Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

0

Share

Download to read offline

Resume_Susanta

Download to read offline

Related Audiobooks

Free with a 30 day trial from Scribd

See all
  • Be the first to like this

Resume_Susanta

  1. 1. Curriculum-Vitae SUSANTA DUTTA BANIK Diploma - Electrical Engineering Contact No. : +91-8100586008 (M) E-mail: susantababai2006@gmail.com Career Objective: To achieve a career in growing and rewarding work environment, where I can actively devote my creative abilities and professional interest to satisfy my urge for excellence. Professional Experience Electrical Engineer with 10 Years Experience in Designing & Construction field of Power Plant Engineering. Career Profile: o Presently working as a Design Executive – Electrical Engineering for Captive Power Plant Projects in Thermax Limited, Pune from January’2011 to till date. o Worked as an Electrical Designer in Development Consultant Private Limited, Kolkata from September’2009 to January’2011. o Worked as an Electrical Design Engineer in Airtech Consultancy Services, Kolkata from March’2009 to August’2009. o Worked as an Electrical CAD Engineer in Acropetal Technologies Limited, Bangalore from December’2006 to February’2009. o Worked as an Electrical Engineer in Vachan Electrical Private Limited, Bangalore from June’2005 to December’2006. Technical expertise area and responsibilities o Design of Electrical Equipment Layout considering statutory clearances. o Checking of Earthing Layout including BOM. o Checking of Lighting Layout including BOM. 1 of 5
  2. 2. o Checking of Cable Tray Layout including BOM. o Cable sizing & estimation. o Co-ordination with inter-department and vendors during designing of layout & documents. o Expertise in engineering with AutoCAD Tool. o Preparation of Electrical LT Control & Power Cable Schedule and Inter-connection Schedule. o Preparation of transmittal system during release of Engineering Released documents. o Offsite support to site person during construction phase. o Vendor drawing review. o Preparation of technical specification for electrical package. o Preparation of erection BOQ. o Site inspection for ongoing project. Skill Set o Application Tools and Software Tools: AUTO CAD 2006, 2007, 2011; CG Lux; Photo Lux, Micro-station, MS- Office. Project Details Projects Handled in Thermax Ltd.: a. Yemen Corporation of Sugar Refinery, Yemen (1x13.5 MW Captive Power Plant). b. Orient Paper Mills, Amlai, Shahdol, M. P. (25 & 30 MW Captive Power Plant). c. KJSA Steel, Barpada, Guali, Keonjhar, Orissa (1x20 MW Captive Power Plants). d. J K Cement, Mangrol, Rajasthan (1x10 MW Captive Power Plants). e. North Eastern Electric Power Corporation Ltd., Agartala, Tripura (2x23 MW Power Plants). f. Dangote Industries LTD. (Tanzania) 3 X 25 MW Captive Power Plants. g. Dangote Industries Ltd. Tanzania (3x25MW Coal Base captive Power Plant.) h. Rain Cements Ltd., Kurnool Andhra Pradesh (1x6.4MW WHRB Base CPP) o Designing & Checking of all electrical layouts. o Preparation of Electrical LT Control & Power cable schedule and inter-connection schedule. 2 of 5
  3. 3. o Vendor drawing review. o Checking of all Drawings. Projects Handled in Development Consultant Pvt. Ltd.: a. CEBU Power Plant in Philippines, (2x100 MW Thermal Power Plants). b. Adhunik Power Natural Resources Ltd. in Jharkhand (2x270 MW Phase-1). c. Jindal Steel & Power Ltd. in, Orissa (6x135 MW Captive Power Plants). o Preparation of Equipment Layout, Earthing Layout, Lightning Layout, Cable Tray Layout, Illumination Layout. Projects Handled in Airtech Consultancy Services: a. Udaypur Resorts in Digha, West Bengal. b. Bankura Zilla Parishad in Bankura, West Bengal. c. Kaanan in Belvedere Road, Kolkata. d. Goldighi Mall in Silchar, Assam. o Preparation of building Earthing Layout, Cable Tray Layout, Illumination Layout. Projects Handled in Acropetal Technologies Ltd.: a. Pama Villa Building in Riyadh. b. Kaust in Saudi Arabia. c. All Asri Villa in Jeddah. d. Ayhar Villa in Riyadh. e. Al Samariya Fram in Jeddah. o Preparation of building Earthing Layout, Cable Tray Layout, Illumination Layout. Projects Handled in Vachan Electrical Pvt. Ltd.: f. Hinduja Park in Bangalore. g. Chatanya Samarpan in Bangalore. h. Bysani Enclave in Bangalore. o Handling a site work for Electrification. Certification 3 of 5
  4. 4. o Achieved Safety Licensing Program Certificate in Thermax Limited. o Done Master Diploma in Electrical CAD in CAD Centre Bangalore. Course Content.  Auto CAD-2006  PC Schematic EL-Automation.  Project Planning & Management. Educational Qualification o Technical Qualification : B-Tech Electrical Engineering. o Duration : Lateral Entry Three years (Part Time). o Year of passing : Pursuing 8 TH Sem (2015). o Board : Karnataka State Open University. o Technical Qualification : Diploma Engineering. o Trade : Electrical. o Duration : Three years (Full Time). o Year of passing : 2005. o Name of Institute : Impact Polytechnic, Bangalore. o Board : Karnataka Technical Board, Bangalore. Personal Details o Date of Birth : 14/10/1981. o Sex : Male. o Marital Status : Married. o Nationality : Indian. o Passport No. : H0936274. Valid till - 14/10/2022. o Languages Known : Bengali, Hindi and English. o Permanent Address : 70A/6, Phoolbagan Road, Baghajatin, Kolkata-700086, West Bengal. o Hobbies : Listening Music. 4 of 5
  5. 5. Winding Up: The all above information is true and correct best to my knowledge. I am confident that I will do justice to the job entrusted to me with a great sense of professionalism and enthusiasm. Place: Pune. ----------------------------------------------------- Date: 24/08/2014 Signature 5 of 5
  6. 6. Winding Up: The all above information is true and correct best to my knowledge. I am confident that I will do justice to the job entrusted to me with a great sense of professionalism and enthusiasm. Place: Pune. ----------------------------------------------------- Date: 24/08/2014 Signature 5 of 5

Views

Total views

536

On Slideshare

0

From embeds

0

Number of embeds

9

Actions

Downloads

2

Shares

0

Comments

0

Likes

0

×