SlideShare a Scribd company logo
1 of 5
Download to read offline
MD. SHUMON KHAN
Address: Flat: B2 House#6,Road#7,Sector#10, Uttara ,Dhaka-1230
Mobile No 1: 01938008000
Mobile No 2 :01726621896
e-mail : shumonkhan@gmail.com
Career Objective:
I am in search for a post as a technical manager/project Manager/Implementation Lead in an established company where I can
put into practice my knowledge of management, communication skills and project implementation ability at its best.
Career Summary:
Project team leader of more than five nationwide govt. project Enterprise IT Projects in heterogeneous platform Implementation
Bangladesh BANK DATA center. Oracle RAC over ASM, DATA guard. Oracle Grid infrastructure. Oracle SOA fully Linux java
platform and environment. Installing Oracle RAC and Data guard NCC BANK. Work as team leader home and abroad as Pakistan,
UAE, Thailand, and KSA. ERP project implementation Manger and APPS and DB Configuration Manager.
Special Qualification:
Project Management, Windows ,Linux server Administration .Experienced in Oracle database, Apps Server configuration, Web
server, Clustering, Fusion Middle ware, administration, RAC, Data guard 10g-11g,Storage configuration, Server Installation
Employment History:
Total Year of Experience : 11 Year(s)
1. Senior Technology Officer (May 1, 2007 to Dec 30, 2012 and May 1 ,2014 to Continue)
ATI LIMITED
Company Location: H#1, R#9/A, Sector-7, Uttara, Dhaka-1230
Department: Implementation & Integration
Duties/Responsibilities:
Define the project management process to be applied to the project.
Select team members and, if cross-functional as the Core Team Leader, select Core Team Members.
Prepare project plan and obtain management approval of the project plan.
Assure that all team members understand their roles and accept their responsibilities
Apply project resources according to the approved project plan.
Analyze risk and instigate avoidance activities. Establish contingency plans and identify trigger events and responsibility for
initiating corrective action.
Track and report on progress to plan.
Analyze the actual performance against the plan and make adjustments consistent with plan objectives.
Keep all stakeholders informed of progress and issues.
Involve functional expertise in design reviews and key decisions as well as risk strategies.
Assure timely adaptive action is taken.
Manage change to preserve business plan commitments. Initiate Phase Review if objectives must change.
Negotiate the performance of activities with team members and their managers.
Establish and publish clear priorities among project activities.
Coordinate management and technical decisions.
Arbitrate and resolve conflict and interface problems within the project.
Provide input on the performance of project team members to their supervisors.
Key Accomplishment
Project 1: BIRDEM HMIS & LIS
Role: Project manager
Work Description: Define Project scope analysis, inception report. Data Migration, Oracle Real Application
Clustered Installation, Software upgrading form oracle 6i to 11g Fusion Middleware forms. Implementation
Centralized laboratory Management information system. Implementation plan, Training Plan and execution.
Project 2: Project Monitoring and Evaluation System (University Grant Commission)
Role : Project Manager
Work Description: Define project scope, Requirement analysis, GAP analysis, Requirement specification,
Implementation plan ,Training plan, SLA, Mobile Apps Design concept, Reseller System, Barcoding
mechanism
Project 3: BSMMU Exam Management system & ELearning
Role : Project Manager
Work Description: Virtual e-learning concept paper preparation for pre-sales team and work as a team to
get the work order, Project inception report, UML design, interface Scratch design, Communicate as
consultant to take the domain knowledge and transform to automation project. Exam management system
pre-concept paper and automation scope report and implementation.
Project 4: Web based Database and Monitoring System for PicoPV (Solar Lantern)
Dissemination in Bangladesh, GIZ
Role: Technical Lead
Work Description: Web Based Database and Monitoring System for PICOPV (Solar Lantern) Dissemination
in Bangladesh, the system will be a web based application of Monitoring and Evaluation process
that stakeholders will perform for Distributor, Reporting, Admin, SMS Module, Security and
Access Control Module. Being a project technical I work with team as an technical lead to choose the right
technology, data structure as well system design documentation.
Project 5: Automated Property Management System, Narayangonj City Corp
Role: Project Manager
Work Description: Define WBS structure based on the SRS and make the inception report, System
design documentation, ERD, DFD, Work flow Definition. Developers Note for the developers and UI
designer, Implementation plan. Project monitoring and Assessment of work status, analyze QA report.
Issue management, Bug fixing note to the developer.
Project 6: Hospital Management information system, Green Life Hospital, Khwaja Yunus Ali
medical college & Hospital
Role: Implementation Manager
Work description: Oracle based application infrastructure design and Installation. Master data
management. Analyze user’s feedback and incorporate to the design doc and guide to developer for
customization.
Project 7: Combined Military Hospital, Picture Archiving and Communication System
Role: Project Manager
Work description: Integration Documentation and technical guide to developer to access the modality
image and store to work list of radiologist. Storage Plan and Design development and customization
guideline to the R&D team by helping technical details doc.
Project: 8: Naval Store Depot, CTG, Enterprise Resource Planning.
Role: Implementation manager
Role: Network design, Oracle Datagurd, Weblogic fusion middleware installation and configuration. Master
data management. Batch data upload
Project 9: Credit Information Bureau, Bangladesh Bank
Role: Oracle DBA
Work Details: Work with Crif ,Italy to assist Bangladesh team FLORA ltd to install and configuration
oracle Maximum available architecture. Real application, Storage Management.
Project 10: Dr. Irfan Hospital, KSA, Up gradation of Oracle Legacy system to 11g r2
Role: Offshore project manager
Work Description : System design documentation, Oracle application database migration Proposal
preparation and analysis existing application framework to upgrade to new technology 11g fusion
middleware. Testing plan and test case preparation.
Project 11: Bangladesh Film Archive, Content Management system
Role: Project manager
Work description: Define scope, SRS, SDD, DFD ERD, Architecture design. Pre-sales of project proposal,
budgeting estimation of project.
Project 12: Online Mobile Billing , MPO Tracking management For Drug International
Limited
Key functionality: Centralized billing through Mobile apps from market print invoice directly to Dhaka
office. To do list. Employee scheduling to visit doctor integrated with GIS. Design the application concept
and make use case and business process analysis to transform in automation
Role: innovator and project manager
Project 13: Radiology Information Management system, Thailand.
Role: Offshore Project implementer
Key functionality: Take business process from Thailand project managers and make the developer note to
Bangladesh team as an solution expert. Oracle Database tuning
Project 14: IT Automation , BEPZA
Key functionality: As an third party Company we analysis the existing system and define the toBe process.
My role was to coordinate with end user and take the demand and prepare the inception report.
Role: Solution specialist
Project 15: E-survey and GIS application development, BANBEIS
Key functionality: Online school management system. GIS map and Reporting .Managing the project
as well technical lead.
Role: Project manager
2. Country Manager ( January 1, 2013 - June 1, 2014)
Auto Informatrik AG
Company Location : House:42,Gorivey Newaj Avenue, Sector: 11Dhaka, Uttara-1230
Duties/Responsibilities:
Auto Informatik AG a Switzerland based software company. The company place one development house for outsource their
software development. I was responsible to manage Bangladesh team. Interaction between Swiss with Bangladesh.
Requirement analysis for best suite technology for upcoming development.
3. Network Administrator ( April 1, 2006 - May 30, 2007)
EYE ON BANGLADESH ONLINE
Company Location : 19/c Monipuri para, Tejagaon, Dhaka
Department: NETWORKING
Duties/Responsibilities:
Configuring Linux server, Maintain network & Supporting Client, Troubleshooting Server, managing bandwidth. Networking
equipment.
Academic Qualification:
Exam Title Concentration/Major Institute Result Pas.Year Duration
CSE
Computer Science &
Engineering
Asian University of
Bangladesh
CGPA:3.4
out of 4
2005 4 year
Training Summary:
Training Title Topic Institute Country Location Year Duration
Practical Project
Management
Customize the popular
project management
methodologies for your
organization
BDjobs Bangladesh Dhaka 2015 30 H
Cloud Development
and Camp
Deploying a Cloud or Utilizing
Cloud Computing Resources,
Next Generation Cloud
Computing in Bangladesh
World Bank
Arranged by
BDjobs
Bangladesh Dhaka 2014 7 day
Cloud Development
and Camp
Deploying a Cloud or Utilizing
Cloud Computing Resources,
Next Generation Cloud
Computing in Bangladesh
World Bank
Arranged by
BDjobs
Bangladesh Dhaka 2014 7 days
Oracle Weblogic
11g Fusion Middle ware Grid
Infrastructure
Oracle
Corporation
Malaysia Kuala Lumpur 2013 7 days
Project Management
for Engineers &
Technicians
Fundamentals of Project
Management, Project Finance
& Cost Estimating, Value,
Quality and Environmental,
Management, Planning ,Risk
Management, Project
Organization Design & Design
Management
Bdjobs Bangladesh Dhaka 2013 2 day
Oracle DBA Oracle 10g Administration
Base BD
Limited
Bangladesh Dhaka 2008 4 M
MCSE
Windows Server
Administration
New Horizon Bangladesh Dhaka 2008 1 M
Cisco
TCP/IP, Network cabling,
Managing switch ,Router
configuration, ACL, Layer 3
switch configuration ,VLSM,
Subnetting
American
International
University of
Bangladesh
Bangladesh Dhaka 2006
8
month
RHCE
Redhat linux server
administration, trouble
shooting, Server
configuration(DHCP,DNS,WEB
SERVER,MAIL SERVER,PROXY
SERVER,),IPTABLES ,Shell
Scripting, Linux Firewall,
Delay Pool for bandwidth
management, CBQ, Kernel
level Firewall, Security
Feature
Base BD
Limited
Bangladesh Dhaka 2006 5 Month
Professional Qualification:
Certification Institute Location From To
Oracle database 10g
Administration - 1
Oracle university
November 10,
2010
November 10,
2010
Cisco
American International
University of Bangladesh
Bangladesh
January 1,
2006
December 16,
2006
Professional Visit Abroad: Malaysia, Thailand, Pakistan ,UAE
Specialization:
Fields of Specialization Description
 Linux
 Oracle
 Project Management
 Networking
 System Administration
 Implementation
 Team Management
 Windows Server Administration
 MySQL
 MSSQL
Have solid understanding of Project management Practice, Risk
management. Requirement analysis, Gap Analysis, Project planning, Roll-
out, Team Management ,Windows, Linux server Administration ,Security
Management, implementation Oracle RAC 10g,11g,Backup Policy, Data
Guard 10g, Weblogic Sever Administration, Fusion Middle ware, Oracle
Forms and Reports 10g,11g.Microsoft System Center Package (SCCM)
administration, configuration, distribution & deployment
 System Analysis & Design
 Business requirement Analysis
 Database Design
 Networking
 Infrastructure
 Project Management
 Be highly organized and a
good multi-tasker
 Take charge and know how
to lead
 Be an effective
communicator.
Scheduling
 Be detail-oriented
Language Proficiency:
Language Reading Writing Speaking
Bangla High High High
English High High High
Personal Details :
Father's Name : Md. Sirazul Haque Khan
Mother's Name : Mrs. Monija Haque
Date of Birth : December 10, 1983
Gender : Male
Marital Status : Married
Nationality : Bangladeshi
National Id No. : 6125206665848
Religion : Islam
Permanent Address : Do
Current Location : Dhaka
Reference (s):
Reference: 01 Reference: 02
Name : Dr. S.M. Monzurur Rahman Sumon Ahmed
Organization : Samsung International Software R&D United international University
Designation : Director Director
Address : Dhanmondi, Dhaka Dhanmondi , Dhaka
E-Mail : smrahman99@gmail.com sumanahmmed@gmail.com
Relation : Professional Professional

More Related Content

What's hot (19)

Resume-Srikanth_Jogula
Resume-Srikanth_JogulaResume-Srikanth_Jogula
Resume-Srikanth_Jogula
 
CV_Gajalakshmi_K_2015
CV_Gajalakshmi_K_2015CV_Gajalakshmi_K_2015
CV_Gajalakshmi_K_2015
 
manoj_new
manoj_newmanoj_new
manoj_new
 
IT ENGINEER
IT ENGINEERIT ENGINEER
IT ENGINEER
 
Mohamed aashik ali.a original
Mohamed aashik ali.a originalMohamed aashik ali.a original
Mohamed aashik ali.a original
 
resume_abdul_up
resume_abdul_upresume_abdul_up
resume_abdul_up
 
cv Bijay Tamrakar
cv Bijay Tamrakarcv Bijay Tamrakar
cv Bijay Tamrakar
 
Rakesh_Resume
Rakesh_ResumeRakesh_Resume
Rakesh_Resume
 
Divya, Miryala
Divya, MiryalaDivya, Miryala
Divya, Miryala
 
Nishant_Patnaik
Nishant_PatnaikNishant_Patnaik
Nishant_Patnaik
 
Tapan Kumar
Tapan KumarTapan Kumar
Tapan Kumar
 
gaurav_singh_MCA_1Yrs
gaurav_singh_MCA_1Yrsgaurav_singh_MCA_1Yrs
gaurav_singh_MCA_1Yrs
 
NarendraKolla
NarendraKollaNarendraKolla
NarendraKolla
 
Iman Mukhopadhyay_Resume
Iman Mukhopadhyay_ResumeIman Mukhopadhyay_Resume
Iman Mukhopadhyay_Resume
 
Ashish_Agrawal_Techincal Architect
Ashish_Agrawal_Techincal ArchitectAshish_Agrawal_Techincal Architect
Ashish_Agrawal_Techincal Architect
 
Babu_Resume
Babu_ResumeBabu_Resume
Babu_Resume
 
Vishal Soni-J2EE
Vishal Soni-J2EEVishal Soni-J2EE
Vishal Soni-J2EE
 
ShaileshKumarPM
ShaileshKumarPMShaileshKumarPM
ShaileshKumarPM
 
pega cssa sample Resume
 pega cssa sample Resume pega cssa sample Resume
pega cssa sample Resume
 

Viewers also liked

vikramkshreedhara
vikramkshreedharavikramkshreedhara
vikramkshreedhara
VIKRAM K S
 
updated resume - vincent morgan
updated resume - vincent morganupdated resume - vincent morgan
updated resume - vincent morgan
Vincent Morgan
 
Resume - IT Solutions Developer-Architect
Resume - IT Solutions Developer-ArchitectResume - IT Solutions Developer-Architect
Resume - IT Solutions Developer-Architect
Nathan Riles
 
199 Pens‚es Et Citations Sp‚ciales Pour Acqu‚rir Un Plus Grand Bien Etre A To...
199 Pens‚es Et Citations Sp‚ciales Pour Acqu‚rir Un Plus Grand Bien Etre A To...199 Pens‚es Et Citations Sp‚ciales Pour Acqu‚rir Un Plus Grand Bien Etre A To...
199 Pens‚es Et Citations Sp‚ciales Pour Acqu‚rir Un Plus Grand Bien Etre A To...
CENTRAFRIQUE WORLD COMMUNICATE
 
Catalogo decanter 2012
Catalogo decanter 2012Catalogo decanter 2012
Catalogo decanter 2012
Isidro More
 
PXIE-brochure-A4 smaller
PXIE-brochure-A4 smallerPXIE-brochure-A4 smaller
PXIE-brochure-A4 smaller
Imaginos NDE
 
ENSEÑANZAS DEPORTIVAS.pptx
ENSEÑANZAS DEPORTIVAS.pptxENSEÑANZAS DEPORTIVAS.pptx
ENSEÑANZAS DEPORTIVAS.pptx
cexfod
 
121224 st13 konzept
121224 st13 konzept121224 st13 konzept
121224 st13 konzept
Nina
 
Suplemento La Ley Universidad Austral 27 junio 2014
Suplemento La Ley Universidad Austral 27 junio 2014Suplemento La Ley Universidad Austral 27 junio 2014
Suplemento La Ley Universidad Austral 27 junio 2014
Susy Inés Bello Knoll
 
10 Best Practice Hr In 2009
10 Best Practice Hr In 200910 Best Practice Hr In 2009
10 Best Practice Hr In 2009
Confidential
 

Viewers also liked (20)

vikramkshreedhara
vikramkshreedharavikramkshreedhara
vikramkshreedhara
 
Thomas Moriearty resume 1.16.15
Thomas Moriearty resume 1.16.15Thomas Moriearty resume 1.16.15
Thomas Moriearty resume 1.16.15
 
S Colwell Resume Master
S Colwell Resume MasterS Colwell Resume Master
S Colwell Resume Master
 
updated resume - vincent morgan
updated resume - vincent morganupdated resume - vincent morgan
updated resume - vincent morgan
 
Robert De Lyser
Robert De LyserRobert De Lyser
Robert De Lyser
 
Professional Work Experience-Completed Projects
Professional Work Experience-Completed ProjectsProfessional Work Experience-Completed Projects
Professional Work Experience-Completed Projects
 
CV Axel Oehlers
CV Axel OehlersCV Axel Oehlers
CV Axel Oehlers
 
Resume - IT Solutions Developer-Architect
Resume - IT Solutions Developer-ArchitectResume - IT Solutions Developer-Architect
Resume - IT Solutions Developer-Architect
 
199 Pens‚es Et Citations Sp‚ciales Pour Acqu‚rir Un Plus Grand Bien Etre A To...
199 Pens‚es Et Citations Sp‚ciales Pour Acqu‚rir Un Plus Grand Bien Etre A To...199 Pens‚es Et Citations Sp‚ciales Pour Acqu‚rir Un Plus Grand Bien Etre A To...
199 Pens‚es Et Citations Sp‚ciales Pour Acqu‚rir Un Plus Grand Bien Etre A To...
 
Catalogo decanter 2012
Catalogo decanter 2012Catalogo decanter 2012
Catalogo decanter 2012
 
The CUBE - Architectural Slides
The CUBE - Architectural SlidesThe CUBE - Architectural Slides
The CUBE - Architectural Slides
 
Motherboard
MotherboardMotherboard
Motherboard
 
PXIE-brochure-A4 smaller
PXIE-brochure-A4 smallerPXIE-brochure-A4 smaller
PXIE-brochure-A4 smaller
 
ENSEÑANZAS DEPORTIVAS.pptx
ENSEÑANZAS DEPORTIVAS.pptxENSEÑANZAS DEPORTIVAS.pptx
ENSEÑANZAS DEPORTIVAS.pptx
 
Eular grafo-y-digrafo
Eular grafo-y-digrafoEular grafo-y-digrafo
Eular grafo-y-digrafo
 
121224 st13 konzept
121224 st13 konzept121224 st13 konzept
121224 st13 konzept
 
Wig flexible working
Wig flexible workingWig flexible working
Wig flexible working
 
Suplemento La Ley Universidad Austral 27 junio 2014
Suplemento La Ley Universidad Austral 27 junio 2014Suplemento La Ley Universidad Austral 27 junio 2014
Suplemento La Ley Universidad Austral 27 junio 2014
 
Alma de dios tarea 1-enfoques pedagogicos
Alma de dios tarea 1-enfoques pedagogicosAlma de dios tarea 1-enfoques pedagogicos
Alma de dios tarea 1-enfoques pedagogicos
 
10 Best Practice Hr In 2009
10 Best Practice Hr In 200910 Best Practice Hr In 2009
10 Best Practice Hr In 2009
 

Similar to Md._Shumon_Khan_CV_project_management

Similar to Md._Shumon_Khan_CV_project_management (20)

Amod_MCA_M.tech_EXPERT IN CA Security tool _total 9Years+_Exp (2)
Amod_MCA_M.tech_EXPERT IN CA Security tool _total   9Years+_Exp (2)Amod_MCA_M.tech_EXPERT IN CA Security tool _total   9Years+_Exp (2)
Amod_MCA_M.tech_EXPERT IN CA Security tool _total 9Years+_Exp (2)
 
Ramesh_Resume.doc
Ramesh_Resume.docRamesh_Resume.doc
Ramesh_Resume.doc
 
Resume_Informatica_4.3yrs_CSC_MCA_from_NIT_Venkat_CV.v1.0
Resume_Informatica_4.3yrs_CSC_MCA_from_NIT_Venkat_CV.v1.0Resume_Informatica_4.3yrs_CSC_MCA_from_NIT_Venkat_CV.v1.0
Resume_Informatica_4.3yrs_CSC_MCA_from_NIT_Venkat_CV.v1.0
 
Aruna_SharepointDeveloper
Aruna_SharepointDeveloperAruna_SharepointDeveloper
Aruna_SharepointDeveloper
 
Amutha Sandra - 1 Page CV
Amutha Sandra - 1 Page CVAmutha Sandra - 1 Page CV
Amutha Sandra - 1 Page CV
 
Dinesh Deo CV
Dinesh Deo CVDinesh Deo CV
Dinesh Deo CV
 
Jialin_Tian_CV_2015_EN
Jialin_Tian_CV_2015_ENJialin_Tian_CV_2015_EN
Jialin_Tian_CV_2015_EN
 
Harikri2
Harikri2Harikri2
Harikri2
 
Nirmal Singh -Resume
Nirmal Singh -ResumeNirmal Singh -Resume
Nirmal Singh -Resume
 
diwakar_singh (1)
diwakar_singh (1)diwakar_singh (1)
diwakar_singh (1)
 
JeevanBabuRGResume
JeevanBabuRGResumeJeevanBabuRGResume
JeevanBabuRGResume
 
Bala_New
Bala_NewBala_New
Bala_New
 
Resume_Achin
Resume_AchinResume_Achin
Resume_Achin
 
Resume_Final-29-10-16
Resume_Final-29-10-16Resume_Final-29-10-16
Resume_Final-29-10-16
 
Anudeep nobleyeleti resume
Anudeep nobleyeleti resumeAnudeep nobleyeleti resume
Anudeep nobleyeleti resume
 
Siddhartha Das
Siddhartha DasSiddhartha Das
Siddhartha Das
 
Siddhartha Das
Siddhartha DasSiddhartha Das
Siddhartha Das
 
Projects delivered
Projects deliveredProjects delivered
Projects delivered
 
Tony_CV New
Tony_CV NewTony_CV New
Tony_CV New
 
Himanshu Bhatia Resume
Himanshu Bhatia ResumeHimanshu Bhatia Resume
Himanshu Bhatia Resume
 

Md._Shumon_Khan_CV_project_management

  • 1. MD. SHUMON KHAN Address: Flat: B2 House#6,Road#7,Sector#10, Uttara ,Dhaka-1230 Mobile No 1: 01938008000 Mobile No 2 :01726621896 e-mail : shumonkhan@gmail.com Career Objective: I am in search for a post as a technical manager/project Manager/Implementation Lead in an established company where I can put into practice my knowledge of management, communication skills and project implementation ability at its best. Career Summary: Project team leader of more than five nationwide govt. project Enterprise IT Projects in heterogeneous platform Implementation Bangladesh BANK DATA center. Oracle RAC over ASM, DATA guard. Oracle Grid infrastructure. Oracle SOA fully Linux java platform and environment. Installing Oracle RAC and Data guard NCC BANK. Work as team leader home and abroad as Pakistan, UAE, Thailand, and KSA. ERP project implementation Manger and APPS and DB Configuration Manager. Special Qualification: Project Management, Windows ,Linux server Administration .Experienced in Oracle database, Apps Server configuration, Web server, Clustering, Fusion Middle ware, administration, RAC, Data guard 10g-11g,Storage configuration, Server Installation Employment History: Total Year of Experience : 11 Year(s) 1. Senior Technology Officer (May 1, 2007 to Dec 30, 2012 and May 1 ,2014 to Continue) ATI LIMITED Company Location: H#1, R#9/A, Sector-7, Uttara, Dhaka-1230 Department: Implementation & Integration Duties/Responsibilities: Define the project management process to be applied to the project. Select team members and, if cross-functional as the Core Team Leader, select Core Team Members. Prepare project plan and obtain management approval of the project plan. Assure that all team members understand their roles and accept their responsibilities Apply project resources according to the approved project plan. Analyze risk and instigate avoidance activities. Establish contingency plans and identify trigger events and responsibility for initiating corrective action. Track and report on progress to plan. Analyze the actual performance against the plan and make adjustments consistent with plan objectives. Keep all stakeholders informed of progress and issues. Involve functional expertise in design reviews and key decisions as well as risk strategies. Assure timely adaptive action is taken. Manage change to preserve business plan commitments. Initiate Phase Review if objectives must change. Negotiate the performance of activities with team members and their managers. Establish and publish clear priorities among project activities. Coordinate management and technical decisions. Arbitrate and resolve conflict and interface problems within the project. Provide input on the performance of project team members to their supervisors.
  • 2. Key Accomplishment Project 1: BIRDEM HMIS & LIS Role: Project manager Work Description: Define Project scope analysis, inception report. Data Migration, Oracle Real Application Clustered Installation, Software upgrading form oracle 6i to 11g Fusion Middleware forms. Implementation Centralized laboratory Management information system. Implementation plan, Training Plan and execution. Project 2: Project Monitoring and Evaluation System (University Grant Commission) Role : Project Manager Work Description: Define project scope, Requirement analysis, GAP analysis, Requirement specification, Implementation plan ,Training plan, SLA, Mobile Apps Design concept, Reseller System, Barcoding mechanism Project 3: BSMMU Exam Management system & ELearning Role : Project Manager Work Description: Virtual e-learning concept paper preparation for pre-sales team and work as a team to get the work order, Project inception report, UML design, interface Scratch design, Communicate as consultant to take the domain knowledge and transform to automation project. Exam management system pre-concept paper and automation scope report and implementation. Project 4: Web based Database and Monitoring System for PicoPV (Solar Lantern) Dissemination in Bangladesh, GIZ Role: Technical Lead Work Description: Web Based Database and Monitoring System for PICOPV (Solar Lantern) Dissemination in Bangladesh, the system will be a web based application of Monitoring and Evaluation process that stakeholders will perform for Distributor, Reporting, Admin, SMS Module, Security and Access Control Module. Being a project technical I work with team as an technical lead to choose the right technology, data structure as well system design documentation. Project 5: Automated Property Management System, Narayangonj City Corp Role: Project Manager Work Description: Define WBS structure based on the SRS and make the inception report, System design documentation, ERD, DFD, Work flow Definition. Developers Note for the developers and UI designer, Implementation plan. Project monitoring and Assessment of work status, analyze QA report. Issue management, Bug fixing note to the developer. Project 6: Hospital Management information system, Green Life Hospital, Khwaja Yunus Ali medical college & Hospital Role: Implementation Manager Work description: Oracle based application infrastructure design and Installation. Master data management. Analyze user’s feedback and incorporate to the design doc and guide to developer for customization. Project 7: Combined Military Hospital, Picture Archiving and Communication System Role: Project Manager Work description: Integration Documentation and technical guide to developer to access the modality image and store to work list of radiologist. Storage Plan and Design development and customization guideline to the R&D team by helping technical details doc. Project: 8: Naval Store Depot, CTG, Enterprise Resource Planning. Role: Implementation manager Role: Network design, Oracle Datagurd, Weblogic fusion middleware installation and configuration. Master data management. Batch data upload Project 9: Credit Information Bureau, Bangladesh Bank Role: Oracle DBA Work Details: Work with Crif ,Italy to assist Bangladesh team FLORA ltd to install and configuration oracle Maximum available architecture. Real application, Storage Management. Project 10: Dr. Irfan Hospital, KSA, Up gradation of Oracle Legacy system to 11g r2 Role: Offshore project manager
  • 3. Work Description : System design documentation, Oracle application database migration Proposal preparation and analysis existing application framework to upgrade to new technology 11g fusion middleware. Testing plan and test case preparation. Project 11: Bangladesh Film Archive, Content Management system Role: Project manager Work description: Define scope, SRS, SDD, DFD ERD, Architecture design. Pre-sales of project proposal, budgeting estimation of project. Project 12: Online Mobile Billing , MPO Tracking management For Drug International Limited Key functionality: Centralized billing through Mobile apps from market print invoice directly to Dhaka office. To do list. Employee scheduling to visit doctor integrated with GIS. Design the application concept and make use case and business process analysis to transform in automation Role: innovator and project manager Project 13: Radiology Information Management system, Thailand. Role: Offshore Project implementer Key functionality: Take business process from Thailand project managers and make the developer note to Bangladesh team as an solution expert. Oracle Database tuning Project 14: IT Automation , BEPZA Key functionality: As an third party Company we analysis the existing system and define the toBe process. My role was to coordinate with end user and take the demand and prepare the inception report. Role: Solution specialist Project 15: E-survey and GIS application development, BANBEIS Key functionality: Online school management system. GIS map and Reporting .Managing the project as well technical lead. Role: Project manager 2. Country Manager ( January 1, 2013 - June 1, 2014) Auto Informatrik AG Company Location : House:42,Gorivey Newaj Avenue, Sector: 11Dhaka, Uttara-1230 Duties/Responsibilities: Auto Informatik AG a Switzerland based software company. The company place one development house for outsource their software development. I was responsible to manage Bangladesh team. Interaction between Swiss with Bangladesh. Requirement analysis for best suite technology for upcoming development. 3. Network Administrator ( April 1, 2006 - May 30, 2007) EYE ON BANGLADESH ONLINE Company Location : 19/c Monipuri para, Tejagaon, Dhaka Department: NETWORKING Duties/Responsibilities: Configuring Linux server, Maintain network & Supporting Client, Troubleshooting Server, managing bandwidth. Networking equipment. Academic Qualification: Exam Title Concentration/Major Institute Result Pas.Year Duration CSE Computer Science & Engineering Asian University of Bangladesh CGPA:3.4 out of 4 2005 4 year
  • 4. Training Summary: Training Title Topic Institute Country Location Year Duration Practical Project Management Customize the popular project management methodologies for your organization BDjobs Bangladesh Dhaka 2015 30 H Cloud Development and Camp Deploying a Cloud or Utilizing Cloud Computing Resources, Next Generation Cloud Computing in Bangladesh World Bank Arranged by BDjobs Bangladesh Dhaka 2014 7 day Cloud Development and Camp Deploying a Cloud or Utilizing Cloud Computing Resources, Next Generation Cloud Computing in Bangladesh World Bank Arranged by BDjobs Bangladesh Dhaka 2014 7 days Oracle Weblogic 11g Fusion Middle ware Grid Infrastructure Oracle Corporation Malaysia Kuala Lumpur 2013 7 days Project Management for Engineers & Technicians Fundamentals of Project Management, Project Finance & Cost Estimating, Value, Quality and Environmental, Management, Planning ,Risk Management, Project Organization Design & Design Management Bdjobs Bangladesh Dhaka 2013 2 day Oracle DBA Oracle 10g Administration Base BD Limited Bangladesh Dhaka 2008 4 M MCSE Windows Server Administration New Horizon Bangladesh Dhaka 2008 1 M Cisco TCP/IP, Network cabling, Managing switch ,Router configuration, ACL, Layer 3 switch configuration ,VLSM, Subnetting American International University of Bangladesh Bangladesh Dhaka 2006 8 month RHCE Redhat linux server administration, trouble shooting, Server configuration(DHCP,DNS,WEB SERVER,MAIL SERVER,PROXY SERVER,),IPTABLES ,Shell Scripting, Linux Firewall, Delay Pool for bandwidth management, CBQ, Kernel level Firewall, Security Feature Base BD Limited Bangladesh Dhaka 2006 5 Month Professional Qualification: Certification Institute Location From To Oracle database 10g Administration - 1 Oracle university November 10, 2010 November 10, 2010 Cisco American International University of Bangladesh Bangladesh January 1, 2006 December 16, 2006
  • 5. Professional Visit Abroad: Malaysia, Thailand, Pakistan ,UAE Specialization: Fields of Specialization Description  Linux  Oracle  Project Management  Networking  System Administration  Implementation  Team Management  Windows Server Administration  MySQL  MSSQL Have solid understanding of Project management Practice, Risk management. Requirement analysis, Gap Analysis, Project planning, Roll- out, Team Management ,Windows, Linux server Administration ,Security Management, implementation Oracle RAC 10g,11g,Backup Policy, Data Guard 10g, Weblogic Sever Administration, Fusion Middle ware, Oracle Forms and Reports 10g,11g.Microsoft System Center Package (SCCM) administration, configuration, distribution & deployment  System Analysis & Design  Business requirement Analysis  Database Design  Networking  Infrastructure  Project Management  Be highly organized and a good multi-tasker  Take charge and know how to lead  Be an effective communicator. Scheduling  Be detail-oriented Language Proficiency: Language Reading Writing Speaking Bangla High High High English High High High Personal Details : Father's Name : Md. Sirazul Haque Khan Mother's Name : Mrs. Monija Haque Date of Birth : December 10, 1983 Gender : Male Marital Status : Married Nationality : Bangladeshi National Id No. : 6125206665848 Religion : Islam Permanent Address : Do Current Location : Dhaka Reference (s): Reference: 01 Reference: 02 Name : Dr. S.M. Monzurur Rahman Sumon Ahmed Organization : Samsung International Software R&D United international University Designation : Director Director Address : Dhanmondi, Dhaka Dhanmondi , Dhaka E-Mail : smrahman99@gmail.com sumanahmmed@gmail.com Relation : Professional Professional