and prototypes of products using three-dimensional design software,working to British (BS), European (EN) and other standards,liaising with others in the design team,liaising with clients and contractors,attending meetings on site,designing and conducting tests,recording, analysing and interpreting test data,proposing modifications and retesting products,qualifying the final product or system,servicing and maintaining equipment,preparing product documentation, writing reports and giving presentations,monitoring a product in use to improve on future design. Architect-attend site meeting or analysis and other problem which may be critical,Work with other professional such as engineer and QS,Need to know the full detail of the project and follow the required and some request by clients,The Architect has the authority to order inspection or testing of the Work by contractor,state the clients’ financial limit and request to the Professional,writing the term of condition of the appointment and request confirmation,Inform clients other professional required.