EXPERIENCE BASED ON THE
ENGINEERING PROJECT CYCLE
2010 - 2012
Being Exposed
Assisting
Participating
Contributing
Performing
PHASE 1
CONSTRUCTION
• Widening Trunk Road 2 (TR2) Highway towards Sir Lowry’s Pass
• Project Cost - R101 047 000
• Duration - 6 Months
• Construction Survey (Setting out / Levelling / Batter slopes)
• Quantity Surveying (Payment Certificate / Sub contractors)
• Quality Control (Layerworks / Steel Fixing / Materials/ Concrete
work)
• Technical Assistant (MOS / Providing Info to Supervisors /
Forecasting)
Being Exposed Assisting Participating
PHASE 2
OPERATION AND MAINTAINANCE
• Ceres Regional Office - 47km Piketberg Area
• Project Cost R11m (Estimated Expenditure)
• 6 Months
• Patching (Base Failure / Rutting / Undulation / Potholes) , Crack Seal
• Reseal, Rejuvenation
• Plant, Material, Labour Management
• Quality Control
• Costing Site
• Planning Manager
• Administration
• Site Supervision
Contributing Performing
PHASE 3
ENGINEERING AND RE – ENGINEERING
• Planning - Prioritisation Matrix Report/ Site Investigation/ Pavement
layer Inspections
• Design - Parking Layout Border of Namibia and South Africa / NMT -
Range Road, Blackheath, Road signs Northern Cape
• Drawing - NMT - Range Road, Blackheath
• Detailing - NMT - Range Road, Blackheath
• Quantities - NMT - Range Road, Blackheath
• Documentation - NMT - Range Road, Blackheath
• Tender – NMT Projects
Participating Contributing Performing
NMT DESIGN – RANGE ROAD (BLACKHEATH)
JUNIOR ENGINEERS REPRESENTATIVE
Construction of Non – Motorised Transport Facilities, Hard and
Soft Landscaping along Weltevreden Parkway, Mitchells Plain
• Client – City of Cape Town
• Consultant – WorleyParsons
• Contractor – Jansen Tarmac
• Total Project Cost - R 5 777 055.36 (R 5.8m)
PHASE 4
• Construction of asphalt surface sidewalk / bicycle path
• Exposed Aggregate brick paving areas at intersection bell mouths
• Construction of tree pits and planting of new trees and Street
lighting
• Construction of two raised intersections and traffic circles
SCOPE OF WORKS
Duties as Junior Engineers Representative
• Health and Safety on Site – OHS Act 85 1993
• Environmental - National Environmental Act (107 of 1998)
• Quality of Materials / Site Plant / Workmanship
• Issue instructions to Contractor
• Receive Communications
• Inspect the works at any time and upon request for approval
• Work done to approved Drawings / Project Specifications
• GCC / COLTO
• Prepare Payment Certificate
PERFORMING
Daily Tasks / Responsibilities
• Ensure accurate record keeping of daily activies on site
• Confirm all oral instructions in Site Note book
• Understand / Study approved drawings / details to ensure correct and
accurate work done.
• To enforce COLTO, GCC 2010 standards.
• Be pro-active in handling errors/omissions from drawings or
specifications.
• Ensure work undertaken in safe manner and report all non-
compliance to the OHS agent or Engineer.
• Control quality of materials / workmanship on behalf of Engineer.
• Ensure all work is done in an Environmentally safe manner and
promote non hazardous working methods for the protection of the
Environment.
PERFORMING
EXPERIENCE GAINED 2010 - 2012
ECOUNTERED PROBLEMS
BUILT A WALL!!!
CLEAR AND GRUB
PLANTED TREES
ENVIRONMENTAL PROBLEM!!
REMOVED AND CLEANED
TRAFFIC SAFETY!!!
TRAFFIC SAFETY!!!
ECSA CODE OF CONDUCT : ETHICS
• COMPETENCY Skill / Efficiency / Professionalism / Knowledge
Training / Experience / Competency
• INTEGRITY Fidelity / Honesty
Dishonesty / Corruption / Bribery
• PUBLIC Health / Safety / Interest
• ENVIRONMENT Due regard for, avoid, adverse impact on the
env.
Sustainable development.
LOCAL LABOUR
COMPASSION RESPECT
TEAMWORK
RYAN ARENDSE
THANK YOU

More Related Content

What's hot

shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley ParsonsShane Reynolds
 
Henry Licis Resume
Henry Licis ResumeHenry Licis Resume
Henry Licis ResumeHenry Licis
 
Resume of Michael Bower
Resume of Michael BowerResume of Michael Bower
Resume of Michael BowerMichael Bower
 
Wincy L CV Apr2015a
Wincy L CV Apr2015aWincy L CV Apr2015a
Wincy L CV Apr2015aWincy Ho
 
Resume (Material Specialist)
Resume (Material Specialist)Resume (Material Specialist)
Resume (Material Specialist)Saeed Ahmad
 
Brophy resume,8-2016
Brophy resume,8-2016Brophy resume,8-2016
Brophy resume,8-2016brian brophy
 
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr
 
Silver Lake Reservoir Complex Storage Replacement; Open House Event Presentation
Silver Lake Reservoir Complex Storage Replacement; Open House Event PresentationSilver Lake Reservoir Complex Storage Replacement; Open House Event Presentation
Silver Lake Reservoir Complex Storage Replacement; Open House Event PresentationTina Howell, MBA LEED AP
 
Saikat 07-profile
Saikat 07-profileSaikat 07-profile
Saikat 07-profileSaikat Roy
 
Rene Perron.ResumeRM2
Rene Perron.ResumeRM2Rene Perron.ResumeRM2
Rene Perron.ResumeRM2Rene Perron
 
Scotts Run and Carderock Sluice Gate Rehabilitation and Odor Control Project
Scotts Run and Carderock Sluice Gate Rehabilitation and Odor Control ProjectScotts Run and Carderock Sluice Gate Rehabilitation and Odor Control Project
Scotts Run and Carderock Sluice Gate Rehabilitation and Odor Control ProjectFairfax County
 

What's hot (20)

shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsons
 
Henry Licis Resume
Henry Licis ResumeHenry Licis Resume
Henry Licis Resume
 
AAMIR - PROFILE
AAMIR - PROFILEAAMIR - PROFILE
AAMIR - PROFILE
 
Resume of Michael Bower
Resume of Michael BowerResume of Michael Bower
Resume of Michael Bower
 
Wincy L CV Apr2015a
Wincy L CV Apr2015aWincy L CV Apr2015a
Wincy L CV Apr2015a
 
Mike C LeBlanc REV3
Mike C LeBlanc REV3Mike C LeBlanc REV3
Mike C LeBlanc REV3
 
INDIAZI CV
INDIAZI CVINDIAZI CV
INDIAZI CV
 
ART Resume
ART Resume ART Resume
ART Resume
 
Philip Skeparnides c.v.doc
Philip Skeparnides c.v.docPhilip Skeparnides c.v.doc
Philip Skeparnides c.v.doc
 
ali al omari CV
ali al omari CVali al omari CV
ali al omari CV
 
Resume (Material Specialist)
Resume (Material Specialist)Resume (Material Specialist)
Resume (Material Specialist)
 
Brophy resume,8-2016
Brophy resume,8-2016Brophy resume,8-2016
Brophy resume,8-2016
 
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)
 
Clifton SC - CV 2017
Clifton SC - CV 2017Clifton SC - CV 2017
Clifton SC - CV 2017
 
Lisa B Resume
Lisa B  ResumeLisa B  Resume
Lisa B Resume
 
Silver Lake Reservoir Complex Storage Replacement; Open House Event Presentation
Silver Lake Reservoir Complex Storage Replacement; Open House Event PresentationSilver Lake Reservoir Complex Storage Replacement; Open House Event Presentation
Silver Lake Reservoir Complex Storage Replacement; Open House Event Presentation
 
PLS1page-flyer
PLS1page-flyerPLS1page-flyer
PLS1page-flyer
 
Saikat 07-profile
Saikat 07-profileSaikat 07-profile
Saikat 07-profile
 
Rene Perron.ResumeRM2
Rene Perron.ResumeRM2Rene Perron.ResumeRM2
Rene Perron.ResumeRM2
 
Scotts Run and Carderock Sluice Gate Rehabilitation and Odor Control Project
Scotts Run and Carderock Sluice Gate Rehabilitation and Odor Control ProjectScotts Run and Carderock Sluice Gate Rehabilitation and Odor Control Project
Scotts Run and Carderock Sluice Gate Rehabilitation and Odor Control Project
 

Similar to Ryan Arendse

Andrew LaGrone Resume
Andrew LaGrone ResumeAndrew LaGrone Resume
Andrew LaGrone ResumeLagrone Andy
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERSajjad Ali
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015Teddy Fernando
 
Cv civil engineer ahmed mansour
Cv civil engineer ahmed mansourCv civil engineer ahmed mansour
Cv civil engineer ahmed mansourahmed mansour
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansourahmed mansour
 
Cv civil ahmed mansour
Cv civil ahmed mansourCv civil ahmed mansour
Cv civil ahmed mansourahmed mansour
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
21-06-16_SIMON CURRICULUM VITAE
21-06-16_SIMON CURRICULUM VITAE21-06-16_SIMON CURRICULUM VITAE
21-06-16_SIMON CURRICULUM VITAESimon Norton
 
updated generally 04apr16
updated generally 04apr16updated generally 04apr16
updated generally 04apr16wasim nasir
 
Johann Fuchs_Resume_2016
Johann Fuchs_Resume_2016Johann Fuchs_Resume_2016
Johann Fuchs_Resume_2016Hans Fuchs
 
Construction of Primary School slides-1.pptx
Construction of Primary School slides-1.pptxConstruction of Primary School slides-1.pptx
Construction of Primary School slides-1.pptxSardarMuhammadHashir
 

Similar to Ryan Arendse (20)

Katleho P LETELE CV with picture
Katleho P LETELE CV with pictureKatleho P LETELE CV with picture
Katleho P LETELE CV with picture
 
Andrew LaGrone Resume
Andrew LaGrone ResumeAndrew LaGrone Resume
Andrew LaGrone Resume
 
Josefino Waje cv 2
Josefino Waje cv 2Josefino Waje cv 2
Josefino Waje cv 2
 
Glenn updated cv
Glenn updated cvGlenn updated cv
Glenn updated cv
 
AH15019
AH15019AH15019
AH15019
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
Steven qaqc insp
Steven qaqc inspSteven qaqc insp
Steven qaqc insp
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
Cv civil engineer ahmed mansour
Cv civil engineer ahmed mansourCv civil engineer ahmed mansour
Cv civil engineer ahmed mansour
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
 
Cv civil ahmed mansour
Cv civil ahmed mansourCv civil ahmed mansour
Cv civil ahmed mansour
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
21-06-16_SIMON CURRICULUM VITAE
21-06-16_SIMON CURRICULUM VITAE21-06-16_SIMON CURRICULUM VITAE
21-06-16_SIMON CURRICULUM VITAE
 
Ravi Resume
Ravi ResumeRavi Resume
Ravi Resume
 
updated generally 04apr16
updated generally 04apr16updated generally 04apr16
updated generally 04apr16
 
Johann Fuchs_Resume_2016
Johann Fuchs_Resume_2016Johann Fuchs_Resume_2016
Johann Fuchs_Resume_2016
 
Hairi Mohd Noor_Resume
Hairi Mohd Noor_ResumeHairi Mohd Noor_Resume
Hairi Mohd Noor_Resume
 
Construction of Primary School slides-1.pptx
Construction of Primary School slides-1.pptxConstruction of Primary School slides-1.pptx
Construction of Primary School slides-1.pptx
 

Ryan Arendse

  • 1. • RYAN ARENDSE • CANDIDATE PROFFESSIONAL TECHNICIAN • WESTERN CAPE GOVERNMENT 2010 - 2013 • ND: CIVIL ENGINEERING 2007 – 2009 GRADUATE PRESENTATION NOVEMBER 2012
  • 2. EXPERIENCE BASED ON THE ENGINEERING PROJECT CYCLE 2010 - 2012 Being Exposed Assisting Participating Contributing Performing
  • 3. PHASE 1 CONSTRUCTION • Widening Trunk Road 2 (TR2) Highway towards Sir Lowry’s Pass • Project Cost - R101 047 000 • Duration - 6 Months • Construction Survey (Setting out / Levelling / Batter slopes) • Quantity Surveying (Payment Certificate / Sub contractors) • Quality Control (Layerworks / Steel Fixing / Materials/ Concrete work) • Technical Assistant (MOS / Providing Info to Supervisors / Forecasting) Being Exposed Assisting Participating
  • 4. PHASE 2 OPERATION AND MAINTAINANCE • Ceres Regional Office - 47km Piketberg Area • Project Cost R11m (Estimated Expenditure) • 6 Months • Patching (Base Failure / Rutting / Undulation / Potholes) , Crack Seal • Reseal, Rejuvenation • Plant, Material, Labour Management • Quality Control • Costing Site • Planning Manager • Administration • Site Supervision Contributing Performing
  • 5. PHASE 3 ENGINEERING AND RE – ENGINEERING • Planning - Prioritisation Matrix Report/ Site Investigation/ Pavement layer Inspections • Design - Parking Layout Border of Namibia and South Africa / NMT - Range Road, Blackheath, Road signs Northern Cape • Drawing - NMT - Range Road, Blackheath • Detailing - NMT - Range Road, Blackheath • Quantities - NMT - Range Road, Blackheath • Documentation - NMT - Range Road, Blackheath • Tender – NMT Projects Participating Contributing Performing
  • 6. NMT DESIGN – RANGE ROAD (BLACKHEATH)
  • 7.
  • 8.
  • 9. JUNIOR ENGINEERS REPRESENTATIVE Construction of Non – Motorised Transport Facilities, Hard and Soft Landscaping along Weltevreden Parkway, Mitchells Plain • Client – City of Cape Town • Consultant – WorleyParsons • Contractor – Jansen Tarmac • Total Project Cost - R 5 777 055.36 (R 5.8m) PHASE 4
  • 10. • Construction of asphalt surface sidewalk / bicycle path • Exposed Aggregate brick paving areas at intersection bell mouths • Construction of tree pits and planting of new trees and Street lighting • Construction of two raised intersections and traffic circles SCOPE OF WORKS
  • 11.
  • 12.
  • 13. Duties as Junior Engineers Representative • Health and Safety on Site – OHS Act 85 1993 • Environmental - National Environmental Act (107 of 1998) • Quality of Materials / Site Plant / Workmanship • Issue instructions to Contractor • Receive Communications • Inspect the works at any time and upon request for approval • Work done to approved Drawings / Project Specifications • GCC / COLTO • Prepare Payment Certificate PERFORMING
  • 14. Daily Tasks / Responsibilities • Ensure accurate record keeping of daily activies on site • Confirm all oral instructions in Site Note book • Understand / Study approved drawings / details to ensure correct and accurate work done. • To enforce COLTO, GCC 2010 standards. • Be pro-active in handling errors/omissions from drawings or specifications. • Ensure work undertaken in safe manner and report all non- compliance to the OHS agent or Engineer. • Control quality of materials / workmanship on behalf of Engineer. • Ensure all work is done in an Environmentally safe manner and promote non hazardous working methods for the protection of the Environment. PERFORMING
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 30. ECSA CODE OF CONDUCT : ETHICS • COMPETENCY Skill / Efficiency / Professionalism / Knowledge Training / Experience / Competency • INTEGRITY Fidelity / Honesty Dishonesty / Corruption / Bribery • PUBLIC Health / Safety / Interest • ENVIRONMENT Due regard for, avoid, adverse impact on the env. Sustainable development.