PROFESSIONAL EXPERIENCE
September 1993 to date:
Worked as Materials Manager and Coordinator, responsible for:
Receipt of materials, checking them for shortages and damages. Verification of receipt against the bill of
quantities.
Replenishment of materials by local purchases or requesting from Europe through the contract manager, if
shortages or damages are detected and also due to site modifications and non-conformities.
Coordination of required materials between the engineering in Europe and erection team on site.
Coordination of all storage and issues of materials to the sub-contractors in charge of erection and
warehousing.
Contact with the shipping agents for cargo movements at port/airports of origin and destination.
Receipt, distribution and handling of all Technical documents pertaining to the project, and upkeep of a
master archives.
Handling of insurance claims in case of damages incurred during transportation and on site damages.
Coordination between divisions for the status of their materials.
Helping the erection supervisors on minor technical issues as regards to construction activities.
Handing over of contractual spares to the clients.
Material Handled: Pipes, Fittings, Valves, Supports, Pumps, Motors, Condensers, Tanks and Vessels, Coal and Ash
Handling Systems, Limestone Silo’s and Pneumatic Transport Systems, Panels, Fire Fighting Equipment, HVAC
Equipment, Water treatment plants, Lubricants, Chemicals, Gas and Steam Turbines, Generators, Transformers,
Electrical Panels and Electrical accessories cables etc.., DCS control panels and associated equipment.
Handled the following projects:
April 2015 to May 2015 Alstom Power France & Poland
Three weeks trip to Belfort and Opole project in Poland to prepare a Material Handling Process as well as
train Polish staff on the utilization of the Material Handling Tool (MTA) as the contract on the said project is
different from other standard projects. Interface with three different partners
May 2012 to March 2015 Alstom Power Manjung Malaysia
Coal fired power plant of 1000MW
Client TNBJ
September 2011 to December 2011 Alstom Power Terga, Algeria
Combined cycle plant of 1200MW, short duration logistical support to the construction team and the material
handling department.
2. CURRICULUM VITAE
2
July 2009 to June 2011 Alstom Power Gabes, Tunisia
Ghannouch Project of 420MW consisting of One GT26 Gas Turbine, One Steam Turbine and One HRSG all
Alstom.
Client STEG (Tunisian Gas and Electricity Authority)
March 2006 to June 2009 Alstom Power Dubai, UAE
Two plants one 450 MW consisting of two GT13E2 gas turbines, two CMI HRSG’s one Steam turbine ,
project CCPP22
Second one was a 150MW of one GT13E2 gas turbine, one CMI HRSG. This plant had a complex piping as
the steam was used as a backup for 6 existing HRSG’s and also for desalination process steam.
Client Dubal (Dubai Aluminium Company Jebel Ali).
On these two projects besides Material Handling I was also the Site Administration Manager.
November 2004 to January 2006 Alstom Power Belfort, France
Mission for Engineering Construction Department for the following Dubaï, Shoiaba (Saudia Arabia), Keppel
(Singapore), Aluar (Argentina) and Dubai CCPP22
Isometric and MTO checking
Preparing erection quality control plan documents
Up date of BOQ (Bill of quantities) for the initial and final quantities, against contractor’s claims
Initial progress reporting prior to actual site construction
January 2004 to November 2004 Alstom Power Dubai, U.A.E
Add on of a combined cycle power plant on existing General Electric Gas turbine frame 9E gas turbines.
Added 250MW to bring total to 350MW.
Client Dubal (Dubai Aluminium Company Jebel Ali).
February 2002 till October 2003 Alstom Power Can, Turkey
Circulating Fluidized Bed Combustion Coal fired thermal power plant. Total 320 MW.
Client EUAS Turkey Power Generation Corp.
January 2002 Alstom Power Belfort Belfort , France
Spent three weeks in France to train on a material management system through the Internet called “
EPC’Ystem”, and subsequently on material management (MAUT) software for site utilization through down
able files from the Internet, also to determine the tool’s feasibility for use on current as well as future sites.
September 2001 to November 2001 Alstom Power Rades, Tunisia
Short tenure for material reconciliation, for a 471MW combined cycle power plant.
January 2001 to July 2001 Alstom Power Tucuman, Argentina
Add on of one gas turbine and a conversion into a combined cycle. Total 350MW.
Client Pluspetrol Energy SA.
3. CURRICULUM VITAE
3
December 1999 to December 2000 Alstom Power Singapore
Combined cycle power plant. Total 800MW.
Client Sembaweng Power
March 1999 to October 1999 ABB Alstom Power Dubai, U.A.E
Add on of a combined cycle power plant on existing European Gas turbine frame 9E gas turbines. Added
350MW to bring total to 700MW.
Client Dubal (Dubai Aluminium Company Jebel Ali).
April 1998 to February 1999 Alstom Power Mejillones, Atacama Chile
Combined cycle power plant. Total 750MW.
Client NOPEL (North East Pacific Electricity Company).
August 1996 to February 1998 GEC Alshtom Chachoengsao, Thailand
Client Alpha Power Co. Ltd combined cycle power plant. Total 210MW.
Due to a default by the client the project was closed. Was involved in the preservation of all erected
equipment for a period of 7 months, until the materials were officially transferred to the client.
September 1993 to June 1996 GEC Alsthom Sousse, Tunisia
Combined cycle power plant. Total 350MW.
Client STEG (Tunisian Electricity and Gas Corporation).
January 1992 to August 1993 Alsthom Export Kawas, India
Materials purchases and shipping agent coordinator for NTPC’s 660MW combined cycle power plant.
Responsibility:
Replenishment through local purchases or through Europe
Coordination of all incoming shipment at the port and their transportation to site with the shipping agent.
Insurance claims for all equipment received damaged or damages sustained during erection process.
Preparation and handing over of contractual spares.
July 1986 to December 1991 Spie Capag/NKK/Toyo Baroda, India
Worked as an assistant to the Administration Manager, and later as an assistant Warehouse Manager at the
projects central warehouse, for the 1700Kms HBJ Gas Pipeline for Gas Authority of India.
Material handled was pipes, fittings, telecom equipment (VHF/UHF Antennas-Omniplexers/Multiplexers-
Telecom tower structures), Scada equipment, earth station equipment, cathodic protection equipment, and test
equipment, VAX 780 mainframes spares.
Was responsible for: -
1- General running of a large-scale warehouse.
2- Receipt of materials from ports/Airports.
3- Inventory, repacking and dispatching to different site location.
4- Inland transportation with local transporters.
5- Sale of vehicles and other construction equipment purchased locally.
6- Container stuffing and inventorying of temporary import of construction equipment.
7- Vehicles maintenance with a team of mechanics including purchases and stocking all spares.
8- Mandatory spares and test equipment segregation and dispatching to all the storage sites designated by
the client along the pipeline.
4. CURRICULUM VITAE
4
February 1985 to April 1986 Mazda Polymers Pvt.Ltd Baroda, India
Was responsible for the feasibility study for setting up of a manufacturing facility for disposable syringes or
automotive polymer parts. This required contacting different organizations spanning the complete value chain
for the two products.
Was involved in the preparation of the project report for getting financial assistance from Gujarat State
Finance Corporation for the manufacturing of disposable syringes, which was the product chosen by the
company for manufacturing.
July 1984 to January 1985 J.P Marketing Baroda, India
Worked as a salesman for Advani Orliekon brand of welding products, mainly electrodes. For which the firm
was an agent.
EDUCATIONAL QUALIFICATIONS
Examination Passed School/College Board/University Year of Passing
Master Of Commerce Faculty of
Commerce
M.S. University Baroda April 1984
Bachelor Of Commerce Faculty of
Commerce
M.S. University Baroda April 1982
Higher secondary School
Certificate
Shreyas Vidyalaya
Baroda
Gujarat State Secondary
Board
April 1979
LANGUAGES
English Fluent in Speaking, Reading and Writing
French Fluent in Speaking, Reading and Writing
Hindi Fluent in Speaking and Average in Reading and Writing
Gujarati Fluent in Speaking and Average in Reading and Writing
Spanish working knowledge
MARITAL STATUS
Married and have a daughter aged 26