IFFCO Phulpur Unit Phase-II has a Carbon Di-Oxide recovery
unit installed in 2006 based on the proprietary KS1 solution.
This provides auxiliary supply of CO2 to boost the urea production
in the plant.
KS1 Solution is an Amine based CO2 solvent that can absorb CO2
at atmospheric pressure.
To dispose of the used/waste KS1 solution we burn it in an
incinerator which is based on RLNG burners.
In this plant & MCCs of other plants also had one common
problem of loose jaw contacts.
Problems faced – Part 1
There were certain
motor in the Incinerator
Group that need to
operated independently
without starting the
other motors.
But there was only a
provision to run all the
motors in the incinerator
group at once along with
the RLNG gas burners.
This caused a loss of Rs
1 lac in cost of RLNG
and Rs 5 lacs in cost of
Electricity every year.
Problems faced – Part 2
Feeder Trolley
Incoming Bus bar
Outgoing Bus bar
Incoming Jaw Contact
Outgoing Jaw Contact
Problems faced – Part 2
Feeder Trolley Burnt Feeder Trolley
Total Problems Faced…
Plant downtime
due to flashoversLoss of energy
and
inconvenience
Great
inconvenience
Increase
in
Downtime
Plant downtime of
6 days a year =
Loss of 1.97 Crore
Rs
No provision
to run motors
independently
Loose jaw contacts
No control
drawings
existed
Mistakes in old rough
control drawings
Implemented Solution Part 1
Interfacing
details added
Now
chattering
contactors
wont cause
damage
Motor can now run
independently
Implemented Solution Part 2
 There was loose contact in the jaw contacts of feeder trolleys resulting in frequent
flashovers.
 This problem was innovatively solved by adding modified spacers as shown above.
 This resulted in reduction in downtime of 6 days in a year causing huge savings.
Implemented Solution Part 2
This is the jaw contact before and after the said modification
Tangible benefits
Due the facility to run motors independently there is a huge
savings in RLNG burners.
The electricity used to run motors that are not used while a
particular required motor is running is also saved.
The flash overs caused due to loose jaw contacts have been
avoided permanently and this has caused a reduction in
plant downtime of about 6 days of Phulpur Unit 2 which
manufactures 3030 TPD of urea at profit of Rs. 1050
rs/Tonne
Tangible benefits calculation….
Savings in RLNG Rs. 1,00,000
Savings in Electricity Rs. 5,37,000
Total Savings in 2014-15 Rs. 6,37,000
Total Profit in Selling Urea Rs. 1050 per Metric Tonne
Savings of days in Downtime Up to 6 days every year
since 2014-15
Total Savings per day of
downtime in 2014-15 =
1050x(3030 tons/day)x6
Rs. 1,90,89,000
Total Yearly Savings Rs. 1,97,26,000
Rewards & Recognitions
 I was awarded 2nd Prize at
INSSAN Creativity Meet in
November 2015 at IFFCO
Phulpur.
 As recognition for my effort
and successful implementation
of my suggestion, I will be
awarded by Hon. M.D. of
IFFCO on 26th Jan-2016.
 I have been considered for
award of flat 1% of the
savings due to my suggestion
as prize money as per new
IFFCO Norms.
Incinerator Suggesstion

More Related Content

What's hot

Steinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design reportSteinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design report
Shrikant Hiremath
 
Turbo tech presentation for ECT in kraft paper manufacturing plant
Turbo tech presentation for ECT in kraft paper manufacturing plantTurbo tech presentation for ECT in kraft paper manufacturing plant
Turbo tech presentation for ECT in kraft paper manufacturing plant
Shreyas Krishna
 
India solar power_plant_vpc
India solar power_plant_vpcIndia solar power_plant_vpc
India solar power_plant_vpc
Pasu Kumar
 
Steinbeis 1MW Grid connected system design
Steinbeis 1MW Grid connected system designSteinbeis 1MW Grid connected system design
Steinbeis 1MW Grid connected system design
Shrikant Hiremath
 

What's hot (20)

Renewable energy in india
Renewable energy in india Renewable energy in india
Renewable energy in india
 
Steinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design reportSteinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design report
 
Turbo tech presentation for ECT in kraft paper manufacturing plant
Turbo tech presentation for ECT in kraft paper manufacturing plantTurbo tech presentation for ECT in kraft paper manufacturing plant
Turbo tech presentation for ECT in kraft paper manufacturing plant
 
Ntpc report
Ntpc reportNtpc report
Ntpc report
 
Power generated-by-using-gravity (1)
Power generated-by-using-gravity (1)Power generated-by-using-gravity (1)
Power generated-by-using-gravity (1)
 
Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC
 
Ntpc badarpur training ppt
Ntpc badarpur training pptNtpc badarpur training ppt
Ntpc badarpur training ppt
 
Shock absorber energy generation
Shock absorber energy generationShock absorber energy generation
Shock absorber energy generation
 
roof top solar
roof top solarroof top solar
roof top solar
 
Pay back period and cost base analysis of solar PV Lantern
Pay back period and cost base analysis of solar PV LanternPay back period and cost base analysis of solar PV Lantern
Pay back period and cost base analysis of solar PV Lantern
 
India solar power_plant_vpc
India solar power_plant_vpcIndia solar power_plant_vpc
India solar power_plant_vpc
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plant
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
 
thermal power plant NTPC singrauli
thermal power plant NTPC singrauli thermal power plant NTPC singrauli
thermal power plant NTPC singrauli
 
NTPC Training Report
NTPC Training ReportNTPC Training Report
NTPC Training Report
 
Km246 scotch yoke and propeller blade solar grass cutter
Km246 scotch yoke and propeller blade solar grass cutterKm246 scotch yoke and propeller blade solar grass cutter
Km246 scotch yoke and propeller blade solar grass cutter
 
1 india in global business operation
1 india in global business operation1 india in global business operation
1 india in global business operation
 
Sub ststion
Sub ststionSub ststion
Sub ststion
 
Convergent Wind Mill with Velocity and Acceleration Control
Convergent Wind Mill with Velocity and Acceleration ControlConvergent Wind Mill with Velocity and Acceleration Control
Convergent Wind Mill with Velocity and Acceleration Control
 
Steinbeis 1MW Grid connected system design
Steinbeis 1MW Grid connected system designSteinbeis 1MW Grid connected system design
Steinbeis 1MW Grid connected system design
 

Similar to Incinerator Suggesstion

Modification in CO2 Compressor Drive
Modification in CO2 Compressor DriveModification in CO2 Compressor Drive
Modification in CO2 Compressor Drive
Satyajeet Naib
 
Converting Shuttle Loom to Rapier Loom5
Converting Shuttle Loom to Rapier Loom5Converting Shuttle Loom to Rapier Loom5
Converting Shuttle Loom to Rapier Loom5
Ravinder Vannam
 
Article_Fertliser_ISO-50001
Article_Fertliser_ISO-50001Article_Fertliser_ISO-50001
Article_Fertliser_ISO-50001
Avijit Choudhury
 
internship report final.DOC
internship report final.DOCinternship report final.DOC
internship report final.DOC
qazi faisal
 
10 years of energy conservation salt plant (2)
10 years of energy conservation salt plant (2)10 years of energy conservation salt plant (2)
10 years of energy conservation salt plant (2)
Ananth Shandilya
 
Dalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfDalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdf
BlentBulut5
 

Similar to Incinerator Suggesstion (20)

Modification in CO2 Compressor Drive
Modification in CO2 Compressor DriveModification in CO2 Compressor Drive
Modification in CO2 Compressor Drive
 
ongc project ppt
ongc project pptongc project ppt
ongc project ppt
 
Presentation on ONGC
Presentation on ONGCPresentation on ONGC
Presentation on ONGC
 
bpcl
bpclbpcl
bpcl
 
Udbhav's presentation on ntpc
Udbhav's presentation on ntpcUdbhav's presentation on ntpc
Udbhav's presentation on ntpc
 
Kota tharmal plant new.pdf
Kota tharmal plant new.pdfKota tharmal plant new.pdf
Kota tharmal plant new.pdf
 
Ntpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILENtpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILE
 
Converting Shuttle Loom to Rapier Loom5
Converting Shuttle Loom to Rapier Loom5Converting Shuttle Loom to Rapier Loom5
Converting Shuttle Loom to Rapier Loom5
 
IRJET- Planning and Designing of Zero Energy Residential Building
IRJET-  	  Planning and Designing of  Zero Energy Residential BuildingIRJET-  	  Planning and Designing of  Zero Energy Residential Building
IRJET- Planning and Designing of Zero Energy Residential Building
 
Article_Fertliser_ISO-50001
Article_Fertliser_ISO-50001Article_Fertliser_ISO-50001
Article_Fertliser_ISO-50001
 
internship report final.DOC
internship report final.DOCinternship report final.DOC
internship report final.DOC
 
COCONUT DEHUSKING MACHINE
COCONUT DEHUSKING MACHINECOCONUT DEHUSKING MACHINE
COCONUT DEHUSKING MACHINE
 
Ntpc report
Ntpc reportNtpc report
Ntpc report
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
10 years of energy conservation salt plant (2)
10 years of energy conservation salt plant (2)10 years of energy conservation salt plant (2)
10 years of energy conservation salt plant (2)
 
IRJET- Performance Analysis of 4-Stroke SI Engine with HHO Generator by Morse...
IRJET- Performance Analysis of 4-Stroke SI Engine with HHO Generator by Morse...IRJET- Performance Analysis of 4-Stroke SI Engine with HHO Generator by Morse...
IRJET- Performance Analysis of 4-Stroke SI Engine with HHO Generator by Morse...
 
Steam_E_RevA_202109_Rev.1_0_Mitsubishi Power.pdf
Steam_E_RevA_202109_Rev.1_0_Mitsubishi Power.pdfSteam_E_RevA_202109_Rev.1_0_Mitsubishi Power.pdf
Steam_E_RevA_202109_Rev.1_0_Mitsubishi Power.pdf
 
Solar Energy in Telecom Sector
Solar Energy in Telecom SectorSolar Energy in Telecom Sector
Solar Energy in Telecom Sector
 
Plant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptxPlant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptx
 
Dalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfDalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdf
 

Incinerator Suggesstion

  • 1. Modification in Incinerator Plant Satyajeet S. Naib Asst. Manager (Electrical) IFFCO Phulpur Unit
  • 2. Contents… 1. Introduction 2. Problem Faced 3. Implemented Suggestion 4. Tangible Benefits 5. Calculations 6. Rewards & Recognition
  • 3. Introduction IFFCO Phulpur Unit Phase-II has a Carbon Di-Oxide recovery unit installed in 2006 based on the proprietary KS1 solution. This provides auxiliary supply of CO2 to boost the urea production in the plant. KS1 Solution is an Amine based CO2 solvent that can absorb CO2 at atmospheric pressure. To dispose of the used/waste KS1 solution we burn it in an incinerator which is based on RLNG burners. In this plant & MCCs of other plants also had one common problem of loose jaw contacts.
  • 4. Problems faced – Part 1 There were certain motor in the Incinerator Group that need to operated independently without starting the other motors. But there was only a provision to run all the motors in the incinerator group at once along with the RLNG gas burners. This caused a loss of Rs 1 lac in cost of RLNG and Rs 5 lacs in cost of Electricity every year.
  • 5. Problems faced – Part 2 Feeder Trolley Incoming Bus bar Outgoing Bus bar Incoming Jaw Contact Outgoing Jaw Contact
  • 6. Problems faced – Part 2 Feeder Trolley Burnt Feeder Trolley
  • 7. Total Problems Faced… Plant downtime due to flashoversLoss of energy and inconvenience Great inconvenience Increase in Downtime Plant downtime of 6 days a year = Loss of 1.97 Crore Rs No provision to run motors independently Loose jaw contacts No control drawings existed Mistakes in old rough control drawings
  • 8. Implemented Solution Part 1 Interfacing details added Now chattering contactors wont cause damage Motor can now run independently
  • 9. Implemented Solution Part 2  There was loose contact in the jaw contacts of feeder trolleys resulting in frequent flashovers.  This problem was innovatively solved by adding modified spacers as shown above.  This resulted in reduction in downtime of 6 days in a year causing huge savings.
  • 10. Implemented Solution Part 2 This is the jaw contact before and after the said modification
  • 11. Tangible benefits Due the facility to run motors independently there is a huge savings in RLNG burners. The electricity used to run motors that are not used while a particular required motor is running is also saved. The flash overs caused due to loose jaw contacts have been avoided permanently and this has caused a reduction in plant downtime of about 6 days of Phulpur Unit 2 which manufactures 3030 TPD of urea at profit of Rs. 1050 rs/Tonne
  • 12. Tangible benefits calculation…. Savings in RLNG Rs. 1,00,000 Savings in Electricity Rs. 5,37,000 Total Savings in 2014-15 Rs. 6,37,000 Total Profit in Selling Urea Rs. 1050 per Metric Tonne Savings of days in Downtime Up to 6 days every year since 2014-15 Total Savings per day of downtime in 2014-15 = 1050x(3030 tons/day)x6 Rs. 1,90,89,000 Total Yearly Savings Rs. 1,97,26,000
  • 13. Rewards & Recognitions  I was awarded 2nd Prize at INSSAN Creativity Meet in November 2015 at IFFCO Phulpur.  As recognition for my effort and successful implementation of my suggestion, I will be awarded by Hon. M.D. of IFFCO on 26th Jan-2016.  I have been considered for award of flat 1% of the savings due to my suggestion as prize money as per new IFFCO Norms.