Evacuation Plans
For use in conjunction with 5-Minute Safety Talk
© 2016 National Safety Council
2
Protecting the lives of everyone within your facility
is the first priority in the event of an emergency.
One common means of protection is evacuation.
© 2016 National Safety Council
3
In the case of fire, an immediate evacuation to a
predetermined area away from your facility may be
necessary.
© 2016 National Safety Council
4
Steps to develop an
evacuation policy & procedure
 Determine the conditions under which an evacuation would be necessary
 Establish a clear chain of command
 Establish specific evacuation procedures
 Establish a system for accounting for personnel - Consider employees’
transportation needs for community-wide evacuations
 Establish procedures for assisting personnel with disabilities and those
who do not speak English. Post evacuation procedures
 Designate personnel to continue or shut down critical operations while an
evacuation is underway. They must be capable of recognizing when to
abandon the operation and evacuate themselves
 Coordinate plans with your local emergency management office
© 2016 National Safety Council
5
Evacuation routes & exits
Designate primary and secondary
evacuation routes and exits
– Make sure routes and exits are
clearly marked and well lit
– Post signs
– Install emergency lighting in case a
power outage occurs during an
evacuation
© 2016 National Safety Council
6
Ensure evacuation routes &
emergency exits are:
• Wide enough to accommodate the
number of evacuating personnel
• Clear and unobstructed at all times
• Unlikely to expose evacuating
personnel to additional hazards
Have evacuation routes evaluated by someone not in
your organization
© 2016 National Safety Council
7
Assembly areas & accountability
Accurately accounting for
personnel after a site
evacuation requires
planning and practice.
© 2016 National Safety Council
8
1. Designate assembly areas
where personnel should gather
after evacuating
2. Take a head count after the
evacuation – determining the
names and last known locations of
personnel not accounted for. List to
be given to Emergency Operations
Center.
3. Establish a method for
accounting for non-employees
such as suppliers and customers
4. Establish procedures for further
evacuation in case the incident
expands. This may involve sending
employees home by normal means
or providing them with transportation
to an off-site location
Assembly areas & accountability
© 2016 National Safety Council
9
Train your employees in
evacuation:
Conduct sessions at least annually or when:
• New employees are hired
• Evacuation wardens, shelter managers, and others
with special assignments are designated
• New equipment, materials or processes are introduced
• Procedures are revised
• Exercises show that employee performance must be
improved
© 2016 National Safety Council
10
Provide emergency information such as checklists and
evacuation maps
Post evacuation maps in strategic locations
Consider the information
needs of customers and
others who visit your facility
© 2016 National Safety Council
11
By keeping these guidelines in place and practicing
evacuation, we can ensure our employees know
how to safely exit the facility and avoid panic.
© 2016 National Safety Council
12
Emergency Preparedness Toolkit
Sign in at nsc.org/members
© 2016 National Safety Council
13
Emergency Preparedness
2-Minute Safety Video
Emergency Preparedness 2-Minute Safety Video
© 2016 National Safety Council
14
For more member-exclusive safety
presentations, webinars, posters and resources
sign in at nsc.org/members
Customer Service – (800) 621-7619
Outside U.S. – +1-630-775-2056
Email us at:
MEMBERSHIPINFO@nsc.org
© 2016 National Safety Council
15
NSC Emergency Preparedness
Workplace Training Now Available
Go further in depth with this course. Content includes 8 independent modules on:
1. Evacuation
2. Weather and Natural Disasters
3. Shelter in Place Emergencies
4. Medical Emergencies
5. Workplace Violence
6. Active Shooter
7. Terrorism Emergencies
8. Communication Before and After Emergencies
Call (800) 621-7619 or visit nsc.org/ep for more information and member pricing.

More Related Content

Similar to Evacuation-Plans-ppt.pptx

Nosa fire services brits forum
Nosa fire services  brits forumNosa fire services  brits forum
Nosa fire services brits forumNOSA (Pty) Ltd
 
BCP – How to develop BCP strategies and Plans 2016.pptx
BCP – How to develop BCP strategies and Plans 2016.pptxBCP – How to develop BCP strategies and Plans 2016.pptx
BCP – How to develop BCP strategies and Plans 2016.pptxFerriFatra1
 
Mitigating COVID-19 Risk During Construction
Mitigating COVID-19 Risk During ConstructionMitigating COVID-19 Risk During Construction
Mitigating COVID-19 Risk During ConstructionPeterGabriel36
 
Employer Considerations to Successfully Reopen a Business
Employer Considerations to Successfully Reopen a BusinessEmployer Considerations to Successfully Reopen a Business
Employer Considerations to Successfully Reopen a BusinessParsons Behle & Latimer
 
TIM European Aide Memoire_V1.1
TIM European Aide Memoire_V1.1TIM European Aide Memoire_V1.1
TIM European Aide Memoire_V1.1Uroš Brumec
 
Industrial Safety Unit -III- Safety activities.pptx
Industrial Safety Unit -III- Safety activities.pptxIndustrial Safety Unit -III- Safety activities.pptx
Industrial Safety Unit -III- Safety activities.pptxNarmatha D
 
Risk assessment covid 19 .
Risk assessment covid 19 .Risk assessment covid 19 .
Risk assessment covid 19 .SOLANKIJAYDEEP4
 
Emergency Dealing Plan
Emergency Dealing PlanEmergency Dealing Plan
Emergency Dealing PlanRaj Acharya
 
NFPA RequirementEvacuation PlanningThe fundamental prerequisit.docx
NFPA RequirementEvacuation PlanningThe fundamental prerequisit.docxNFPA RequirementEvacuation PlanningThe fundamental prerequisit.docx
NFPA RequirementEvacuation PlanningThe fundamental prerequisit.docxcurwenmichaela
 
Network Return to Work Pack - guidance for your clients
Network Return to Work Pack - guidance for your clients Network Return to Work Pack - guidance for your clients
Network Return to Work Pack - guidance for your clients Alice Bowerman
 
Return to work guidance pack
Return to work guidance pack Return to work guidance pack
Return to work guidance pack BravoGroupUK
 
AIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdf
AIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdfAIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdf
AIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdfMATSNorthpack
 
unit-iv-facility-safety.pptx
unit-iv-facility-safety.pptxunit-iv-facility-safety.pptx
unit-iv-facility-safety.pptxssuser1ecccc
 

Similar to Evacuation-Plans-ppt.pptx (20)

Nosa fire services brits forum
Nosa fire services  brits forumNosa fire services  brits forum
Nosa fire services brits forum
 
BCP – How to develop BCP strategies and Plans 2016.pptx
BCP – How to develop BCP strategies and Plans 2016.pptxBCP – How to develop BCP strategies and Plans 2016.pptx
BCP – How to develop BCP strategies and Plans 2016.pptx
 
Mitigating COVID-19 Risk During Construction
Mitigating COVID-19 Risk During ConstructionMitigating COVID-19 Risk During Construction
Mitigating COVID-19 Risk During Construction
 
Confined_space_rescue_procedure
Confined_space_rescue_procedureConfined_space_rescue_procedure
Confined_space_rescue_procedure
 
Employer Considerations to Successfully Reopen a Business
Employer Considerations to Successfully Reopen a BusinessEmployer Considerations to Successfully Reopen a Business
Employer Considerations to Successfully Reopen a Business
 
TIM European Aide Memoire_V1.1
TIM European Aide Memoire_V1.1TIM European Aide Memoire_V1.1
TIM European Aide Memoire_V1.1
 
Industrial Safety Unit -III- Safety activities.pptx
Industrial Safety Unit -III- Safety activities.pptxIndustrial Safety Unit -III- Safety activities.pptx
Industrial Safety Unit -III- Safety activities.pptx
 
Easing of lockdown – practical considerations for managing and supporting staff
Easing of lockdown – practical considerations for managing and supporting staffEasing of lockdown – practical considerations for managing and supporting staff
Easing of lockdown – practical considerations for managing and supporting staff
 
NCVO Webinar: Legal and practical considerations for returning to work
NCVO Webinar: Legal and practical considerations for returning to workNCVO Webinar: Legal and practical considerations for returning to work
NCVO Webinar: Legal and practical considerations for returning to work
 
Risk assessment covid 19 .
Risk assessment covid 19 .Risk assessment covid 19 .
Risk assessment covid 19 .
 
Emergency planning
Emergency planningEmergency planning
Emergency planning
 
Emergency Dealing Plan
Emergency Dealing PlanEmergency Dealing Plan
Emergency Dealing Plan
 
murad c v
murad c vmurad c v
murad c v
 
NFPA RequirementEvacuation PlanningThe fundamental prerequisit.docx
NFPA RequirementEvacuation PlanningThe fundamental prerequisit.docxNFPA RequirementEvacuation PlanningThe fundamental prerequisit.docx
NFPA RequirementEvacuation PlanningThe fundamental prerequisit.docx
 
Network Return to Work Pack - guidance for your clients
Network Return to Work Pack - guidance for your clients Network Return to Work Pack - guidance for your clients
Network Return to Work Pack - guidance for your clients
 
Return to work guidance pack
Return to work guidance pack Return to work guidance pack
Return to work guidance pack
 
3220 warehouse
3220 warehouse3220 warehouse
3220 warehouse
 
AIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdf
AIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdfAIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdf
AIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdf
 
Lone Working Policy
Lone Working PolicyLone Working Policy
Lone Working Policy
 
unit-iv-facility-safety.pptx
unit-iv-facility-safety.pptxunit-iv-facility-safety.pptx
unit-iv-facility-safety.pptx
 

Recently uploaded

ACM CHT Best Inspection Practices Kinben Innovation MIC Slideshare.pdf
ACM CHT Best Inspection Practices Kinben Innovation MIC Slideshare.pdfACM CHT Best Inspection Practices Kinben Innovation MIC Slideshare.pdf
ACM CHT Best Inspection Practices Kinben Innovation MIC Slideshare.pdfKinben Innovation Private Limited
 
DAY 0 8 A Revelation 05-19-2024 PPT.pptx
DAY 0 8 A Revelation 05-19-2024 PPT.pptxDAY 0 8 A Revelation 05-19-2024 PPT.pptx
DAY 0 8 A Revelation 05-19-2024 PPT.pptxFamilyWorshipCenterD
 
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...Sosiaali- ja terveysministeriö / yleiset
 
The Concession of Asaba International Airport: Balancing Politics and Policy ...
The Concession of Asaba International Airport: Balancing Politics and Policy ...The Concession of Asaba International Airport: Balancing Politics and Policy ...
The Concession of Asaba International Airport: Balancing Politics and Policy ...Kayode Fayemi
 
2024-05-15-Surat Meetup-Hyperautomation.pptx
2024-05-15-Surat Meetup-Hyperautomation.pptx2024-05-15-Surat Meetup-Hyperautomation.pptx
2024-05-15-Surat Meetup-Hyperautomation.pptxnitishjain2015
 
Using AI to boost productivity for developers
Using AI to boost productivity for developersUsing AI to boost productivity for developers
Using AI to boost productivity for developersTeri Eyenike
 
2024 mega trends for the digital workplace - FINAL.pdf
2024 mega trends for the digital workplace - FINAL.pdf2024 mega trends for the digital workplace - FINAL.pdf
2024 mega trends for the digital workplace - FINAL.pdfNancy Goebel
 
SaaStr Workshop Wednesday with CEO of Guru
SaaStr Workshop Wednesday with CEO of GuruSaaStr Workshop Wednesday with CEO of Guru
SaaStr Workshop Wednesday with CEO of Gurusaastr
 
"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXR"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXRMegan Campos
 
Databricks Machine Learning Associate Exam Dumps 2024.pdf
Databricks Machine Learning Associate Exam Dumps 2024.pdfDatabricks Machine Learning Associate Exam Dumps 2024.pdf
Databricks Machine Learning Associate Exam Dumps 2024.pdfSkillCertProExams
 
TSM unit 5 Toxicokinetics seminar by Ansari Aashif Raza.pptx
TSM unit 5 Toxicokinetics seminar by  Ansari Aashif Raza.pptxTSM unit 5 Toxicokinetics seminar by  Ansari Aashif Raza.pptx
TSM unit 5 Toxicokinetics seminar by Ansari Aashif Raza.pptxAnsari Aashif Raza Mohd Imtiyaz
 
Microsoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdf
Microsoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdfMicrosoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdf
Microsoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdfSkillCertProExams
 

Recently uploaded (12)

ACM CHT Best Inspection Practices Kinben Innovation MIC Slideshare.pdf
ACM CHT Best Inspection Practices Kinben Innovation MIC Slideshare.pdfACM CHT Best Inspection Practices Kinben Innovation MIC Slideshare.pdf
ACM CHT Best Inspection Practices Kinben Innovation MIC Slideshare.pdf
 
DAY 0 8 A Revelation 05-19-2024 PPT.pptx
DAY 0 8 A Revelation 05-19-2024 PPT.pptxDAY 0 8 A Revelation 05-19-2024 PPT.pptx
DAY 0 8 A Revelation 05-19-2024 PPT.pptx
 
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
 
The Concession of Asaba International Airport: Balancing Politics and Policy ...
The Concession of Asaba International Airport: Balancing Politics and Policy ...The Concession of Asaba International Airport: Balancing Politics and Policy ...
The Concession of Asaba International Airport: Balancing Politics and Policy ...
 
2024-05-15-Surat Meetup-Hyperautomation.pptx
2024-05-15-Surat Meetup-Hyperautomation.pptx2024-05-15-Surat Meetup-Hyperautomation.pptx
2024-05-15-Surat Meetup-Hyperautomation.pptx
 
Using AI to boost productivity for developers
Using AI to boost productivity for developersUsing AI to boost productivity for developers
Using AI to boost productivity for developers
 
2024 mega trends for the digital workplace - FINAL.pdf
2024 mega trends for the digital workplace - FINAL.pdf2024 mega trends for the digital workplace - FINAL.pdf
2024 mega trends for the digital workplace - FINAL.pdf
 
SaaStr Workshop Wednesday with CEO of Guru
SaaStr Workshop Wednesday with CEO of GuruSaaStr Workshop Wednesday with CEO of Guru
SaaStr Workshop Wednesday with CEO of Guru
 
"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXR"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXR
 
Databricks Machine Learning Associate Exam Dumps 2024.pdf
Databricks Machine Learning Associate Exam Dumps 2024.pdfDatabricks Machine Learning Associate Exam Dumps 2024.pdf
Databricks Machine Learning Associate Exam Dumps 2024.pdf
 
TSM unit 5 Toxicokinetics seminar by Ansari Aashif Raza.pptx
TSM unit 5 Toxicokinetics seminar by  Ansari Aashif Raza.pptxTSM unit 5 Toxicokinetics seminar by  Ansari Aashif Raza.pptx
TSM unit 5 Toxicokinetics seminar by Ansari Aashif Raza.pptx
 
Microsoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdf
Microsoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdfMicrosoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdf
Microsoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdf
 

Evacuation-Plans-ppt.pptx

  • 1. ® © 2016 National Safety Council Evacuation Plans For use in conjunction with 5-Minute Safety Talk
  • 2. © 2016 National Safety Council 2 Protecting the lives of everyone within your facility is the first priority in the event of an emergency. One common means of protection is evacuation.
  • 3. © 2016 National Safety Council 3 In the case of fire, an immediate evacuation to a predetermined area away from your facility may be necessary.
  • 4. © 2016 National Safety Council 4 Steps to develop an evacuation policy & procedure  Determine the conditions under which an evacuation would be necessary  Establish a clear chain of command  Establish specific evacuation procedures  Establish a system for accounting for personnel - Consider employees’ transportation needs for community-wide evacuations  Establish procedures for assisting personnel with disabilities and those who do not speak English. Post evacuation procedures  Designate personnel to continue or shut down critical operations while an evacuation is underway. They must be capable of recognizing when to abandon the operation and evacuate themselves  Coordinate plans with your local emergency management office
  • 5. © 2016 National Safety Council 5 Evacuation routes & exits Designate primary and secondary evacuation routes and exits – Make sure routes and exits are clearly marked and well lit – Post signs – Install emergency lighting in case a power outage occurs during an evacuation
  • 6. © 2016 National Safety Council 6 Ensure evacuation routes & emergency exits are: • Wide enough to accommodate the number of evacuating personnel • Clear and unobstructed at all times • Unlikely to expose evacuating personnel to additional hazards Have evacuation routes evaluated by someone not in your organization
  • 7. © 2016 National Safety Council 7 Assembly areas & accountability Accurately accounting for personnel after a site evacuation requires planning and practice.
  • 8. © 2016 National Safety Council 8 1. Designate assembly areas where personnel should gather after evacuating 2. Take a head count after the evacuation – determining the names and last known locations of personnel not accounted for. List to be given to Emergency Operations Center. 3. Establish a method for accounting for non-employees such as suppliers and customers 4. Establish procedures for further evacuation in case the incident expands. This may involve sending employees home by normal means or providing them with transportation to an off-site location Assembly areas & accountability
  • 9. © 2016 National Safety Council 9 Train your employees in evacuation: Conduct sessions at least annually or when: • New employees are hired • Evacuation wardens, shelter managers, and others with special assignments are designated • New equipment, materials or processes are introduced • Procedures are revised • Exercises show that employee performance must be improved
  • 10. © 2016 National Safety Council 10 Provide emergency information such as checklists and evacuation maps Post evacuation maps in strategic locations Consider the information needs of customers and others who visit your facility
  • 11. © 2016 National Safety Council 11 By keeping these guidelines in place and practicing evacuation, we can ensure our employees know how to safely exit the facility and avoid panic.
  • 12. © 2016 National Safety Council 12 Emergency Preparedness Toolkit Sign in at nsc.org/members
  • 13. © 2016 National Safety Council 13 Emergency Preparedness 2-Minute Safety Video Emergency Preparedness 2-Minute Safety Video
  • 14. © 2016 National Safety Council 14 For more member-exclusive safety presentations, webinars, posters and resources sign in at nsc.org/members Customer Service – (800) 621-7619 Outside U.S. – +1-630-775-2056 Email us at: MEMBERSHIPINFO@nsc.org
  • 15. © 2016 National Safety Council 15 NSC Emergency Preparedness Workplace Training Now Available Go further in depth with this course. Content includes 8 independent modules on: 1. Evacuation 2. Weather and Natural Disasters 3. Shelter in Place Emergencies 4. Medical Emergencies 5. Workplace Violence 6. Active Shooter 7. Terrorism Emergencies 8. Communication Before and After Emergencies Call (800) 621-7619 or visit nsc.org/ep for more information and member pricing.

Editor's Notes

  1. Protecting the lives of everyone within your facility is the first priority in the event of an emergency. One common means of protection is evacuation.
  2. In the case of fire, an immediate evacuation to a predetermined area away from your facility may be necessary.
  3. Here are steps to take to develop an evacuation policy & procedure Determine the conditions under which an evacuation would be necessary Establish a clear chain of command Establish specific evacuation procedures Establish a system for accounting for personnel - Consider employees’ transportation needs for community-wide evacuations Establish procedures for assisting personnel with disabilities and those who do not speak English. Post evacuation procedures Designate personnel to continue or shut down critical operations while an evacuation is underway. They must be capable of recognizing when to abandon the operation and evacuate themselves Coordinate plans with your local emergency management office
  4. Evacuation routes & exits Designate primary and secondary evacuation routes and exits Make sure routes and exits are clearly marked and well lit Post signs Install emergency lighting in case a power outage occurs during an evacuation
  5. Ensure evacuation routes & emergency exits are: Wide enough to accommodate the number of evacuating personnel Clear and unobstructed at all times Unlikely to expose evacuating personnel to additional hazards Have evacuation routes evaluated by someone not in your organization
  6. Assembly areas and accountability Accurately accounting for personnel after a site evacuation requires planning and practice.
  7. Assembly areas & accountability • Designate assembly areas where personnel should gather after evacuating. • Take a head count after the evacuation. Determine the names and last known locations of personnel not accounted for and give them to your Emergency Operations Center. (Confusion in the assembly areas can lead to unnecessary and dangerous search and rescue operations). • Establish a method for accounting for non-employees such as suppliers and customers. • Establish procedures for further evacuation in case the incident expands. This may involve sending employees home by normal means or providing them with transportation to an off-site location.
  8. Train your employees in evacuation: Conduct sessions at least annually or when: -New employees are hired -Evacuation wardens, shelter managers, and others with special assignments are designated -New equipment, materials or processes are introduced -Procedures are revised -Exercises show that employee performance must be improved
  9. Provide emergency information such as checklists and evacuation maps Post evacuation maps in strategic locations Consider the information needs of customers and others who visit your facility
  10. By keeping these guidelines in place and practicing evacuation, we can ensure our employees know how to safely exit the facility and avoid panic.
  11. An Emergency Preparedness Toolkit is available when you sign in at nsc.org/members
  12. See also a 2 Minute Safety Video on Emergency Preparedness in the toolkit and in the Safety Video section at nsc.org/members. (Click on link during slide show if you are connected to Wi-Fi)
  13. New Workplace Training Course Available: NSC Emergency Preparedness