Filming Schedule

Scenes(with respect to   Details                              Date
the storyboard)
Scene 7,11 & 16          Live footage of Billy Lockett-       Thursday 1st November
                         (Leicester-The Donkey)               Starts at 8:30PM
                         Two cameras at different
                         angles, main focus being the
                         artist not the audience or
                         band.
Scene 1,2,6,13,17 & 18   Filming the male character           Friday 2nd November
                         with a guitar down a street to       Start at 11:00AM
                         meet his girlfriend/partner.
                         This can be cut into these
                         scenes as oppose to filming
                         each one separately.
Scenes 3 & 4             Filming in the club/pub.             Friday 9th November
                         Two separate groups, girls and       Start at 7:00PM
                         boys, they meet at the bar.
                         Long shot of the groups. Close
                         up of the two main characters.
Scene 5                  The two characters walking in        Saturday 10th November
                         a field, holding hands. Close up     Start at 12:00PM
                         of their faces and an extreme
                         close up of their hands. Mid
                         shot of them, maybe a wide
                         shot of the location.
Scene 8,9,10 & 12        The footage of the two               Sunday 11th November
                         characters moving into a             Start at 11:00AM
                         house, and all the scenes that
                         involves filming in this location.
Scenes 14 & 15           Filming the two scenes. Scene        Saturday 17th November
                         15 involves possible stop            Start at 1:00PM
                         motion, we will film this as well
                         as taking pictures on a camera,
                         incase the stop motion doesn’t
                         work.
Editing Schedule

Details                                         Date
Upload all footage into the project and         Monday 19th November
collect together all clips.
Put the clips in order of the scenes and cut    Wednesday 21st November
them to a desired length.
Refine the footage and add the soundtrack.      Friday 23rd November
Begin to look closely at the timings and how    Tuesday 27th November
they synch to the clips.
Continue with the timings and synching of       Thursday 29th November
the clips.
Finish synching the clips and timings of the    Friday 30th November
music.
Edit in the transitions between clips and add   Tuesday 4th December
desired effects to the video.
Finish all the editing                          Thursday 6th December

Filming and Editing Schedules

  • 1.
    Filming Schedule Scenes(with respectto Details Date the storyboard) Scene 7,11 & 16 Live footage of Billy Lockett- Thursday 1st November (Leicester-The Donkey) Starts at 8:30PM Two cameras at different angles, main focus being the artist not the audience or band. Scene 1,2,6,13,17 & 18 Filming the male character Friday 2nd November with a guitar down a street to Start at 11:00AM meet his girlfriend/partner. This can be cut into these scenes as oppose to filming each one separately. Scenes 3 & 4 Filming in the club/pub. Friday 9th November Two separate groups, girls and Start at 7:00PM boys, they meet at the bar. Long shot of the groups. Close up of the two main characters. Scene 5 The two characters walking in Saturday 10th November a field, holding hands. Close up Start at 12:00PM of their faces and an extreme close up of their hands. Mid shot of them, maybe a wide shot of the location. Scene 8,9,10 & 12 The footage of the two Sunday 11th November characters moving into a Start at 11:00AM house, and all the scenes that involves filming in this location. Scenes 14 & 15 Filming the two scenes. Scene Saturday 17th November 15 involves possible stop Start at 1:00PM motion, we will film this as well as taking pictures on a camera, incase the stop motion doesn’t work.
  • 2.
    Editing Schedule Details Date Upload all footage into the project and Monday 19th November collect together all clips. Put the clips in order of the scenes and cut Wednesday 21st November them to a desired length. Refine the footage and add the soundtrack. Friday 23rd November Begin to look closely at the timings and how Tuesday 27th November they synch to the clips. Continue with the timings and synching of Thursday 29th November the clips. Finish synching the clips and timings of the Friday 30th November music. Edit in the transitions between clips and add Tuesday 4th December desired effects to the video. Finish all the editing Thursday 6th December