FUSIONOPOLIS 2A
Proposed Central Exchange of One-North Development
Developer Jurong Town Corporation
Architect P&T architects & engineers Pte Ltd
Engineer Arup Singapore Pte Ltd
Main Contractor L&M Foundation Specialist Pte Ltd
Contract Sum Approximately S$ 35.0 M
Construction Period From January 2008 to September 2008
Scope of Works Diaphragm Wall & Bored Pile Works
Location At One-North Business Park , Singapore
Your Partner
In Ground Engineering
L&M Foundation Specialist Pte Ltd
( a member of CSC Holdings Limited)
This Project involved construction of 1,000 mm and 1,500 mm thick diaphragm wall (~620 m wall length)
in blocks A, B & C and 258 nos of 800 mm to 1,200 mm diameter foundation bored pile (at Block C only)
with cut off level 17.0 m below ground level.
Diaphragm walls at Block A&B were designed as temporary and permanent retaining wall as well as load
bearing wall for a six basements deep structure. Excavation depth of diaphragm wall panels varied from 30m
to 56m depth. High rock head level was encountered above the lowest basement level, rock socketing were
up to 22m deep.
Your Partner
In Ground Engineering
Fusionopolis 2A
reinforced with density ratio of 350 kg/m3 to 525kg/m3.
250 ton service cranes were used to hoist and
launch the steel reinforcement cages (65 ton per 3m
cage) and heavy stop end pipe of 30m length during
the installation works. During the peak construction
stage up to 12 sets of machineries were deployed .
The diaphragm walls were heavily

More Related Content

What's hot

ALEX KALAJ resume
ALEX KALAJ resumeALEX KALAJ resume
ALEX KALAJ resumeAlex Kalaj
 
An introduction to Men in White, Sydney
An introduction to Men in White, SydneyAn introduction to Men in White, Sydney
An introduction to Men in White, Sydneymeninwhite
 
An introduction to Men in White, Sydney
An introduction to Men in White, SydneyAn introduction to Men in White, Sydney
An introduction to Men in White, Sydneymeninwhite
 
Introduction of Prefabricated structures
Introduction  of Prefabricated structuresIntroduction  of Prefabricated structures
Introduction of Prefabricated structuresYogi Yogesh
 
Soil Nailing
Soil NailingSoil Nailing
Soil NailingAshif AR
 
Burj al arab (Cofferdam&Rigging)
Burj al arab (Cofferdam&Rigging)Burj al arab (Cofferdam&Rigging)
Burj al arab (Cofferdam&Rigging)Sunny Mahajan
 
PRESENTATION ON THE INTERNSHIP
 PRESENTATION ON THE INTERNSHIP PRESENTATION ON THE INTERNSHIP
PRESENTATION ON THE INTERNSHIPSufiyanAhmedJeddy
 
Turkey - Retaining Wall case study
Turkey - Retaining Wall case studyTurkey - Retaining Wall case study
Turkey - Retaining Wall case studyHilit Noy
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Mastersimon smith
 
Tilt up concrete structures
Tilt up concrete structuresTilt up concrete structures
Tilt up concrete structuresMECandPMV
 
BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9 BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9 StrucSoft Solutions
 
HC PRECAST SYSTEM's Technical Property
HC PRECAST SYSTEM's Technical PropertyHC PRECAST SYSTEM's Technical Property
HC PRECAST SYSTEM's Technical PropertyTeow Beng Hur
 
Prefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusPrefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusIEI GSC
 
PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDINGsathish sak
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure pptAbhishekM45
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication constructionDivya Vishnoi
 
Creek Road Case Study - D.Higgins
Creek Road Case Study - D.HigginsCreek Road Case Study - D.Higgins
Creek Road Case Study - D.HigginsDarren Higgins
 
Prefabricated structures in UK
Prefabricated structures in UKPrefabricated structures in UK
Prefabricated structures in UKsanthitunuguntla
 

What's hot (20)

ALEX KALAJ resume
ALEX KALAJ resumeALEX KALAJ resume
ALEX KALAJ resume
 
An introduction to Men in White, Sydney
An introduction to Men in White, SydneyAn introduction to Men in White, Sydney
An introduction to Men in White, Sydney
 
An introduction to Men in White, Sydney
An introduction to Men in White, SydneyAn introduction to Men in White, Sydney
An introduction to Men in White, Sydney
 
Introduction of Prefabricated structures
Introduction  of Prefabricated structuresIntroduction  of Prefabricated structures
Introduction of Prefabricated structures
 
Soil Nailing
Soil NailingSoil Nailing
Soil Nailing
 
Burj al arab (Cofferdam&Rigging)
Burj al arab (Cofferdam&Rigging)Burj al arab (Cofferdam&Rigging)
Burj al arab (Cofferdam&Rigging)
 
PRESENTATION ON THE INTERNSHIP
 PRESENTATION ON THE INTERNSHIP PRESENTATION ON THE INTERNSHIP
PRESENTATION ON THE INTERNSHIP
 
C.V for M.ZAKI
C.V  for M.ZAKIC.V  for M.ZAKI
C.V for M.ZAKI
 
Turkey - Retaining Wall case study
Turkey - Retaining Wall case studyTurkey - Retaining Wall case study
Turkey - Retaining Wall case study
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Master
 
Tilt up concrete structures
Tilt up concrete structuresTilt up concrete structures
Tilt up concrete structures
 
BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9 BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9
 
HC PRECAST SYSTEM's Technical Property
HC PRECAST SYSTEM's Technical PropertyHC PRECAST SYSTEM's Technical Property
HC PRECAST SYSTEM's Technical Property
 
Prefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusPrefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed Impetus
 
PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDING
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure ppt
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication construction
 
Creek Road Case Study - D.Higgins
Creek Road Case Study - D.HigginsCreek Road Case Study - D.Higgins
Creek Road Case Study - D.Higgins
 
Prefabricated structures in UK
Prefabricated structures in UKPrefabricated structures in UK
Prefabricated structures in UK
 
Adrian Filmer_CV
Adrian Filmer_CVAdrian Filmer_CV
Adrian Filmer_CV
 

Viewers also liked

Viewers also liked (16)

Mis cosas favoritas
Mis cosas  favoritasMis cosas  favoritas
Mis cosas favoritas
 
Reactivos 1
Reactivos 1Reactivos 1
Reactivos 1
 
Doc2
Doc2Doc2
Doc2
 
Activate
ActivateActivate
Activate
 
Scan_Doc0002
Scan_Doc0002Scan_Doc0002
Scan_Doc0002
 
Feliz Cunple
Feliz CunpleFeliz Cunple
Feliz Cunple
 
Evidencia
EvidenciaEvidencia
Evidencia
 
Hung Phat Silver Star - Hung Phat 2 Giá rẻ khu vực Quận 7
Hung Phat Silver Star - Hung Phat 2 Giá rẻ khu vực Quận 7Hung Phat Silver Star - Hung Phat 2 Giá rẻ khu vực Quận 7
Hung Phat Silver Star - Hung Phat 2 Giá rẻ khu vực Quận 7
 
MAX RESUME Oct 2015
MAX RESUME  Oct 2015MAX RESUME  Oct 2015
MAX RESUME Oct 2015
 
Dr. Anoop
Dr. AnoopDr. Anoop
Dr. Anoop
 
I Giorni dello sport e del volontariato 2014
I Giorni dello sport e del volontariato 2014I Giorni dello sport e del volontariato 2014
I Giorni dello sport e del volontariato 2014
 
Ali_Murtadlo_PT_BNI_Life_KPM
Ali_Murtadlo_PT_BNI_Life_KPMAli_Murtadlo_PT_BNI_Life_KPM
Ali_Murtadlo_PT_BNI_Life_KPM
 
Aprendizaje colaborativo y tic.cmap
Aprendizaje colaborativo y tic.cmapAprendizaje colaborativo y tic.cmap
Aprendizaje colaborativo y tic.cmap
 
Reactivos 14
Reactivos 14Reactivos 14
Reactivos 14
 
Diptico xornadas formacion_ednlg
Diptico xornadas formacion_ednlgDiptico xornadas formacion_ednlg
Diptico xornadas formacion_ednlg
 
THFC Attacking Analysis PL 2015-16 and Preview of PL 2016-17
THFC Attacking Analysis PL 2015-16 and Preview of PL 2016-17THFC Attacking Analysis PL 2015-16 and Preview of PL 2016-17
THFC Attacking Analysis PL 2015-16 and Preview of PL 2016-17
 

Similar to projects_highlights_fusionopolis_2a

PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...DougDos
 
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...Tonyamis
 
I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3
I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3
I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3Charles Willis-Dixon
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard buildingBirukYared3
 
Insulated reinforced concrete built fast v0.1
Insulated reinforced concrete built fast v0.1Insulated reinforced concrete built fast v0.1
Insulated reinforced concrete built fast v0.1aravindcalpine
 
Cam flick group
Cam flick groupCam flick group
Cam flick groupRothna sou
 
Aasra Martech Pvt. Ltd., New Delhi, Prefab Building Systems
Aasra Martech Pvt. Ltd., New Delhi, Prefab Building SystemsAasra Martech Pvt. Ltd., New Delhi, Prefab Building Systems
Aasra Martech Pvt. Ltd., New Delhi, Prefab Building SystemsIndiaMART InterMESH Limited
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline KH
 
Company Profile Parama Steel
Company Profile Parama SteelCompany Profile Parama Steel
Company Profile Parama SteelMartius Irwan
 
LWC Presentation Extract @ Zak Precast Concrete India Conference - India
LWC Presentation Extract @ Zak Precast Concrete India Conference - IndiaLWC Presentation Extract @ Zak Precast Concrete India Conference - India
LWC Presentation Extract @ Zak Precast Concrete India Conference - IndiaZak Trade Fairs & Exhibitions Pvt. Ltd.
 
projects_highlights_marina_bfc_phase_2
projects_highlights_marina_bfc_phase_2projects_highlights_marina_bfc_phase_2
projects_highlights_marina_bfc_phase_2Saiful Islam
 

Similar to projects_highlights_fusionopolis_2a (20)

Coates Hire - Case Study
Coates Hire - Case Study Coates Hire - Case Study
Coates Hire - Case Study
 
Concrete Lego Block Ideas
Concrete Lego Block IdeasConcrete Lego Block Ideas
Concrete Lego Block Ideas
 
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
 
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
 
PP Profile
PP ProfilePP Profile
PP Profile
 
Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"
 
spar iso
spar isospar iso
spar iso
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3
I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3
I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3
 
Magazine 061
Magazine 061Magazine 061
Magazine 061
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard building
 
Insulated reinforced concrete built fast v0.1
Insulated reinforced concrete built fast v0.1Insulated reinforced concrete built fast v0.1
Insulated reinforced concrete built fast v0.1
 
Cam flick group
Cam flick groupCam flick group
Cam flick group
 
Cam flick group
Cam flick groupCam flick group
Cam flick group
 
Capital gate abu dhabi
Capital gate abu dhabiCapital gate abu dhabi
Capital gate abu dhabi
 
Aasra Martech Pvt. Ltd., New Delhi, Prefab Building Systems
Aasra Martech Pvt. Ltd., New Delhi, Prefab Building SystemsAasra Martech Pvt. Ltd., New Delhi, Prefab Building Systems
Aasra Martech Pvt. Ltd., New Delhi, Prefab Building Systems
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
 
Company Profile Parama Steel
Company Profile Parama SteelCompany Profile Parama Steel
Company Profile Parama Steel
 
LWC Presentation Extract @ Zak Precast Concrete India Conference - India
LWC Presentation Extract @ Zak Precast Concrete India Conference - IndiaLWC Presentation Extract @ Zak Precast Concrete India Conference - India
LWC Presentation Extract @ Zak Precast Concrete India Conference - India
 
projects_highlights_marina_bfc_phase_2
projects_highlights_marina_bfc_phase_2projects_highlights_marina_bfc_phase_2
projects_highlights_marina_bfc_phase_2
 

projects_highlights_fusionopolis_2a

  • 1. FUSIONOPOLIS 2A Proposed Central Exchange of One-North Development Developer Jurong Town Corporation Architect P&T architects & engineers Pte Ltd Engineer Arup Singapore Pte Ltd Main Contractor L&M Foundation Specialist Pte Ltd Contract Sum Approximately S$ 35.0 M Construction Period From January 2008 to September 2008 Scope of Works Diaphragm Wall & Bored Pile Works Location At One-North Business Park , Singapore Your Partner In Ground Engineering L&M Foundation Specialist Pte Ltd ( a member of CSC Holdings Limited)
  • 2. This Project involved construction of 1,000 mm and 1,500 mm thick diaphragm wall (~620 m wall length) in blocks A, B & C and 258 nos of 800 mm to 1,200 mm diameter foundation bored pile (at Block C only) with cut off level 17.0 m below ground level. Diaphragm walls at Block A&B were designed as temporary and permanent retaining wall as well as load bearing wall for a six basements deep structure. Excavation depth of diaphragm wall panels varied from 30m to 56m depth. High rock head level was encountered above the lowest basement level, rock socketing were up to 22m deep. Your Partner In Ground Engineering Fusionopolis 2A reinforced with density ratio of 350 kg/m3 to 525kg/m3. 250 ton service cranes were used to hoist and launch the steel reinforcement cages (65 ton per 3m cage) and heavy stop end pipe of 30m length during the installation works. During the peak construction stage up to 12 sets of machineries were deployed . The diaphragm walls were heavily