SlideShare a Scribd company logo
1 of 1
Contract’s between Feb 2012 and August 2013
Te Papa Tongarewa, Museum of New Zealand
Wellington
May 2013 – Aug 2013
VDI(Virtual Desktop Infrastructure) Deployment Engineer (Hewlett Packard) (3 month contract)
Key tasks and responsibilities
• Imaged Zero Clients and PC’s into a thin clientwith either the Full image build ofthe Thin/Fat build VMware
• Created 2nd
level supportdocumentation for IT staff that consisted ofbasic trouble shooting documentation
for SCCM 2012 Application Deployment, Application not being pushed to Application Catalogue etc
Wellington Institute of Technology
Petone Campus
November 2012 – May 2013
System Support Engineer (6 month contract)
Key tasks and responsibilities
• Packaging Software to deploy via SCCM (SCCM Administration) 50 packages thatwere identified as
needing updating for the Student year beginning 2013
Created packages,WIM’s, task sequenced deployments ofimages,packages etc
• Completing change requests to update licensing servers
• SAS supportfor EG, Dataminer,Forecastserver,worked on creating a ForecastServer/Studio solution for
the Classroom Labs for Business/Commerce Tutor and Students thatwas more reliable than whatthey had
in place lastyear (details at request)
Department of Internal Affairs
National Office Wellington
June 2012 – November 2012
Desktop Support Analyst (6 month contract)
Key tasks and responsibilities
• Imaging PC’s and Laptops (using SCCM)
Configured these devices for customers for use, install Non-standard software ifrequired.
• Working closelywith 1stlevel supportstaff, 3rd level supportstaff
• 2nd
Level supportfor all incidents and requests,remotelyaccessing machines via Dameware Remote
Assistance Software to troubleshootthe problem further with more diagnosis for level 3 to determine the
issue /ifproblem is presentor to resolve for customer.
• Migration of Charities and Ministerial Secretarial Services
Ministry of Health
National Office Wellington
February 2012 – May 2012
Desktop Engineer (3 month contract)
Key tasks and responsibilities
• Imaging PC’s and Laptops (using SCCM)
Configured these devices for customers for use,configuring Lotus Notes Profiles,install Non-standard
software if required.
• Working closelywith 1stlevel supportstaff, 3rd level supportstaff
• 2nd
Level supportfor all incidents and requests,remotelyaccessing machines via RDP and Windows Remote
Assistance tools to troubleshootthe problem further with more diagnosis for level 3 to determine the issue /if
problem is presentor to resolve for customer.
• BAU while the seconded staffwere working on a hard-ware refresh programme and update to office 2010

More Related Content

Viewers also liked

コイルと磁石が与えられたものとせよ
コイルと磁石が与えられたものとせよコイルと磁石が与えられたものとせよ
コイルと磁石が与えられたものとせよjohnsmith8402
 
Análisis critico del libro "los desafíos de la gerencia para el siglo XXI"
Análisis critico del libro "los desafíos de la gerencia para el siglo XXI"Análisis critico del libro "los desafíos de la gerencia para el siglo XXI"
Análisis critico del libro "los desafíos de la gerencia para el siglo XXI"santiago mariño
 
java.io - fluxos (streams) e arquivos
java.io - fluxos (streams) e arquivosjava.io - fluxos (streams) e arquivos
java.io - fluxos (streams) e arquivosMarcello Thiry
 
Resume_Nayda_Agosto PR
Resume_Nayda_Agosto PRResume_Nayda_Agosto PR
Resume_Nayda_Agosto PRNayda Agosto
 
November 2015 Real Estate Market Report, The Woodlands, TX
November 2015 Real Estate Market Report, The Woodlands, TXNovember 2015 Real Estate Market Report, The Woodlands, TX
November 2015 Real Estate Market Report, The Woodlands, TXReferred Realty Group
 

Viewers also liked (8)

コイルと磁石が与えられたものとせよ
コイルと磁石が与えられたものとせよコイルと磁石が与えられたものとせよ
コイルと磁石が与えられたものとせよ
 
Análisis critico del libro "los desafíos de la gerencia para el siglo XXI"
Análisis critico del libro "los desafíos de la gerencia para el siglo XXI"Análisis critico del libro "los desafíos de la gerencia para el siglo XXI"
Análisis critico del libro "los desafíos de la gerencia para el siglo XXI"
 
java.io - fluxos (streams) e arquivos
java.io - fluxos (streams) e arquivosjava.io - fluxos (streams) e arquivos
java.io - fluxos (streams) e arquivos
 
Arte prehelénico
Arte   prehelénicoArte   prehelénico
Arte prehelénico
 
FRUIT PLANTS 2
FRUIT PLANTS 2FRUIT PLANTS 2
FRUIT PLANTS 2
 
Resume_Nayda_Agosto PR
Resume_Nayda_Agosto PRResume_Nayda_Agosto PR
Resume_Nayda_Agosto PR
 
November 2015 Real Estate Market Report, The Woodlands, TX
November 2015 Real Estate Market Report, The Woodlands, TXNovember 2015 Real Estate Market Report, The Woodlands, TX
November 2015 Real Estate Market Report, The Woodlands, TX
 
14 02 2014 - Bodas Colectivas 2014.
14 02 2014 - Bodas Colectivas 2014.14 02 2014 - Bodas Colectivas 2014.
14 02 2014 - Bodas Colectivas 2014.
 

Similar to Contracts list

Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...Ricky Chan
 
aswathi mohandas new CV (1)
aswathi mohandas new CV (1)aswathi mohandas new CV (1)
aswathi mohandas new CV (1)Aswathi K
 
Sai Krishna_Resume
Sai Krishna_ResumeSai Krishna_Resume
Sai Krishna_Resumesai krishna
 
Resume - Desktop Support Engineer
Resume - Desktop Support EngineerResume - Desktop Support Engineer
Resume - Desktop Support EngineerNauman Ahmed
 
Resume Manoj Kumar M
Resume Manoj Kumar MResume Manoj Kumar M
Resume Manoj Kumar MManoj Kumar
 
PriyankaMeher_TestEngineer_Profile
PriyankaMeher_TestEngineer_ProfilePriyankaMeher_TestEngineer_Profile
PriyankaMeher_TestEngineer_ProfilePriyanka Meher
 
Sasikumar Selvaraj CV- Mainframe
Sasikumar Selvaraj CV- MainframeSasikumar Selvaraj CV- Mainframe
Sasikumar Selvaraj CV- Mainframesasikumar s
 
Project charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeProject charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeTheodore Van Patten, Jr.
 

Similar to Contracts list (20)

Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
Chan Siu Keung - CV IBM Mainframe Production Control & Senior Lead Operation ...
 
Venugopal - BO Resume
Venugopal - BO ResumeVenugopal - BO Resume
Venugopal - BO Resume
 
aswathi mohandas new CV (1)
aswathi mohandas new CV (1)aswathi mohandas new CV (1)
aswathi mohandas new CV (1)
 
Puvvati_Resume
Puvvati_ResumePuvvati_Resume
Puvvati_Resume
 
Sai Krishna_Resume
Sai Krishna_ResumeSai Krishna_Resume
Sai Krishna_Resume
 
Resume - Desktop Support Engineer
Resume - Desktop Support EngineerResume - Desktop Support Engineer
Resume - Desktop Support Engineer
 
Lambert_testing
Lambert_testingLambert_testing
Lambert_testing
 
CV_Celestina
CV_CelestinaCV_Celestina
CV_Celestina
 
Tony_CV New
Tony_CV NewTony_CV New
Tony_CV New
 
KotaSriHarsha
KotaSriHarsha KotaSriHarsha
KotaSriHarsha
 
software_eng
software_engsoftware_eng
software_eng
 
Resume Manoj Kumar M
Resume Manoj Kumar MResume Manoj Kumar M
Resume Manoj Kumar M
 
F_Meas_CV
F_Meas_CVF_Meas_CV
F_Meas_CV
 
AdeyemiOlaleye_updated
AdeyemiOlaleye_updatedAdeyemiOlaleye_updated
AdeyemiOlaleye_updated
 
Pavankumar Kakarla
Pavankumar KakarlaPavankumar Kakarla
Pavankumar Kakarla
 
Chiranjit S Dutta
Chiranjit S DuttaChiranjit S Dutta
Chiranjit S Dutta
 
PriyankaMeher_TestEngineer_Profile
PriyankaMeher_TestEngineer_ProfilePriyankaMeher_TestEngineer_Profile
PriyankaMeher_TestEngineer_Profile
 
Sasikumar Selvaraj CV- Mainframe
Sasikumar Selvaraj CV- MainframeSasikumar Selvaraj CV- Mainframe
Sasikumar Selvaraj CV- Mainframe
 
Ilyasuddin_Sayed
Ilyasuddin_SayedIlyasuddin_Sayed
Ilyasuddin_Sayed
 
Project charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeProject charter and plan document for millennium upgrade
Project charter and plan document for millennium upgrade
 

Contracts list

  • 1. Contract’s between Feb 2012 and August 2013 Te Papa Tongarewa, Museum of New Zealand Wellington May 2013 – Aug 2013 VDI(Virtual Desktop Infrastructure) Deployment Engineer (Hewlett Packard) (3 month contract) Key tasks and responsibilities • Imaged Zero Clients and PC’s into a thin clientwith either the Full image build ofthe Thin/Fat build VMware • Created 2nd level supportdocumentation for IT staff that consisted ofbasic trouble shooting documentation for SCCM 2012 Application Deployment, Application not being pushed to Application Catalogue etc Wellington Institute of Technology Petone Campus November 2012 – May 2013 System Support Engineer (6 month contract) Key tasks and responsibilities • Packaging Software to deploy via SCCM (SCCM Administration) 50 packages thatwere identified as needing updating for the Student year beginning 2013 Created packages,WIM’s, task sequenced deployments ofimages,packages etc • Completing change requests to update licensing servers • SAS supportfor EG, Dataminer,Forecastserver,worked on creating a ForecastServer/Studio solution for the Classroom Labs for Business/Commerce Tutor and Students thatwas more reliable than whatthey had in place lastyear (details at request) Department of Internal Affairs National Office Wellington June 2012 – November 2012 Desktop Support Analyst (6 month contract) Key tasks and responsibilities • Imaging PC’s and Laptops (using SCCM) Configured these devices for customers for use, install Non-standard software ifrequired. • Working closelywith 1stlevel supportstaff, 3rd level supportstaff • 2nd Level supportfor all incidents and requests,remotelyaccessing machines via Dameware Remote Assistance Software to troubleshootthe problem further with more diagnosis for level 3 to determine the issue /ifproblem is presentor to resolve for customer. • Migration of Charities and Ministerial Secretarial Services Ministry of Health National Office Wellington February 2012 – May 2012 Desktop Engineer (3 month contract) Key tasks and responsibilities • Imaging PC’s and Laptops (using SCCM) Configured these devices for customers for use,configuring Lotus Notes Profiles,install Non-standard software if required. • Working closelywith 1stlevel supportstaff, 3rd level supportstaff • 2nd Level supportfor all incidents and requests,remotelyaccessing machines via RDP and Windows Remote Assistance tools to troubleshootthe problem further with more diagnosis for level 3 to determine the issue /if problem is presentor to resolve for customer. • BAU while the seconded staffwere working on a hard-ware refresh programme and update to office 2010