This document outlines a production schedule for a music video and film. It lists dates for auditions, location scouting, filming various scenes, and obtaining equipment. It also details the casting for each filming date. The schedule then lists dates for editing rough cuts of the film, with 12 rough cuts being created by March 14th. Additional filming was done on March 16th and 21st to add more narrative scenes. The final cut was scheduled to be completed by March 24th.