SlideShare a Scribd company logo
1 of 20
Tool for dynamic visualization of project schedules data
 Key Features
 Advantages over PDF sharing
 Use Cases
 Clients
Introduction to
ScheduleReader™
Available in Standard and PRO version
ScheduleReader™ offers a more sophisticated, dynamic way for viewing and sharing project data in XER, XML and
XLS file format between the project team and stakeholders.
The solution is designed to deliver overview of important project plan details among all parties involved.
Introduction
Key Features
 Roles – view the roles assigned to resources
 OBS – Organizational Breakdown Structure
 Details – detailed information for selections
 Baselines – compare different project versions
 Custom and Auto filters – find and filter specified tasks
 Progress Updates - report Activity status updates from field
 Activities – overview of the open project activities
 Resources – view the resource structure and details
 WBS – Work Breakdown Structure of the project
 Projects – view of the Enterprise Project Structure
 Assignments – resource allocation and cost info
 Reports - create dynamic graphical reports with single click
The new way of viewing Project Schedules
Introduction to ScheduleReader™ - viewer for .xer, xml and .xls project schedules
This feature enables detailed
overview and graphical
representation of the activities
included in the project schedule.
Benefits: Users can view information
in the Activities panel, which is
divided between the Activity Table
on the left side, the Gantt chart on
the right side, options ribbon at the
top and the details view at the
bottom of the screen.
Activities
Have a detailed overview and insights of plan’s activities
Activities View & Relation to predecessors/ successors
The Work Breakdown Structure
view offers an elaborate overview
and decomposition of the work
to be executed by the project
team.
Benefits: Users can preview the
Work Breakdown Structure (WBS)
for the currently open project
accompanied by a Gantt chart on
the right.
Work Breakdown Structure
Know your Work Breakdown Structure
WBS View
The resource tab shows a list of
all resources needed to complete
the projects included in the
Enterprise Project Structure.
Benefits: Users can view the
availability limits, unit prices and
the calendar which defines their
standard work time and non-
work time for each resource.
Resources
This feature can
be hidden by
request
Preview the resources information in full detail
Resources View
The Assignments view shows a
display of the resource allocations
across all imported project
schedules.
Benefits: Users can view resource
usage, cost and quantity
information in a detailed
spreadsheet and can use curves
to define any nonlinear
distribution of the resource
usage.
Assignments
Assignment spreadsheet with full allocation insights
Assignments View
This feature enables you to customize
the order and design of different
project elements in the appropriate
view: Activities, WBS, Projects,
Resources and Assignments.
Benefits: You can create custom
layouts from default ones or modify
layouts that are imported as PLF file,
from Oracle® Primavera P6 and
specify new arrangement according
to the project requirements.
Custom Layouts
Create custom layout for different types of views
Apply personalized layout for specific view
The baselines functionality
enables comparison of up to
four updated versions of a
project schedule.
Benefits: Users can get a detailed
graphical presentation of the
aspects that have been changed
from the original schedule in the
Gantt preview on the right side
of the interface.
Baselines
Compare the changes to the previous project plans
Baseline View
Auto Filtering allows filtering of the
data in one or more columns
according to the cell contents. User-
defined filters Allows you to specify
exactly which Activities related
information you need to view in the
Activities table.
Benefits: Users can view and
navigate the display of data of
interest from the activities in the
project schedule, particularly if it is a
large schedule.
User-defined Filters & Filters
No worries while working in large plans  filter data of your interest only
Filter + Auto Filters
You can organize the project
profiles and specify which
information to be displayed in
the graph: costs or units.
Benefits: With the use of the
Resource Usage Profile, you can
analyze the cost and quantity
usage for roles and resources, for
a single project or for multiple
projects.
Various types of information
Resource Usage Profile view
Analyze resources and roles units and costs
This feature enables you to add
new bar types, to remove the
unnecessary one or to make
modification.
Benefits: You can use the Bars
dialog to create new layouts,
presenting project information
that is not visible and share it
with the team.
Gantt Chart customization
Bar Customization
Create your personal view
This feature enables you to insert
proposals for adding or
removing activities from project
plan.
Benefits: Team members can
insert proposal for new activities
that are already in progress on
the field or to inform the
scheduler which tasks are
canceled and should be
removed from the plan.
Update the project plan
Progress Update: Add/Delete Bars & Gantt Preview
Get detailed information from the field
The new ScheduleReader PRO version is designed for
Schedulers, Planners and other experienced Project
Professionals who need to, analyse schedules, create
reports and better visualize and present summaries of
project data.
Included:
• Predefined Graphical Reports
(DCMA 14 Schedule Report, Activity Metrics, Relationshop
Types, Constraint Metrics, Activity Status, Activity Steps,
WBS/Costs)
• Custom Reports
PRO version
ScheduleReader™ PRO Version
Standard version + Reports and Dasboard features
• Bring informed decisions
• Analyze Project KPI's
• Improve Communication
• Manage project more efficiently
Why Consider:
This feature enables you to work
with default report categories or
to create your own and share it
with your team.
Benefits: You can use the
graphical reports to provide
business critical information to
PMO, project stakeholders and
sponsors, making the business
reporting process meaningful.
Reports and dashboards
Graphical Reports
Professional graphical reports for all project stakeholders (only available in PRO version)
1. Provide an Interactive overview of the project
2. Use Custom and Auto filters
Why choose ScheduleReader™ instead of sharing PDF files
5 main advantages over PDF printed schedules
The team members can import the company’s custom layouts
in PLF format or choose how assignment data is displayed in
their view. Each layout shows different columns and applies
different groping and sorting of data.
The project team members have flexibility when viewing their
Activities and Filters, which is a basic feature needed to easily
handle plans that contain hundreds of lines / activities.
3. Navigate through predecessors and successors
Team members have a complete overview of the project
relations and don’t feel isolated from the whole.
4. Work with custom layouts (import PLF files)
Each member has a personalized view, chance to add/remove
columns and see relationships inside an elaborate Gantt chart.
Also there are Activities, WBS, IPS, resource assignments views,
which offer full information regarding the specified topic.
5. Baselines comparison of project schedules
Users can easily spot what has been changed from the previous
schedule with the clear visual comparison of the Activity updates
from previous XER file version.
Case:
Project Scheduler is preparing a project plan in Oracle®
Primavera® P6® and needs to share it to other team
members, who only need to view the schedule
activities.
Solution:
Use ScheduleReader™ as a cost-effective solution for
all Project managers, TL and other project participant
that don’t require editing of the schedule plan.
Users get quick access to activities and gain detailed
overview of the progress of activities or responsibilities
that have been assigned to them.
Sharing plans between [Project Scheduler] and [TL & Members]
General Use-case
Complex plans including [Subcontractors] and [Stakeholders]
General Use-case
Case:
Along the project team, there is a great number of
consultants and subcontractors that are included in the
project activities or are included in the management of
deliverables.
Solution:
Use ScheduleReader™ as an excellent cost-effective
solution that will allow detailed view to all the
stakeholder, without complex tutorials or worries if some
changes by mistake occur.
ScheduleReader™ also allows opening multiple projects
without the need of importing XER files in P6®
Database.
• Offers dynamic working environment for the whole project team
• Has intuitive user interface [requires no learning curve; no training costs]
• Provides all of the important views from Oracle® Primavera® P6®
• Save on software licensing costs
• Fast view of plan schedules without import/ export in DB [open +450K activities in -5 seconds]
• Matching company environment with custom layouts & filters
• It replaces the use of alternative methods to share XER schedules [like PDF reader]
Reasons for implementing ScheduleReader™
Our solution is flexible in implementing new features to meet your organizational requirements!
Improve project performance and save on costs
Main reasons for implementing ScheduleReader™
Experience in Project Viewing tools [+15years] & [+6million users]
The Team Behind ScheduleReader™
Customers using our PM toolsCustomers using ScheduleReader™
Download Free Trial (Windows)
For more details, please contact us at: sales@schedulereader.com or visit
www.schedulereader.com
Thank You
Available in Standard and PRO version. Citrix and Company licensing models included.

More Related Content

What's hot

Project Management Quick Reference Guide for Microsoft Project 2007
Project Management Quick Reference Guide for Microsoft Project 2007Project Management Quick Reference Guide for Microsoft Project 2007
Project Management Quick Reference Guide for Microsoft Project 2007Toney Sisk
 
SAP BI BO Commentary solution
SAP BI BO Commentary solutionSAP BI BO Commentary solution
SAP BI BO Commentary solutionPeter Scheffelt
 
Ps configuration manual
Ps configuration manualPs configuration manual
Ps configuration manualSoumya De
 
PWA Dashboards Presentation
PWA Dashboards PresentationPWA Dashboards Presentation
PWA Dashboards PresentationRyan Werge
 
BPC 10.1 basics
BPC 10.1 basicsBPC 10.1 basics
BPC 10.1 basicskamal ega
 
PROGNOZ Platform
PROGNOZ PlatformPROGNOZ Platform
PROGNOZ PlatformPrognoz
 
IT7113 research project_group_4
IT7113 research project_group_4IT7113 research project_group_4
IT7113 research project_group_4ethanlchandler
 
CASPUG - Developing Reusable Workflow Features
CASPUG - Developing Reusable Workflow FeaturesCASPUG - Developing Reusable Workflow Features
CASPUG - Developing Reusable Workflow FeaturesMichael Oryszak
 
Advanced level planning and budgeting in Hyperion - Inge Prangel
Advanced level planning and budgeting in Hyperion - Inge PrangelAdvanced level planning and budgeting in Hyperion - Inge Prangel
Advanced level planning and budgeting in Hyperion - Inge PrangelORACLE USER GROUP ESTONIA
 
Summary Project Server Psi
Summary Project Server PsiSummary Project Server Psi
Summary Project Server PsiPhuong Nguyen
 
Lecture14 abap on line
Lecture14 abap on lineLecture14 abap on line
Lecture14 abap on lineMilind Patil
 
Project Planning
Project Planning Project Planning
Project Planning Abbas Tahir
 
Iwsm2014 solution based estimating (eltjo poort)
Iwsm2014   solution based estimating (eltjo poort)Iwsm2014   solution based estimating (eltjo poort)
Iwsm2014 solution based estimating (eltjo poort)Nesma
 
Intuit quick books enterprise 12
Intuit quick books enterprise 12Intuit quick books enterprise 12
Intuit quick books enterprise 12Ahmed Yasir Khan
 
Jira sync spec-en_2v0
Jira sync spec-en_2v0Jira sync spec-en_2v0
Jira sync spec-en_2v0Onlio
 
Kahn.theodore
Kahn.theodoreKahn.theodore
Kahn.theodoreNASAPMC
 

What's hot (20)

Project Management Quick Reference Guide for Microsoft Project 2007
Project Management Quick Reference Guide for Microsoft Project 2007Project Management Quick Reference Guide for Microsoft Project 2007
Project Management Quick Reference Guide for Microsoft Project 2007
 
SAP BI BO Commentary solution
SAP BI BO Commentary solutionSAP BI BO Commentary solution
SAP BI BO Commentary solution
 
Active Collab
Active CollabActive Collab
Active Collab
 
Ps configuration manual
Ps configuration manualPs configuration manual
Ps configuration manual
 
PWA Dashboards Presentation
PWA Dashboards PresentationPWA Dashboards Presentation
PWA Dashboards Presentation
 
BPC 10.1 basics
BPC 10.1 basicsBPC 10.1 basics
BPC 10.1 basics
 
PSC & OOMXL
PSC & OOMXLPSC & OOMXL
PSC & OOMXL
 
PROGNOZ Platform
PROGNOZ PlatformPROGNOZ Platform
PROGNOZ Platform
 
IT7113 research project_group_4
IT7113 research project_group_4IT7113 research project_group_4
IT7113 research project_group_4
 
CASPUG - Developing Reusable Workflow Features
CASPUG - Developing Reusable Workflow FeaturesCASPUG - Developing Reusable Workflow Features
CASPUG - Developing Reusable Workflow Features
 
Advanced level planning and budgeting in Hyperion - Inge Prangel
Advanced level planning and budgeting in Hyperion - Inge PrangelAdvanced level planning and budgeting in Hyperion - Inge Prangel
Advanced level planning and budgeting in Hyperion - Inge Prangel
 
Summary Project Server Psi
Summary Project Server PsiSummary Project Server Psi
Summary Project Server Psi
 
Documenting Software Architectures
Documenting Software ArchitecturesDocumenting Software Architectures
Documenting Software Architectures
 
Lecture14 abap on line
Lecture14 abap on lineLecture14 abap on line
Lecture14 abap on line
 
Project Planning
Project Planning Project Planning
Project Planning
 
Iwsm2014 solution based estimating (eltjo poort)
Iwsm2014   solution based estimating (eltjo poort)Iwsm2014   solution based estimating (eltjo poort)
Iwsm2014 solution based estimating (eltjo poort)
 
Intuit quick books enterprise 12
Intuit quick books enterprise 12Intuit quick books enterprise 12
Intuit quick books enterprise 12
 
Jira sync spec-en_2v0
Jira sync spec-en_2v0Jira sync spec-en_2v0
Jira sync spec-en_2v0
 
Kahn.theodore
Kahn.theodoreKahn.theodore
Kahn.theodore
 
R2 roadshows
R2 roadshowsR2 roadshows
R2 roadshows
 

Similar to Dynamic project schedule viewer for XER, XML & XLS files

Companion by Minitab - Desktop App
Companion by Minitab - Desktop AppCompanion by Minitab - Desktop App
Companion by Minitab - Desktop AppGMSL S.r.l.
 
Scheduling minimizing the input while maximizing the output white paper
Scheduling   minimizing the input while maximizing the output white paperScheduling   minimizing the input while maximizing the output white paper
Scheduling minimizing the input while maximizing the output white paperp6academy
 
Project & portfolio management
Project & portfolio managementProject & portfolio management
Project & portfolio managementwickj3231
 
Agile Methodology Approach to SSRS Reporting
Agile Methodology Approach to SSRS ReportingAgile Methodology Approach to SSRS Reporting
Agile Methodology Approach to SSRS ReportingDanielson Samuel
 
Primavara
PrimavaraPrimavara
Primavaradanabl
 
Digité Enterprise v6.4
Digité Enterprise v6.4Digité Enterprise v6.4
Digité Enterprise v6.4Digite, Inc.
 
Project proposal
Project proposalProject proposal
Project proposalHuba Akhtar
 
Project Planning Board Overview_SAP PS.pptx
Project Planning Board Overview_SAP PS.pptxProject Planning Board Overview_SAP PS.pptx
Project Planning Board Overview_SAP PS.pptxNCHKRISHNATEJA
 
P6 visualizer interactive demonstration wp
P6 visualizer interactive demonstration wpP6 visualizer interactive demonstration wp
P6 visualizer interactive demonstration wpp6academy
 
TS Editor 3.0 White Paper
TS Editor 3.0 White PaperTS Editor 3.0 White Paper
TS Editor 3.0 White PaperHydroOffice.org
 
IBM Rational Team Concert at Landmap
IBM Rational Team Concert at LandmapIBM Rational Team Concert at Landmap
IBM Rational Team Concert at LandmapBharti Gupta
 
Desklog workingHow To Use Desklog Project Management Software Features
Desklog workingHow To Use Desklog Project Management Software FeaturesDesklog workingHow To Use Desklog Project Management Software Features
Desklog workingHow To Use Desklog Project Management Software FeaturesDesklog
 
PMO View Interactive Dashboard
PMO View Interactive DashboardPMO View Interactive Dashboard
PMO View Interactive DashboardMatt Angerer
 
What’s New in Cognos Analytics 11.1.4
What’s New in Cognos Analytics 11.1.4What’s New in Cognos Analytics 11.1.4
What’s New in Cognos Analytics 11.1.4Senturus
 
Project Tracking System
Project Tracking SystemProject Tracking System
Project Tracking Systemncct
 
Project Planning Board_Project Systems.pptx
Project Planning Board_Project Systems.pptxProject Planning Board_Project Systems.pptx
Project Planning Board_Project Systems.pptxNCHKRISHNATEJA
 

Similar to Dynamic project schedule viewer for XER, XML & XLS files (20)

Companion by Minitab - Desktop App
Companion by Minitab - Desktop AppCompanion by Minitab - Desktop App
Companion by Minitab - Desktop App
 
Preview release 6.5
Preview release 6.5Preview release 6.5
Preview release 6.5
 
Scheduling minimizing the input while maximizing the output white paper
Scheduling   minimizing the input while maximizing the output white paperScheduling   minimizing the input while maximizing the output white paper
Scheduling minimizing the input while maximizing the output white paper
 
Project & portfolio management
Project & portfolio managementProject & portfolio management
Project & portfolio management
 
Agile Methodology Approach to SSRS Reporting
Agile Methodology Approach to SSRS ReportingAgile Methodology Approach to SSRS Reporting
Agile Methodology Approach to SSRS Reporting
 
Primavara
PrimavaraPrimavara
Primavara
 
Digité Enterprise v6.4
Digité Enterprise v6.4Digité Enterprise v6.4
Digité Enterprise v6.4
 
tcc primavera
tcc primaveratcc primavera
tcc primavera
 
Project proposal
Project proposalProject proposal
Project proposal
 
Project proposal
Project proposalProject proposal
Project proposal
 
Project Planning Board Overview_SAP PS.pptx
Project Planning Board Overview_SAP PS.pptxProject Planning Board Overview_SAP PS.pptx
Project Planning Board Overview_SAP PS.pptx
 
P6 visualizer interactive demonstration wp
P6 visualizer interactive demonstration wpP6 visualizer interactive demonstration wp
P6 visualizer interactive demonstration wp
 
TS Editor 3.0 White Paper
TS Editor 3.0 White PaperTS Editor 3.0 White Paper
TS Editor 3.0 White Paper
 
IBM Rational Team Concert at Landmap
IBM Rational Team Concert at LandmapIBM Rational Team Concert at Landmap
IBM Rational Team Concert at Landmap
 
Desklog workingHow To Use Desklog Project Management Software Features
Desklog workingHow To Use Desklog Project Management Software FeaturesDesklog workingHow To Use Desklog Project Management Software Features
Desklog workingHow To Use Desklog Project Management Software Features
 
PMO View Interactive Dashboard
PMO View Interactive DashboardPMO View Interactive Dashboard
PMO View Interactive Dashboard
 
Difference between versions of primavera 6,7,R8.1,R8.2,R8.3
Difference between versions of primavera 6,7,R8.1,R8.2,R8.3Difference between versions of primavera 6,7,R8.1,R8.2,R8.3
Difference between versions of primavera 6,7,R8.1,R8.2,R8.3
 
What’s New in Cognos Analytics 11.1.4
What’s New in Cognos Analytics 11.1.4What’s New in Cognos Analytics 11.1.4
What’s New in Cognos Analytics 11.1.4
 
Project Tracking System
Project Tracking SystemProject Tracking System
Project Tracking System
 
Project Planning Board_Project Systems.pptx
Project Planning Board_Project Systems.pptxProject Planning Board_Project Systems.pptx
Project Planning Board_Project Systems.pptx
 

Recently uploaded

Asset Management Software - Infographic
Asset Management Software - InfographicAsset Management Software - Infographic
Asset Management Software - InfographicHr365.us smith
 
The Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdfThe Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdfPower Karaoke
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEEVICTOR MAESTRE RAMIREZ
 
Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantAxelRicardoTrocheRiq
 
React Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaReact Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaHanief Utama
 
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...stazi3110
 
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio, Inc.
 
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...Christina Lin
 
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEOrtus Solutions, Corp
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideChristina Lin
 
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdfGOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdfAlina Yurenko
 
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...gurkirankumar98700
 
Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...OnePlan Solutions
 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...MyIntelliSource, Inc.
 
Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackCloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackVICTOR MAESTRE RAMIREZ
 
Professional Resume Template for Software Developers
Professional Resume Template for Software DevelopersProfessional Resume Template for Software Developers
Professional Resume Template for Software DevelopersVinodh Ram
 
Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024Andreas Granig
 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...MyIntelliSource, Inc.
 
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer DataAdobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer DataBradBedford3
 

Recently uploaded (20)

Asset Management Software - Infographic
Asset Management Software - InfographicAsset Management Software - Infographic
Asset Management Software - Infographic
 
The Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdfThe Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdf
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEE
 
Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service Consultant
 
React Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaReact Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief Utama
 
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
 
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
 
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
 
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
 
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
 
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdfGOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
GOING AOT WITH GRAALVM – DEVOXX GREECE.pdf
 
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
 
Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...Advancing Engineering with AI through the Next Generation of Strategic Projec...
Advancing Engineering with AI through the Next Generation of Strategic Projec...
 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
 
Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackCloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStack
 
Professional Resume Template for Software Developers
Professional Resume Template for Software DevelopersProfessional Resume Template for Software Developers
Professional Resume Template for Software Developers
 
Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024
 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
 
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer DataAdobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
 

Dynamic project schedule viewer for XER, XML & XLS files

  • 1. Tool for dynamic visualization of project schedules data  Key Features  Advantages over PDF sharing  Use Cases  Clients Introduction to ScheduleReader™ Available in Standard and PRO version
  • 2. ScheduleReader™ offers a more sophisticated, dynamic way for viewing and sharing project data in XER, XML and XLS file format between the project team and stakeholders. The solution is designed to deliver overview of important project plan details among all parties involved. Introduction Key Features  Roles – view the roles assigned to resources  OBS – Organizational Breakdown Structure  Details – detailed information for selections  Baselines – compare different project versions  Custom and Auto filters – find and filter specified tasks  Progress Updates - report Activity status updates from field  Activities – overview of the open project activities  Resources – view the resource structure and details  WBS – Work Breakdown Structure of the project  Projects – view of the Enterprise Project Structure  Assignments – resource allocation and cost info  Reports - create dynamic graphical reports with single click The new way of viewing Project Schedules Introduction to ScheduleReader™ - viewer for .xer, xml and .xls project schedules
  • 3. This feature enables detailed overview and graphical representation of the activities included in the project schedule. Benefits: Users can view information in the Activities panel, which is divided between the Activity Table on the left side, the Gantt chart on the right side, options ribbon at the top and the details view at the bottom of the screen. Activities Have a detailed overview and insights of plan’s activities Activities View & Relation to predecessors/ successors
  • 4. The Work Breakdown Structure view offers an elaborate overview and decomposition of the work to be executed by the project team. Benefits: Users can preview the Work Breakdown Structure (WBS) for the currently open project accompanied by a Gantt chart on the right. Work Breakdown Structure Know your Work Breakdown Structure WBS View
  • 5. The resource tab shows a list of all resources needed to complete the projects included in the Enterprise Project Structure. Benefits: Users can view the availability limits, unit prices and the calendar which defines their standard work time and non- work time for each resource. Resources This feature can be hidden by request Preview the resources information in full detail Resources View
  • 6. The Assignments view shows a display of the resource allocations across all imported project schedules. Benefits: Users can view resource usage, cost and quantity information in a detailed spreadsheet and can use curves to define any nonlinear distribution of the resource usage. Assignments Assignment spreadsheet with full allocation insights Assignments View
  • 7. This feature enables you to customize the order and design of different project elements in the appropriate view: Activities, WBS, Projects, Resources and Assignments. Benefits: You can create custom layouts from default ones or modify layouts that are imported as PLF file, from Oracle® Primavera P6 and specify new arrangement according to the project requirements. Custom Layouts Create custom layout for different types of views Apply personalized layout for specific view
  • 8. The baselines functionality enables comparison of up to four updated versions of a project schedule. Benefits: Users can get a detailed graphical presentation of the aspects that have been changed from the original schedule in the Gantt preview on the right side of the interface. Baselines Compare the changes to the previous project plans Baseline View
  • 9. Auto Filtering allows filtering of the data in one or more columns according to the cell contents. User- defined filters Allows you to specify exactly which Activities related information you need to view in the Activities table. Benefits: Users can view and navigate the display of data of interest from the activities in the project schedule, particularly if it is a large schedule. User-defined Filters & Filters No worries while working in large plans  filter data of your interest only Filter + Auto Filters
  • 10. You can organize the project profiles and specify which information to be displayed in the graph: costs or units. Benefits: With the use of the Resource Usage Profile, you can analyze the cost and quantity usage for roles and resources, for a single project or for multiple projects. Various types of information Resource Usage Profile view Analyze resources and roles units and costs
  • 11. This feature enables you to add new bar types, to remove the unnecessary one or to make modification. Benefits: You can use the Bars dialog to create new layouts, presenting project information that is not visible and share it with the team. Gantt Chart customization Bar Customization Create your personal view
  • 12. This feature enables you to insert proposals for adding or removing activities from project plan. Benefits: Team members can insert proposal for new activities that are already in progress on the field or to inform the scheduler which tasks are canceled and should be removed from the plan. Update the project plan Progress Update: Add/Delete Bars & Gantt Preview Get detailed information from the field
  • 13. The new ScheduleReader PRO version is designed for Schedulers, Planners and other experienced Project Professionals who need to, analyse schedules, create reports and better visualize and present summaries of project data. Included: • Predefined Graphical Reports (DCMA 14 Schedule Report, Activity Metrics, Relationshop Types, Constraint Metrics, Activity Status, Activity Steps, WBS/Costs) • Custom Reports PRO version ScheduleReader™ PRO Version Standard version + Reports and Dasboard features • Bring informed decisions • Analyze Project KPI's • Improve Communication • Manage project more efficiently Why Consider:
  • 14. This feature enables you to work with default report categories or to create your own and share it with your team. Benefits: You can use the graphical reports to provide business critical information to PMO, project stakeholders and sponsors, making the business reporting process meaningful. Reports and dashboards Graphical Reports Professional graphical reports for all project stakeholders (only available in PRO version)
  • 15. 1. Provide an Interactive overview of the project 2. Use Custom and Auto filters Why choose ScheduleReader™ instead of sharing PDF files 5 main advantages over PDF printed schedules The team members can import the company’s custom layouts in PLF format or choose how assignment data is displayed in their view. Each layout shows different columns and applies different groping and sorting of data. The project team members have flexibility when viewing their Activities and Filters, which is a basic feature needed to easily handle plans that contain hundreds of lines / activities. 3. Navigate through predecessors and successors Team members have a complete overview of the project relations and don’t feel isolated from the whole. 4. Work with custom layouts (import PLF files) Each member has a personalized view, chance to add/remove columns and see relationships inside an elaborate Gantt chart. Also there are Activities, WBS, IPS, resource assignments views, which offer full information regarding the specified topic. 5. Baselines comparison of project schedules Users can easily spot what has been changed from the previous schedule with the clear visual comparison of the Activity updates from previous XER file version.
  • 16. Case: Project Scheduler is preparing a project plan in Oracle® Primavera® P6® and needs to share it to other team members, who only need to view the schedule activities. Solution: Use ScheduleReader™ as a cost-effective solution for all Project managers, TL and other project participant that don’t require editing of the schedule plan. Users get quick access to activities and gain detailed overview of the progress of activities or responsibilities that have been assigned to them. Sharing plans between [Project Scheduler] and [TL & Members] General Use-case
  • 17. Complex plans including [Subcontractors] and [Stakeholders] General Use-case Case: Along the project team, there is a great number of consultants and subcontractors that are included in the project activities or are included in the management of deliverables. Solution: Use ScheduleReader™ as an excellent cost-effective solution that will allow detailed view to all the stakeholder, without complex tutorials or worries if some changes by mistake occur. ScheduleReader™ also allows opening multiple projects without the need of importing XER files in P6® Database.
  • 18. • Offers dynamic working environment for the whole project team • Has intuitive user interface [requires no learning curve; no training costs] • Provides all of the important views from Oracle® Primavera® P6® • Save on software licensing costs • Fast view of plan schedules without import/ export in DB [open +450K activities in -5 seconds] • Matching company environment with custom layouts & filters • It replaces the use of alternative methods to share XER schedules [like PDF reader] Reasons for implementing ScheduleReader™ Our solution is flexible in implementing new features to meet your organizational requirements! Improve project performance and save on costs Main reasons for implementing ScheduleReader™
  • 19. Experience in Project Viewing tools [+15years] & [+6million users] The Team Behind ScheduleReader™ Customers using our PM toolsCustomers using ScheduleReader™
  • 20. Download Free Trial (Windows) For more details, please contact us at: sales@schedulereader.com or visit www.schedulereader.com Thank You Available in Standard and PRO version. Citrix and Company licensing models included.