SlideShare a Scribd company logo
1 of 21
LOCATION OF AKOSOMBO DAM
• Located at
Volta river in
south-eastern
Ghana on
Volta river
Basin.
 Building of the Akosombo Dam takes almost a period of
two decades of planning which began in 1947.
 Actual construction took place within 1962-1972 by the
management of the Volta River Authority (VRA).
 Jointly financed by government of Ghana, the World
Bank, the United States, and the United Kingdom.
 3 phase of the project
• Phase one was installation of 588MW unit of electricity
completed in 1966.
• Phase two involved addition of 304MW electricity results
total of 912MW electricity.
• Last phase consist of setting up of a smaller hydro-electric
power(HEP) dam, 21km downstream, at Kpong.
HISTORY
 To make VALCO (Volta Aluminum Company) energy
sufficient so that its activity which is mainly aluminum
smelting would be proceed without interruption.
 To supply electricity for both domestic and industrial
use and also export to the basin sharing countries (Benin
and Togo).
 To provide opportunities for large-scale irrigation,
modernization of agriculture, promotion of factories and
industries, and the establishment of tourist facilities.
OBJECTIVE
Dam and spillways
Type of dam Embankment, rock-fill
Impounds White Volta, Black Volta, Oti River
Discharge Lower Volta River
Height (foundation) 114 m (374 ft)
Length 660 m (2,170 ft)
Width (base) 366 m (1,201 ft)
Dam volume 7,900,000 m
3
(280,000,000 cu ft)
Spillways Twin gate-controlled
Spillway capacity 34,000 m
3
/s (1,200,000 cu ft/s)
DESIGN SPECIFICATIONS
Reservoir
Creates Lake Volta (largest man-made lake)
Total capacity 148 km
3
(120,000,000 acre⋅ft)
Surface area 8,502 km
2
(3,283 sq mi)
Maximum length 400 km (250 mi)
Power Station
Hydraulic head 68.8 m (226 ft) (max)
Turbines 6 x 170 MW (230,000 hp) Francis-type
Penstock specifications 112-116 m long with 7.2 m diameter
Installed capacity 1,072 MW (1,392,000 hp) as per VRA
2010
DESIGN SPECIFICATIONS
(contd.)
 85% of all electricity generated in Ghana leads to economic
and industrial development provides by Akosombo HEP.
 Boost Ghana’s economy twice the average of the West African
sub regions.
 Volta Lake leads to increase in fishing stock.
 Farming activities is also intensified along the 5500 km
shoreline especially locations downstream of the lake.
 Navigation on the Volta river has changed significantly serving
as a mean for transportation for goods.
 The direct tourism impact resulting from the lake includes
opening up part of hitherto inaccessible attractions to both local
and international travellers.
SOCIO-ECONOMIC BENEFITS
 Generation of total hydro generation of 5,960GWh from
the Akosombo and Kpong Hydro Generating Stations in
the year of 2010 which is 2% greater than 2009.
 Average plant discharge in 2010 at Akosombo GS
1,201.85 cu.m/sec which is 0.5% grater than the year of
2009.
 The average unit availability attained at the Akosombo
was 96.87% above a set target of 94%.
 Ratio of gross hydro generation to firm capability of
Akosombo is132.74% in 2010.
SOCIO-ECONOMIC BENEFITS
(contd.)
 There has been a steady decline in agricultural productivity along
the lake and the associated tributaries.
 Downstream agricultural systems are losing soil fertility without
the periodic flooding that brought nutrients to the soil before the
natural river flow was halted by the dam.
 The land surrounding Lake Volta is not nearly as fertile as the
formerly cultivated land residing underneath the lake.
 Heavy agricultural activity has exhausted already because of
inadequate soils.
EFFECT ON ECOLOGY
 The growth of commercially intensive agriculture has
produced a rise in fertilizer run-off into the river leads to
eutrophication of the river waters.
 The nutrient enrichment, in combination with the low
water movement, has allowed for the invasion of aquatic
weeds which creates a formidable challenge to water
navigation and transportation.
EFFECT ON ECOLOGY (contd.)
 Displacement of 80,000 people across 700 villages in
low lying areas and resettle them into 52 new villages
lead to the lost of the original communities resulted in
many socio-physiological problems in the communities.
 The Volta lake creation leads to a loss of 3.6% of the
total land surface of Ghana including forest land to the
reservoir.
 As a result of less arable land to farm the men switch to
fishing while most of the women were involved in
prostitution as a profession to satisfy the male workers
whom were building the dam.
CHALLENGES ON SOCIAL
ACTIVITY
 For fish and other aquatic biota, due to the ability of the
dam to alter or blocking the migration resulting in
genetic disconnect between species population.
 Injustice to the communities upstream and downstream
is that it took three decades to be connected to the
national electricity grids.
CHALLENGES ON SOCIAL
ACTIVITY (contd.)
 The upstream and downstream communities are among the
poorest in the country lacking access to basic necessities like
hospital, roads, proper sanitation and water facilities.
 The lost land lead to decline in the primary economic
activities of crop and livestock farming for most of the
communities both downstream and upstream of the dam.
 The extensive human migration and degradation of natural
resources within the Volta-basin area, are the products of
poverty in conjunction with population pressure.
 The rural and industrial economies have experienced the
financial losses associated with the decimation of
river aquaculture.
CHALLENGES ON ECONOMIC
ACTIVITY
 The presence of aquatic weeds provide the necessary habitat for
black-fly, mosquitoes and snails, which are the vectors of water-
borne illnesses such as bilharzia ( 2% to 32% at downstream and
0.5% to 27.4% in upstream), river blindness and malaria
(increased by an average of 10% both upstream and downstream ).
 Children and fishermen have been especially hard hit by this rise of
disease prevalence.
 This migration enabled the contraction of HIV and has since led to
its heightened prevalence within Volta Basin communities.
IMPACT ON HUMAN WALFARE
 Increase in seismic activities (4 major earthquakes of
magnitude 5 or higher have been recorded in the area) around
the dam since the construction of the lake.
 Believing that earthquakes are due to the overloading of the
geological bedrock underlying the lake with which is triggering
the active Akwapim fault.
 Sediments load have decrease by about 60mg/l downstream of
the dam as a result of the impoundment.
 The lack of sediment has lead to the erosion of the coastline in
the neighbouring Togo and Benin at a rate of 10-15m/y.
IMPACT ON GEOLOGY
 Morphology of the delta have shifted 12 km eastward
from the original lower Volta entre point to the sea
leading to coastal erosion at Ada.
 In accordance with the behaviour of tropical dam
microclimate the temperature and rainfall in the south
eastern part of Ghana is higher than the average in other
parts of the basin.
IMPACT ON GEOLOGY (contd.)
POLITICAL MOTIVES
 Initially 20% of Akosombo Dam's electric output (serving 70% of
national demand) was provided to Ghanaians in the form of
electricity, the remaining 80% was generated for the American-
owned Volta Aluminum Company (VALCO).
 The Ghana Government was compelled, by contract, to pay for
over 50% of the cost of Akosombo's construction, but the country
was allowed only 20% of the power generated.
 Neocolonialism - Power to make decisions about development
(sustainable or otherwise) provided to powerful actors (the Prime
Minister of Ghana, the Ghanaian Government, the World Bank, the
USA, the UK, the Export-Import Bank of America, and several
companies) Ideally, those people would have been enabled made
decisions that affected the lives of rural fishers and farmers who
had scarce power, representation or resources. to participate in a
decision-making process that was to have such profound
implications for their lives.
CONTROVERSIES
STRENGTH WEAKNESS
The Akosombo HEP provides over 85%
of all electricity generated in Ghana which
encouraged economic and industrial
development in Ghana
Today an estimated 60% of the population has
access to electricity including 20% of the rural
communities. Urban dwellers are being more
beneficial than the people affected by the
dam.
Over two-thirds of all the electricity
generated goes to industries and
commercial entities leading to rapid
expansion and immigration of industries
into Ghana and resulting Ghana’s
economy is twice the average of the West
African sub region.
Ghana’s overreliance on HEP have hamper the
development of alternative renewable energy
sources which have affected the country in
times of drought. In years of drought where
HEP energy generation has been poor,
unemployment rate rises exponential attesting
to a positive externality of the Akosombo dam
Sustainable Development Akosombo Dam involved a trade-off between
environment and development.
It created, rather than reduced, poverty for
many people (those who were displaced by the
creation of Lake Volta).
OPPORTUNITIES THREATS
VRA undertook some activities towards the
fulfillment of non-generation goals like the
creation of the Akosombo Textiles Company,
Kpong Farms Limited, the Akosombo Hotel
Limited and Volta Lake Transport Company
Limited (VLTC) to boast jobs and economic
activity within the region.
Inhabitants did not have the specialized
skills and education levels required to take
advantage of working in textiles industries
or operating advanced machinery in the
1960’s.
The generation of electricity as stated earlier
lead to the positive economic and industrial
development along the eastern coast of Ghana.
Even after 50 years of operation, that the
majority of the affected people by the
project were not connected to the national
grid until recently .
Large-scale irrigation, modernization of
agriculture, promotion of factories and
industries, and the establishment of tourist
facilities
The resettlement of the communities and
the compensation promised to the
inhabitants were not fully paid, farming
lands were insufficient for the villages.
VRA irrigation and modernization of
agriculture programs collapsed.
CONTROVERSIES (contd.)
 https://en.wikipedia.org/wiki/Akosombo_Dam
 https://www.ukessays.com/essays/environmental-
sciences/case-study-of-the-akosombo-hydroelectric-
dam-environmental-sciences-essay.php
 https://www.soas.ac.uk/cedep-demos /000
_P501_USD_K3736-Demo/unit1/page_19.htm
 https://www.vra.com/resources/annual_reports/2010.pdf
 https://www.britannica.com/topic/Akosombo-Dam
REFERENCES
Akosombo Dam (1).pptx

More Related Content

Similar to Akosombo Dam (1).pptx

Implementing climate change policy in an african megacity
Implementing climate change policy in an african megacityImplementing climate change policy in an african megacity
Implementing climate change policy in an african megacityAdedoyin Lasisi
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentendw
 
EFFECTS OF INCREASED LAND USE CHANGES ON RUNOFF AND SEDIMENT YIELD IN THE UPP...
EFFECTS OF INCREASED LAND USE CHANGES ON RUNOFF AND SEDIMENT YIELD IN THE UPP...EFFECTS OF INCREASED LAND USE CHANGES ON RUNOFF AND SEDIMENT YIELD IN THE UPP...
EFFECTS OF INCREASED LAND USE CHANGES ON RUNOFF AND SEDIMENT YIELD IN THE UPP...IAEME Publication
 
Gcse geography case studies 2013
Gcse geography case studies 2013Gcse geography case studies 2013
Gcse geography case studies 2013Mrs Coles
 
Brantaggregate 120923133722-phpapp01
Brantaggregate 120923133722-phpapp01Brantaggregate 120923133722-phpapp01
Brantaggregate 120923133722-phpapp01Louisette Lanteigne
 
Brant's water supply, aggregate & development risks
Brant's water supply, aggregate & development risksBrant's water supply, aggregate & development risks
Brant's water supply, aggregate & development riskslouisette lanteigne
 
River interlinking
River interlinkingRiver interlinking
River interlinkingVikas Kumar
 
Water source and water demand needs assessments for bonwire
Water source and water demand needs assessments for bonwireWater source and water demand needs assessments for bonwire
Water source and water demand needs assessments for bonwireAlexander Decker
 
The Ontario Siphon Hug Project
The Ontario Siphon Hug ProjectThe Ontario Siphon Hug Project
The Ontario Siphon Hug Projectroaudet
 
MVG - Access to water in Kigoma, Tanzania
MVG - Access to water in Kigoma, TanzaniaMVG - Access to water in Kigoma, Tanzania
MVG - Access to water in Kigoma, TanzaniaJanet Chapman
 
Damsustainability 13054265721522-phpapp02-110514213257-phpapp02
Damsustainability 13054265721522-phpapp02-110514213257-phpapp02Damsustainability 13054265721522-phpapp02-110514213257-phpapp02
Damsustainability 13054265721522-phpapp02-110514213257-phpapp02Mushfiqul Hassan
 
Water related issues in the Mekong Basin and Mekong Delta, Nguyen Tat Dac
Water related issues in the Mekong Basin and Mekong Delta, Nguyen Tat Dac Water related issues in the Mekong Basin and Mekong Delta, Nguyen Tat Dac
Water related issues in the Mekong Basin and Mekong Delta, Nguyen Tat Dac Hanna Stahlberg
 
Aeo 2 ch05-coastal_and_marine_environments
Aeo 2 ch05-coastal_and_marine_environmentsAeo 2 ch05-coastal_and_marine_environments
Aeo 2 ch05-coastal_and_marine_environmentsDr Lendy Spires
 
Geography yemen presentation
Geography yemen presentationGeography yemen presentation
Geography yemen presentationYCIS Beijing
 
Climate change vulnerability and adaptation in Egygpt and NAP process
Climate change vulnerability and adaptation in Egygpt and NAP processClimate change vulnerability and adaptation in Egygpt and NAP process
Climate change vulnerability and adaptation in Egygpt and NAP processNAP Events
 
Chemical analysis of freshwater bodies in the kumasi metropolis and its envir...
Chemical analysis of freshwater bodies in the kumasi metropolis and its envir...Chemical analysis of freshwater bodies in the kumasi metropolis and its envir...
Chemical analysis of freshwater bodies in the kumasi metropolis and its envir...Alexander Decker
 
9.1.2. Public presentation of country NAPs - Togo
9.1.2. Public presentation of country NAPs - Togo9.1.2. Public presentation of country NAPs - Togo
9.1.2. Public presentation of country NAPs - TogoNAP Events
 

Similar to Akosombo Dam (1).pptx (20)

Implementing climate change policy in an african megacity
Implementing climate change policy in an african megacityImplementing climate change policy in an african megacity
Implementing climate change policy in an african megacity
 
Evolution of Strategic Environmental Assessment (SEA) to inform hydropower de...
Evolution of Strategic Environmental Assessment (SEA) to inform hydropower de...Evolution of Strategic Environmental Assessment (SEA) to inform hydropower de...
Evolution of Strategic Environmental Assessment (SEA) to inform hydropower de...
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
EFFECTS OF INCREASED LAND USE CHANGES ON RUNOFF AND SEDIMENT YIELD IN THE UPP...
EFFECTS OF INCREASED LAND USE CHANGES ON RUNOFF AND SEDIMENT YIELD IN THE UPP...EFFECTS OF INCREASED LAND USE CHANGES ON RUNOFF AND SEDIMENT YIELD IN THE UPP...
EFFECTS OF INCREASED LAND USE CHANGES ON RUNOFF AND SEDIMENT YIELD IN THE UPP...
 
Gcse geography case studies 2013
Gcse geography case studies 2013Gcse geography case studies 2013
Gcse geography case studies 2013
 
Brantaggregate 120923133722-phpapp01
Brantaggregate 120923133722-phpapp01Brantaggregate 120923133722-phpapp01
Brantaggregate 120923133722-phpapp01
 
Brant's water supply, aggregate & development risks
Brant's water supply, aggregate & development risksBrant's water supply, aggregate & development risks
Brant's water supply, aggregate & development risks
 
River interlinking
River interlinkingRiver interlinking
River interlinking
 
Water source and water demand needs assessments for bonwire
Water source and water demand needs assessments for bonwireWater source and water demand needs assessments for bonwire
Water source and water demand needs assessments for bonwire
 
The Ontario Siphon Hug Project
The Ontario Siphon Hug ProjectThe Ontario Siphon Hug Project
The Ontario Siphon Hug Project
 
MVG - Access to water in Kigoma, Tanzania
MVG - Access to water in Kigoma, TanzaniaMVG - Access to water in Kigoma, Tanzania
MVG - Access to water in Kigoma, Tanzania
 
Damsustainability 13054265721522-phpapp02-110514213257-phpapp02
Damsustainability 13054265721522-phpapp02-110514213257-phpapp02Damsustainability 13054265721522-phpapp02-110514213257-phpapp02
Damsustainability 13054265721522-phpapp02-110514213257-phpapp02
 
Water related issues in the Mekong Basin and Mekong Delta, Nguyen Tat Dac
Water related issues in the Mekong Basin and Mekong Delta, Nguyen Tat Dac Water related issues in the Mekong Basin and Mekong Delta, Nguyen Tat Dac
Water related issues in the Mekong Basin and Mekong Delta, Nguyen Tat Dac
 
Aeo 2 ch05-coastal_and_marine_environments
Aeo 2 ch05-coastal_and_marine_environmentsAeo 2 ch05-coastal_and_marine_environments
Aeo 2 ch05-coastal_and_marine_environments
 
Geography yemen presentation
Geography yemen presentationGeography yemen presentation
Geography yemen presentation
 
Climate change vulnerability and adaptation in Egygpt and NAP process
Climate change vulnerability and adaptation in Egygpt and NAP processClimate change vulnerability and adaptation in Egygpt and NAP process
Climate change vulnerability and adaptation in Egygpt and NAP process
 
Bangladesh floods
Bangladesh floodsBangladesh floods
Bangladesh floods
 
Chemical analysis of freshwater bodies in the kumasi metropolis and its envir...
Chemical analysis of freshwater bodies in the kumasi metropolis and its envir...Chemical analysis of freshwater bodies in the kumasi metropolis and its envir...
Chemical analysis of freshwater bodies in the kumasi metropolis and its envir...
 
H04534853
H04534853H04534853
H04534853
 
9.1.2. Public presentation of country NAPs - Togo
9.1.2. Public presentation of country NAPs - Togo9.1.2. Public presentation of country NAPs - Togo
9.1.2. Public presentation of country NAPs - Togo
 

Recently uploaded

Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 

Recently uploaded (20)

Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 

Akosombo Dam (1).pptx

  • 1.
  • 2. LOCATION OF AKOSOMBO DAM • Located at Volta river in south-eastern Ghana on Volta river Basin.
  • 3.  Building of the Akosombo Dam takes almost a period of two decades of planning which began in 1947.  Actual construction took place within 1962-1972 by the management of the Volta River Authority (VRA).  Jointly financed by government of Ghana, the World Bank, the United States, and the United Kingdom.  3 phase of the project • Phase one was installation of 588MW unit of electricity completed in 1966. • Phase two involved addition of 304MW electricity results total of 912MW electricity. • Last phase consist of setting up of a smaller hydro-electric power(HEP) dam, 21km downstream, at Kpong. HISTORY
  • 4.  To make VALCO (Volta Aluminum Company) energy sufficient so that its activity which is mainly aluminum smelting would be proceed without interruption.  To supply electricity for both domestic and industrial use and also export to the basin sharing countries (Benin and Togo).  To provide opportunities for large-scale irrigation, modernization of agriculture, promotion of factories and industries, and the establishment of tourist facilities. OBJECTIVE
  • 5. Dam and spillways Type of dam Embankment, rock-fill Impounds White Volta, Black Volta, Oti River Discharge Lower Volta River Height (foundation) 114 m (374 ft) Length 660 m (2,170 ft) Width (base) 366 m (1,201 ft) Dam volume 7,900,000 m 3 (280,000,000 cu ft) Spillways Twin gate-controlled Spillway capacity 34,000 m 3 /s (1,200,000 cu ft/s) DESIGN SPECIFICATIONS
  • 6. Reservoir Creates Lake Volta (largest man-made lake) Total capacity 148 km 3 (120,000,000 acre⋅ft) Surface area 8,502 km 2 (3,283 sq mi) Maximum length 400 km (250 mi) Power Station Hydraulic head 68.8 m (226 ft) (max) Turbines 6 x 170 MW (230,000 hp) Francis-type Penstock specifications 112-116 m long with 7.2 m diameter Installed capacity 1,072 MW (1,392,000 hp) as per VRA 2010 DESIGN SPECIFICATIONS (contd.)
  • 7.  85% of all electricity generated in Ghana leads to economic and industrial development provides by Akosombo HEP.  Boost Ghana’s economy twice the average of the West African sub regions.  Volta Lake leads to increase in fishing stock.  Farming activities is also intensified along the 5500 km shoreline especially locations downstream of the lake.  Navigation on the Volta river has changed significantly serving as a mean for transportation for goods.  The direct tourism impact resulting from the lake includes opening up part of hitherto inaccessible attractions to both local and international travellers. SOCIO-ECONOMIC BENEFITS
  • 8.  Generation of total hydro generation of 5,960GWh from the Akosombo and Kpong Hydro Generating Stations in the year of 2010 which is 2% greater than 2009.  Average plant discharge in 2010 at Akosombo GS 1,201.85 cu.m/sec which is 0.5% grater than the year of 2009.  The average unit availability attained at the Akosombo was 96.87% above a set target of 94%.  Ratio of gross hydro generation to firm capability of Akosombo is132.74% in 2010. SOCIO-ECONOMIC BENEFITS (contd.)
  • 9.  There has been a steady decline in agricultural productivity along the lake and the associated tributaries.  Downstream agricultural systems are losing soil fertility without the periodic flooding that brought nutrients to the soil before the natural river flow was halted by the dam.  The land surrounding Lake Volta is not nearly as fertile as the formerly cultivated land residing underneath the lake.  Heavy agricultural activity has exhausted already because of inadequate soils. EFFECT ON ECOLOGY
  • 10.  The growth of commercially intensive agriculture has produced a rise in fertilizer run-off into the river leads to eutrophication of the river waters.  The nutrient enrichment, in combination with the low water movement, has allowed for the invasion of aquatic weeds which creates a formidable challenge to water navigation and transportation. EFFECT ON ECOLOGY (contd.)
  • 11.  Displacement of 80,000 people across 700 villages in low lying areas and resettle them into 52 new villages lead to the lost of the original communities resulted in many socio-physiological problems in the communities.  The Volta lake creation leads to a loss of 3.6% of the total land surface of Ghana including forest land to the reservoir.  As a result of less arable land to farm the men switch to fishing while most of the women were involved in prostitution as a profession to satisfy the male workers whom were building the dam. CHALLENGES ON SOCIAL ACTIVITY
  • 12.  For fish and other aquatic biota, due to the ability of the dam to alter or blocking the migration resulting in genetic disconnect between species population.  Injustice to the communities upstream and downstream is that it took three decades to be connected to the national electricity grids. CHALLENGES ON SOCIAL ACTIVITY (contd.)
  • 13.  The upstream and downstream communities are among the poorest in the country lacking access to basic necessities like hospital, roads, proper sanitation and water facilities.  The lost land lead to decline in the primary economic activities of crop and livestock farming for most of the communities both downstream and upstream of the dam.  The extensive human migration and degradation of natural resources within the Volta-basin area, are the products of poverty in conjunction with population pressure.  The rural and industrial economies have experienced the financial losses associated with the decimation of river aquaculture. CHALLENGES ON ECONOMIC ACTIVITY
  • 14.  The presence of aquatic weeds provide the necessary habitat for black-fly, mosquitoes and snails, which are the vectors of water- borne illnesses such as bilharzia ( 2% to 32% at downstream and 0.5% to 27.4% in upstream), river blindness and malaria (increased by an average of 10% both upstream and downstream ).  Children and fishermen have been especially hard hit by this rise of disease prevalence.  This migration enabled the contraction of HIV and has since led to its heightened prevalence within Volta Basin communities. IMPACT ON HUMAN WALFARE
  • 15.  Increase in seismic activities (4 major earthquakes of magnitude 5 or higher have been recorded in the area) around the dam since the construction of the lake.  Believing that earthquakes are due to the overloading of the geological bedrock underlying the lake with which is triggering the active Akwapim fault.  Sediments load have decrease by about 60mg/l downstream of the dam as a result of the impoundment.  The lack of sediment has lead to the erosion of the coastline in the neighbouring Togo and Benin at a rate of 10-15m/y. IMPACT ON GEOLOGY
  • 16.  Morphology of the delta have shifted 12 km eastward from the original lower Volta entre point to the sea leading to coastal erosion at Ada.  In accordance with the behaviour of tropical dam microclimate the temperature and rainfall in the south eastern part of Ghana is higher than the average in other parts of the basin. IMPACT ON GEOLOGY (contd.)
  • 17. POLITICAL MOTIVES  Initially 20% of Akosombo Dam's electric output (serving 70% of national demand) was provided to Ghanaians in the form of electricity, the remaining 80% was generated for the American- owned Volta Aluminum Company (VALCO).  The Ghana Government was compelled, by contract, to pay for over 50% of the cost of Akosombo's construction, but the country was allowed only 20% of the power generated.  Neocolonialism - Power to make decisions about development (sustainable or otherwise) provided to powerful actors (the Prime Minister of Ghana, the Ghanaian Government, the World Bank, the USA, the UK, the Export-Import Bank of America, and several companies) Ideally, those people would have been enabled made decisions that affected the lives of rural fishers and farmers who had scarce power, representation or resources. to participate in a decision-making process that was to have such profound implications for their lives.
  • 18. CONTROVERSIES STRENGTH WEAKNESS The Akosombo HEP provides over 85% of all electricity generated in Ghana which encouraged economic and industrial development in Ghana Today an estimated 60% of the population has access to electricity including 20% of the rural communities. Urban dwellers are being more beneficial than the people affected by the dam. Over two-thirds of all the electricity generated goes to industries and commercial entities leading to rapid expansion and immigration of industries into Ghana and resulting Ghana’s economy is twice the average of the West African sub region. Ghana’s overreliance on HEP have hamper the development of alternative renewable energy sources which have affected the country in times of drought. In years of drought where HEP energy generation has been poor, unemployment rate rises exponential attesting to a positive externality of the Akosombo dam Sustainable Development Akosombo Dam involved a trade-off between environment and development. It created, rather than reduced, poverty for many people (those who were displaced by the creation of Lake Volta).
  • 19. OPPORTUNITIES THREATS VRA undertook some activities towards the fulfillment of non-generation goals like the creation of the Akosombo Textiles Company, Kpong Farms Limited, the Akosombo Hotel Limited and Volta Lake Transport Company Limited (VLTC) to boast jobs and economic activity within the region. Inhabitants did not have the specialized skills and education levels required to take advantage of working in textiles industries or operating advanced machinery in the 1960’s. The generation of electricity as stated earlier lead to the positive economic and industrial development along the eastern coast of Ghana. Even after 50 years of operation, that the majority of the affected people by the project were not connected to the national grid until recently . Large-scale irrigation, modernization of agriculture, promotion of factories and industries, and the establishment of tourist facilities The resettlement of the communities and the compensation promised to the inhabitants were not fully paid, farming lands were insufficient for the villages. VRA irrigation and modernization of agriculture programs collapsed. CONTROVERSIES (contd.)
  • 20.  https://en.wikipedia.org/wiki/Akosombo_Dam  https://www.ukessays.com/essays/environmental- sciences/case-study-of-the-akosombo-hydroelectric- dam-environmental-sciences-essay.php  https://www.soas.ac.uk/cedep-demos /000 _P501_USD_K3736-Demo/unit1/page_19.htm  https://www.vra.com/resources/annual_reports/2010.pdf  https://www.britannica.com/topic/Akosombo-Dam REFERENCES