SlideShare a Scribd company logo
1 of 31
Download to read offline
Nitte School of Architecture
planning and design
Subject Code: 18ENG85
Subject Code: 18ENG85
Subject Title: CONSTRUCION AND PROJECT
MANAGEMENT
Semester: VIII
Section: A & B
Faculty Name: SUMANTA PATIL, SUPTHA RAO
Feasibility study
Feasibility studies are primary studies undertaken in the early stage of a project. They tend
to be carried out when the project is large or complex and the investment is high. Every
construction project must give benefits for the investor. These benefits includes of profit,
business development, etc.
The profits are achieved in a long period and one must have an accurate forecast of the
investment so that the investors still have willingness to invest their money.
Feasibility study analysis also provides information about the value of investment and the
benefits that investors may get. The return on investment can be seen from feasibility study.
Generally, Cost benefit analysis through
Generally, Cost benefit analysis through
Net Present Value (NPV),
Internal Rate of Return (IRR)
Are the tools that are used by investors to consider this project is feasible or not. Risks can
influence the profits and it will decrease the feasibility for investing in the project. Hence
risks must be anticipated and counter actions must be planned and calculated in the
feasibility analysis.
Project Feasibility study
In project management, a project feasibility study evaluates the following areas:
• Technical Capability: Is the organization equipped with the necessary technical
resources to complete the project
• Budget: Does the organization have the financial resources to carry out the project,
and does the cost-benefit analysis justify moving forward?
• Legality: What is the project's legal requirements, and can the company meet them?
• Risk: What are the risks involved in completing this project? Is the risk worth the
• Risk: What are the risks involved in completing this project? Is the risk worth the
company's money and time based on the expected benefits?
• Operational feasibility: Does the project, in its intended scope, address the
organization's needs through fixing problems and/or seizing opportunities?
• Time: How much time would it take for completion?
Importance of Feasibility Study:
The value of a feasibility study stems from the desire of an organization to “get it right”
before investing resources, time, or money. A feasibility study may discover fresh ideas that
alter the scope of a project. It's preferable to make these decisions ahead of time rather
than rushing into a project only to discover that it won't work. A feasibility study is usually
advantageous to a project since it provides you and other stakeholders with a clear picture
of what is being planned.
Following are the major benefits that project feasibility study offers:
• Improves the attention of project teams
• Discovers fresh possibilities
• Provides relevant information that helps in making the judgment regarding whether to
proceed or not.
• Eliminates (unwanted) options
• Identifies a compelling reason for pursuing the project.
• By examining several parameters, it improves the success rate.
• By examining several parameters, it improves the success rate.
• Assists in project decision-making
• Determines why it's not a good idea to go ahead.
Project Appraisal
Project appraisal:
Appraisal consists of an evaluation of all of the feasibility studies to determine the ability of
the project to succeed. Thus, feasibility analysis and appraisal form the critical juncture in
the integrated project cycle.
Generally mega projects involve large investments. Lending institutions before executing
credits to borrowers will take up project appraisal considering the following aspects
• The social aspect though unquantifiable aims at visible progress in quality of life and to
the advancement of local conditions.
• The technical aspects relating to design engineering and realistic implementation
• The technical aspects relating to design engineering and realistic implementation
schedule.
• The institutional aspect dealing with creation of a sound and viable institution for
operation and management.
• The economic aspect to review justification for the project
• Financial aspect dealing with the manner by which costs incurred are recovered from
the beneficiaries.
• Environmental aspects for protection of environment and natural resources.
DECISION MAKING IN PROJECT MANAGEMENT
In project management, decisions need to be made on a frequent basis. Decisions can be
important unimportant, or critical if critical then decision taken will cause the project to be
successful or to fail.
Decision-making is the act of choosing between two or more alternative options. In the
wider process of problem-solving, decision-making involves choosing between possible
solutions to a problem. The final decisions can be made through either an intuitive or
reasoned process, or a combination of the two, depending on the nature of the decision.
Examples of decisions :
• Selection of project manager
• Whether services of a consultant is to be availed and if so, scope of services and
• Whether services of a consultant is to be availed and if so, scope of services and
method of selection.
• Mode of execution of project works – through contractor, direct execution by owner or
a combination of both
• If the work is to be executed through a contractor, the decision to be taken by the
owner on the advice of consultant before approval of tender document.
© Acharya's NRV School of Architecture
Decision making approach
Identify the
problem
Gather/ collect
information
Monitor and
Evaluate the
result
Identify the
alternatives/
other possible
solutions
Assess the
possible
solutions and the
their feasibility
Select the best
option
Implement the
solution
Decision making tools
Project managers often use some extra methods that can support the correctness of their
decisions. While the basic principles might be the same, there are many different techniques
and tools that can be used.
They can also be used as combination of these techniques to arrive at the final decisions.
So, in that case, a skill that it would be an advantage for the project managers to have is to
select which of the below are appropriate and relevant at any case.
• Decision tree
• Decision matrix
• Swot analysis
• Swot analysis
• Cost benefit analysis
Investment criteria:
NPV
Payback period
ARR
IRR
• Voting - A decision-making technique that can be used includes voting. Voting can
facilitate making decisions based on unanimity, majority, or plurality.
© Acharya's NRV School of Architecture
Decision tree
This is a graph or model that involves contemplating each option and the outcomes of
each. Statistical analysis is also conducted with this technique.
Selection of
Option 1
100k profit
20 k loss
Within
India
Success
80%
chance
Failure
20% chance
Selection of
vendor
20 k loss
Option 2
120k profit
15 k loss
overseas
20% chance
Success
50% chance
Failure 50%
chance
Swot Analysis
SWOT stands for strengths, weaknesses, opportunities and threats, which is exactly what
this planning tool assesses.
Internal
to
project
Internal
to
project
External
to
the
project
Decision Matrix
A decision matrix is similar to a pros/cons list, but it allows you to place a level of
importance on each factor. That way, you can more accurately weigh the different options
against each other.
List your decision alternatives as rows
List relevant factors as columns
Establish a consistent scale to assess the value of each combination of alternatives and
factors
Determine how important each factor is towards making your final decision and assign
weights accordingly
Multiply your original ratings by the weighted rankings
Add up the factors under each decision alternative
The option that scores the highest wins
Cost-benefit Analysis
A cost-benefit analysis involves comparing the explicit and implicit costs of taking an action
versus expected benefits. The process of gathering that information may be enlightening in
itself because it may require the business to assign monetary value to factors that don’t
have explicit costs. The resulting analysis allows decision-makers to weigh all information
and make rational choices.
As a pros-and-cons evaluation tool, CBAs are most closely associated with public-sector
decision-making. But they’re also used when it comes time for project planning around
adding employees, purchasing technology or equipment, expanding facilities and more. A
CBA can weigh the benefits of taking an action over maintaining the status quo or help a
business compare two or more options to see which one makes the most sense.
Advantages of (CBA):
Advantages of (CBA):
 Cost-benefit analyses help businesses weigh pros and cons in a data-driven way so they
can make complex decisions in a systematic manner.
 For a successful CBA, leaders need to identify and project the explicit and implicit costs
and benefits of a proposed action or investment.
 It’s also a good idea to assign someone to make the case for the status quo as a way to
compare the opportunity cost of doing nothing and investing cash versus proposed
actions.
 A cost-benefit analysis is based on the data on which it is based, so companies with
more mature financial reporting have a higher likelihood of success.
In general most of the companies go for CBA for major decisions in the 5 areas:
1. Capital investments
2. Business process change
3. Organizational change
4. Adjusting pricing or introducing new product or service
5. Entering into a merger, acquisition or divestiture
Investment criteria:
Investment criteria:
Payback period
NPV
ARR
IRR
Investment Criteria of Capital Budgeting:
Payback Period: is the traditional method which is simple and most widely used method of
ascertaining economic viability. It is a measure in terms of time, it will take to recover initial
cash investment from proposed operations. Salvage value is ignored.
Time value of money is ignored.
PB in years = Original investment
Annual income
if investment on a project is 150 lakhs. And annual income is 30 lakhs,
PB = 150/30 = 5 years
PB = 150/30 = 5 years
NPV (Net Present Value):
NPV – Net Present Value the Time Value of Money concept is the recognised method. this
is a widely used economic method of evaluating investment proposals.
NPV = Today's value of the expected cash flows − Today's value of invested cash.
If analyzing a longer-term project with multiple cash flows, then the formula for the NPV of
the project is as follows:
If PV = Present value
R1, R2, R3 are cash flows at the end of 1st year 2nd year and 3rd year etc. and I is the
R1, R2, R3 are cash flows at the end of 1 year 2 year and 3 year etc. and I is the
initial investment.
Let r = rate of interest/discount rate/opportunity cost of capital
PV = Present Value = R1 + R2 + R3 +………. Rt - Initial investment
(1+i)1 (1+i)2 (1+i)3 (1+r)n
i.e
Where,
Rt - Net cash flow – out flows during a single time period t
i - Discount rates or return that could be earned through alternative investments
t - Number of time periods
IRR (Internal Rate of Returns ): The internal rate of return (IRR) is the discount rate for
which the net present value of a project is zero. In other words, the sum of discounted costs
is equal to the sum of discounted benefits when discounted by the IRR. This method is
appropriate when there is only one alternative to the status quo.
• The internal rate of return (IRR) is the annual rate of growth that an investment is
expected to generate.
• IRR is calculated using the same concept as net present value (NPV), except it sets the
NPV equal to zero.
• The ultimate goal of IRR is to identify the rate of discount, which makes the present
value of the sum of annual nominal cash inflows equal to the initial net cash outlay for
the investment.
the investment.
• IRR is ideal for analyzing capital budgeting projects to understand and compare
potential rates of annual return over time.
• In addition to being used by companies to determine which capital projects to use, IRR
can help investors determine the investment return of various assets.
NPV and internal rate of return (IRR) are closely related concepts, in that the IRR of an
investment is the discount rate that would cause that investment to have an NPV of
zero. Another way of thinking about this is that NPV and IRR are trying to answer two
separate but related questions.
For NPV, the question is, “What is the total amount of money I will make if I proceed with
this investment, after taking into account the time value of money?”
For IRR, the question is, “If I proceed with this investment, what would be the equivalent
annual rate of return that I would receive?”
ARR (Accounting rate of return) : this method uses accounting information, as revealed by
financial statements to measure the profitability of investment proposals. It is found out by
dividing the average income after taxes by the average investment. The average investment
would be equal to the original investment plus salvage value (if any) divided by two.
ARR = Average income/ Average investment
Criteria for acceptance of proposal: Accept all the proposals whose ARR is higher than the
minimum rate established by the management and reject the proposals with ARR lesser than
the minimum rate.
ARR does not consider the time value of money
Value Engineering
What is Value engineering… ?
• is a systematic and organized approach to providing the necessary functions in a
project at the lowest cost. Value engineering promotes the substitution of materials
and methods with less expensive alternatives, without sacrificing functionality.
• Value Engineering is used in construction projects to provide a clear and detailed
analysis of how best to meet the goals of the construction project.
• Value Engineering, when used with cost estimating, allows for an independent review
of the entire construction project. This review process, typically completed within a
Value Engineering workshop, is focused on one common goal: to provide the highest
Value Engineering workshop, is focused on one common goal: to provide the highest
value at the lowest cost.
• However, this does not mean that Value Engineering is all about cost-cutting.
• Rather through an established set of industry guidelines and procedures, Value
Engineering gives all parties involved the confidence that the maximum performance
and highest value is possible.
• Value Engineering (VE) is not a design/peer review or cost-cutting exercise. VE is a
creative, organized effort, which analyzes the requirements of a project for the
purpose of achieving the essential functions at the lowest total costs (capital, staffing,
energy, maintenance) over the life of the project.
• Through a group investigation, using experienced, multi-disciplinary team, value and
economy are improved through a study of alternate design concepts, materials, and
methods without compromising the functional and value objectives of the client.
• In construction, this involves considering the availability of materials, construction
methods, transportation issues, site limitations or restrictions, planning and
organization, costs, profits, and so on. Benefits that can be delivered include a
reduction in life cycle costs, improvement in quality, reduction of environmental
impacts, and so on.
• Value engineering should start at project inception where the benefits can be greatest,
however the contractor may also have a significant contribution to make as long as the
changes required to the contract do not affect the timescales, completion dates or
incur additional costs that outweigh the savings on offer.
Identify the elements
Analyse the functions
Develop alternative
solutions
Assess alternative
solutions
Allocate costs to
alternative solutions
Develop and zero in
on alternative with
most likelihood of
success
Ultimate goal of Value Engineering:
optimum value for both initial and long-term investment, a three stage Value Engineering
process is used
Planning
Designing
Methodology and Approach
Why Value engineering….?
With Value Engineering it s possible to eliminate stressors
identify potential barriers
bring new and novel design and materials to the project
limit environmental risks, and keep future maintenance costs of the project low.
Roles & responsibility of Project manager/construction manager
A project manager collaborates with the client throughout the entire project, from the initial
budget and planning stage to the final building. A construction manager may begin working
during the budgeting stage, but they're primarily involved in the construction stage.
Roles & responsibility of Project manager/construction managerProject managers are
owners representatives, his responsibilities can be summarised the following way:
The role and responsibilities of project managers would vary depending on the agency he
represents.
If he represents the owner, his focus is on highest productivity of capital investment.
If he represents contractor his objective would be completion of work as per agreement and
earn a fair return on investment.
earn a fair return on investment.
As owners representative he controls resources within time, cost and performance
perspective.
Construction projects are multi skilled operations, hence the project managers are expected
to have all the basic knowledge of all the processes and activities involved, along with good
experience to anticipate critical areas and solve likely problems that would arise in the
process of managing such projects.
The project manager should have ability to manage changes which may affect the project
activities. He should possess skills in the following areas :
 Organizational planning
 Coordination including liaisons with owner, consultant and contractor.
 Operations scheduling
 Financial management and costing
 Monitoring and reporting skills

 Projecting and managing projections periodically during project execution stage.
Roles & responsibility of Project manager/construction manager
Project manager should motivate people to work towards the better performance of the
project. Should focus on team building activities which can achieve positive synergy in the
project team so as to achieve targeted level of performance.
Should have an in-depth knowledge human behaviour and the dynamics of their behaviours.
An ideal project manager should recognise change, identifies its effects and makes use of
change to manage change.
With respect to changes in the project the role of project manager is to
• Plan the project activities and manage planned activities accordingly.
• Recognise change and its impacts (both positive ad negative impact) and make use of
the identified factors to manage change (make use of change to manage change).
• Recognise change and its impacts (both positive ad negative impact) and make use of
the identified factors to manage change (make use of change to manage change).
• Responsible for periodic monitoring and effective coordination
• Keeps up schedule, controls and updates budget expenditure.
• Chairs site meetings
• In totality he is responsible to complete the project as planned.
• Project manager should recognise that motivation and job satisfaction are 2 dimensions
That influence and affects the productivity of employees (team members). Identify
motivated employees as those who work willingly and give their best.
• Under assignment, over assignment buck master ship, coercive type of control are
some of the factors that demotivate the team members, which should be avoided by a
project manager for betterment of project.
SP1
Slide 23
SP1 Sumanta Patil, 5/11/2022
Roles and responsibilities of Construction manager
• Implements general conditions of contract
• Manages sub-contractors
• Determines sequence of work
• Plays a vital role in project implementation
• Certifies payments
Project manager/construction manager
Construction Manager: A construction manager may have the following responsibilities:
• Supervising a construction team and delegating tasks
• Overseeing the daily construction process on the job site
• Collaborating with contractors and material suppliers
• Maintaining material inventory and ordering new items
• Checking local construction guidelines to ensure the project meets all requirements
• Creating schedules for the team members
• Writing cost estimates for the construction tasks
• Writing cost estimates for the construction tasks
• Observing the building project's progress and updating the project manager
Project Manager: A project manager's duties can include:
• Meeting with a client to discuss a new project design
• Creating a project budget and plan
• Selecting a project location and working to secure the land for a new building
• Designing a project timeline with deadlines for each stage
• Recruiting and hiring team members, including the construction manager
• Writing cost estimates for all elements of a project, including the marketing and hiring process
• Managing a project's paperwork, including the initial plans and zoning documents
Project scope management
Scope Management in Construction
Project Scope Management includes the processes required to ensure that the project
includes all the work required, and only the work required, to complete the project
successfully. Managing the project scope is primarily concerned with defining and
controlling what is and is not included in the project.
The Project Scope Management processes are:
Plan Scope Management—The process of creating a scope management plan that
documents how the project and product scope will be defined, validated, and controlled.
It includes:
Scope management
Scope management
Detailed project scope statement
Expected project deliverables
Breakdown of all the project requirements
Organizations can also use a previous project’s
scope management plan as a reference for this.
Project change control process
Collect Requirements—The process of determining, documenting, and managing
stakeholder needs and requirements to meet project objectives.
will be required to document all the project requirements, expectations, budgets, and
deliverables through interviews, surveys, and focus groups.
This is a rather important step because more often than not, stakeholders can have
unrealistic requirements or expectations and the project managers would be required to
step in to find a solution that is acceptable by everyone from avoiding project delays.
At the end of the collection requirements stage, you should have the following:
Functional as well as non-functional requirements
Stakeholder requirements
Business requirements
Support and training requirements
Project requirements
Define Scope—The process of developing a detailed description of the project and product.
This process will turn requirements into a well-detailed description of the service or product
that project team is trying to deliver through the project. It will then have a project scope
statement that can then be referred to throughout the project.
While it is important to list what is in the scope of the project, it is just as important to note
down what is out of the project scope. Any kind of inclusions to the scope would then have
to go through the entire change control process to ensure the team is only working on
things that they are supposed to work on.
With a defined scope, you get a reference point for your project team and anyone else
involved. In case there is something that is not involved in the scope, it doesn’t need to be
completed by the team.
Create WBS—The process of subdividing project deliverables and project work into smaller,
more manageable components.
A project breakdown structure is a document that breaks down all the work which needs to
be done in the project and then assigns all the tasks to the team members. It lists the
deliverables that need to be completed and their respective deadlines as well.
You can use project management software for this step of the process to assign and
prioritize project tasks which will make it easier to track the entire progress of the project
and avoid any unnecessary bottlenecks.
Validate Scope—The process of formalizing acceptance of the completed project
Validate Scope—The process of formalizing acceptance of the completed project
deliverables.
In this step, the scope and deliverables that you have recorded need to be sent to project
executives and stakeholders to get the necessary approvals. Scope validation needs to be
done before starting the project to ensure that if something goes wrong then it is easy to
find where it went wrong.
Control Scope—The process of monitoring the status of the project and product scope and
managing changes to the scope baseline.
Project managers need to ensure that as the project begins, it always stays within the
defined scope. In case there are some things that need to change, then the proper change
control process should be followed.

More Related Content

Similar to Module 2.pdf

Feasibilty .pptx
Feasibilty .pptxFeasibilty .pptx
Feasibilty .pptxMIANMNADEEM
 
UU-Project Chapter 3.pptx
UU-Project Chapter 3.pptxUU-Project Chapter 3.pptx
UU-Project Chapter 3.pptxKiyaTesfaye2
 
CHAPTER 4.pdf
CHAPTER 4.pdfCHAPTER 4.pdf
CHAPTER 4.pdfkena6
 
PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -Hossam Maghrabi
 
CRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementCRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementChris Gorga
 
Healthcare Project Prioritization 102708
Healthcare Project Prioritization 102708Healthcare Project Prioritization 102708
Healthcare Project Prioritization 102708Carolyn Reid
 
presentation 2222222 Azhar swati aaa.pptx
presentation 2222222 Azhar swati aaa.pptxpresentation 2222222 Azhar swati aaa.pptx
presentation 2222222 Azhar swati aaa.pptxAzharMahmoodMahmood
 
L03 integration management
L03 integration managementL03 integration management
L03 integration managementAsa Chan
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility studyMars Mfyam
 
Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...
Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...
Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...Robert Greiner
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMdAliMujawar1
 
Managerial Economics - Capital Budgeting
Managerial Economics - Capital BudgetingManagerial Economics - Capital Budgeting
Managerial Economics - Capital BudgetingMohammedHasanRazi
 
Factors to be considered for project selection
Factors to be considered for project selectionFactors to be considered for project selection
Factors to be considered for project selectionYuvaraj neelakandan
 
Pm0010 – interduction to project management
Pm0010 – interduction to project managementPm0010 – interduction to project management
Pm0010 – interduction to project managementsmumbahelp
 
Project Analysis and Methods of project evaluation
Project Analysis and Methods of project evaluationProject Analysis and Methods of project evaluation
Project Analysis and Methods of project evaluationYousuf Razzaq
 
Feasibility study and its importance in context of organization
Feasibility study and its importance in context of organizationFeasibility study and its importance in context of organization
Feasibility study and its importance in context of organizationLalita Shrestha
 

Similar to Module 2.pdf (20)

Feasibilty .pptx
Feasibilty .pptxFeasibilty .pptx
Feasibilty .pptx
 
UU-Project Chapter 3.pptx
UU-Project Chapter 3.pptxUU-Project Chapter 3.pptx
UU-Project Chapter 3.pptx
 
CHAPTER 4.pdf
CHAPTER 4.pdfCHAPTER 4.pdf
CHAPTER 4.pdf
 
PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -
 
project planning
project planningproject planning
project planning
 
CRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementCRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project Management
 
Project Auditing
Project AuditingProject Auditing
Project Auditing
 
Healthcare Project Prioritization 102708
Healthcare Project Prioritization 102708Healthcare Project Prioritization 102708
Healthcare Project Prioritization 102708
 
2.pptx
2.pptx2.pptx
2.pptx
 
presentation 2222222 Azhar swati aaa.pptx
presentation 2222222 Azhar swati aaa.pptxpresentation 2222222 Azhar swati aaa.pptx
presentation 2222222 Azhar swati aaa.pptx
 
abate and h.pptx
abate and h.pptxabate and h.pptx
abate and h.pptx
 
L03 integration management
L03 integration managementL03 integration management
L03 integration management
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility study
 
Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...
Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...
Portfolio Rationalization - Making Sound Financial and Strategic Decisions in...
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptx
 
Managerial Economics - Capital Budgeting
Managerial Economics - Capital BudgetingManagerial Economics - Capital Budgeting
Managerial Economics - Capital Budgeting
 
Factors to be considered for project selection
Factors to be considered for project selectionFactors to be considered for project selection
Factors to be considered for project selection
 
Pm0010 – interduction to project management
Pm0010 – interduction to project managementPm0010 – interduction to project management
Pm0010 – interduction to project management
 
Project Analysis and Methods of project evaluation
Project Analysis and Methods of project evaluationProject Analysis and Methods of project evaluation
Project Analysis and Methods of project evaluation
 
Feasibility study and its importance in context of organization
Feasibility study and its importance in context of organizationFeasibility study and its importance in context of organization
Feasibility study and its importance in context of organization
 

More from SaffanAhmed1

corian material detailed case study.pptx
corian material detailed case study.pptxcorian material detailed case study.pptx
corian material detailed case study.pptxSaffanAhmed1
 
foodstreet case study for architecture project
foodstreet case study for architecture projectfoodstreet case study for architecture project
foodstreet case study for architecture projectSaffanAhmed1
 
MODULE-5 Urban planning.pptx (1).pdf
MODULE-5 Urban planning.pptx (1).pdfMODULE-5 Urban planning.pptx (1).pdf
MODULE-5 Urban planning.pptx (1).pdfSaffanAhmed1
 
Thesis Seminar 18ARC83.pptx
Thesis Seminar 18ARC83.pptxThesis Seminar 18ARC83.pptx
Thesis Seminar 18ARC83.pptxSaffanAhmed1
 
underwater consruction VIII sem MMBC.pptx
underwater consruction VIII sem MMBC.pptxunderwater consruction VIII sem MMBC.pptx
underwater consruction VIII sem MMBC.pptxSaffanAhmed1
 
literature study.pptx
literature study.pptxliterature study.pptx
literature study.pptxSaffanAhmed1
 
LIFE CYCLE OF A BUILDING.pptx
LIFE CYCLE OF A BUILDING.pptxLIFE CYCLE OF A BUILDING.pptx
LIFE CYCLE OF A BUILDING.pptxSaffanAhmed1
 
Tender PP 27-4-23.pptx
Tender PP 27-4-23.pptxTender PP 27-4-23.pptx
Tender PP 27-4-23.pptxSaffanAhmed1
 
MMBC - VGP MARINE KINGDOM REPORT.pptx
MMBC - VGP MARINE KINGDOM REPORT.pptxMMBC - VGP MARINE KINGDOM REPORT.pptx
MMBC - VGP MARINE KINGDOM REPORT.pptxSaffanAhmed1
 
DOC-20230108-WA0002..pptx
DOC-20230108-WA0002..pptxDOC-20230108-WA0002..pptx
DOC-20230108-WA0002..pptxSaffanAhmed1
 
BIODIVERCITY-Panang MALAYSIA [Autosaved].pptx
BIODIVERCITY-Panang MALAYSIA [Autosaved].pptxBIODIVERCITY-Panang MALAYSIA [Autosaved].pptx
BIODIVERCITY-Panang MALAYSIA [Autosaved].pptxSaffanAhmed1
 
Thesis seminar.pdf
Thesis seminar.pdfThesis seminar.pdf
Thesis seminar.pdfSaffanAhmed1
 

More from SaffanAhmed1 (19)

corian material detailed case study.pptx
corian material detailed case study.pptxcorian material detailed case study.pptx
corian material detailed case study.pptx
 
foodstreet case study for architecture project
foodstreet case study for architecture projectfoodstreet case study for architecture project
foodstreet case study for architecture project
 
MODULE-4.pdf
MODULE-4.pdfMODULE-4.pdf
MODULE-4.pdf
 
MODULE-5 Urban planning.pptx (1).pdf
MODULE-5 Urban planning.pptx (1).pdfMODULE-5 Urban planning.pptx (1).pdf
MODULE-5 Urban planning.pptx (1).pdf
 
Thesis Seminar 18ARC83.pptx
Thesis Seminar 18ARC83.pptxThesis Seminar 18ARC83.pptx
Thesis Seminar 18ARC83.pptx
 
HOLOGRAPHY.pptx
HOLOGRAPHY.pptxHOLOGRAPHY.pptx
HOLOGRAPHY.pptx
 
site analysis.pdf
site analysis.pdfsite analysis.pdf
site analysis.pdf
 
underwater consruction VIII sem MMBC.pptx
underwater consruction VIII sem MMBC.pptxunderwater consruction VIII sem MMBC.pptx
underwater consruction VIII sem MMBC.pptx
 
literature study.pptx
literature study.pptxliterature study.pptx
literature study.pptx
 
case study.pptx
case study.pptxcase study.pptx
case study.pptx
 
LIFE CYCLE OF A BUILDING.pptx
LIFE CYCLE OF A BUILDING.pptxLIFE CYCLE OF A BUILDING.pptx
LIFE CYCLE OF A BUILDING.pptx
 
Tender PP 27-4-23.pptx
Tender PP 27-4-23.pptxTender PP 27-4-23.pptx
Tender PP 27-4-23.pptx
 
MMBC - VGP MARINE KINGDOM REPORT.pptx
MMBC - VGP MARINE KINGDOM REPORT.pptxMMBC - VGP MARINE KINGDOM REPORT.pptx
MMBC - VGP MARINE KINGDOM REPORT.pptx
 
DOC-20230108-WA0002..pptx
DOC-20230108-WA0002..pptxDOC-20230108-WA0002..pptx
DOC-20230108-WA0002..pptx
 
BIODIVERCITY-Panang MALAYSIA [Autosaved].pptx
BIODIVERCITY-Panang MALAYSIA [Autosaved].pptxBIODIVERCITY-Panang MALAYSIA [Autosaved].pptx
BIODIVERCITY-Panang MALAYSIA [Autosaved].pptx
 
Thesis seminar.pdf
Thesis seminar.pdfThesis seminar.pdf
Thesis seminar.pdf
 
case study.pdf
case study.pdfcase study.pdf
case study.pdf
 
electives.pdf
electives.pdfelectives.pdf
electives.pdf
 
3919841 (1).ppt
3919841 (1).ppt3919841 (1).ppt
3919841 (1).ppt
 

Recently uploaded

Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130Suhani Kapoor
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...Amil baba
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in designnooreen17
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改yuu sss
 
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRdollysharma2066
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCRdollysharma2066
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 

Recently uploaded (20)

Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in design
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
 
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 

Module 2.pdf

  • 1. Nitte School of Architecture planning and design Subject Code: 18ENG85 Subject Code: 18ENG85 Subject Title: CONSTRUCION AND PROJECT MANAGEMENT Semester: VIII Section: A & B Faculty Name: SUMANTA PATIL, SUPTHA RAO
  • 2. Feasibility study Feasibility studies are primary studies undertaken in the early stage of a project. They tend to be carried out when the project is large or complex and the investment is high. Every construction project must give benefits for the investor. These benefits includes of profit, business development, etc. The profits are achieved in a long period and one must have an accurate forecast of the investment so that the investors still have willingness to invest their money. Feasibility study analysis also provides information about the value of investment and the benefits that investors may get. The return on investment can be seen from feasibility study. Generally, Cost benefit analysis through Generally, Cost benefit analysis through Net Present Value (NPV), Internal Rate of Return (IRR) Are the tools that are used by investors to consider this project is feasible or not. Risks can influence the profits and it will decrease the feasibility for investing in the project. Hence risks must be anticipated and counter actions must be planned and calculated in the feasibility analysis.
  • 3. Project Feasibility study In project management, a project feasibility study evaluates the following areas: • Technical Capability: Is the organization equipped with the necessary technical resources to complete the project • Budget: Does the organization have the financial resources to carry out the project, and does the cost-benefit analysis justify moving forward? • Legality: What is the project's legal requirements, and can the company meet them? • Risk: What are the risks involved in completing this project? Is the risk worth the • Risk: What are the risks involved in completing this project? Is the risk worth the company's money and time based on the expected benefits? • Operational feasibility: Does the project, in its intended scope, address the organization's needs through fixing problems and/or seizing opportunities? • Time: How much time would it take for completion? Importance of Feasibility Study: The value of a feasibility study stems from the desire of an organization to “get it right” before investing resources, time, or money. A feasibility study may discover fresh ideas that alter the scope of a project. It's preferable to make these decisions ahead of time rather than rushing into a project only to discover that it won't work. A feasibility study is usually advantageous to a project since it provides you and other stakeholders with a clear picture of what is being planned.
  • 4. Following are the major benefits that project feasibility study offers: • Improves the attention of project teams • Discovers fresh possibilities • Provides relevant information that helps in making the judgment regarding whether to proceed or not. • Eliminates (unwanted) options • Identifies a compelling reason for pursuing the project. • By examining several parameters, it improves the success rate. • By examining several parameters, it improves the success rate. • Assists in project decision-making • Determines why it's not a good idea to go ahead.
  • 5. Project Appraisal Project appraisal: Appraisal consists of an evaluation of all of the feasibility studies to determine the ability of the project to succeed. Thus, feasibility analysis and appraisal form the critical juncture in the integrated project cycle. Generally mega projects involve large investments. Lending institutions before executing credits to borrowers will take up project appraisal considering the following aspects • The social aspect though unquantifiable aims at visible progress in quality of life and to the advancement of local conditions. • The technical aspects relating to design engineering and realistic implementation • The technical aspects relating to design engineering and realistic implementation schedule. • The institutional aspect dealing with creation of a sound and viable institution for operation and management. • The economic aspect to review justification for the project • Financial aspect dealing with the manner by which costs incurred are recovered from the beneficiaries. • Environmental aspects for protection of environment and natural resources.
  • 6. DECISION MAKING IN PROJECT MANAGEMENT In project management, decisions need to be made on a frequent basis. Decisions can be important unimportant, or critical if critical then decision taken will cause the project to be successful or to fail. Decision-making is the act of choosing between two or more alternative options. In the wider process of problem-solving, decision-making involves choosing between possible solutions to a problem. The final decisions can be made through either an intuitive or reasoned process, or a combination of the two, depending on the nature of the decision. Examples of decisions : • Selection of project manager • Whether services of a consultant is to be availed and if so, scope of services and • Whether services of a consultant is to be availed and if so, scope of services and method of selection. • Mode of execution of project works – through contractor, direct execution by owner or a combination of both • If the work is to be executed through a contractor, the decision to be taken by the owner on the advice of consultant before approval of tender document. © Acharya's NRV School of Architecture
  • 7. Decision making approach Identify the problem Gather/ collect information Monitor and Evaluate the result Identify the alternatives/ other possible solutions Assess the possible solutions and the their feasibility Select the best option Implement the solution
  • 8. Decision making tools Project managers often use some extra methods that can support the correctness of their decisions. While the basic principles might be the same, there are many different techniques and tools that can be used. They can also be used as combination of these techniques to arrive at the final decisions. So, in that case, a skill that it would be an advantage for the project managers to have is to select which of the below are appropriate and relevant at any case. • Decision tree • Decision matrix • Swot analysis • Swot analysis • Cost benefit analysis Investment criteria: NPV Payback period ARR IRR • Voting - A decision-making technique that can be used includes voting. Voting can facilitate making decisions based on unanimity, majority, or plurality. © Acharya's NRV School of Architecture
  • 9. Decision tree This is a graph or model that involves contemplating each option and the outcomes of each. Statistical analysis is also conducted with this technique. Selection of Option 1 100k profit 20 k loss Within India Success 80% chance Failure 20% chance Selection of vendor 20 k loss Option 2 120k profit 15 k loss overseas 20% chance Success 50% chance Failure 50% chance
  • 10. Swot Analysis SWOT stands for strengths, weaknesses, opportunities and threats, which is exactly what this planning tool assesses. Internal to project Internal to project External to the project
  • 11. Decision Matrix A decision matrix is similar to a pros/cons list, but it allows you to place a level of importance on each factor. That way, you can more accurately weigh the different options against each other. List your decision alternatives as rows List relevant factors as columns Establish a consistent scale to assess the value of each combination of alternatives and factors Determine how important each factor is towards making your final decision and assign weights accordingly Multiply your original ratings by the weighted rankings Add up the factors under each decision alternative The option that scores the highest wins
  • 12. Cost-benefit Analysis A cost-benefit analysis involves comparing the explicit and implicit costs of taking an action versus expected benefits. The process of gathering that information may be enlightening in itself because it may require the business to assign monetary value to factors that don’t have explicit costs. The resulting analysis allows decision-makers to weigh all information and make rational choices. As a pros-and-cons evaluation tool, CBAs are most closely associated with public-sector decision-making. But they’re also used when it comes time for project planning around adding employees, purchasing technology or equipment, expanding facilities and more. A CBA can weigh the benefits of taking an action over maintaining the status quo or help a business compare two or more options to see which one makes the most sense. Advantages of (CBA): Advantages of (CBA):  Cost-benefit analyses help businesses weigh pros and cons in a data-driven way so they can make complex decisions in a systematic manner.  For a successful CBA, leaders need to identify and project the explicit and implicit costs and benefits of a proposed action or investment.  It’s also a good idea to assign someone to make the case for the status quo as a way to compare the opportunity cost of doing nothing and investing cash versus proposed actions.  A cost-benefit analysis is based on the data on which it is based, so companies with more mature financial reporting have a higher likelihood of success.
  • 13. In general most of the companies go for CBA for major decisions in the 5 areas: 1. Capital investments 2. Business process change 3. Organizational change 4. Adjusting pricing or introducing new product or service 5. Entering into a merger, acquisition or divestiture Investment criteria: Investment criteria: Payback period NPV ARR IRR
  • 14. Investment Criteria of Capital Budgeting: Payback Period: is the traditional method which is simple and most widely used method of ascertaining economic viability. It is a measure in terms of time, it will take to recover initial cash investment from proposed operations. Salvage value is ignored. Time value of money is ignored. PB in years = Original investment Annual income if investment on a project is 150 lakhs. And annual income is 30 lakhs, PB = 150/30 = 5 years PB = 150/30 = 5 years NPV (Net Present Value): NPV – Net Present Value the Time Value of Money concept is the recognised method. this is a widely used economic method of evaluating investment proposals. NPV = Today's value of the expected cash flows − Today's value of invested cash.
  • 15. If analyzing a longer-term project with multiple cash flows, then the formula for the NPV of the project is as follows: If PV = Present value R1, R2, R3 are cash flows at the end of 1st year 2nd year and 3rd year etc. and I is the R1, R2, R3 are cash flows at the end of 1 year 2 year and 3 year etc. and I is the initial investment. Let r = rate of interest/discount rate/opportunity cost of capital PV = Present Value = R1 + R2 + R3 +………. Rt - Initial investment (1+i)1 (1+i)2 (1+i)3 (1+r)n i.e Where, Rt - Net cash flow – out flows during a single time period t i - Discount rates or return that could be earned through alternative investments t - Number of time periods
  • 16. IRR (Internal Rate of Returns ): The internal rate of return (IRR) is the discount rate for which the net present value of a project is zero. In other words, the sum of discounted costs is equal to the sum of discounted benefits when discounted by the IRR. This method is appropriate when there is only one alternative to the status quo. • The internal rate of return (IRR) is the annual rate of growth that an investment is expected to generate. • IRR is calculated using the same concept as net present value (NPV), except it sets the NPV equal to zero. • The ultimate goal of IRR is to identify the rate of discount, which makes the present value of the sum of annual nominal cash inflows equal to the initial net cash outlay for the investment. the investment. • IRR is ideal for analyzing capital budgeting projects to understand and compare potential rates of annual return over time. • In addition to being used by companies to determine which capital projects to use, IRR can help investors determine the investment return of various assets. NPV and internal rate of return (IRR) are closely related concepts, in that the IRR of an investment is the discount rate that would cause that investment to have an NPV of zero. Another way of thinking about this is that NPV and IRR are trying to answer two separate but related questions. For NPV, the question is, “What is the total amount of money I will make if I proceed with this investment, after taking into account the time value of money?” For IRR, the question is, “If I proceed with this investment, what would be the equivalent annual rate of return that I would receive?”
  • 17. ARR (Accounting rate of return) : this method uses accounting information, as revealed by financial statements to measure the profitability of investment proposals. It is found out by dividing the average income after taxes by the average investment. The average investment would be equal to the original investment plus salvage value (if any) divided by two. ARR = Average income/ Average investment Criteria for acceptance of proposal: Accept all the proposals whose ARR is higher than the minimum rate established by the management and reject the proposals with ARR lesser than the minimum rate. ARR does not consider the time value of money
  • 18. Value Engineering What is Value engineering… ? • is a systematic and organized approach to providing the necessary functions in a project at the lowest cost. Value engineering promotes the substitution of materials and methods with less expensive alternatives, without sacrificing functionality. • Value Engineering is used in construction projects to provide a clear and detailed analysis of how best to meet the goals of the construction project. • Value Engineering, when used with cost estimating, allows for an independent review of the entire construction project. This review process, typically completed within a Value Engineering workshop, is focused on one common goal: to provide the highest Value Engineering workshop, is focused on one common goal: to provide the highest value at the lowest cost. • However, this does not mean that Value Engineering is all about cost-cutting. • Rather through an established set of industry guidelines and procedures, Value Engineering gives all parties involved the confidence that the maximum performance and highest value is possible. • Value Engineering (VE) is not a design/peer review or cost-cutting exercise. VE is a creative, organized effort, which analyzes the requirements of a project for the purpose of achieving the essential functions at the lowest total costs (capital, staffing, energy, maintenance) over the life of the project. • Through a group investigation, using experienced, multi-disciplinary team, value and economy are improved through a study of alternate design concepts, materials, and methods without compromising the functional and value objectives of the client.
  • 19. • In construction, this involves considering the availability of materials, construction methods, transportation issues, site limitations or restrictions, planning and organization, costs, profits, and so on. Benefits that can be delivered include a reduction in life cycle costs, improvement in quality, reduction of environmental impacts, and so on. • Value engineering should start at project inception where the benefits can be greatest, however the contractor may also have a significant contribution to make as long as the changes required to the contract do not affect the timescales, completion dates or incur additional costs that outweigh the savings on offer. Identify the elements Analyse the functions Develop alternative solutions Assess alternative solutions Allocate costs to alternative solutions Develop and zero in on alternative with most likelihood of success
  • 20. Ultimate goal of Value Engineering: optimum value for both initial and long-term investment, a three stage Value Engineering process is used Planning Designing Methodology and Approach Why Value engineering….? With Value Engineering it s possible to eliminate stressors identify potential barriers bring new and novel design and materials to the project limit environmental risks, and keep future maintenance costs of the project low.
  • 21. Roles & responsibility of Project manager/construction manager A project manager collaborates with the client throughout the entire project, from the initial budget and planning stage to the final building. A construction manager may begin working during the budgeting stage, but they're primarily involved in the construction stage. Roles & responsibility of Project manager/construction managerProject managers are owners representatives, his responsibilities can be summarised the following way: The role and responsibilities of project managers would vary depending on the agency he represents. If he represents the owner, his focus is on highest productivity of capital investment. If he represents contractor his objective would be completion of work as per agreement and earn a fair return on investment. earn a fair return on investment. As owners representative he controls resources within time, cost and performance perspective. Construction projects are multi skilled operations, hence the project managers are expected to have all the basic knowledge of all the processes and activities involved, along with good experience to anticipate critical areas and solve likely problems that would arise in the process of managing such projects.
  • 22. The project manager should have ability to manage changes which may affect the project activities. He should possess skills in the following areas :  Organizational planning  Coordination including liaisons with owner, consultant and contractor.  Operations scheduling  Financial management and costing  Monitoring and reporting skills   Projecting and managing projections periodically during project execution stage.
  • 23. Roles & responsibility of Project manager/construction manager Project manager should motivate people to work towards the better performance of the project. Should focus on team building activities which can achieve positive synergy in the project team so as to achieve targeted level of performance. Should have an in-depth knowledge human behaviour and the dynamics of their behaviours. An ideal project manager should recognise change, identifies its effects and makes use of change to manage change. With respect to changes in the project the role of project manager is to • Plan the project activities and manage planned activities accordingly. • Recognise change and its impacts (both positive ad negative impact) and make use of the identified factors to manage change (make use of change to manage change). • Recognise change and its impacts (both positive ad negative impact) and make use of the identified factors to manage change (make use of change to manage change). • Responsible for periodic monitoring and effective coordination • Keeps up schedule, controls and updates budget expenditure. • Chairs site meetings • In totality he is responsible to complete the project as planned. • Project manager should recognise that motivation and job satisfaction are 2 dimensions That influence and affects the productivity of employees (team members). Identify motivated employees as those who work willingly and give their best. • Under assignment, over assignment buck master ship, coercive type of control are some of the factors that demotivate the team members, which should be avoided by a project manager for betterment of project. SP1
  • 24. Slide 23 SP1 Sumanta Patil, 5/11/2022
  • 25. Roles and responsibilities of Construction manager • Implements general conditions of contract • Manages sub-contractors • Determines sequence of work • Plays a vital role in project implementation • Certifies payments
  • 26. Project manager/construction manager Construction Manager: A construction manager may have the following responsibilities: • Supervising a construction team and delegating tasks • Overseeing the daily construction process on the job site • Collaborating with contractors and material suppliers • Maintaining material inventory and ordering new items • Checking local construction guidelines to ensure the project meets all requirements • Creating schedules for the team members • Writing cost estimates for the construction tasks • Writing cost estimates for the construction tasks • Observing the building project's progress and updating the project manager Project Manager: A project manager's duties can include: • Meeting with a client to discuss a new project design • Creating a project budget and plan • Selecting a project location and working to secure the land for a new building • Designing a project timeline with deadlines for each stage • Recruiting and hiring team members, including the construction manager • Writing cost estimates for all elements of a project, including the marketing and hiring process • Managing a project's paperwork, including the initial plans and zoning documents
  • 28. Scope Management in Construction Project Scope Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully. Managing the project scope is primarily concerned with defining and controlling what is and is not included in the project. The Project Scope Management processes are: Plan Scope Management—The process of creating a scope management plan that documents how the project and product scope will be defined, validated, and controlled. It includes: Scope management Scope management Detailed project scope statement Expected project deliverables Breakdown of all the project requirements Organizations can also use a previous project’s scope management plan as a reference for this. Project change control process
  • 29. Collect Requirements—The process of determining, documenting, and managing stakeholder needs and requirements to meet project objectives. will be required to document all the project requirements, expectations, budgets, and deliverables through interviews, surveys, and focus groups. This is a rather important step because more often than not, stakeholders can have unrealistic requirements or expectations and the project managers would be required to step in to find a solution that is acceptable by everyone from avoiding project delays. At the end of the collection requirements stage, you should have the following: Functional as well as non-functional requirements Stakeholder requirements Business requirements Support and training requirements Project requirements
  • 30. Define Scope—The process of developing a detailed description of the project and product. This process will turn requirements into a well-detailed description of the service or product that project team is trying to deliver through the project. It will then have a project scope statement that can then be referred to throughout the project. While it is important to list what is in the scope of the project, it is just as important to note down what is out of the project scope. Any kind of inclusions to the scope would then have to go through the entire change control process to ensure the team is only working on things that they are supposed to work on. With a defined scope, you get a reference point for your project team and anyone else involved. In case there is something that is not involved in the scope, it doesn’t need to be completed by the team.
  • 31. Create WBS—The process of subdividing project deliverables and project work into smaller, more manageable components. A project breakdown structure is a document that breaks down all the work which needs to be done in the project and then assigns all the tasks to the team members. It lists the deliverables that need to be completed and their respective deadlines as well. You can use project management software for this step of the process to assign and prioritize project tasks which will make it easier to track the entire progress of the project and avoid any unnecessary bottlenecks. Validate Scope—The process of formalizing acceptance of the completed project Validate Scope—The process of formalizing acceptance of the completed project deliverables. In this step, the scope and deliverables that you have recorded need to be sent to project executives and stakeholders to get the necessary approvals. Scope validation needs to be done before starting the project to ensure that if something goes wrong then it is easy to find where it went wrong. Control Scope—The process of monitoring the status of the project and product scope and managing changes to the scope baseline. Project managers need to ensure that as the project begins, it always stays within the defined scope. In case there are some things that need to change, then the proper change control process should be followed.