SlideShare a Scribd company logo
1 of 5
RÉSUMÉ
SHARAYU WANKHEDE
PUNE, MAHARASHTRA, INDIA
Contact No +91- 9673195972
E-mail: sharayuw@gmail.com
PROFESSIONAL SUMMARY
An engineer with more than 5 years of experience in OEM as well as in engineering services
with expertise in schematic design, wiring harness and control panel layouts by using E-3
schematic design tool and PRO-E.
Exposure to work off-shore(Germany) with international teams and clients
OBJECTIVE
To obtain a challenging position with an established company where combination of my
skills and abilities will aim in the achievement of company goals.
EDUCATION
 2006 – 2010 : B.E. Electronics and Telecommunication from P.I.E.T, Nagpur ;
 2005 – 2006 : H.S.C in Science from Kamla Nehru Mahavidyalaya, Maharashtra State
Board
E-CAD, DATABASE SKILLS
 Electrical Schematic tools E3 series
 Developed E3 component library
 Create sheet template, Connection table format, Device table format in E3 Database
 Scripting/customization at low end in E3
 VESYS 2.0
 Auto-cad electrical (2008 version)
 PDM (Product data management)
 Integration of CATIA V5 with E3.Series (Zuken)
 Wire harness layout in E3 series
 Wiring harness in PRO/Cabling
 Ability to communicate professionally with strong organization skills
 Good in project execution & program management as per QCD (Quality customer
delivery) parameters.
KEY CAD SOFTWARE AWARENESS
 MS Office , Adobe Acrobat, Internet Tools, Lotus Notes
PROFESSIONAL EXPERIENCE
HCL TECHNOLOGIES.
DESIGNATION : PRODUCT DESIGN ENGINEER, ENGINEERING
ROLE : LEAD DESIGN ENGINEER
TOOL USED : PRO-E
DURATION : SEP 2014 TO PRESENT
Engineering design: services in body/exterior, chassis, suspension and brakes,
CAD/CAM/CAE, engine compartment, HVAC, interiors, powertrain, reliability engineering,
technical publications, and value analysis and value engineering.
PROJECT : DESIGN & DEVELOPMENT OF WIRING HARNESS IN PR0/CABLING
CLIENT : MANITOWOC
 Design of Wiring harness for off highway vehicle i.e. Manitowoc Crane.
 Creating 3D Modelling, Flattening & Drawing with Parametric BOM Table, From –To
Table and Splice Table etc.
 Creating Schematics by using E3.
 Creating Electrical Harness Installation drawing and 3d Model.
 Design of harness support components.
 Modelling and Detailing of Electric Components and Decals.
 Experience in Design Revision, Design Releases, Design Modifications & Validation
and Assembly Structuring in PDM.
 Preparing and Releasing ECN and Updating BOM as per changes in product.
 Coordinating with Onsite Coordinators and Delegating Projects to Team Members.
 Interacting with the customer for queries and providing cost effective solutions.
 Conducting Knowledge Transfer Session for Team Members
BOMBARDIER TRANSPORTATION INDIA LTD.
DESIGNATION : PRODUCT DESIGN ENGINEER, ENGINEERING
ROLE : E-3 KEY USER
DURATION : DEC 2011 TO AUG 2014
Bombardier is a world leader in innovative transportation solutions, from commercial aircraft
and business jets to rail transportation coaches, equipment, systems and services having
presence in over 60 countries and 5 continents.
Bombardier Transportation India (BT) has supplied over 600 BOMBARDIER MOVIA metro
cars to the Delhi Metro Rail Corporation Ltd (DMRC). The contract valued at approximately
800m USD. Company has successfully executed project for Mumbai Rail Vikas Corporation.
Company has recently, secured 4.4 Billion ASD order from government of state of
Queensland, Australia.
PROJECT : DESIGN & DEVELOPMENT OF ELECTRICAL SCHEMATICS
CLIENT : MUMBAI RAIL VIKAS CORPORATION
RESPONSIBILITIES :
 Design of electrical schematics of 12-Car train set having 4 types of cars using Electrical
Engineering Tool E3, Zuken in multiuser environment.
 Frequent interaction with overseas E3 key users to update the progress of project.
 Executed project as per E3.series Bombardier methodology.
 E3 project execution as per EN-15380 for assigning product group and EN-13433 for deliverables
and alignment with project gate review process.
 Assignment of cables and wires, signals and Cable markers.
 Assignment of line index for generation of wire reports.
 Consistency check of complete circuit diagram.
 Creation of components in database as per Bombardier methodology. Also followed EN-60617.
 Prepared output reports like wire reports, harness reports, device list and list of content using
wiring tool and other Add-ons.
 Verification and validation of schematic based on end customer’s requirement and specialist
inputs.
 First project release and modification release using Revision management functionality of E3
 Release all project related data in PDM.
PROJECT : SYDNEY NWRL BID
RESPONSIBILITIES :
 System required document preparation as per Customer Invitation to tender & reviews for interior
and exterior light
 Verification and validation based on end customer’s requirement and specialist inputs for the
vehicle performance parameters i.e. EMC, Fire, Noise, Design Life etc.
 Technical offer & Clause by clause evaluation as per System requirement document submitted to
supplier
 Review of all supplier inputs which are required in Bid phase as per contract data requirement list
 Joint design definition process with light suppliers to arrive at cost effective solution for light
system
 Most cost effective solution for Light system by component comparison of Prices between Delhi
and Mumbai metro project
 System requirement document release in PDM & Bid Document management through common
share point
KDS TECHNOLOGIES INDIA, NAGPUR, MAHARASHTRA
DESIGNATION : DESIGN ENGINEER
DURATION : JUN 2010 TO NOV 2011
KSD Technologies India is a leading company in the area of Engineering Services for
design and development and Global Sourcing for the Earthmoving, Construction,
Automobile & Mining machineries.
PROJECT : REDESIGN OF ELECTRICAL SYSTEM FOR TRUCK (LPK 3118) AND
INTEGRATED THE SAME ON 3D MODEL USING CATIA V5
CLIENT : TATA MOTORS
RESPONSIBILITIES :
 Execution of complete project in E3 in single user environment
 Identification of electrical component manufacturer
 Creation of Zuken E3 Component Library
 Design of electrical schematics and harness
 Preparing Wiring list & Bill of material
 Integration of E3 schematics with CATIA 3D module
 Automatic harness layout creation in CATIA V5
PROJECT : DEVELOPMENT OF 3D CONNECTOR LIBRARY IN CATIA V5 FOR VESYS
INTEGRATION
CLIENT : MAHINDRA & MAHINDRA AUTOMOTIVE
RESPONSIBILITIES :
 Study of electrical harness drawings
 Preparation of Bill of Material from harness drawings
 Verification of supplier connector information with physical harness
 Verification of CAD models with physical connectors
 Develop 3D Connector catalogue for Tyco, Deutsch, Molex, Harting, ITT CANON etc
PROJECT : REDESIGN & DEVELOPMENT OF ELECTRICAL SYSTEM FOR 70 SERIES
BACK-HOE LOADER
CLIENT : TEREX INDIA
RESPONSIBILITIES :
 Identification of electrical component manufacturer
 Design of electrical schematics and wire harness drawings in Zukene E3
 Creation of Zuken E3 Component Library
 Selection of cables/wires, cable protection
 Create and maintain product schematic and support product development.
 Prepared output reports as per customer requirement.eg Harness reports, Device list
 Schematics Sheet Template Creation
 Scripting/customization at low end in E3
STRENGTH
 High grasping power for getting into any new field within a short period.
 High-end satisfaction level and hard working for achieving quality results.
 Sky-scraping confident level in meeting the challenges and achieving time bounded
goals.
 Broad-minded to break traditional practices and make continuous improvements.
 Ability to work under pressure and handle multiple tasks
PERSONAL DETAILS
DATE OF BIRTH : NOVEMBER 14, 1988
GENDER : FEMALE
MARITAL STATUS : MARRIED
LANGUAGES KNOWN : ENGLISH, HINDI, AND MARATHI
HOBBIES : LISTENING TO MUSIC, PAINTING, PLAYING GUITAR, SINGING

More Related Content

What's hot

Power Electronics Engineer Resume - Sachin Khante
Power Electronics Engineer Resume - Sachin KhantePower Electronics Engineer Resume - Sachin Khante
Power Electronics Engineer Resume - Sachin KhanteSachin Khante
 
Cv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqaCv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqaahmadalsaqqa1
 
MARGERIT KAYED new resume
MARGERIT KAYED new resumeMARGERIT KAYED new resume
MARGERIT KAYED new resumeMargerit kayed
 
sakthibalan_resume
sakthibalan_resumesakthibalan_resume
sakthibalan_resumesakthi balan
 
Ibrahim Sr Engineer Electrical _CV
Ibrahim Sr Engineer Electrical _CV Ibrahim Sr Engineer Electrical _CV
Ibrahim Sr Engineer Electrical _CV GULMOHAMMED IBRAHIM
 
Electrical engineer cv_template
Electrical engineer cv_templateElectrical engineer cv_template
Electrical engineer cv_templatetathanhluan
 
Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)khaja Ahammad
 
CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _ CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _ Nitin Niwariya
 
Ahmed Mohammed Riziq- Electrical Power Engineer CV
Ahmed Mohammed Riziq- Electrical Power Engineer CVAhmed Mohammed Riziq- Electrical Power Engineer CV
Ahmed Mohammed Riziq- Electrical Power Engineer CVAhmed Riziq
 
Embedded_&_Automation_Profile-Amit
Embedded_&_Automation_Profile-AmitEmbedded_&_Automation_Profile-Amit
Embedded_&_Automation_Profile-AmitAmit Sahoo
 
Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014Srandev2014
 

What's hot (20)

Power Electronics Engineer Resume - Sachin Khante
Power Electronics Engineer Resume - Sachin KhantePower Electronics Engineer Resume - Sachin Khante
Power Electronics Engineer Resume - Sachin Khante
 
CV SUBHASH
CV SUBHASHCV SUBHASH
CV SUBHASH
 
Govind-CVC5
Govind-CVC5Govind-CVC5
Govind-CVC5
 
Cv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqaCv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqa
 
MARGERIT KAYED new resume
MARGERIT KAYED new resumeMARGERIT KAYED new resume
MARGERIT KAYED new resume
 
sakthibalan_resume
sakthibalan_resumesakthibalan_resume
sakthibalan_resume
 
noorCV
noorCVnoorCV
noorCV
 
Ibrahim Sr Engineer Electrical _CV
Ibrahim Sr Engineer Electrical _CV Ibrahim Sr Engineer Electrical _CV
Ibrahim Sr Engineer Electrical _CV
 
Electrical engineer cv_template
Electrical engineer cv_templateElectrical engineer cv_template
Electrical engineer cv_template
 
Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)
 
ehab mohamed
ehab mohamedehab mohamed
ehab mohamed
 
CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _ CV-NITIN NIWARIYA _ Electrical _
CV-NITIN NIWARIYA _ Electrical _
 
Resume
ResumeResume
Resume
 
Ahmed Mohammed Riziq- Electrical Power Engineer CV
Ahmed Mohammed Riziq- Electrical Power Engineer CVAhmed Mohammed Riziq- Electrical Power Engineer CV
Ahmed Mohammed Riziq- Electrical Power Engineer CV
 
Renjith Resume_20161011
Renjith Resume_20161011Renjith Resume_20161011
Renjith Resume_20161011
 
sunny_cv
sunny_cvsunny_cv
sunny_cv
 
Embedded_&_Automation_Profile-Amit
Embedded_&_Automation_Profile-AmitEmbedded_&_Automation_Profile-Amit
Embedded_&_Automation_Profile-Amit
 
JOVIN RESUME
JOVIN RESUMEJOVIN RESUME
JOVIN RESUME
 
Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014Sanjeev Randev Resume Electrical Engineer MBA-2014
Sanjeev Randev Resume Electrical Engineer MBA-2014
 
RESUME
RESUME RESUME
RESUME
 

Viewers also liked

Cbo club PT SAP member ATACORP presentation 2016
Cbo club PT SAP member ATACORP presentation 2016Cbo club PT SAP member ATACORP presentation 2016
Cbo club PT SAP member ATACORP presentation 2016Tumijan Arsho
 
Самопрезентация на английском
Самопрезентация на английском Самопрезентация на английском
Самопрезентация на английском Skyeng
 
Как выучить английский за 6 месяцев
Как выучить английский за 6 месяцевКак выучить английский за 6 месяцев
Как выучить английский за 6 месяцевSkyeng
 
Sample Comprehensive Personal Financial Plan Created in Excel based Personal ...
Sample Comprehensive Personal Financial Plan Created in Excel based Personal ...Sample Comprehensive Personal Financial Plan Created in Excel based Personal ...
Sample Comprehensive Personal Financial Plan Created in Excel based Personal ...Satish Mistry
 
Как разговаривать на английском более естественно
Как разговаривать на английском более естественноКак разговаривать на английском более естественно
Как разговаривать на английском более естественноMaria Sorokina
 
sai none myne resume
sai none myne resumesai none myne resume
sai none myne resumeSai None Myne
 

Viewers also liked (10)

rajesh resume latest
rajesh resume latestrajesh resume latest
rajesh resume latest
 
Cbo club PT SAP member ATACORP presentation 2016
Cbo club PT SAP member ATACORP presentation 2016Cbo club PT SAP member ATACORP presentation 2016
Cbo club PT SAP member ATACORP presentation 2016
 
Jornal1
Jornal1Jornal1
Jornal1
 
degre
degredegre
degre
 
Computacion
ComputacionComputacion
Computacion
 
Самопрезентация на английском
Самопрезентация на английском Самопрезентация на английском
Самопрезентация на английском
 
Как выучить английский за 6 месяцев
Как выучить английский за 6 месяцевКак выучить английский за 6 месяцев
Как выучить английский за 6 месяцев
 
Sample Comprehensive Personal Financial Plan Created in Excel based Personal ...
Sample Comprehensive Personal Financial Plan Created in Excel based Personal ...Sample Comprehensive Personal Financial Plan Created in Excel based Personal ...
Sample Comprehensive Personal Financial Plan Created in Excel based Personal ...
 
Как разговаривать на английском более естественно
Как разговаривать на английском более естественноКак разговаривать на английском более естественно
Как разговаривать на английском более естественно
 
sai none myne resume
sai none myne resumesai none myne resume
sai none myne resume
 

Similar to Resume

Similar to Resume (20)

CURRICULUM VITAE_Balu
CURRICULUM VITAE_BaluCURRICULUM VITAE_Balu
CURRICULUM VITAE_Balu
 
spi 3+ years resume
spi 3+ years resumespi 3+ years resume
spi 3+ years resume
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
elecworks for PTC Creo - Mechatronics software - 3D CAD software
elecworks for PTC Creo - Mechatronics software - 3D CAD softwareelecworks for PTC Creo - Mechatronics software - 3D CAD software
elecworks for PTC Creo - Mechatronics software - 3D CAD software
 
AbdulKalamAzad - CAD Designer
AbdulKalamAzad - CAD DesignerAbdulKalamAzad - CAD Designer
AbdulKalamAzad - CAD Designer
 
Anbazhagan_Resume
Anbazhagan_ResumeAnbazhagan_Resume
Anbazhagan_Resume
 
karthick-new
karthick-newkarthick-new
karthick-new
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
Ramesh.S.M
Ramesh.S.MRamesh.S.M
Ramesh.S.M
 
CV_Chetan Kumar RJ
CV_Chetan Kumar RJCV_Chetan Kumar RJ
CV_Chetan Kumar RJ
 
Girish BG - CV
Girish BG - CVGirish BG - CV
Girish BG - CV
 
Resume - 2016
Resume - 2016Resume - 2016
Resume - 2016
 
CV_SRINATH_Electrical Engineer
CV_SRINATH_Electrical EngineerCV_SRINATH_Electrical Engineer
CV_SRINATH_Electrical Engineer
 
VikramShete_New-1
VikramShete_New-1VikramShete_New-1
VikramShete_New-1
 
Sandeep Suryavanshi CoverLetter and Resume
Sandeep Suryavanshi  CoverLetter and ResumeSandeep Suryavanshi  CoverLetter and Resume
Sandeep Suryavanshi CoverLetter and Resume
 
Saichander resume
Saichander resumeSaichander resume
Saichander resume
 
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram NarayanaSr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
 
Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016
 
Jayaprakash Resume
Jayaprakash ResumeJayaprakash Resume
Jayaprakash Resume
 
Resume2
Resume2Resume2
Resume2
 

Resume

  • 1. RÉSUMÉ SHARAYU WANKHEDE PUNE, MAHARASHTRA, INDIA Contact No +91- 9673195972 E-mail: sharayuw@gmail.com PROFESSIONAL SUMMARY An engineer with more than 5 years of experience in OEM as well as in engineering services with expertise in schematic design, wiring harness and control panel layouts by using E-3 schematic design tool and PRO-E. Exposure to work off-shore(Germany) with international teams and clients OBJECTIVE To obtain a challenging position with an established company where combination of my skills and abilities will aim in the achievement of company goals. EDUCATION  2006 – 2010 : B.E. Electronics and Telecommunication from P.I.E.T, Nagpur ;  2005 – 2006 : H.S.C in Science from Kamla Nehru Mahavidyalaya, Maharashtra State Board E-CAD, DATABASE SKILLS  Electrical Schematic tools E3 series  Developed E3 component library  Create sheet template, Connection table format, Device table format in E3 Database  Scripting/customization at low end in E3  VESYS 2.0  Auto-cad electrical (2008 version)  PDM (Product data management)  Integration of CATIA V5 with E3.Series (Zuken)  Wire harness layout in E3 series  Wiring harness in PRO/Cabling  Ability to communicate professionally with strong organization skills  Good in project execution & program management as per QCD (Quality customer delivery) parameters. KEY CAD SOFTWARE AWARENESS  MS Office , Adobe Acrobat, Internet Tools, Lotus Notes
  • 2. PROFESSIONAL EXPERIENCE HCL TECHNOLOGIES. DESIGNATION : PRODUCT DESIGN ENGINEER, ENGINEERING ROLE : LEAD DESIGN ENGINEER TOOL USED : PRO-E DURATION : SEP 2014 TO PRESENT Engineering design: services in body/exterior, chassis, suspension and brakes, CAD/CAM/CAE, engine compartment, HVAC, interiors, powertrain, reliability engineering, technical publications, and value analysis and value engineering. PROJECT : DESIGN & DEVELOPMENT OF WIRING HARNESS IN PR0/CABLING CLIENT : MANITOWOC  Design of Wiring harness for off highway vehicle i.e. Manitowoc Crane.  Creating 3D Modelling, Flattening & Drawing with Parametric BOM Table, From –To Table and Splice Table etc.  Creating Schematics by using E3.  Creating Electrical Harness Installation drawing and 3d Model.  Design of harness support components.  Modelling and Detailing of Electric Components and Decals.  Experience in Design Revision, Design Releases, Design Modifications & Validation and Assembly Structuring in PDM.  Preparing and Releasing ECN and Updating BOM as per changes in product.  Coordinating with Onsite Coordinators and Delegating Projects to Team Members.  Interacting with the customer for queries and providing cost effective solutions.  Conducting Knowledge Transfer Session for Team Members BOMBARDIER TRANSPORTATION INDIA LTD. DESIGNATION : PRODUCT DESIGN ENGINEER, ENGINEERING ROLE : E-3 KEY USER DURATION : DEC 2011 TO AUG 2014 Bombardier is a world leader in innovative transportation solutions, from commercial aircraft and business jets to rail transportation coaches, equipment, systems and services having presence in over 60 countries and 5 continents. Bombardier Transportation India (BT) has supplied over 600 BOMBARDIER MOVIA metro cars to the Delhi Metro Rail Corporation Ltd (DMRC). The contract valued at approximately
  • 3. 800m USD. Company has successfully executed project for Mumbai Rail Vikas Corporation. Company has recently, secured 4.4 Billion ASD order from government of state of Queensland, Australia. PROJECT : DESIGN & DEVELOPMENT OF ELECTRICAL SCHEMATICS CLIENT : MUMBAI RAIL VIKAS CORPORATION RESPONSIBILITIES :  Design of electrical schematics of 12-Car train set having 4 types of cars using Electrical Engineering Tool E3, Zuken in multiuser environment.  Frequent interaction with overseas E3 key users to update the progress of project.  Executed project as per E3.series Bombardier methodology.  E3 project execution as per EN-15380 for assigning product group and EN-13433 for deliverables and alignment with project gate review process.  Assignment of cables and wires, signals and Cable markers.  Assignment of line index for generation of wire reports.  Consistency check of complete circuit diagram.  Creation of components in database as per Bombardier methodology. Also followed EN-60617.  Prepared output reports like wire reports, harness reports, device list and list of content using wiring tool and other Add-ons.  Verification and validation of schematic based on end customer’s requirement and specialist inputs.  First project release and modification release using Revision management functionality of E3  Release all project related data in PDM. PROJECT : SYDNEY NWRL BID RESPONSIBILITIES :  System required document preparation as per Customer Invitation to tender & reviews for interior and exterior light  Verification and validation based on end customer’s requirement and specialist inputs for the vehicle performance parameters i.e. EMC, Fire, Noise, Design Life etc.  Technical offer & Clause by clause evaluation as per System requirement document submitted to supplier  Review of all supplier inputs which are required in Bid phase as per contract data requirement list  Joint design definition process with light suppliers to arrive at cost effective solution for light system  Most cost effective solution for Light system by component comparison of Prices between Delhi and Mumbai metro project  System requirement document release in PDM & Bid Document management through common share point KDS TECHNOLOGIES INDIA, NAGPUR, MAHARASHTRA DESIGNATION : DESIGN ENGINEER DURATION : JUN 2010 TO NOV 2011
  • 4. KSD Technologies India is a leading company in the area of Engineering Services for design and development and Global Sourcing for the Earthmoving, Construction, Automobile & Mining machineries. PROJECT : REDESIGN OF ELECTRICAL SYSTEM FOR TRUCK (LPK 3118) AND INTEGRATED THE SAME ON 3D MODEL USING CATIA V5 CLIENT : TATA MOTORS RESPONSIBILITIES :  Execution of complete project in E3 in single user environment  Identification of electrical component manufacturer  Creation of Zuken E3 Component Library  Design of electrical schematics and harness  Preparing Wiring list & Bill of material  Integration of E3 schematics with CATIA 3D module  Automatic harness layout creation in CATIA V5 PROJECT : DEVELOPMENT OF 3D CONNECTOR LIBRARY IN CATIA V5 FOR VESYS INTEGRATION CLIENT : MAHINDRA & MAHINDRA AUTOMOTIVE RESPONSIBILITIES :  Study of electrical harness drawings  Preparation of Bill of Material from harness drawings  Verification of supplier connector information with physical harness  Verification of CAD models with physical connectors  Develop 3D Connector catalogue for Tyco, Deutsch, Molex, Harting, ITT CANON etc PROJECT : REDESIGN & DEVELOPMENT OF ELECTRICAL SYSTEM FOR 70 SERIES BACK-HOE LOADER CLIENT : TEREX INDIA RESPONSIBILITIES :  Identification of electrical component manufacturer  Design of electrical schematics and wire harness drawings in Zukene E3
  • 5.  Creation of Zuken E3 Component Library  Selection of cables/wires, cable protection  Create and maintain product schematic and support product development.  Prepared output reports as per customer requirement.eg Harness reports, Device list  Schematics Sheet Template Creation  Scripting/customization at low end in E3 STRENGTH  High grasping power for getting into any new field within a short period.  High-end satisfaction level and hard working for achieving quality results.  Sky-scraping confident level in meeting the challenges and achieving time bounded goals.  Broad-minded to break traditional practices and make continuous improvements.  Ability to work under pressure and handle multiple tasks PERSONAL DETAILS DATE OF BIRTH : NOVEMBER 14, 1988 GENDER : FEMALE MARITAL STATUS : MARRIED LANGUAGES KNOWN : ENGLISH, HINDI, AND MARATHI HOBBIES : LISTENING TO MUSIC, PAINTING, PLAYING GUITAR, SINGING