SlideShare a Scribd company logo
1 of 5
LABORATORY OF INSTRUMENTAL SOIL
RESEARCH METHODS, STANDARDIZATION AND
METROLOGY
NATIONAL SCIENTIFIC CENTER «INSTITUTE FOR SOIL SCIENCE AND AGROCHEMISTRY
RESEARCH NAMED AFTER O.N. SOKOLOVSKY»
UNSlab (Ukrainian National Soil Laboratory)
Maksym Solokha
Status of establishment: under establishment
Official name of the National Soil Laboratory Network: UNSlab (Ukrainian National Soil
Laboratory) – may be modified in future
Actual or expected procedure for establishing the National Soil Laboratory Network (in
steps):
1. Collected information on the availability of specialized laboratories in Ukraine.
2. After receiving the contacts of the specialized laboratories, invitations were sent to
participate in the network of national laboratories.
3. Within a short period of time, the laboratories got acquainted with the initiative to
create a network of national laboratories and registered on the website in a profile form
4. At the moment, information is being collected on the presence of non-core
laboratories (in related departments, universities, academies, organizations of various
forms of ownership)
5. In the process of work, a number of laboratories were not involved in the network of
laboratories due to various reasons, including:
- lack of the required quality of the laboratory (it means that the laboratory is located
even in another country, and analysis services are offered in Ukraine
- lack of an interested person, personnel for the network's profile work
- a low level of laboratory quality (an annual ring test is carried out for verification)
Actual or expected number of laboratories in the network: actual – 7, expected - 2
Please specify if you received any help to establish the network by a
donor/international initiative/etc. (please specify) : Yes, we get on an ongoing basis
Obstacles encountered
during the establishment
of the network
How did you overcome
the obstacle?
Notes
Workload of laboratory
personnel, as a result of lack
of time to understand the
problem and its solution
The required time is reserved
for the execution of
documents along with the
annual ring test
It took time to fill out profile
forms on the Internet
During the ring test (our
number # 28), due to the lack
of certification for some
research methods, we could
not analyze them.
We conduct SOP studies on
these indicators and plan to
conduct an analysis
-
To disseminate knowledge
between laboratories, it was
planned to hold about five
meetings with
representatives of the
national network
Due to the quarantine and its
further tightening, the
meetings were canceled,
Internet on-line conferences
have not yet been held due
to the technical unavailability
of a number of laboratories
The problem has not yet been
resolved
In case you are presenting about a already established network, please briefly
report on the main activities (including meetings) implemented by the network so
far:
- Development and approval of a plan for the implementation of COP
GLOSOLAN at the national level. Discuss, agree on a plan at the academic
council of the national center.
- After translation and approval of all SOPs, we plan to distribute them over the
backbone network in order to discuss them later via e-mail.
- -After the distribution of the SOP throughout the national network, receive
feedback from them (comments, additions) and agree on the subsequent
actions for the implementation of the SOP.
- After specifying the deadlines, it is planned to introduce SOPs according to the
approved plan, conducting mandatory ring tests and training seminars for each
SOP (we believe this is necessary to improve the level of each laboratory).
- Carry out the results obtained for each SOP on standard samples and agree
with the data that GLOSOLANE has.
Unfortunately, the meeting schedule is currently violated and it is not yet known
when the quarantine will be canceled.
Thanks for your
attention

More Related Content

More from Soils FAO-GSP

The status of salt-affected soils in Africa with a focus on Djibouti
The status of salt-affected soils in Africa with a focus on DjiboutiThe status of salt-affected soils in Africa with a focus on Djibouti
The status of salt-affected soils in Africa with a focus on DjiboutiSoils FAO-GSP
 
The status of salt-affected soils and spatial modelling of the soil salinity ...
The status of salt-affected soils and spatial modelling of the soil salinity ...The status of salt-affected soils and spatial modelling of the soil salinity ...
The status of salt-affected soils and spatial modelling of the soil salinity ...Soils FAO-GSP
 
Avances de LATSOLAN. Rol de laboratorios de referencia y laboratorios inscrit...
Avances de LATSOLAN. Rol de laboratorios de referencia y laboratorios inscrit...Avances de LATSOLAN. Rol de laboratorios de referencia y laboratorios inscrit...
Avances de LATSOLAN. Rol de laboratorios de referencia y laboratorios inscrit...Soils FAO-GSP
 
Presentación del piloto de implementación del programa RECSOIL en Costa Rica ...
Presentación del piloto de implementación del programa RECSOIL en Costa Rica ...Presentación del piloto de implementación del programa RECSOIL en Costa Rica ...
Presentación del piloto de implementación del programa RECSOIL en Costa Rica ...Soils FAO-GSP
 
Implementación del Código Internacional de conducta para el Uso y Manejo Sost...
Implementación del Código Internacional de conducta para el Uso y Manejo Sost...Implementación del Código Internacional de conducta para el Uso y Manejo Sost...
Implementación del Código Internacional de conducta para el Uso y Manejo Sost...Soils FAO-GSP
 
Implementación del Programa de Doctores de los Suelos - Laura Bertha Reyes
Implementación del Programa de Doctores de los Suelos - Laura Bertha ReyesImplementación del Programa de Doctores de los Suelos - Laura Bertha Reyes
Implementación del Programa de Doctores de los Suelos - Laura Bertha ReyesSoils FAO-GSP
 
Propuestas, para el trabajo conjunto alrededor del tema de RECSOIL y del TCP ...
Propuestas, para el trabajo conjunto alrededor del tema de RECSOIL y del TCP ...Propuestas, para el trabajo conjunto alrededor del tema de RECSOIL y del TCP ...
Propuestas, para el trabajo conjunto alrededor del tema de RECSOIL y del TCP ...Soils FAO-GSP
 
Ejemplo de formulación de un proyecto sobre re carbonización de suelos, para ...
Ejemplo de formulación de un proyecto sobre re carbonización de suelos, para ...Ejemplo de formulación de un proyecto sobre re carbonización de suelos, para ...
Ejemplo de formulación de un proyecto sobre re carbonización de suelos, para ...Soils FAO-GSP
 
El compromiso de la fao
El compromiso de la faoEl compromiso de la fao
El compromiso de la faoSoils FAO-GSP
 
Spectroscopy workshop - ASPAC
Spectroscopy workshop - ASPACSpectroscopy workshop - ASPAC
Spectroscopy workshop - ASPACSoils FAO-GSP
 
INFA launch meeting - Item 2: Introduction to the International Code of Condu...
INFA launch meeting - Item 2: Introduction to the International Code of Condu...INFA launch meeting - Item 2: Introduction to the International Code of Condu...
INFA launch meeting - Item 2: Introduction to the International Code of Condu...Soils FAO-GSP
 
INFA launch meeting - Item 1: Introduction to the International Network on Fe...
INFA launch meeting - Item 1: Introduction to the International Network on Fe...INFA launch meeting - Item 1: Introduction to the International Network on Fe...
INFA launch meeting - Item 1: Introduction to the International Network on Fe...Soils FAO-GSP
 
INFA launch meeting - Item 8: INFA work plan
INFA launch meeting - Item 8: INFA work planINFA launch meeting - Item 8: INFA work plan
INFA launch meeting - Item 8: INFA work planSoils FAO-GSP
 
INFA launch meeting - Item 7 - INFA governance
INFA launch meeting - Item 7 - INFA governanceINFA launch meeting - Item 7 - INFA governance
INFA launch meeting - Item 7 - INFA governanceSoils FAO-GSP
 
INFA launch meeting - Item 6 - Mission and objectives of INFA
INFA launch meeting - Item 6 - Mission and objectives of INFAINFA launch meeting - Item 6 - Mission and objectives of INFA
INFA launch meeting - Item 6 - Mission and objectives of INFASoils FAO-GSP
 
INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...
INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...
INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...Soils FAO-GSP
 
Soil biodiversity Global Report - Cuevas
Soil biodiversity Global Report - CuevasSoil biodiversity Global Report - Cuevas
Soil biodiversity Global Report - CuevasSoils FAO-GSP
 

More from Soils FAO-GSP (20)

The status of salt-affected soils in Africa with a focus on Djibouti
The status of salt-affected soils in Africa with a focus on DjiboutiThe status of salt-affected soils in Africa with a focus on Djibouti
The status of salt-affected soils in Africa with a focus on Djibouti
 
The status of salt-affected soils and spatial modelling of the soil salinity ...
The status of salt-affected soils and spatial modelling of the soil salinity ...The status of salt-affected soils and spatial modelling of the soil salinity ...
The status of salt-affected soils and spatial modelling of the soil salinity ...
 
Avances de LATSOLAN. Rol de laboratorios de referencia y laboratorios inscrit...
Avances de LATSOLAN. Rol de laboratorios de referencia y laboratorios inscrit...Avances de LATSOLAN. Rol de laboratorios de referencia y laboratorios inscrit...
Avances de LATSOLAN. Rol de laboratorios de referencia y laboratorios inscrit...
 
Presentación del piloto de implementación del programa RECSOIL en Costa Rica ...
Presentación del piloto de implementación del programa RECSOIL en Costa Rica ...Presentación del piloto de implementación del programa RECSOIL en Costa Rica ...
Presentación del piloto de implementación del programa RECSOIL en Costa Rica ...
 
Implementación del Código Internacional de conducta para el Uso y Manejo Sost...
Implementación del Código Internacional de conducta para el Uso y Manejo Sost...Implementación del Código Internacional de conducta para el Uso y Manejo Sost...
Implementación del Código Internacional de conducta para el Uso y Manejo Sost...
 
Implementación del Programa de Doctores de los Suelos - Laura Bertha Reyes
Implementación del Programa de Doctores de los Suelos - Laura Bertha ReyesImplementación del Programa de Doctores de los Suelos - Laura Bertha Reyes
Implementación del Programa de Doctores de los Suelos - Laura Bertha Reyes
 
Propuestas, para el trabajo conjunto alrededor del tema de RECSOIL y del TCP ...
Propuestas, para el trabajo conjunto alrededor del tema de RECSOIL y del TCP ...Propuestas, para el trabajo conjunto alrededor del tema de RECSOIL y del TCP ...
Propuestas, para el trabajo conjunto alrededor del tema de RECSOIL y del TCP ...
 
Ejemplo de formulación de un proyecto sobre re carbonización de suelos, para ...
Ejemplo de formulación de un proyecto sobre re carbonización de suelos, para ...Ejemplo de formulación de un proyecto sobre re carbonización de suelos, para ...
Ejemplo de formulación de un proyecto sobre re carbonización de suelos, para ...
 
ASLAC: Pilar 1
ASLAC: Pilar 1ASLAC: Pilar 1
ASLAC: Pilar 1
 
Placa
PlacaPlaca
Placa
 
El compromiso de la fao
El compromiso de la faoEl compromiso de la fao
El compromiso de la fao
 
Pilar 4
Pilar 4Pilar 4
Pilar 4
 
Spectroscopy workshop - ASPAC
Spectroscopy workshop - ASPACSpectroscopy workshop - ASPAC
Spectroscopy workshop - ASPAC
 
INFA launch meeting - Item 2: Introduction to the International Code of Condu...
INFA launch meeting - Item 2: Introduction to the International Code of Condu...INFA launch meeting - Item 2: Introduction to the International Code of Condu...
INFA launch meeting - Item 2: Introduction to the International Code of Condu...
 
INFA launch meeting - Item 1: Introduction to the International Network on Fe...
INFA launch meeting - Item 1: Introduction to the International Network on Fe...INFA launch meeting - Item 1: Introduction to the International Network on Fe...
INFA launch meeting - Item 1: Introduction to the International Network on Fe...
 
INFA launch meeting - Item 8: INFA work plan
INFA launch meeting - Item 8: INFA work planINFA launch meeting - Item 8: INFA work plan
INFA launch meeting - Item 8: INFA work plan
 
INFA launch meeting - Item 7 - INFA governance
INFA launch meeting - Item 7 - INFA governanceINFA launch meeting - Item 7 - INFA governance
INFA launch meeting - Item 7 - INFA governance
 
INFA launch meeting - Item 6 - Mission and objectives of INFA
INFA launch meeting - Item 6 - Mission and objectives of INFAINFA launch meeting - Item 6 - Mission and objectives of INFA
INFA launch meeting - Item 6 - Mission and objectives of INFA
 
INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...
INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...
INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...
 
Soil biodiversity Global Report - Cuevas
Soil biodiversity Global Report - CuevasSoil biodiversity Global Report - Cuevas
Soil biodiversity Global Report - Cuevas
 

Recently uploaded

TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...Nguyen Thanh Tu Collection
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSAnaAcapella
 
Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...EduSkills OECD
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽中 央社
 
Book Review of Run For Your Life Powerpoint
Book Review of Run For Your Life PowerpointBook Review of Run For Your Life Powerpoint
Book Review of Run For Your Life Powerpoint23600690
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjMohammed Sikander
 
e-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopale-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi RajagopalEADTU
 
SPLICE Working Group: Reusable Code Examples
SPLICE Working Group:Reusable Code ExamplesSPLICE Working Group:Reusable Code Examples
SPLICE Working Group: Reusable Code ExamplesPeter Brusilovsky
 
Observing-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptxObserving-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptxAdelaideRefugio
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...Gary Wood
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...Nguyen Thanh Tu Collection
 
How to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptxHow to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptxCeline George
 
8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital ManagementMBA Assignment Experts
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project researchCaitlinCummins3
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...Nguyen Thanh Tu Collection
 
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading RoomSternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading RoomSean M. Fox
 

Recently uploaded (20)

TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
 
Book Review of Run For Your Life Powerpoint
Book Review of Run For Your Life PowerpointBook Review of Run For Your Life Powerpoint
Book Review of Run For Your Life Powerpoint
 
Supporting Newcomer Multilingual Learners
Supporting Newcomer  Multilingual LearnersSupporting Newcomer  Multilingual Learners
Supporting Newcomer Multilingual Learners
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
 
e-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopale-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopal
 
SPLICE Working Group: Reusable Code Examples
SPLICE Working Group:Reusable Code ExamplesSPLICE Working Group:Reusable Code Examples
SPLICE Working Group: Reusable Code Examples
 
Observing-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptxObserving-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptx
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
How to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptxHow to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptx
 
8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project research
 
Including Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdfIncluding Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdf
 
OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
 
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading RoomSternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
 

Item 5 - Case studies on the establishment of NASOLAN - Ukrainian Soil Laboratory Network

  • 1. LABORATORY OF INSTRUMENTAL SOIL RESEARCH METHODS, STANDARDIZATION AND METROLOGY NATIONAL SCIENTIFIC CENTER «INSTITUTE FOR SOIL SCIENCE AND AGROCHEMISTRY RESEARCH NAMED AFTER O.N. SOKOLOVSKY» UNSlab (Ukrainian National Soil Laboratory) Maksym Solokha
  • 2. Status of establishment: under establishment Official name of the National Soil Laboratory Network: UNSlab (Ukrainian National Soil Laboratory) – may be modified in future Actual or expected procedure for establishing the National Soil Laboratory Network (in steps): 1. Collected information on the availability of specialized laboratories in Ukraine. 2. After receiving the contacts of the specialized laboratories, invitations were sent to participate in the network of national laboratories. 3. Within a short period of time, the laboratories got acquainted with the initiative to create a network of national laboratories and registered on the website in a profile form 4. At the moment, information is being collected on the presence of non-core laboratories (in related departments, universities, academies, organizations of various forms of ownership) 5. In the process of work, a number of laboratories were not involved in the network of laboratories due to various reasons, including: - lack of the required quality of the laboratory (it means that the laboratory is located even in another country, and analysis services are offered in Ukraine - lack of an interested person, personnel for the network's profile work - a low level of laboratory quality (an annual ring test is carried out for verification)
  • 3. Actual or expected number of laboratories in the network: actual – 7, expected - 2 Please specify if you received any help to establish the network by a donor/international initiative/etc. (please specify) : Yes, we get on an ongoing basis Obstacles encountered during the establishment of the network How did you overcome the obstacle? Notes Workload of laboratory personnel, as a result of lack of time to understand the problem and its solution The required time is reserved for the execution of documents along with the annual ring test It took time to fill out profile forms on the Internet During the ring test (our number # 28), due to the lack of certification for some research methods, we could not analyze them. We conduct SOP studies on these indicators and plan to conduct an analysis - To disseminate knowledge between laboratories, it was planned to hold about five meetings with representatives of the national network Due to the quarantine and its further tightening, the meetings were canceled, Internet on-line conferences have not yet been held due to the technical unavailability of a number of laboratories The problem has not yet been resolved
  • 4. In case you are presenting about a already established network, please briefly report on the main activities (including meetings) implemented by the network so far: - Development and approval of a plan for the implementation of COP GLOSOLAN at the national level. Discuss, agree on a plan at the academic council of the national center. - After translation and approval of all SOPs, we plan to distribute them over the backbone network in order to discuss them later via e-mail. - -After the distribution of the SOP throughout the national network, receive feedback from them (comments, additions) and agree on the subsequent actions for the implementation of the SOP. - After specifying the deadlines, it is planned to introduce SOPs according to the approved plan, conducting mandatory ring tests and training seminars for each SOP (we believe this is necessary to improve the level of each laboratory). - Carry out the results obtained for each SOP on standard samples and agree with the data that GLOSOLANE has. Unfortunately, the meeting schedule is currently violated and it is not yet known when the quarantine will be canceled.