RÉSUMÉ (1992-2014)
INTERNAL AUDIT, MANAGEMENT AND ADMINISTRATION OF CONSTRUCTION
AUTHOR: RANDY DE LA ROSA RUBALCAVA
MISSION
PHILOSOPHY
 We are an organization which purpose is to satisfy and overcome the common
expectative of the national and international industry of construction, by always
achieving excellence in the management of construction work.
 To integrate all the tasks involved in Planning and Controlling Construction Work, with
the priority goal of finishing the project within time, cost and quality.
2
PROJECT MANAGEMENT SYSTEM
3
 Procedure Manual
 Control System
 Not Failing Guarantee
 VEGA has developed a methodology
which allows us guarantee the complete
satisfaction of our client achieving from a
20% to a 30% either is an industrial,
commercial or residential project.
SERVICES OFFERED BY VEGA
VEGAConstruction
Management
Project
Management
Engineering
Development
Internal Audit
Redesign
Procedure
Manual
Strategy
Supervision in
Maintenance
Personal
Services for
Administration
4
5
FOCUS ON OUR SERVICES
VEGA
Hotels
Working
Offices
Malls
IndustriesTourism
Development
Infrastructure
Urbanization
School
and
Institution
s
Residenti
al
6
BENEFITS OF SUPERVISION
MORE($)INVESTEMENT
TIME MORELESS
VEGA
• Continuous presence at
construction site
• Strict control of quality
• Organized budget control
• Direct coordination with
companies specialists
• 25% guaranteed savings and
on in
TIME and COST
TRADITIONAL SYSTEM
• Lack of supervision
• Lack of time and cost
control
• No budget control
• Poor quality
• Extra Costs and Overhead
Costs
• Generally a 25% more than
planned
7
PROJECT METHODOLOGY
We rely on our system that
assures the best quality in our
service provided based on
the experienced
workmanship and the
procedure of our
methodology that certifies
our service quality. This is
supported by specialists in
different areas of
construction, guarantying an
excellent project closure.
General
Statement
Financial Budget
Control
Resource
Estimation
1. Generate the Conceptual
Project
II. Select Project
Direction
III. Develop the Preliminary
Project
IV. Develop the Executive
Project
V. Invitation to
Tender
VI. Management and
Supervision
VII. Start Up and
Tests
VIII. Settlement of Building
Site
Tracking and Monitoring of
Progress
OUR PROJECTS
Residential, Commercial, Industrial, Apartments
8
OUR PROJECTS
Residential, Commercial, Industrial, Apartments
9
INDUSTRIAL PROJECTS
Some industrial projects
10
INDUSTRIAL PROJECTS
Some industrial projects
11
COMMERCIAL RÉSUMÉ
12
13
COMMERCIALRÉSUMÉ 1) CLIENT: Cigarrera La Moderna 1. Rectangular and Semicircular Stables.
PROJECT: Desarrollo Hípico “El Diente” 2. Food Storage
LOCATION: Monterrey, Nuevo León 3. Roofed Riding School
CONSTRUCTION: 100 Hectáreas 4. Roads
TERM: 1992 - 1995 5. High and Low Tension System
PHONE: 83-47-78-07 6. Tracks
RESPONSIBLE: Ing. Gustavo Romo 7. International Stables
COST: $ 73,000,000.00
2) CLIENT: Propiedad de la Inmobiliaria INVEC, S. A. de C. V. (Fina Factor)
PROJECT: Mall “Plaza Carranza”
DESCRIPTION: Project Management and Mall Construction
LOCATION: Monterrey, Nuevo León
CONSTRUCTION: 4,950 m2
TERM: July-December 1992
PHONE: 83-35-21-63/83-35-49-30
RESPONSIBLE: Ing. Hugo Chapa
COST: $10,500,000.00
3) CLIENT: Propiedad de Inversiones Safi, S. A. de C. V.
PROJECT: Best Western Royal Hotel
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 7,500 m2
TERM: November 1992.
PHONE: 83-40-11-88/83-43-81-00
RESPONSIBLE: Sr. Jorge Safi.
COST: $8,500,000.00
4) CLIENT: Internacional de Inversiones, S.A. De C. V.
PROJECT: San Agustín Medical Center
DESCRIPTION: Project Direction, Development of Preliminary Project, Permits and Engineering
LOCATION: San Pedro, Garza García, Nuevo León.
CONSTRUCTION: 18,000 m2
TERM: From March to July 1993
PHONE: 83-63-24-34/83-63-30-70
RESPONSIBLE: Lic. Octavio Hinojosa
COST: $30,000.00
5) CLIENT: Planeación Inmobiliaria Capital.
PROJECT: Santa Elena Building
DESCRIPTION: Engineering Direction
LOCATION: San Pedro, Garza García, Nuevo León.
CONSTRUCTION: 3,000 m2
TERM: May 1995
RESPONSIBLE: Lic. Luis Oseguera.
COST: $6,000,000.00
14
6) CLIENT: Galáz, Gómez, Mortin, Chavero, Yamazaki, S.C.
PROJECT: Corp. Torres Kumay.
DESCRIPTION: Project Direction, Development of Preliminary Project, Permits and Engineering
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 21,000 m2
TERM: August de 1995.
PHONE: 83-33-10-33 / 83-48-68-92
RESPONSIBLE: C.P. Ma. Estela Imamura, C.P. Celso Javier Treviño.
COST: $30,000,000.00
7) CLIENT: Comercial América.
PROJECT: Remodel of Cash Registers.
LOCATION: San Pedro, Garza García, Nuevo León.
CONSTRUCTION: 150 m2
TERM: March to April 1996.
PHONE: 83-68-40-78
RESPONSIBLE: C.P. Armando Fernández.
COST: $200,000.00
8) CLIENT: Restaurante Remembers.
PROJECT: Remodeling and construction of the new construction of the Restaurant Remembers.
LOCATION: Monterrey, Nuevo León.
TERM: April 1996
PHONE: 83-78-44-14
RESPONSIBLE: Arq. Felipe Mier.
COST: $1,000,000.00
9) CLIENT: Comercial América.
PROJECT: Office Remodeling of: Promotoría en Seguros.
LOCATION: San Pedro, Garza García, Nuevo León.
CONSTRUCTION: 400 m2
TERM: November1996.
PHONE: 83-68-40-78
RESPONSIBLE: C.P. Armando Fernández.
COST: $900,000.00
10) CLIENT: Comercial América.
PROJECT: Employee Dinning Room.
LOCATION: San Pedro, Garza García, Nuevo León.
CONSTRUCTION: 180 m2
TERM: January 1997.
PHONE: 83-68-40-78
RESPONSIBLE: C.P. Armando Fernández.
COST: $550,000.00
COMMERCIALRÉSUMÉ
15
11) CLIENT: Bueno Alimentos, S.A. de C.V.
PROJECT: Corp. for Bueno Alimentos, S.A. de C.V.
DESCRIPTION: Direction of the Engineering and the Construction of the Office Building
UBICATION: Monterrey, Nuevo León.
TERM: December 1997 to January 1999.
PHONE: 83-33-34-43
RESPONSIBLE: Lic. Guillermo Bueno.
COST: $500,000.00
12) CLIENT: Lic. Alejandro Bueno, Arq. Felipe Mier, Lic. Alfonso Guzmán.
PROJECT: Apartments in the Project: Torre Blanca.
LOCATION: San Pedro, Garza García, Nuevo León.
TERM: May 1998.
PHONE: 83-48-63-55
RESPONSIBLE: Lic. Alejandro Bueno.
COST: $2,500,000.00
13) CLIENT: Superficies Decorativas, S. A. de C.V.
PROJECT: Construction of Distribution Center
LOCATION: Direction of the Engineering, the Construction of the Office Building and the Industrial Warehouse
CONSTRUCTION: Monterrey, Nuevo León.
TERM: June 2000
PHONE: 86-25-50-00
RESPONSIBLE: Lic. Luis de la Garza.
COST: $15,000,000.00
14) CLIENT: Chrysler.
PROJECT: Chrysler Poza Rica Chrysler Agency
DESCRIPTION: Direction of the Engineering, the Construction of the Office Building, exposure area, industrial workshop, stock and maneuver
UBICATION: Poza Rica, Veracruz.
TERM: July 2000
PHONE: (138) 2-22-42
RESPONSIBLE: Lic. Ramón Caballero.
COST: $ 18'000,000.00
15) CLIENT: Supermercados Internacionales HEB.
PROJECT: HEB
DESCRIPTION: Store and Mall Construction
UBICATION: Santa Catarina, Nuevo León.
TERM: January 15 of 2001 to August 29 of 2001.
PHONE: 81-53-11-61
RESPONSIBLE: Arq. Irene Padilla
COST: $150,000,000.00
COMMERCIALRÉSUMÉ
16
16) CLIENT: Super Mercados Internacionales HEB.
PROJECT: HEB Tampico.
DESCRIPTION: Mall and Store Construction
LOCATION: Tampico, Tamaulipas.
TERM: October 2001
PHONE: 81-53-11-61
RESPONSIBLE: Arq. Mauricio Toloumsis.
COST: $150,000,000.00
17) CLIENT: Internet por Fibra, S. A. de C. V.
PROJECT: Celda S5.
DESCRIPTION: Project Direction, Permits, Engineering and Fiber Optic Network Construction.
LOCATION: San Pedro Garza García, Nuevo León.
TERM: April 2002
PHONE: 84-79-55-10
RESPONSIBLE: Ing. Jorge Eugenio Ortíz.
COST: $3,000,000.00
18) CLIENT: Parroquia Santa Engracia
PROJECT: Centro Pastoral San Agustín
DESCRIPTION: Temple Construction including chapel, offices, salons and parking lot. (20,000 m2)
LOCATION: Sendero de las Privanzas 402, Col. Las Privanzas, San Pedro Garza García
TERM: November 2003
PHONE: 80-40-28-95
RESPONSIBLE: Pbro. Marcelo Varela
COST: $ 16'000,000.00
19) CLIENT: Grupo Acosta Verde
PROJECT: Mall: Plaza Periférico
DESCRIPTION: Construction Management of: High Category Mall Center
LOCATION: Reynosa, Tamaulipas
TERM: January 2004 to December de 2004
PHONE: 10-01-98-00
RESPONSIBLE: Arq. Miguel Reyes Vidales
COST: $ 280'000,000.00
20) CLIENT: Corporación Control
PROJECT: Woolworth Monterrey
DESCRIPTION: Construction Management of the Departmental Store.
LOCATION: Monterrey, N.L.
TERM: September 2004 to December 2004
PHONE: 83-29-55-00
RESPONSIBLE: Arq. Javier Ibarra
COST: $ 20'000,000.00
COMMERCIALRÉSUMÉ
17
21) CLIENT: Lic. Javier Delgado
PROJECT: Centro Comercial Las Lajas
DESCRIPTION: Construction Management of the Mall
LOCATION: Monterrey, N.L.
TERM: January 2005.
PHONE: 83-45-88-45
RESPONSIBLE: Ing. Javier Delgado
COST: $ 5'000,000.00
22) CLIENT: G y H de Juárez
PROJECT: Plaza Galería TEC (Multimedios)
DESCRIPTION: Project and Construction Management
LOCATION: Cd. Juárez, Chihuahua.
TERM: January 2005 to November 2006
PHONE: 83-56-20-99
RESPONSIBLE: Lic. Marco Martínez
COST: $ 60'000,000.00
23) CLIENT: Wal Mart de México
PROYECT: Supercenter Miguel Alemán Remodeling
DESCRIPTION: Direction and Supervision
LOCATION: Monterrey, N.L.
TERM: May 2005 to August 2005
PHONE: 83-18-04-34
RESPONSIBLE: Ing. Luis Eduardo Ochoa
COSTO: $3,000,000.00
24) CLIENT: Wal Mart de México
PROJECT: Supercenter Las Torres Remodeling
DESCRIPTION: Direction and Supervision
LOCATION: Monterrey, N.L.
TERM: May 2005 a August 2005
PHONE: 83-18-04-34
RESPONSIBLE: Ing. Luis Eduardo Ochoa
COST: $3,000,000.00
25) CLIENT: Wal Mart de México
PROJECT: Bodega Aurrera Saltillo (Change of A/C Equipment)
DESCRIPTION: Direction and Supervision
LOCATION: Saltillo, Coah.
TERM: January 2006 to March 2006
PHONE: 83-18-04-34
RESPONSIBLE: Ing. Luis Eduardo Ochoa
COST: $1,500,000.00
COMMERCIALRÉSUMÉ
18
26) CLIENT: Grupo Soriana
PROJECT: Soriana Tangamanga
DESCRIPTION: Direction and Supervision
LOCATION: San Luis Potosí, S.L.P.
TERM: February 2006 to July 2006
PHONE: 83-29-90-00
RESPONSIBLE: Ing. Sergio Díaz
COST: $ 85'000,000.00
27) CLIENT: Fideicomiso Paque Fundidora
PROJECT: Fundidora Park Expansion Phase 1
DESCRIPTION: Direction and Supervision
LOCATION: Monterrey, N.L.
TERM: March 2006 to June 2006
PHONE: 83-40-52-50
RESPONSIBLE: Ing. Sergio Cantú
COST: $140,000,000.00
28) CLIENT: Fundación Monterrey 2007 A.C
PROJECT: Fundidora Park Expansion Phase 2
DESCRIPTION: Direction and Supervision
LOCATION: Monterrey, N.L.
TERM: April 2006 to December 2006
PHONE: 83-40-52-50
RESPONSIBLE: Ing. Sergio Cantú
COST: $120,000,000.00
29) CLIENT: Wal Mart de México
PROJECT: Suburbia La Silla (Remodeling)
DESCRIPTION: Direction and Supervision
LOCATION: Monterrey, N.L.
TERM: April 2006 a July 2006
PHONE: 83-18-04-34
RESPONSIBLE: Ing. Carlos Acevedo
COST: $3,000,000.00
30) CLIENT: Wal Mart de México
PROJECT: Bodega Aurrera Construction
DESCRIPTION: Direction and Supervision
LOCATION: Río Grande, Zacatecas
TERM: June 2006 to September 2006
PHONE: 83-56-84-10
RESPONSIBLE: Arq. Rodrigo Mariscal
COST: $13,500,000.00
COMMERCIALRÉSUMÉ
19
31) CLIENT: Universidad de Monterrey
PROJECT: Internal Audit UDEM Residences
DESCRIPTION: Internal Audit
LOCATION: San Pedro Garza García, N.L.
TERM: September 2006 to December 2006
PHONE: 81-24-11-21
RESPONSIBLE: Lic. Luis Miranda
COST:
32) CLIENT: Lic. Luis Alberto Troncoso / Arq. José Carlos Villanueva
PROJECT: La Cima Apartment Building
DESCRIPTION: Management and Supervision
LOCATION: San Pedro Garza García, N.L.
TERM: September 2006
PHONE: 80-40-20-05
RESPONSIBLE: Lic. Luis Alberto Troncoso / Arq. José Carlos Villanueva
COST: $16,500,000.00
33) CLIENT: Wal Mart de México
PROJECT: Mi Bodega Aurrera
DESCRIPTION: Direction and Supervision
LOCATION: Madero, Coahuila
TERM: January 2007 a March 2007
PHONE: 01-55-53-70-30-00
RESPONSIBLE: Arq. Federico Díaz
COST: $8,000,000.00
34) CLIENT: Wal Mart de México
PROJECT: Bodega Aurrera
DESCRIPTION: Direction and Supervision
LOCATION: Villa de García, N.L.
TERM: March 2007
PHONE: 01-55-53-71-30-00
RESPONSIBLE: Arq. Rodrigo Mariscal
COST: $ 34'000,000.00
35) CLIENT: Desarrolladora M
PROJECT: School Classrooms
DESCRIPTION: Direction and Supervision
LOCATION: Monterrey, N.L. y su área Metropolitana
TERM: April 2007 -
PHONE: (55) 52-57-17-56
RESPONSIBLE: Ing. Joaquín Martínez del Campo
COST: $ 100'000,000.00
COMMERCIALRÉSUMÉ
20
36) CLIENT: Motores Competitivos SA de CV
PROJECT: Agency Pro-shop Suzuki
DESCRIPTION: Direction and Supervision
LOCATION: Monterrey, N.L. y su área Metropolitana
TERM: October 2007- February 2008
PHONE: 12-33-00-00
RESPONSIBLE: Ing. Humberto Guzmán
COST: $3,500,000.00
37) CLIENT: Trebotti SA de CV
PROJECT: Torre de Departamentos y Oficinas
LOCATION: Torreón Coahuila
TERMN: Octubre 2007
PHONE: 01-871) 719-10-00
RESPONSIBLE: Lic. Luis Treviño Botti
38) CLIENT: Max Construcciones de Arenas y Parques SA de CV
PROJECT: Estacionamiento Oriente Arena Monterrey
DESCRIPTION: Direction and Construction
LOCATION: Monterrey, N. L.
TERM: May 2008 – July 2009
PHONE: 82-21-20-20
RESPONSIBLE: C.P. Guillermo Garza Mercado
COST:
39) CLIENT: Inversity Desarrollo Inmobiliario
PROJECT: Habitation Apartments in: Campo de Golf
LOCATION: San Miguel de Allende, Gto.
TERM: May to September 2008
PHONE: 83-63-86-32
RESPONSIBLE: Arq, Marco Garza
COST:
COMMERCIALRÉSUMÉ
21
40) CLIENT: Century 21 Marcos & Assad
PROJECT: Apartment Tower
DESCRIPTION: Direction and Construction
LOCATION: Monterrey. N. L.
TERM: August 2008 to May 2009
PHONE: 50-00-21-00
RESPONSIBLE: Lic. Marco Garza Mercado
COST:
41) CLIENT: Ing. Rogelio Sada Zambrano
PROJECT: Fraccionamiento Canoas
DESCRIPTION: Parametric Budget Elaboration
LOCATION: Montemorelos Nuevo León
TERM: June to July 2009
PHONE: 83-65-02-21
RESPONSIBLE: Ing. Rogelio Sada Zambrano
42) CLIENT: Arq. Eudelio Garza
PROJECT: Plaza Fiesta Anáhuac
DESCRIPTION: Internal Audit
LOCATION: San Nicolás de los Garza Nuevo León
TERM: August 2009 to January 2010
PHONE: 83-63-31-08
RESPONSIBLE: Arq. Eudelio Garza
43) CLIENT: Inmobiliaria Celer SA de CV
PROJECT: Hidalgo Tower
DESCRIPTION: Direction and Construction
LOCATION: Monterrey, Nuevo León
TERM: October 2010
PHONE: 83-99-88-00
RESPONSIBLE: Arq. Alick Amador
COMMERCIALRÉSUMÉ
22
44) CLIENT: Deportivo Alpino Chipinque
PROJECT: Parking lot, Golf Practice Camp, Elevator Installation and Internal Remodel
DESCRIPTION: Diagnose and Internal Audit
LOCATION: Av. San Ángel No. 118 Col. Chipinque, CP 66290, San Pedro Garza García . N. L.
TERM: 2014
PHONE: 81-15-00-00
RESPONSIBLE: Ing. Sergio Unger
COST: $30,300,000.00
45) CLIENT: Trazzo Desarrollos Verticales, S.A. de C.V.
PROJECT: SAQQARA
DESCRIPTION: Diagnose and Internal Audit
LOCATION: Batallon de San Patricio 109 Col. Valle Oriente, San Pedro Garza García . N. L.
TERM: 2014
PHONE:
RESPONSIBLE: Matias Kreifler
COST: $685,000,000.00
46) CLIENT: IDEI
PROJECT: KOI Sky Residences
DESCRIPTION: Diagnose and Internal Audit
LOCATION: Av. Fundadores Esq. Con David Alfaro Siqueiros Valle Oriente, San Pedro Garza García . N. L.
TERM: 2014
PHONE:
RESPONSIBLE: Abelardo Garza Evia
COST: $1,726,382,951.00
COMMERCIALRÉSUMÉ
INDUSTRIAL RÉSUMÉ
23
24
1) CLIENT: Abogados Garza O’farrill y Asociados.
PROJECT: Abogados Garza O’farrill y Asociados Headquarters
LOCATION: Monterrey, Nuevo León.
TERM: 1987
PHONE: 83-45-70-16
RESPONSIBLE: Lic. Antonio O'farril
COST: $5,000,000.00
2) PROJECT: Bolsa Profesional Building.
UBICACIÓN: Los Ángeles, California, USA.
TERM: 1998-1990
COST: $3,000,000.00 U.S. Dlls.
3) CLIENT: Ing. Cecilio Villanueva.
PROJECT: Villanueva Industrial Storage
DESCRIPTION: Two Level Storage Construction
LOCATION: Monterrey, Nuevo, León.
CONSTRUCTION: 1,500 m2
TERM: March1993 to January de 1994.
PHONE: 83-51-88-86
RESPONSIBLE: Ing. Cecilio Villanueva.
COST: $1,400,000.00
4) CLIENT: Fama, S. A. de C. V.
PROJECT: New Roof for: Nave Maquinaria of Vitro Group
LOCATION: Monterrey, Nuevo León.
TERM: 1996
RESPONSIBLE: Ing. Juan Manuel Arrieta.
COST: $800,000.00
5) CLIENT: Vidriera Monterrey, S. A. de C. V.
PROJECT: Horno No. 6. Remodel
DESCRIPTION: Demolition, Survey for new installations
LOCATION: Monterrey, Nuevo León.
TERM: 1997
PHONE: 83-29-10-00
RESPONSIBLE: Ing. Ramiro Sánchez.
COST: $52,663,810.00
6) CLIENT: Promapi, S. A. de C. V.
PROJECT: (WWTP) Waste Water Treatment Plant Construction.
LOCATION: México, D.F.
TERM: 1997
PHONE: (55) 58-55-30-33
RESPONSIBLE: C.P. Justo Gómez.
COST: $4,800,000.00
INDUSTRIALRÉSUMÉ
25
INDUSTRIALRÉSUMÉ
7) CLIENT: Auto Templex, S. A. de C. V.
PROJECT: Horno T-11 Auto Templex.
DESCRIPTION: Production line construction, fans and warehouse
LOCATION: Villa de García, Nuevo León.
TERM: 1997 to 1998
PHONE: 83-29-36-00
RESPONSIBLE: Ing. Sergio Martínez.
COST: $108,576,000.00
8) CLIENT: Lic. Patricio O’farrill.
PROJECT: Titanium Almacenaje y Maquila.
DESCRIPTION: 6 warehouses construction for storage for light industry.
LOCATION: 10,000 m2.
CONSTRUCTION: Apodaca, Nuevo, León.
TERM: March to September 1997.
PHONE: 83-40-32-48
RESPONSIBLE: Lic. Antonio O’farrill.
COST: $5,850,000.00
9) CLIENT: Bueno Alimentos, S.A. de C.V.
PROJECT: Warehouse Reconstruction
DESCRIPTION: Demolition and Construction.
LOCATION: Santa Catarina, Nuevo, León.
CONSTRUCTION: 1,680 m2
TERM: January 1998.
PHONE: 83-33-34-43
RESPONSIBLE: Lic. Eugenio Bueno.
COST: $ 800,000.00.
10) CLIENT: Cervecería Cuauhtémoc Moctezuma.
PROJECT: Project MP Phase I.
DESCRIPTION: Orizaba, Veracruz.
LOCATION: 2,500 m2
TERM: February 1998 to August 1999.
PHONE: 83-28-50-00 / 83-28-54-93
RESPONSIBLE: Ing. Eduardo Saldaña.
COST: $80,000,000.00
11) CLIENT: Seguros Comercial América.
PROJECT: Valuation área stands
LOCATION: Monterrey, Nuevo León.
TERM: April to May 1998.
PHONE: 83-68-40-78
RESPONSIBLE: C.P. Armando Fernández.
COST: $15,000,000.00
12) CLIENT: Metalsa, S.A, de C.V.
PROJECT: Thermic Treatment Warehouse
DESCRIPTION: Apodaca, Nuevo, León.
LOCATION: 17,200 m2
TERM: August de 1998.
PHONE: 83-69-74-00
RESPONSIBLE: Ing. Ignacio Prieto
COST: $30,000,000.00
26
INDUSTRIALRÉSUMÉ
13) CLIENT: Vitro Supermatic, S. A. de C. V.
PROJECT: Storage Warehouse Roofing
DESCRIPTION: Apodaca, Nuevo León.
LOCATION: 17,000 m2
TERM: August 1998.
PHONE: 83-29-23-00
RESPONSIBLE: Ing. Juan Antonio Villarreal.
COST: $6,500,000.00
14) CLIENT: Vidriera Monterrey, S. A.
PROJECT: Remodeling Historic Hallway
DESCRIPTION: Monterrey, Nuevo León.
LOCATION: 6,000 m2
TERM: Augusto 1998.
PHONE: 83-29-10-00
RESPONSIBLE: Arq. Eduardo Carrillo.
COST: $3,200,000.00
15) CLIENT: Vidriera Monterrey, S. A.
PROJECT: Remodeling Horno No.7.
DESCRIPTION: Demolition and Construction of production line, fans and warehouse
LOCATION: Monterrey, Nuevo León.
TERM: Septiember 1998 to Junr 1999.
PHONE: 83-29-10-00
RESPONSIBLE: Ing. Jesús García.
COST: $98,000,000.00
16) CLIENT: Perrigo de México.
PROJECT: Warehouse for: Reempaque de Perrigo de México.
DESCRIPTION: Ramos Arizpe, Coahuila.
LOCATION: 2,500 m2
TERM: December 1998 to September 1999.
PHONE: 83-88-36-46
RESPONSIBLE: Ing. Vicente Saro.
COST: $ 1,592,000.00 Dlls.
17) CLIENT: Supermatic.
PROJECT: New roof for Supermatic Warehouse.
DESCRIPTION: Metallic cover installation for the existing warehouse, while plant was still working and producing.
LOCATION: Apodaca, Nuevo León.
TERM: December1998 to September 1999.
PHONE: 83-29-23-00
RESPONSIBLE: Ing. Alfonso Campos
COST: $15,000,000.00
18) CLIENT: Ampolletas, S. A. de C. V.
PROJECT: Warehouse for: Frascos y Cuarto Limpio.
LOCATION: Querétaro, Querétaro.
TERM: 1999
PHONE: (442) 2-11-11-65
RESPONSIBLE: Ing. Jesús Delgado.
COST: $3,765,000.00
27
INDUSTRIALRÉSUMÉ 19) CLIENT: Cervecería Cuauhtémoc Moctezuma.
PROYECT: Carbonic Gas Line Modification
LOCATION: Navojoa, Sonora.
TERM: March a December de 1999.
RESPONSIBLE: Ing. Cristóbal Cantú.
COST: $56,000,000.00
20) CLIENT: Simeprodeso.
PROJECT: Processing Plant of Solid Wastes from the Landfill
DESCRIPTION: Construction of a Processing Plant of Solid Wastes
LOCATION: Monterrey, Nuevo León.
TERM: April1999 to March 2000.
PHONE: 83-44-54-30
RESPONSIBLE: Lic. Guillermo Castillo.
COST: $35,000,000.00
21) CLIENT: Cervecería Cuauhtémoc Moctezuma.
PROJECT: Carta Blanca de Hidalgo Agency
LOCATIONN: Parral, Chihuahua.
TERM: May to July 1999.
RESPONSIBLE: Ing. Javier Marroquín.
COST: $10,000,000.00
22) CLIENT: Pepsi Gemex.
PROJECT: Warehouse of: Llenos y Vacíos.
DESCRIPTION: Warehouse and maneuver patio construction
LOCATION: Apodaca, Nuevo León.
TERM: June1999 to January 2000
PHONE: 83-86-37-55
RESPONSIBLE: Arq. Enrique de la Jara
COST: $4,200,000.00
23) CLIENT: Industrial Power Counting.
PROJECT: Línea de Polvos, Largueros de Camión en Metalsa.
DESCRIPTION: Civil Work and Equipment installation for painting rooms
LOCATION: Apodaca, Nuevo León.
TERM: July 1999 February 2000.
PHONE: 83-69-75-61
RESPONSIBLE: Ing. Luis Carlos Carranza.
COST: $ 2,300,000.00 Dlls
24) CLIENT: Transportes Tamaulipas, S.A de C.V.
PROJECT: Box Office, Service Workshops, Dorm rooms Project
LOCATION: Various places at the North-East of Mexico
TERM: July 1999 to 2001.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller.
COST: $11,000,000.00
28
INDUSTRIALRÉSUMÉ
25) CLIENT: Autobuses del Noreste, S. A. de C. V.
PROJECT:: Box Office, Service Workshops, Dorm rooms Project
LOCATION: Various places at the North-East of Mexico
TERM: July 1999 to 2001.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller.
COST: $6,000,000.00
26) CLIENT: Prefabricados Monterrey, S. A. de C. V.
PROJECT: Plant II
DESCRIPTION: Construction of a Prefabricated Block Plant
LOCATION: México, D. F.
TERM: September 1999 to August 2000.
PHONE: 83-84-85-40
RESPONSIBLE: Ing. Mauricio Flores.
COST: $16,000,000.00
27) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V.
PROJECT: Construction of Pensión S.I.R. F
DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio
LOCATION: Guadalupe, Nuevo León.
TERM: November 1999 to April 2000.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.
COST: $5,500,000.00
28) CLIENT: Pepsi Gemex.
PROJECT: Centro de Distribución Monclova. CEDIS.
DESCRIPTION: Warehouse Construction and Office Remodel
LOCATION: Monclova, Coahuila.
TERM: 2000
PHONE: 83-86-37-55
RESPONSIBLE: Arq. Enrique de la Jara.
COST: $900,000.00
29) CLIENT: Autobuses del Noreste, S. A. de C. V.
PROJECT: North-East Villagrán Headquarters
DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio
LOCATION: Noreste Villagrán.
TERM: Janury to October 2000.
PHONE: Ing. Rodolfo Siller.
RESPONSIBLE: 81-51-44-00
COST: $ 20,500'000.00
30) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V.
PROJECT: Workshop, Dorm Rooms and Warehouse Extension
DESCRIPTION: ConsConstruction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio
LOCATION: Monterrey, Nuevo León.
TERM: February to June 2000.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.
COST: $2,000,000.00
29
INDUSTRIALRÉSUMÉ 31) CLIENT: Grupo Toluca S.A de C.V.
PROJECT: Bus Station Morelia.
DESCRIPTION: 18 hour Project of 13,000 m2
LOCATION: Morelia, Michoacán.
TERM: April 2000 to August 2002
PHONE: (5) 273-30-09
RESPONSIBLE: C.P. Rodolfo Flores.
COST: $150,000,000.00
32) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V.
PROJECT: Dinning Room Construction S.I.R. B
LOCATION: San Nicolás de los Garza, Nuevo León.
TERM: April to June 2000.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.
COST: $250,000.00
33) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V.
PROJECT: Pension Construction S.I.R. G
DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio
LOCATION: Escobedo, Nuevo León.
TERM: October 2000
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.
COST: $ 3, 000,000.00
34) CLIENT: Transportes Tamaulipas, S.A de C.V.
PROJECT: Workshop and Dorm Rooms for: Autobuses Coahuilenses y Transportes Tamaulipas.
DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio
LOCATION: Monterrey, N.L.
TERM: January to August 2001.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller.
COST: $13,500,000.00
35) CLIENT: Autobuses Coahuilenses S.A. De C.V.
PROJECT: Dorm Rooms, Bus wash, Workshop and Offices.
DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio
LOCATION: Monclova, Coahuila.
TERM: January to September 2001.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller.
COST: $3,000,000.00
36) CLIENT: Transportes Tamaulipas, S.A. de C.V.
PROJECT: Polyvalent Classroom Construction in: Centro de Desarrollo Senda.
LOCATION: Monterrey, Nuevo León.
TERM: February to July 2001.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller.
COST: $1,200,000.00
30
INDUSTRIALRÉSUMÉ 37) CLIENTE: Vidriera Querétaro, S. A. de C. V.
PROYECTO: Line VQ-34.
DESCRIPCIÓN: Warehouse Construction, Remodel and Line VQ-34 Installation of Glass Bottle Production.
UBICACIÓN: Querétaro, Querétaro.
CONSTRUCCIÓN: 750 m2
FECHA: June 2002 February 2003
TELÉFONO: 88-63-10-00
RESPONSABLE: Ing. Humberto Calderón.
COSTO: $10,000,000.00 Dlls.
38) CLIENT: Franklin Electric.
PROJECT: Phase I Offices and Plant.
DESCRIPTION: 700 m2 construction: Office, 2200 m2 construction: Warehouse
LOCATION: Linares, Nuevo León.
TERM: August 2002 to March 2003
RESPONSIBLE: Mr. Dan Cross
COST: $14,000,000.00
39) CLIENT: Franklin Electric.
PROJECT: Phase II Offices and Plant.
DESCRIPTION: Production Warehouse of 9000 m2 Construction.
LOCATION: Linares, Nuevo León.
TERM: September 2003
RESPONSIBLE: Mr. Dan Cross
COST: $46,000,000.00
40) CLIENT: Grupo Empresarial Logistik
PROJECT: Urban Master Plan and Multimodal Terminal
DESCRIPTION: Project Management and Industrial Park Construction
LOCATION: San Luis Potosí, S.L.P.
TERM: September 2004
PHONE: 82-62-35-17
RESPONSIBLE: C.P. Félix García
COST: $ 120'000,000.00
41) CLIENT: Alcoa Wheel Products México
PROJECT: Industrial Warehouse
DESCRIPTION: Project and Construction Management
LOCATION: Ciénega de Flores, N.L.
TERM: February 2005.
PHONE: 81-54-64-32
RESPONSIBLE: Rodrigo Cortés
COST: $ 5'500,000.00
42) CLIENT: Fortacero, S.A. de C.V:
PROJECT: Industrial Warehouse
DESCRIPTION: Direction and Supervision
LOCATION: Gómez Palacio, Durango.
TERM: October 2006
PHONE: 81-56-52-00
RESPONSIBLE: Ing. Luis Treviño Guajardo
COST: $16,000,000.00
31
INDUSTRIALRÉSUMÉ 43) CLIENT: Adhoc Bienes Raíces
PROJECT: GonherMex Warehouse
DESCRIPTION: Direction and Construction
LOCATION: León, Guanajuato
TERM: November 2008 to August 2009
PHONE: 81-74-40-00
RESPONSIBLE: C.P. Patricia Ramírez
COST:
44) CLIENT: Industrias Alen SA de CV
PROJECT: Preforma Industril Warehouse
DESCRIPTION: Direction and Construction
LOCATION: Santa Catarina, N. L.
TERM: March 2010
PHONE: 81-22-10-00
RESPONSIBLE: Pedro Alejandro Salas Marmolejo
COST:
45) CLIENT: Adhoc Bienes Raíces
PROJECT: Warehouse GonherMex
DESCRIPTION: Direction and Construction
LOCATION: Pachuca, Los Mochis y San Luis Potosí
TERM: June 2010
PHONE: 81-74-40-00
RESPONSIBLE: C.P. Patricia Ramírez
COST:
46) CLIENT: Industrias Alen SA de CV
PROJECT: Office Construction and Remodel.
DESCRIPTION: Direction and Construction
LOCATION: Santa Catarina, N. L.
TERM: May 2010
PHONE: 81-22-10-00
RESPONSIBLE: Pedro Alejandro Salas Marmolejo
COST:
32
INDUSTRIALRÉSUMÉ
47) CLIENT: Plásticos Industriales Monterrey, S.A. de C.V.
PROJECT: Industrial Warehouse
DESCRIPTION: Internal Audit
LOCATION: 25 de Mayo 153 Col. Trabajadores, CP. 66149 Santa Catarina, NL.
TERM: 2014
PHONE: 83-3601-99
RESPONSIBLE: Ing. Jorge García
COST: $27,000,000.00
48) CLIENT: FORTACERO Jalisco
PROJECT: Industrial Warehouse
DESCRIPTION: Internal Audit
LOCATION: El Salto, Jalisco
TERM: 2014
PHONE:
RESPONSIBLE: Luis Treviño
COST: $46,000,000.00
RESIDENTIAL RÉSUMÉ
33
34
RESIDENTIALRÉSUMÉ 1) CLIENT: Ing. Reynaldo Reina.
PROJECT: Ing. Reynaldo Reina’s Residence , Director of Cervecería Cuauhtémoc.
LOCATION: San Pedro Garza García, Nuevo León.
TERM: 1986
RESPONSIBLE: Ing. Reynaldo Reina.
COST: $4,500,000.00
2) CLIENT: Lic. Antonio O’farrill.
PROJECT: Lic. Antonio O’farrill’s Residence
LOCATION: San Pedro Garza García, Nuevo León.
TERM: 1987
PHONE: 83-40-32-48
RESPONSIBLE: Lic. Antonio O’farrill.
COST: $7,000,000.00
3) CLIENT: Sr. Don David Garza Lagüera.
PROJECT: Sr. Don David Garza Lagüera’s Residence Remodel
LOCATION: San Pedro Garza García, Nuevo León.
TERM: 1988
RESPONSIBLE: Sr. Don David Garza Lagüera.
COST: $1,000,000.00
4) CLIENT: Ing. Alejandro O’farrill.
PROJECT: Ing. Alejandro O’farrill Residence
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 450 m2
TERM: February to December 1992.
PHONE: 83-56-68-27 83-56-35-85
RESPONSIBLE: Ing. Alejandro O’farrill.
COST: $4,500,000.00
5) CLIENT: Lic. Sergio Tapia C.
PROJECT: Lic. Sergio Tapia C.’s Residence Phase I
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 150 m2
TERM: March to August 1992.
PHONE: 83-78-96-30 / 83-78-97-36
RESPONSIBLE: Lic. Sergio Tapia C.
COST: $180,000.00
35
RESIDENTIALRÉSUMÉ 6) CLIENT: Ing. Alejandro Torres Q.
PROJECT: Residence Remodel.
LOCATION: San Pedro Garza García, Nuevo León.
TERM: March to October 1992.
PHONE: 83-03-38-74
RESPONSIBLE: Ing. Alejandro Torres Q.
COST: $1,600,000.00
7) CLIENT: Omega.
PROJECT: Phase I Urbanization of: “Residencial Valle Alto”
LOCATION: Monterrey, Nuevo León.
TERM: March to December 1992.
PHONE: 83-48-21-77
RESPONSIBLE: Lic. Mateo Mazal.
COST: $25,500,000.00
8) CLIENT: Ing. Alejandro Torres Q.
PROJECT: “Villa las Flores” neighborhood
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 15 Acres.
TERM: May to July 1992.
PHONE: 83-99-56-72
RESPONSIBLE: Ing. Alejandro Torres Q.
COST: $5,000,000.00
9) CLIENT: Arq. Agustín Landa.
PROJECT: 3 level residence construction, including pool, yard construction.
LOCATION: San Pedro Garza García, Nuevo León.
CONSTRUCTION: 600 m2
TERM: September1992 to October 1993.
PHONE: 83-46-95-29
RESPONSIBLE: Arq. Agustín Landa.
COST: $2,000,000.00
10) CLIENT: Ing. Alejandro Lamothe.
PROJECT: Ing. Alejandro Lamothe’s Residence
LOCATION: San Pedro Garza García, Nuevo León.
CONSTRUCTION: 750 m2
TERM: April 1993 to June 1994.
PHONE: 83-56-65-50
RESPONSIBLE: Ing. Alejandro Lamothe.
COST: $3,500,000.00
36
RESIDENTIALRÉSUMÉ 11) CLIENT: Lic. Bruno Ferrari de Alba.
PROJECT: Lic. Bruno Ferrari’s Residence
LOCATION: San Pedro Garza García, Nuevo León.
CONSTRUCTION: 650 m2
TERM: March 1994 to October 1995.
PHONE: 83-63-15-10
RESPONSIBLE: Lic. Bruno Ferrari de Alba.
COST: $5,000,000.00
12) CLIENT: C.P. Raúl Farías.
PROJECT: Torreón located inFracc. Villa Las Flores.
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 10,000 m2
TERM: January 1995.
PHONE: 83-99-56-00
RESPONSIBLE: C.P. Raúl Farías.
COST: $350,000.00
13) CLIENT: Ing. Rubén Alanís.
PROJECT: Ing. Rubén Alanis's Residence
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 300 m2
TERM: January 1995.
PHONE: 83-48-80-85
RESPONSIBLE: Ing. Rubén Alanís.
COST: $500,000.00
14) CLIENT: Ing. Eugenio Nájera.
PROJECT: Construction and Urbanization of: Fraccionamiento Villa las Flores.
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 10,000 m2
TERM: July 1995 to August 1996.
PHONE: 83-33-46-46
RESPONSIBLE: Ing. Eugenio Nájera.
COST: $1,500,000.00
15) CLIENT: Sra. Roberta Brittingham.
PROJECT: Construction and Urbanization of: pista y redondel for Mrs. Roberta Brittingham.
LOCATION: Villa de Santiago, Nuevo León.
CONSTRUCTION: 3,000 m2
TERM: January 1996.
PHONE: 83-65-52-39
RESPONSIBLE: Lic. Daniel Milmo.
COST: $700,000.00
37
RESIDENTIALRÉSUMÉ 16) CLIENT: Fideicomiso Desarrollado por Confia, S. A.
PROJECT: Supervision of 24 habitation houses of: INFONAVIT Line III.
LOCATION: Reynosa, Tamaulipas.
CONSTRUCTION: 2,000 m2
TERM: January to June 1996.
PHONE: 83-99-60-70
RESPONSIBLE: Lic. Horacio Tijerina.
COST: $2,500,000.00
17) CLIENT: Lic. María Elena Chapa.
PROJECT: Remodel and Last Details in Misiones Residence.
LOCATION: Villa de Santiago, Nuevo León.
CONSTRUCTION: 600 m2
TERM: March to June 1996.
PHONE: 83-43-88-16
RESPONSIBLE: Lic. María Elena Chapa.
COST: $150,000.00
18) CLIENT: Ing. Alejandro Torres Q.
PROJECT: Palapa Construction in San José de la Montaña.
LOCATION: Villa de Santiago, Nuevo León.
CONSTRUCTION: 150 m2
TERM: March 1996 to March de 1997.
PHONE: 83-99-56-72
RESPONSIBLE: Ing. Alejandro Torres Q.
COST: $450,000.00
19) CLIENT: Ing. Carlos Rosenzweig.
PROJECT: Structural Development and Project for Ing. Carlos Rosenzweig’s Residence
LOCATION: San Pedro Garza García, Nuevo León.
CONSTRUCTION: 450 m2
TERM: April to June 1996.
PHONE: 83-90-09-32
RESPONSIBLE: Ing. Carlos Rosenzweig.
COST: $15,000.00
20) CLIENT: Sra. Eugenia Rodríguez.
PROJECT: Mrs. Eugenia Rodríguez’s Residence
LOCATION: San Pedro Garza García, Nuevo León.
TERM: August 1997.
PHONE: 83-18-35-69
RESPONSIBLE: Sra. Eugenia Rodríguez.
COST: $1,000,000.00
38
RESIDENTIALRÉSUMÉ 21) CLIENT: Libra Alimentos, S. A. de C. V.
PROJECT: Two Habitation Houses in: Fraccionamiento la Muralla.
LOCATION: Monterrey, Nuevo León.
TERM: 750 m2
PHONE: June 1998.
RESPONSIBLE: 83-50-09-21
COST: $1,050,000.00
22) CLIENT: Ing. Bernardo Garza de la Fuente.
PROJECT: Garza de la Fuente Familiar Residence
LOCATION: San Pedro Garza García, Nuevo León.
TERM: August 2000.
PHONE: 83-99-90-02
RESPONSIBLE: Ing. Bernardo Garza de la Fuente.
COST: $ 20'000,000.00
23) CLIENT: Cap. Enrique Vázquez.
PROJECT: Residence in: Fraccionamiento Las Misiones.
LOCATION: Villa de Santiago, Nuevo León.
TERM: January 2001 to July 2002.
PHONE: 83-86-25-33
RESPONSIBLE: Cap. Enrique Vázquez.
COST: $10,000,000.00
24) CLIENT: Inversiones Trim.
PROJECT: Las Palmas Residential Condos
LOCATION: Construction of 60 departments.
CONSTRUCTION: Monterrey, Nuevo León.
TERM: June 2001 to December 2002
PHONE: 83-33-00-19
RESPONSIBLE: C.P. Celso Javier Treviño.
COST: $50,000,000.00
25) CLIENT: Grupo Delphi, S. A. de C. V.
PROJECT: Balcones de la Loma
LOCATION: Construction Management of: 82 Residential Apartments
CONSTRUCTION: Monterrey, Nuevo León.
TERM: May 2002 to November 2003
PHONE: 83-35-55-76
RESPONSIBLE: Ing. Keneth Cruz Acosta.
COST: $50,000,000.00
39
RESIDENTIALRÉSUMÉ 26) CLIENT: Ing. Eduardo Cantú Segovia
PROJECT: Bosques de Linda Vista
LOCATION: Construction of 25 Habitation Houses
CONSTRUCTION: San Nicolás de los Garza
TERM: May 2003.
PHONE: 83-90-70-50
RESPONSIBLE: Ing. Eduardo Cantú Segovia
COST: $ 7'500,000.00
27) CLIENT: Familia Cantú Segovia
PROJECT: Fraccionamiento Los Encinos
LOCATION: Project Management and Construction of 19 Residential Houses
CONSTRUCTION: San Pedro Garza García, Nuevo León
TERM: October 2003
PHONE: 83-90-70-50
RESPONSIBLE: Ing. Eduardo Cantú Segovia
COST: $ 25'000,000.00
28) CLIENT: Grupo Atlas
PROJECT: Pedregal de Valle Alto
LOCATION: 5 Acre Development in: Fraccionamiento Residencial
CONSTRUCTION: Monterrey, Nuevo León, Zona Valle Alto
TERM: October 2003
PHONE: 83-78-45-18
RESPONSIBLE: Lic. Estanislao Martínez Paz
COST: $4,000,000.00
29) CLIENT: Nadiex, S. A. de C. V.
PROJECT: Residencial Miravalle
LOCATION: 17 apartments
CONSTRUCTION: Av. San Jerónimo No. 200, Col. Miravalle, Monterrey, N. L.
TERM: November 2003
PHONE: 83-45-88-45
RESPONSIBLE: Lic. Javier Delgado Navarro
COST: $ 18'000,000.00
30) CLIENT: Constructora Milimex
PROJECT: Balcones de Satélite
DESCRIPTION: Vertical Construction, 10 floors for 486 low-cost housing in 16 Acres
LOCATION: Monterrey, Nuevo León
TERM: January 2004
PHONE: 83-78-46-00
RESPONSIBLE: Lic. Estanislao Martínez Martínez
COST: $ 24'000,000.00
40
RESIDENTIALRÉSUMÉ 31) CLIENT: Acuña Bienes Raíces
PROJECT: Benetton Tower
LOCATION: Project Direction and Construction
CONSTRUCTION: Monterrey, N.L.
TERM: April 2005 to October 2006.
PHONE: 83-35-70-15
RESPONSIBLE: Lic. Rafael Acuña
COST: $40,000,000.00
32) CLIENT: Gamo Bienes Raíces
PROJECT: Fraccionamiento La Silla
LOCATION: Project Management and Construction
CONSTRUCTION: Monterrey, N.L.
TERM: August 2005 to December 2006
PHONE: 83-35-23-20
RESPONSIBLE: Lic. Raúl Garza
COST: $20,000,000.00
33) CLIENT: Quail Construction
PROJECT: Fraccionamiento Codornices
LOCATION: Direction and Supervision
CONSTRUCTION: Monterrey, N.L.
TERM: April 2006
PHONE: 83-56-84-10
RESPONSIBLE: Ing. Eugenio Nájera
COST: $10,000,000.00
34) CLIENT: Desarrollos Sierra Madre
PROJECT: Fraccionamiento La Silla
LOCATION: Direction and Supervision
CONSTRUCTION: Monterrey, N.L.
TERM: April 2006
PHONE: 83-38-10-30
RESPONSIBLE: Sra. Lila Garza
COST: $110,000,000.00
35) CLIENT: Quail Construction
PROJECT: Fraccionamiento Los Aldama
LOCATION: Direction and Supervision
CONSTRUCTION: Monterrey, N.L.
TERM: Septiember 2006
PHONE: 83-56-84-10
RESPONSIBLE: Ing. Eugenio Nájera Padilla
COST: $8,500,000.00
41
RESIDENTIALRÉSUMÉ 36) CLIENT: Fam. Argüelles
PROJECT: Casa - Club
LOCATION: Direction and Supervision
CONSTRUCTION: San Pedro Garza García
TERM: December 2006
PHONE: 81-52-42-49
RESPONSIBLE: Lic. Sergio Argüelles
COST: $ 5'000,000.00
37) CLIENT: Empresas Santos
PROJECT: Fracc. Los Ángeles
LOCATION: Direction and Supervision
CONSTRUCTION: San Pedro Garza García, N.L.
TERM: February 2007
PHONE: 81-14-20-20
RESPONSIBLE: Ing. Fernando Moreno
COST: $ 26'000,000.00
38) CLIENT: Empresas Ese
PROJECT: Fracc. Santa Catarina
LOCATION: Direction and Supervision
CONSTRUCTION: Santa Catarina, N.L.
TERM: April 2007
PHONE: 81-80-10-60-50
RESPONSIBLE: Lic. Salvador Alanís
COST: $ 5'500,000.00
39) CLIENT: Grupo Gentor
PROJECT: Fracc. Las Fuentes
LOCATION: Internal Audit
CONSTRUCTION: San Pedro Garza García, N.L.
TERM: April 2007
PHONE: 83-44-75-65
RESPONSIBLE: Lic. Luis Alberto Ruiz
COST: $ 206'000,000.00
40) CLIENT: Lic. Ernesto Santos
PROJECT: Residencial
LOCATION: Direction and Supervision
CONSTRUCTION: San Pedro Garza García, N.L.
TERM: January 2008
PHONE: 81-73-53-53
RESPONSIBLE: Lic. Ernesto Santos
COST: $ 206'000,000.00
41) CLIENT: Lic. Angel Galván
PROJECT: Residentiall
DESCRIPTION: Direction and Supervision
LOCATION: San Pedro Garza García, N.L.
TERM: October 2008 to May 2009
PHONE: 15-94-27-61
RESPONSIBLE: Lic. Angel Galván
42
RESIDENTIALRÉSUMÉ
42) CLIENT: Inmobiliaria Cañón del Huajuco
PROJECT: Fracc. Los Azulejos
LOCATION: Direction
CONSTRUCTION: Monterrey, N. L.
TERM: 2008
PHONE: 83-63-38-88
RESPONSIBLE: C.P. Artemio Garza
COST:
43) CLIENT: Ing. Jorge Llaguno
PROJECT: Fam . Llaguno’s Residence
LOCATION: Direction and Supervision
CONSTRUCTION: San Pedro Garza García
TERM: July 2009
PHONE: 83-31-77-01
RESPONSIBLE: Ing. Jorge Llaguno
COST:
44) CLIENT: Lic. Armando Vejar
PROJECT: Fracc. Puerto Bahía Villas
LOCATION: Direction and Supervision
CONSTRUCTION: Puerto Vallarta
TERM: July 2010
PHONE: 81-55-65-05
RESPONSIBLE: Lic. Armando Vejar
COST:
43
RESIDENTIALRÉSUMÉ 45) CLIENT: Grupo Corporativo BATAB, S.A. de C.V. (NURBAN)
PROJECT: Fraccionamiento de Lotes Urbanizados con Campos de Golf
LOCATION: Ave. Patria 1300 Col. Villa Universidad, Zapopan, Jalisco.
CONSTRUCTION: Fraccionamiento de Lotes Urbanizados con Campos de Golf
TERM: 2014.
PHONE: 122-917-94444
RESPONSIBLE: Ing. Ernesto Bortoni
COST: $264,000,000.00
46) CLIENT: GESTA Desarrollos, S.A. de C.V.
PROJECT: Habitation Building
LOCATION: Av. Eugenio Garza Sada No. 800 sur Col. Mas Palomas, Monterrey, NL.
CONSTRUCTION: Edificio de Usos Multiples 2 niveles comercial, 9 niveles de departamentos y sotano 4 niveles.
TERM: 2014
PHONE: 81-5536-54
RESPONSIBLE: Ing. Oscar de la Garza Clariond
COST: $360,000,000.00
47) CLIENT: El Molino
PROJECT: Internal Audit
LOCATION: Leon, Guanajuato
CONSTRUCTION: Fraccionamiento Residencial con Campo de Gold y Casa Club
TERM: 2014
PHONE: 477-7811-016
RESPONSIBLE: Ing. Ernesto Bortoni
COST: $200,000,000.00
48) CLIENT: La Reserva
PROJECT: Internal Audit
LOCATION: Queretaro, Qro
CONSTRUCTION: Fraccionamiento con Edificios Multifamiliares
TERM: 2014
PHONE: 442-1927-700
RESPONSIBLE: Yolanda Hernandez
COST: $400,000,000.00
GENERAL INFORMATION
 Enterprise: VEGA CONSULTORES S.A. de C.V.
 Location: Distrito B-4 #397 Col. Leones, Monterrey, N.L.
 Phone/Fax: (81)-83333-6400, 8333-8818
 Executive Director: Ing. Manuel Ventosa Gzz.
 Webpage: www.vegagerencia.com.mx
44
AUTHOR: RANDY DE LA ROSA RUBALCAVA

More Related Content

Similar to RÉSUMÉ highlights construction management experience

Axiare Patrimonio Asset Portfolio
Axiare Patrimonio Asset PortfolioAxiare Patrimonio Asset Portfolio
Axiare Patrimonio Asset PortfolioAxiare_Patrimonio
 
Curriculum2013-2015 English
Curriculum2013-2015 EnglishCurriculum2013-2015 English
Curriculum2013-2015 EnglishAmador Gonzalez
 
Productos de nuestra División Multimaq
Productos de nuestra División MultimaqProductos de nuestra División Multimaq
Productos de nuestra División MultimaqMultifrio S.A.
 
101010 Cv English
101010 Cv English101010 Cv English
101010 Cv Englishfersantov
 
Curriculum Vitae Ariel Salinas English
Curriculum Vitae Ariel Salinas EnglishCurriculum Vitae Ariel Salinas English
Curriculum Vitae Ariel Salinas Englishariel salinas
 
110429 pgi cv_hotels_english_redux
110429 pgi cv_hotels_english_redux110429 pgi cv_hotels_english_redux
110429 pgi cv_hotels_english_reduxPGI ENGINEERING
 
Idea Arqitectos
Idea ArqitectosIdea Arqitectos
Idea Arqitectosjull_m
 
2008 Corporate Presentation
2008 Corporate Presentation2008 Corporate Presentation
2008 Corporate Presentationasierpz
 
Biển quảng cáo tại Hồ Chí Minh
Biển quảng cáo tại Hồ Chí MinhBiển quảng cáo tại Hồ Chí Minh
Biển quảng cáo tại Hồ Chí MinhOOH ADVERTISING
 
Real estate business opportunity in argentina for usa investors
Real estate business opportunity in argentina for usa investorsReal estate business opportunity in argentina for usa investors
Real estate business opportunity in argentina for usa investorseldanisalomon
 
SAGE GARDEN RESIDENCES PROJECT PRESENTATION.pdf
SAGE GARDEN RESIDENCES PROJECT PRESENTATION.pdfSAGE GARDEN RESIDENCES PROJECT PRESENTATION.pdf
SAGE GARDEN RESIDENCES PROJECT PRESENTATION.pdfEden DMCI
 
Mahmoud.F.Taha _c.v_
Mahmoud.F.Taha _c.v_Mahmoud.F.Taha _c.v_
Mahmoud.F.Taha _c.v_Mahmoud Taha
 
CS.Eng Civil_Luimen Rojas_042015
CS.Eng Civil_Luimen Rojas_042015CS.Eng Civil_Luimen Rojas_042015
CS.Eng Civil_Luimen Rojas_042015Luimen Rojas
 

Similar to RÉSUMÉ highlights construction management experience (20)

CGC 2016
CGC 2016CGC 2016
CGC 2016
 
Resume_Alejandro Weiss M
Resume_Alejandro Weiss MResume_Alejandro Weiss M
Resume_Alejandro Weiss M
 
Axiare Patrimonio Asset Portfolio
Axiare Patrimonio Asset PortfolioAxiare Patrimonio Asset Portfolio
Axiare Patrimonio Asset Portfolio
 
Curriculum2013-2015 English
Curriculum2013-2015 EnglishCurriculum2013-2015 English
Curriculum2013-2015 English
 
NASEER CV JUNE 2015
NASEER CV JUNE 2015NASEER CV JUNE 2015
NASEER CV JUNE 2015
 
Productos de nuestra División Multimaq
Productos de nuestra División MultimaqProductos de nuestra División Multimaq
Productos de nuestra División Multimaq
 
101010 Cv English
101010 Cv English101010 Cv English
101010 Cv English
 
Curriculum Vitae Ariel Salinas English
Curriculum Vitae Ariel Salinas EnglishCurriculum Vitae Ariel Salinas English
Curriculum Vitae Ariel Salinas English
 
Pic inversionistas ingles 3
Pic inversionistas ingles 3Pic inversionistas ingles 3
Pic inversionistas ingles 3
 
110429 pgi cv_hotels_english_redux
110429 pgi cv_hotels_english_redux110429 pgi cv_hotels_english_redux
110429 pgi cv_hotels_english_redux
 
Ginsa English
Ginsa EnglishGinsa English
Ginsa English
 
Pic inversionistas ingles 3
Pic inversionistas ingles 3Pic inversionistas ingles 3
Pic inversionistas ingles 3
 
Idea Arqitectos
Idea ArqitectosIdea Arqitectos
Idea Arqitectos
 
2008 Corporate Presentation
2008 Corporate Presentation2008 Corporate Presentation
2008 Corporate Presentation
 
Biển quảng cáo tại Hồ Chí Minh
Biển quảng cáo tại Hồ Chí MinhBiển quảng cáo tại Hồ Chí Minh
Biển quảng cáo tại Hồ Chí Minh
 
Real estate business opportunity in argentina for usa investors
Real estate business opportunity in argentina for usa investorsReal estate business opportunity in argentina for usa investors
Real estate business opportunity in argentina for usa investors
 
International Project Profile - Grupo Kalos
International Project Profile - Grupo KalosInternational Project Profile - Grupo Kalos
International Project Profile - Grupo Kalos
 
SAGE GARDEN RESIDENCES PROJECT PRESENTATION.pdf
SAGE GARDEN RESIDENCES PROJECT PRESENTATION.pdfSAGE GARDEN RESIDENCES PROJECT PRESENTATION.pdf
SAGE GARDEN RESIDENCES PROJECT PRESENTATION.pdf
 
Mahmoud.F.Taha _c.v_
Mahmoud.F.Taha _c.v_Mahmoud.F.Taha _c.v_
Mahmoud.F.Taha _c.v_
 
CS.Eng Civil_Luimen Rojas_042015
CS.Eng Civil_Luimen Rojas_042015CS.Eng Civil_Luimen Rojas_042015
CS.Eng Civil_Luimen Rojas_042015
 

RÉSUMÉ highlights construction management experience

  • 1. RÉSUMÉ (1992-2014) INTERNAL AUDIT, MANAGEMENT AND ADMINISTRATION OF CONSTRUCTION AUTHOR: RANDY DE LA ROSA RUBALCAVA
  • 2. MISSION PHILOSOPHY  We are an organization which purpose is to satisfy and overcome the common expectative of the national and international industry of construction, by always achieving excellence in the management of construction work.  To integrate all the tasks involved in Planning and Controlling Construction Work, with the priority goal of finishing the project within time, cost and quality. 2
  • 3. PROJECT MANAGEMENT SYSTEM 3  Procedure Manual  Control System  Not Failing Guarantee  VEGA has developed a methodology which allows us guarantee the complete satisfaction of our client achieving from a 20% to a 30% either is an industrial, commercial or residential project.
  • 4. SERVICES OFFERED BY VEGA VEGAConstruction Management Project Management Engineering Development Internal Audit Redesign Procedure Manual Strategy Supervision in Maintenance Personal Services for Administration 4
  • 5. 5 FOCUS ON OUR SERVICES VEGA Hotels Working Offices Malls IndustriesTourism Development Infrastructure Urbanization School and Institution s Residenti al
  • 6. 6 BENEFITS OF SUPERVISION MORE($)INVESTEMENT TIME MORELESS VEGA • Continuous presence at construction site • Strict control of quality • Organized budget control • Direct coordination with companies specialists • 25% guaranteed savings and on in TIME and COST TRADITIONAL SYSTEM • Lack of supervision • Lack of time and cost control • No budget control • Poor quality • Extra Costs and Overhead Costs • Generally a 25% more than planned
  • 7. 7 PROJECT METHODOLOGY We rely on our system that assures the best quality in our service provided based on the experienced workmanship and the procedure of our methodology that certifies our service quality. This is supported by specialists in different areas of construction, guarantying an excellent project closure. General Statement Financial Budget Control Resource Estimation 1. Generate the Conceptual Project II. Select Project Direction III. Develop the Preliminary Project IV. Develop the Executive Project V. Invitation to Tender VI. Management and Supervision VII. Start Up and Tests VIII. Settlement of Building Site Tracking and Monitoring of Progress
  • 8. OUR PROJECTS Residential, Commercial, Industrial, Apartments 8
  • 9. OUR PROJECTS Residential, Commercial, Industrial, Apartments 9
  • 13. 13 COMMERCIALRÉSUMÉ 1) CLIENT: Cigarrera La Moderna 1. Rectangular and Semicircular Stables. PROJECT: Desarrollo Hípico “El Diente” 2. Food Storage LOCATION: Monterrey, Nuevo León 3. Roofed Riding School CONSTRUCTION: 100 Hectáreas 4. Roads TERM: 1992 - 1995 5. High and Low Tension System PHONE: 83-47-78-07 6. Tracks RESPONSIBLE: Ing. Gustavo Romo 7. International Stables COST: $ 73,000,000.00 2) CLIENT: Propiedad de la Inmobiliaria INVEC, S. A. de C. V. (Fina Factor) PROJECT: Mall “Plaza Carranza” DESCRIPTION: Project Management and Mall Construction LOCATION: Monterrey, Nuevo León CONSTRUCTION: 4,950 m2 TERM: July-December 1992 PHONE: 83-35-21-63/83-35-49-30 RESPONSIBLE: Ing. Hugo Chapa COST: $10,500,000.00 3) CLIENT: Propiedad de Inversiones Safi, S. A. de C. V. PROJECT: Best Western Royal Hotel LOCATION: Monterrey, Nuevo León. CONSTRUCTION: 7,500 m2 TERM: November 1992. PHONE: 83-40-11-88/83-43-81-00 RESPONSIBLE: Sr. Jorge Safi. COST: $8,500,000.00 4) CLIENT: Internacional de Inversiones, S.A. De C. V. PROJECT: San Agustín Medical Center DESCRIPTION: Project Direction, Development of Preliminary Project, Permits and Engineering LOCATION: San Pedro, Garza García, Nuevo León. CONSTRUCTION: 18,000 m2 TERM: From March to July 1993 PHONE: 83-63-24-34/83-63-30-70 RESPONSIBLE: Lic. Octavio Hinojosa COST: $30,000.00 5) CLIENT: Planeación Inmobiliaria Capital. PROJECT: Santa Elena Building DESCRIPTION: Engineering Direction LOCATION: San Pedro, Garza García, Nuevo León. CONSTRUCTION: 3,000 m2 TERM: May 1995 RESPONSIBLE: Lic. Luis Oseguera. COST: $6,000,000.00
  • 14. 14 6) CLIENT: Galáz, Gómez, Mortin, Chavero, Yamazaki, S.C. PROJECT: Corp. Torres Kumay. DESCRIPTION: Project Direction, Development of Preliminary Project, Permits and Engineering LOCATION: Monterrey, Nuevo León. CONSTRUCTION: 21,000 m2 TERM: August de 1995. PHONE: 83-33-10-33 / 83-48-68-92 RESPONSIBLE: C.P. Ma. Estela Imamura, C.P. Celso Javier Treviño. COST: $30,000,000.00 7) CLIENT: Comercial América. PROJECT: Remodel of Cash Registers. LOCATION: San Pedro, Garza García, Nuevo León. CONSTRUCTION: 150 m2 TERM: March to April 1996. PHONE: 83-68-40-78 RESPONSIBLE: C.P. Armando Fernández. COST: $200,000.00 8) CLIENT: Restaurante Remembers. PROJECT: Remodeling and construction of the new construction of the Restaurant Remembers. LOCATION: Monterrey, Nuevo León. TERM: April 1996 PHONE: 83-78-44-14 RESPONSIBLE: Arq. Felipe Mier. COST: $1,000,000.00 9) CLIENT: Comercial América. PROJECT: Office Remodeling of: Promotoría en Seguros. LOCATION: San Pedro, Garza García, Nuevo León. CONSTRUCTION: 400 m2 TERM: November1996. PHONE: 83-68-40-78 RESPONSIBLE: C.P. Armando Fernández. COST: $900,000.00 10) CLIENT: Comercial América. PROJECT: Employee Dinning Room. LOCATION: San Pedro, Garza García, Nuevo León. CONSTRUCTION: 180 m2 TERM: January 1997. PHONE: 83-68-40-78 RESPONSIBLE: C.P. Armando Fernández. COST: $550,000.00 COMMERCIALRÉSUMÉ
  • 15. 15 11) CLIENT: Bueno Alimentos, S.A. de C.V. PROJECT: Corp. for Bueno Alimentos, S.A. de C.V. DESCRIPTION: Direction of the Engineering and the Construction of the Office Building UBICATION: Monterrey, Nuevo León. TERM: December 1997 to January 1999. PHONE: 83-33-34-43 RESPONSIBLE: Lic. Guillermo Bueno. COST: $500,000.00 12) CLIENT: Lic. Alejandro Bueno, Arq. Felipe Mier, Lic. Alfonso Guzmán. PROJECT: Apartments in the Project: Torre Blanca. LOCATION: San Pedro, Garza García, Nuevo León. TERM: May 1998. PHONE: 83-48-63-55 RESPONSIBLE: Lic. Alejandro Bueno. COST: $2,500,000.00 13) CLIENT: Superficies Decorativas, S. A. de C.V. PROJECT: Construction of Distribution Center LOCATION: Direction of the Engineering, the Construction of the Office Building and the Industrial Warehouse CONSTRUCTION: Monterrey, Nuevo León. TERM: June 2000 PHONE: 86-25-50-00 RESPONSIBLE: Lic. Luis de la Garza. COST: $15,000,000.00 14) CLIENT: Chrysler. PROJECT: Chrysler Poza Rica Chrysler Agency DESCRIPTION: Direction of the Engineering, the Construction of the Office Building, exposure area, industrial workshop, stock and maneuver UBICATION: Poza Rica, Veracruz. TERM: July 2000 PHONE: (138) 2-22-42 RESPONSIBLE: Lic. Ramón Caballero. COST: $ 18'000,000.00 15) CLIENT: Supermercados Internacionales HEB. PROJECT: HEB DESCRIPTION: Store and Mall Construction UBICATION: Santa Catarina, Nuevo León. TERM: January 15 of 2001 to August 29 of 2001. PHONE: 81-53-11-61 RESPONSIBLE: Arq. Irene Padilla COST: $150,000,000.00 COMMERCIALRÉSUMÉ
  • 16. 16 16) CLIENT: Super Mercados Internacionales HEB. PROJECT: HEB Tampico. DESCRIPTION: Mall and Store Construction LOCATION: Tampico, Tamaulipas. TERM: October 2001 PHONE: 81-53-11-61 RESPONSIBLE: Arq. Mauricio Toloumsis. COST: $150,000,000.00 17) CLIENT: Internet por Fibra, S. A. de C. V. PROJECT: Celda S5. DESCRIPTION: Project Direction, Permits, Engineering and Fiber Optic Network Construction. LOCATION: San Pedro Garza García, Nuevo León. TERM: April 2002 PHONE: 84-79-55-10 RESPONSIBLE: Ing. Jorge Eugenio Ortíz. COST: $3,000,000.00 18) CLIENT: Parroquia Santa Engracia PROJECT: Centro Pastoral San Agustín DESCRIPTION: Temple Construction including chapel, offices, salons and parking lot. (20,000 m2) LOCATION: Sendero de las Privanzas 402, Col. Las Privanzas, San Pedro Garza García TERM: November 2003 PHONE: 80-40-28-95 RESPONSIBLE: Pbro. Marcelo Varela COST: $ 16'000,000.00 19) CLIENT: Grupo Acosta Verde PROJECT: Mall: Plaza Periférico DESCRIPTION: Construction Management of: High Category Mall Center LOCATION: Reynosa, Tamaulipas TERM: January 2004 to December de 2004 PHONE: 10-01-98-00 RESPONSIBLE: Arq. Miguel Reyes Vidales COST: $ 280'000,000.00 20) CLIENT: Corporación Control PROJECT: Woolworth Monterrey DESCRIPTION: Construction Management of the Departmental Store. LOCATION: Monterrey, N.L. TERM: September 2004 to December 2004 PHONE: 83-29-55-00 RESPONSIBLE: Arq. Javier Ibarra COST: $ 20'000,000.00 COMMERCIALRÉSUMÉ
  • 17. 17 21) CLIENT: Lic. Javier Delgado PROJECT: Centro Comercial Las Lajas DESCRIPTION: Construction Management of the Mall LOCATION: Monterrey, N.L. TERM: January 2005. PHONE: 83-45-88-45 RESPONSIBLE: Ing. Javier Delgado COST: $ 5'000,000.00 22) CLIENT: G y H de Juárez PROJECT: Plaza Galería TEC (Multimedios) DESCRIPTION: Project and Construction Management LOCATION: Cd. Juárez, Chihuahua. TERM: January 2005 to November 2006 PHONE: 83-56-20-99 RESPONSIBLE: Lic. Marco Martínez COST: $ 60'000,000.00 23) CLIENT: Wal Mart de México PROYECT: Supercenter Miguel Alemán Remodeling DESCRIPTION: Direction and Supervision LOCATION: Monterrey, N.L. TERM: May 2005 to August 2005 PHONE: 83-18-04-34 RESPONSIBLE: Ing. Luis Eduardo Ochoa COSTO: $3,000,000.00 24) CLIENT: Wal Mart de México PROJECT: Supercenter Las Torres Remodeling DESCRIPTION: Direction and Supervision LOCATION: Monterrey, N.L. TERM: May 2005 a August 2005 PHONE: 83-18-04-34 RESPONSIBLE: Ing. Luis Eduardo Ochoa COST: $3,000,000.00 25) CLIENT: Wal Mart de México PROJECT: Bodega Aurrera Saltillo (Change of A/C Equipment) DESCRIPTION: Direction and Supervision LOCATION: Saltillo, Coah. TERM: January 2006 to March 2006 PHONE: 83-18-04-34 RESPONSIBLE: Ing. Luis Eduardo Ochoa COST: $1,500,000.00 COMMERCIALRÉSUMÉ
  • 18. 18 26) CLIENT: Grupo Soriana PROJECT: Soriana Tangamanga DESCRIPTION: Direction and Supervision LOCATION: San Luis Potosí, S.L.P. TERM: February 2006 to July 2006 PHONE: 83-29-90-00 RESPONSIBLE: Ing. Sergio Díaz COST: $ 85'000,000.00 27) CLIENT: Fideicomiso Paque Fundidora PROJECT: Fundidora Park Expansion Phase 1 DESCRIPTION: Direction and Supervision LOCATION: Monterrey, N.L. TERM: March 2006 to June 2006 PHONE: 83-40-52-50 RESPONSIBLE: Ing. Sergio Cantú COST: $140,000,000.00 28) CLIENT: Fundación Monterrey 2007 A.C PROJECT: Fundidora Park Expansion Phase 2 DESCRIPTION: Direction and Supervision LOCATION: Monterrey, N.L. TERM: April 2006 to December 2006 PHONE: 83-40-52-50 RESPONSIBLE: Ing. Sergio Cantú COST: $120,000,000.00 29) CLIENT: Wal Mart de México PROJECT: Suburbia La Silla (Remodeling) DESCRIPTION: Direction and Supervision LOCATION: Monterrey, N.L. TERM: April 2006 a July 2006 PHONE: 83-18-04-34 RESPONSIBLE: Ing. Carlos Acevedo COST: $3,000,000.00 30) CLIENT: Wal Mart de México PROJECT: Bodega Aurrera Construction DESCRIPTION: Direction and Supervision LOCATION: Río Grande, Zacatecas TERM: June 2006 to September 2006 PHONE: 83-56-84-10 RESPONSIBLE: Arq. Rodrigo Mariscal COST: $13,500,000.00 COMMERCIALRÉSUMÉ
  • 19. 19 31) CLIENT: Universidad de Monterrey PROJECT: Internal Audit UDEM Residences DESCRIPTION: Internal Audit LOCATION: San Pedro Garza García, N.L. TERM: September 2006 to December 2006 PHONE: 81-24-11-21 RESPONSIBLE: Lic. Luis Miranda COST: 32) CLIENT: Lic. Luis Alberto Troncoso / Arq. José Carlos Villanueva PROJECT: La Cima Apartment Building DESCRIPTION: Management and Supervision LOCATION: San Pedro Garza García, N.L. TERM: September 2006 PHONE: 80-40-20-05 RESPONSIBLE: Lic. Luis Alberto Troncoso / Arq. José Carlos Villanueva COST: $16,500,000.00 33) CLIENT: Wal Mart de México PROJECT: Mi Bodega Aurrera DESCRIPTION: Direction and Supervision LOCATION: Madero, Coahuila TERM: January 2007 a March 2007 PHONE: 01-55-53-70-30-00 RESPONSIBLE: Arq. Federico Díaz COST: $8,000,000.00 34) CLIENT: Wal Mart de México PROJECT: Bodega Aurrera DESCRIPTION: Direction and Supervision LOCATION: Villa de García, N.L. TERM: March 2007 PHONE: 01-55-53-71-30-00 RESPONSIBLE: Arq. Rodrigo Mariscal COST: $ 34'000,000.00 35) CLIENT: Desarrolladora M PROJECT: School Classrooms DESCRIPTION: Direction and Supervision LOCATION: Monterrey, N.L. y su área Metropolitana TERM: April 2007 - PHONE: (55) 52-57-17-56 RESPONSIBLE: Ing. Joaquín Martínez del Campo COST: $ 100'000,000.00 COMMERCIALRÉSUMÉ
  • 20. 20 36) CLIENT: Motores Competitivos SA de CV PROJECT: Agency Pro-shop Suzuki DESCRIPTION: Direction and Supervision LOCATION: Monterrey, N.L. y su área Metropolitana TERM: October 2007- February 2008 PHONE: 12-33-00-00 RESPONSIBLE: Ing. Humberto Guzmán COST: $3,500,000.00 37) CLIENT: Trebotti SA de CV PROJECT: Torre de Departamentos y Oficinas LOCATION: Torreón Coahuila TERMN: Octubre 2007 PHONE: 01-871) 719-10-00 RESPONSIBLE: Lic. Luis Treviño Botti 38) CLIENT: Max Construcciones de Arenas y Parques SA de CV PROJECT: Estacionamiento Oriente Arena Monterrey DESCRIPTION: Direction and Construction LOCATION: Monterrey, N. L. TERM: May 2008 – July 2009 PHONE: 82-21-20-20 RESPONSIBLE: C.P. Guillermo Garza Mercado COST: 39) CLIENT: Inversity Desarrollo Inmobiliario PROJECT: Habitation Apartments in: Campo de Golf LOCATION: San Miguel de Allende, Gto. TERM: May to September 2008 PHONE: 83-63-86-32 RESPONSIBLE: Arq, Marco Garza COST: COMMERCIALRÉSUMÉ
  • 21. 21 40) CLIENT: Century 21 Marcos & Assad PROJECT: Apartment Tower DESCRIPTION: Direction and Construction LOCATION: Monterrey. N. L. TERM: August 2008 to May 2009 PHONE: 50-00-21-00 RESPONSIBLE: Lic. Marco Garza Mercado COST: 41) CLIENT: Ing. Rogelio Sada Zambrano PROJECT: Fraccionamiento Canoas DESCRIPTION: Parametric Budget Elaboration LOCATION: Montemorelos Nuevo León TERM: June to July 2009 PHONE: 83-65-02-21 RESPONSIBLE: Ing. Rogelio Sada Zambrano 42) CLIENT: Arq. Eudelio Garza PROJECT: Plaza Fiesta Anáhuac DESCRIPTION: Internal Audit LOCATION: San Nicolás de los Garza Nuevo León TERM: August 2009 to January 2010 PHONE: 83-63-31-08 RESPONSIBLE: Arq. Eudelio Garza 43) CLIENT: Inmobiliaria Celer SA de CV PROJECT: Hidalgo Tower DESCRIPTION: Direction and Construction LOCATION: Monterrey, Nuevo León TERM: October 2010 PHONE: 83-99-88-00 RESPONSIBLE: Arq. Alick Amador COMMERCIALRÉSUMÉ
  • 22. 22 44) CLIENT: Deportivo Alpino Chipinque PROJECT: Parking lot, Golf Practice Camp, Elevator Installation and Internal Remodel DESCRIPTION: Diagnose and Internal Audit LOCATION: Av. San Ángel No. 118 Col. Chipinque, CP 66290, San Pedro Garza García . N. L. TERM: 2014 PHONE: 81-15-00-00 RESPONSIBLE: Ing. Sergio Unger COST: $30,300,000.00 45) CLIENT: Trazzo Desarrollos Verticales, S.A. de C.V. PROJECT: SAQQARA DESCRIPTION: Diagnose and Internal Audit LOCATION: Batallon de San Patricio 109 Col. Valle Oriente, San Pedro Garza García . N. L. TERM: 2014 PHONE: RESPONSIBLE: Matias Kreifler COST: $685,000,000.00 46) CLIENT: IDEI PROJECT: KOI Sky Residences DESCRIPTION: Diagnose and Internal Audit LOCATION: Av. Fundadores Esq. Con David Alfaro Siqueiros Valle Oriente, San Pedro Garza García . N. L. TERM: 2014 PHONE: RESPONSIBLE: Abelardo Garza Evia COST: $1,726,382,951.00 COMMERCIALRÉSUMÉ
  • 24. 24 1) CLIENT: Abogados Garza O’farrill y Asociados. PROJECT: Abogados Garza O’farrill y Asociados Headquarters LOCATION: Monterrey, Nuevo León. TERM: 1987 PHONE: 83-45-70-16 RESPONSIBLE: Lic. Antonio O'farril COST: $5,000,000.00 2) PROJECT: Bolsa Profesional Building. UBICACIÓN: Los Ángeles, California, USA. TERM: 1998-1990 COST: $3,000,000.00 U.S. Dlls. 3) CLIENT: Ing. Cecilio Villanueva. PROJECT: Villanueva Industrial Storage DESCRIPTION: Two Level Storage Construction LOCATION: Monterrey, Nuevo, León. CONSTRUCTION: 1,500 m2 TERM: March1993 to January de 1994. PHONE: 83-51-88-86 RESPONSIBLE: Ing. Cecilio Villanueva. COST: $1,400,000.00 4) CLIENT: Fama, S. A. de C. V. PROJECT: New Roof for: Nave Maquinaria of Vitro Group LOCATION: Monterrey, Nuevo León. TERM: 1996 RESPONSIBLE: Ing. Juan Manuel Arrieta. COST: $800,000.00 5) CLIENT: Vidriera Monterrey, S. A. de C. V. PROJECT: Horno No. 6. Remodel DESCRIPTION: Demolition, Survey for new installations LOCATION: Monterrey, Nuevo León. TERM: 1997 PHONE: 83-29-10-00 RESPONSIBLE: Ing. Ramiro Sánchez. COST: $52,663,810.00 6) CLIENT: Promapi, S. A. de C. V. PROJECT: (WWTP) Waste Water Treatment Plant Construction. LOCATION: México, D.F. TERM: 1997 PHONE: (55) 58-55-30-33 RESPONSIBLE: C.P. Justo Gómez. COST: $4,800,000.00 INDUSTRIALRÉSUMÉ
  • 25. 25 INDUSTRIALRÉSUMÉ 7) CLIENT: Auto Templex, S. A. de C. V. PROJECT: Horno T-11 Auto Templex. DESCRIPTION: Production line construction, fans and warehouse LOCATION: Villa de García, Nuevo León. TERM: 1997 to 1998 PHONE: 83-29-36-00 RESPONSIBLE: Ing. Sergio Martínez. COST: $108,576,000.00 8) CLIENT: Lic. Patricio O’farrill. PROJECT: Titanium Almacenaje y Maquila. DESCRIPTION: 6 warehouses construction for storage for light industry. LOCATION: 10,000 m2. CONSTRUCTION: Apodaca, Nuevo, León. TERM: March to September 1997. PHONE: 83-40-32-48 RESPONSIBLE: Lic. Antonio O’farrill. COST: $5,850,000.00 9) CLIENT: Bueno Alimentos, S.A. de C.V. PROJECT: Warehouse Reconstruction DESCRIPTION: Demolition and Construction. LOCATION: Santa Catarina, Nuevo, León. CONSTRUCTION: 1,680 m2 TERM: January 1998. PHONE: 83-33-34-43 RESPONSIBLE: Lic. Eugenio Bueno. COST: $ 800,000.00. 10) CLIENT: Cervecería Cuauhtémoc Moctezuma. PROJECT: Project MP Phase I. DESCRIPTION: Orizaba, Veracruz. LOCATION: 2,500 m2 TERM: February 1998 to August 1999. PHONE: 83-28-50-00 / 83-28-54-93 RESPONSIBLE: Ing. Eduardo Saldaña. COST: $80,000,000.00 11) CLIENT: Seguros Comercial América. PROJECT: Valuation área stands LOCATION: Monterrey, Nuevo León. TERM: April to May 1998. PHONE: 83-68-40-78 RESPONSIBLE: C.P. Armando Fernández. COST: $15,000,000.00 12) CLIENT: Metalsa, S.A, de C.V. PROJECT: Thermic Treatment Warehouse DESCRIPTION: Apodaca, Nuevo, León. LOCATION: 17,200 m2 TERM: August de 1998. PHONE: 83-69-74-00 RESPONSIBLE: Ing. Ignacio Prieto COST: $30,000,000.00
  • 26. 26 INDUSTRIALRÉSUMÉ 13) CLIENT: Vitro Supermatic, S. A. de C. V. PROJECT: Storage Warehouse Roofing DESCRIPTION: Apodaca, Nuevo León. LOCATION: 17,000 m2 TERM: August 1998. PHONE: 83-29-23-00 RESPONSIBLE: Ing. Juan Antonio Villarreal. COST: $6,500,000.00 14) CLIENT: Vidriera Monterrey, S. A. PROJECT: Remodeling Historic Hallway DESCRIPTION: Monterrey, Nuevo León. LOCATION: 6,000 m2 TERM: Augusto 1998. PHONE: 83-29-10-00 RESPONSIBLE: Arq. Eduardo Carrillo. COST: $3,200,000.00 15) CLIENT: Vidriera Monterrey, S. A. PROJECT: Remodeling Horno No.7. DESCRIPTION: Demolition and Construction of production line, fans and warehouse LOCATION: Monterrey, Nuevo León. TERM: Septiember 1998 to Junr 1999. PHONE: 83-29-10-00 RESPONSIBLE: Ing. Jesús García. COST: $98,000,000.00 16) CLIENT: Perrigo de México. PROJECT: Warehouse for: Reempaque de Perrigo de México. DESCRIPTION: Ramos Arizpe, Coahuila. LOCATION: 2,500 m2 TERM: December 1998 to September 1999. PHONE: 83-88-36-46 RESPONSIBLE: Ing. Vicente Saro. COST: $ 1,592,000.00 Dlls. 17) CLIENT: Supermatic. PROJECT: New roof for Supermatic Warehouse. DESCRIPTION: Metallic cover installation for the existing warehouse, while plant was still working and producing. LOCATION: Apodaca, Nuevo León. TERM: December1998 to September 1999. PHONE: 83-29-23-00 RESPONSIBLE: Ing. Alfonso Campos COST: $15,000,000.00 18) CLIENT: Ampolletas, S. A. de C. V. PROJECT: Warehouse for: Frascos y Cuarto Limpio. LOCATION: Querétaro, Querétaro. TERM: 1999 PHONE: (442) 2-11-11-65 RESPONSIBLE: Ing. Jesús Delgado. COST: $3,765,000.00
  • 27. 27 INDUSTRIALRÉSUMÉ 19) CLIENT: Cervecería Cuauhtémoc Moctezuma. PROYECT: Carbonic Gas Line Modification LOCATION: Navojoa, Sonora. TERM: March a December de 1999. RESPONSIBLE: Ing. Cristóbal Cantú. COST: $56,000,000.00 20) CLIENT: Simeprodeso. PROJECT: Processing Plant of Solid Wastes from the Landfill DESCRIPTION: Construction of a Processing Plant of Solid Wastes LOCATION: Monterrey, Nuevo León. TERM: April1999 to March 2000. PHONE: 83-44-54-30 RESPONSIBLE: Lic. Guillermo Castillo. COST: $35,000,000.00 21) CLIENT: Cervecería Cuauhtémoc Moctezuma. PROJECT: Carta Blanca de Hidalgo Agency LOCATIONN: Parral, Chihuahua. TERM: May to July 1999. RESPONSIBLE: Ing. Javier Marroquín. COST: $10,000,000.00 22) CLIENT: Pepsi Gemex. PROJECT: Warehouse of: Llenos y Vacíos. DESCRIPTION: Warehouse and maneuver patio construction LOCATION: Apodaca, Nuevo León. TERM: June1999 to January 2000 PHONE: 83-86-37-55 RESPONSIBLE: Arq. Enrique de la Jara COST: $4,200,000.00 23) CLIENT: Industrial Power Counting. PROJECT: Línea de Polvos, Largueros de Camión en Metalsa. DESCRIPTION: Civil Work and Equipment installation for painting rooms LOCATION: Apodaca, Nuevo León. TERM: July 1999 February 2000. PHONE: 83-69-75-61 RESPONSIBLE: Ing. Luis Carlos Carranza. COST: $ 2,300,000.00 Dlls 24) CLIENT: Transportes Tamaulipas, S.A de C.V. PROJECT: Box Office, Service Workshops, Dorm rooms Project LOCATION: Various places at the North-East of Mexico TERM: July 1999 to 2001. PHONE: 81-51-44-00 RESPONSIBLE: Ing. Rodolfo Siller. COST: $11,000,000.00
  • 28. 28 INDUSTRIALRÉSUMÉ 25) CLIENT: Autobuses del Noreste, S. A. de C. V. PROJECT:: Box Office, Service Workshops, Dorm rooms Project LOCATION: Various places at the North-East of Mexico TERM: July 1999 to 2001. PHONE: 81-51-44-00 RESPONSIBLE: Ing. Rodolfo Siller. COST: $6,000,000.00 26) CLIENT: Prefabricados Monterrey, S. A. de C. V. PROJECT: Plant II DESCRIPTION: Construction of a Prefabricated Block Plant LOCATION: México, D. F. TERM: September 1999 to August 2000. PHONE: 83-84-85-40 RESPONSIBLE: Ing. Mauricio Flores. COST: $16,000,000.00 27) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V. PROJECT: Construction of Pensión S.I.R. F DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio LOCATION: Guadalupe, Nuevo León. TERM: November 1999 to April 2000. PHONE: 81-51-44-00 RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez. COST: $5,500,000.00 28) CLIENT: Pepsi Gemex. PROJECT: Centro de Distribución Monclova. CEDIS. DESCRIPTION: Warehouse Construction and Office Remodel LOCATION: Monclova, Coahuila. TERM: 2000 PHONE: 83-86-37-55 RESPONSIBLE: Arq. Enrique de la Jara. COST: $900,000.00 29) CLIENT: Autobuses del Noreste, S. A. de C. V. PROJECT: North-East Villagrán Headquarters DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio LOCATION: Noreste Villagrán. TERM: Janury to October 2000. PHONE: Ing. Rodolfo Siller. RESPONSIBLE: 81-51-44-00 COST: $ 20,500'000.00 30) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V. PROJECT: Workshop, Dorm Rooms and Warehouse Extension DESCRIPTION: ConsConstruction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio LOCATION: Monterrey, Nuevo León. TERM: February to June 2000. PHONE: 81-51-44-00 RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez. COST: $2,000,000.00
  • 29. 29 INDUSTRIALRÉSUMÉ 31) CLIENT: Grupo Toluca S.A de C.V. PROJECT: Bus Station Morelia. DESCRIPTION: 18 hour Project of 13,000 m2 LOCATION: Morelia, Michoacán. TERM: April 2000 to August 2002 PHONE: (5) 273-30-09 RESPONSIBLE: C.P. Rodolfo Flores. COST: $150,000,000.00 32) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V. PROJECT: Dinning Room Construction S.I.R. B LOCATION: San Nicolás de los Garza, Nuevo León. TERM: April to June 2000. PHONE: 81-51-44-00 RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez. COST: $250,000.00 33) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V. PROJECT: Pension Construction S.I.R. G DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio LOCATION: Escobedo, Nuevo León. TERM: October 2000 PHONE: 81-51-44-00 RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez. COST: $ 3, 000,000.00 34) CLIENT: Transportes Tamaulipas, S.A de C.V. PROJECT: Workshop and Dorm Rooms for: Autobuses Coahuilenses y Transportes Tamaulipas. DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio LOCATION: Monterrey, N.L. TERM: January to August 2001. PHONE: 81-51-44-00 RESPONSIBLE: Ing. Rodolfo Siller. COST: $13,500,000.00 35) CLIENT: Autobuses Coahuilenses S.A. De C.V. PROJECT: Dorm Rooms, Bus wash, Workshop and Offices. DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio LOCATION: Monclova, Coahuila. TERM: January to September 2001. PHONE: 81-51-44-00 RESPONSIBLE: Ing. Rodolfo Siller. COST: $3,000,000.00 36) CLIENT: Transportes Tamaulipas, S.A. de C.V. PROJECT: Polyvalent Classroom Construction in: Centro de Desarrollo Senda. LOCATION: Monterrey, Nuevo León. TERM: February to July 2001. PHONE: 81-51-44-00 RESPONSIBLE: Ing. Rodolfo Siller. COST: $1,200,000.00
  • 30. 30 INDUSTRIALRÉSUMÉ 37) CLIENTE: Vidriera Querétaro, S. A. de C. V. PROYECTO: Line VQ-34. DESCRIPCIÓN: Warehouse Construction, Remodel and Line VQ-34 Installation of Glass Bottle Production. UBICACIÓN: Querétaro, Querétaro. CONSTRUCCIÓN: 750 m2 FECHA: June 2002 February 2003 TELÉFONO: 88-63-10-00 RESPONSABLE: Ing. Humberto Calderón. COSTO: $10,000,000.00 Dlls. 38) CLIENT: Franklin Electric. PROJECT: Phase I Offices and Plant. DESCRIPTION: 700 m2 construction: Office, 2200 m2 construction: Warehouse LOCATION: Linares, Nuevo León. TERM: August 2002 to March 2003 RESPONSIBLE: Mr. Dan Cross COST: $14,000,000.00 39) CLIENT: Franklin Electric. PROJECT: Phase II Offices and Plant. DESCRIPTION: Production Warehouse of 9000 m2 Construction. LOCATION: Linares, Nuevo León. TERM: September 2003 RESPONSIBLE: Mr. Dan Cross COST: $46,000,000.00 40) CLIENT: Grupo Empresarial Logistik PROJECT: Urban Master Plan and Multimodal Terminal DESCRIPTION: Project Management and Industrial Park Construction LOCATION: San Luis Potosí, S.L.P. TERM: September 2004 PHONE: 82-62-35-17 RESPONSIBLE: C.P. Félix García COST: $ 120'000,000.00 41) CLIENT: Alcoa Wheel Products México PROJECT: Industrial Warehouse DESCRIPTION: Project and Construction Management LOCATION: Ciénega de Flores, N.L. TERM: February 2005. PHONE: 81-54-64-32 RESPONSIBLE: Rodrigo Cortés COST: $ 5'500,000.00 42) CLIENT: Fortacero, S.A. de C.V: PROJECT: Industrial Warehouse DESCRIPTION: Direction and Supervision LOCATION: Gómez Palacio, Durango. TERM: October 2006 PHONE: 81-56-52-00 RESPONSIBLE: Ing. Luis Treviño Guajardo COST: $16,000,000.00
  • 31. 31 INDUSTRIALRÉSUMÉ 43) CLIENT: Adhoc Bienes Raíces PROJECT: GonherMex Warehouse DESCRIPTION: Direction and Construction LOCATION: León, Guanajuato TERM: November 2008 to August 2009 PHONE: 81-74-40-00 RESPONSIBLE: C.P. Patricia Ramírez COST: 44) CLIENT: Industrias Alen SA de CV PROJECT: Preforma Industril Warehouse DESCRIPTION: Direction and Construction LOCATION: Santa Catarina, N. L. TERM: March 2010 PHONE: 81-22-10-00 RESPONSIBLE: Pedro Alejandro Salas Marmolejo COST: 45) CLIENT: Adhoc Bienes Raíces PROJECT: Warehouse GonherMex DESCRIPTION: Direction and Construction LOCATION: Pachuca, Los Mochis y San Luis Potosí TERM: June 2010 PHONE: 81-74-40-00 RESPONSIBLE: C.P. Patricia Ramírez COST: 46) CLIENT: Industrias Alen SA de CV PROJECT: Office Construction and Remodel. DESCRIPTION: Direction and Construction LOCATION: Santa Catarina, N. L. TERM: May 2010 PHONE: 81-22-10-00 RESPONSIBLE: Pedro Alejandro Salas Marmolejo COST:
  • 32. 32 INDUSTRIALRÉSUMÉ 47) CLIENT: Plásticos Industriales Monterrey, S.A. de C.V. PROJECT: Industrial Warehouse DESCRIPTION: Internal Audit LOCATION: 25 de Mayo 153 Col. Trabajadores, CP. 66149 Santa Catarina, NL. TERM: 2014 PHONE: 83-3601-99 RESPONSIBLE: Ing. Jorge García COST: $27,000,000.00 48) CLIENT: FORTACERO Jalisco PROJECT: Industrial Warehouse DESCRIPTION: Internal Audit LOCATION: El Salto, Jalisco TERM: 2014 PHONE: RESPONSIBLE: Luis Treviño COST: $46,000,000.00
  • 34. 34 RESIDENTIALRÉSUMÉ 1) CLIENT: Ing. Reynaldo Reina. PROJECT: Ing. Reynaldo Reina’s Residence , Director of Cervecería Cuauhtémoc. LOCATION: San Pedro Garza García, Nuevo León. TERM: 1986 RESPONSIBLE: Ing. Reynaldo Reina. COST: $4,500,000.00 2) CLIENT: Lic. Antonio O’farrill. PROJECT: Lic. Antonio O’farrill’s Residence LOCATION: San Pedro Garza García, Nuevo León. TERM: 1987 PHONE: 83-40-32-48 RESPONSIBLE: Lic. Antonio O’farrill. COST: $7,000,000.00 3) CLIENT: Sr. Don David Garza Lagüera. PROJECT: Sr. Don David Garza Lagüera’s Residence Remodel LOCATION: San Pedro Garza García, Nuevo León. TERM: 1988 RESPONSIBLE: Sr. Don David Garza Lagüera. COST: $1,000,000.00 4) CLIENT: Ing. Alejandro O’farrill. PROJECT: Ing. Alejandro O’farrill Residence LOCATION: Monterrey, Nuevo León. CONSTRUCTION: 450 m2 TERM: February to December 1992. PHONE: 83-56-68-27 83-56-35-85 RESPONSIBLE: Ing. Alejandro O’farrill. COST: $4,500,000.00 5) CLIENT: Lic. Sergio Tapia C. PROJECT: Lic. Sergio Tapia C.’s Residence Phase I LOCATION: Monterrey, Nuevo León. CONSTRUCTION: 150 m2 TERM: March to August 1992. PHONE: 83-78-96-30 / 83-78-97-36 RESPONSIBLE: Lic. Sergio Tapia C. COST: $180,000.00
  • 35. 35 RESIDENTIALRÉSUMÉ 6) CLIENT: Ing. Alejandro Torres Q. PROJECT: Residence Remodel. LOCATION: San Pedro Garza García, Nuevo León. TERM: March to October 1992. PHONE: 83-03-38-74 RESPONSIBLE: Ing. Alejandro Torres Q. COST: $1,600,000.00 7) CLIENT: Omega. PROJECT: Phase I Urbanization of: “Residencial Valle Alto” LOCATION: Monterrey, Nuevo León. TERM: March to December 1992. PHONE: 83-48-21-77 RESPONSIBLE: Lic. Mateo Mazal. COST: $25,500,000.00 8) CLIENT: Ing. Alejandro Torres Q. PROJECT: “Villa las Flores” neighborhood LOCATION: Monterrey, Nuevo León. CONSTRUCTION: 15 Acres. TERM: May to July 1992. PHONE: 83-99-56-72 RESPONSIBLE: Ing. Alejandro Torres Q. COST: $5,000,000.00 9) CLIENT: Arq. Agustín Landa. PROJECT: 3 level residence construction, including pool, yard construction. LOCATION: San Pedro Garza García, Nuevo León. CONSTRUCTION: 600 m2 TERM: September1992 to October 1993. PHONE: 83-46-95-29 RESPONSIBLE: Arq. Agustín Landa. COST: $2,000,000.00 10) CLIENT: Ing. Alejandro Lamothe. PROJECT: Ing. Alejandro Lamothe’s Residence LOCATION: San Pedro Garza García, Nuevo León. CONSTRUCTION: 750 m2 TERM: April 1993 to June 1994. PHONE: 83-56-65-50 RESPONSIBLE: Ing. Alejandro Lamothe. COST: $3,500,000.00
  • 36. 36 RESIDENTIALRÉSUMÉ 11) CLIENT: Lic. Bruno Ferrari de Alba. PROJECT: Lic. Bruno Ferrari’s Residence LOCATION: San Pedro Garza García, Nuevo León. CONSTRUCTION: 650 m2 TERM: March 1994 to October 1995. PHONE: 83-63-15-10 RESPONSIBLE: Lic. Bruno Ferrari de Alba. COST: $5,000,000.00 12) CLIENT: C.P. Raúl Farías. PROJECT: Torreón located inFracc. Villa Las Flores. LOCATION: Monterrey, Nuevo León. CONSTRUCTION: 10,000 m2 TERM: January 1995. PHONE: 83-99-56-00 RESPONSIBLE: C.P. Raúl Farías. COST: $350,000.00 13) CLIENT: Ing. Rubén Alanís. PROJECT: Ing. Rubén Alanis's Residence LOCATION: Monterrey, Nuevo León. CONSTRUCTION: 300 m2 TERM: January 1995. PHONE: 83-48-80-85 RESPONSIBLE: Ing. Rubén Alanís. COST: $500,000.00 14) CLIENT: Ing. Eugenio Nájera. PROJECT: Construction and Urbanization of: Fraccionamiento Villa las Flores. LOCATION: Monterrey, Nuevo León. CONSTRUCTION: 10,000 m2 TERM: July 1995 to August 1996. PHONE: 83-33-46-46 RESPONSIBLE: Ing. Eugenio Nájera. COST: $1,500,000.00 15) CLIENT: Sra. Roberta Brittingham. PROJECT: Construction and Urbanization of: pista y redondel for Mrs. Roberta Brittingham. LOCATION: Villa de Santiago, Nuevo León. CONSTRUCTION: 3,000 m2 TERM: January 1996. PHONE: 83-65-52-39 RESPONSIBLE: Lic. Daniel Milmo. COST: $700,000.00
  • 37. 37 RESIDENTIALRÉSUMÉ 16) CLIENT: Fideicomiso Desarrollado por Confia, S. A. PROJECT: Supervision of 24 habitation houses of: INFONAVIT Line III. LOCATION: Reynosa, Tamaulipas. CONSTRUCTION: 2,000 m2 TERM: January to June 1996. PHONE: 83-99-60-70 RESPONSIBLE: Lic. Horacio Tijerina. COST: $2,500,000.00 17) CLIENT: Lic. María Elena Chapa. PROJECT: Remodel and Last Details in Misiones Residence. LOCATION: Villa de Santiago, Nuevo León. CONSTRUCTION: 600 m2 TERM: March to June 1996. PHONE: 83-43-88-16 RESPONSIBLE: Lic. María Elena Chapa. COST: $150,000.00 18) CLIENT: Ing. Alejandro Torres Q. PROJECT: Palapa Construction in San José de la Montaña. LOCATION: Villa de Santiago, Nuevo León. CONSTRUCTION: 150 m2 TERM: March 1996 to March de 1997. PHONE: 83-99-56-72 RESPONSIBLE: Ing. Alejandro Torres Q. COST: $450,000.00 19) CLIENT: Ing. Carlos Rosenzweig. PROJECT: Structural Development and Project for Ing. Carlos Rosenzweig’s Residence LOCATION: San Pedro Garza García, Nuevo León. CONSTRUCTION: 450 m2 TERM: April to June 1996. PHONE: 83-90-09-32 RESPONSIBLE: Ing. Carlos Rosenzweig. COST: $15,000.00 20) CLIENT: Sra. Eugenia Rodríguez. PROJECT: Mrs. Eugenia Rodríguez’s Residence LOCATION: San Pedro Garza García, Nuevo León. TERM: August 1997. PHONE: 83-18-35-69 RESPONSIBLE: Sra. Eugenia Rodríguez. COST: $1,000,000.00
  • 38. 38 RESIDENTIALRÉSUMÉ 21) CLIENT: Libra Alimentos, S. A. de C. V. PROJECT: Two Habitation Houses in: Fraccionamiento la Muralla. LOCATION: Monterrey, Nuevo León. TERM: 750 m2 PHONE: June 1998. RESPONSIBLE: 83-50-09-21 COST: $1,050,000.00 22) CLIENT: Ing. Bernardo Garza de la Fuente. PROJECT: Garza de la Fuente Familiar Residence LOCATION: San Pedro Garza García, Nuevo León. TERM: August 2000. PHONE: 83-99-90-02 RESPONSIBLE: Ing. Bernardo Garza de la Fuente. COST: $ 20'000,000.00 23) CLIENT: Cap. Enrique Vázquez. PROJECT: Residence in: Fraccionamiento Las Misiones. LOCATION: Villa de Santiago, Nuevo León. TERM: January 2001 to July 2002. PHONE: 83-86-25-33 RESPONSIBLE: Cap. Enrique Vázquez. COST: $10,000,000.00 24) CLIENT: Inversiones Trim. PROJECT: Las Palmas Residential Condos LOCATION: Construction of 60 departments. CONSTRUCTION: Monterrey, Nuevo León. TERM: June 2001 to December 2002 PHONE: 83-33-00-19 RESPONSIBLE: C.P. Celso Javier Treviño. COST: $50,000,000.00 25) CLIENT: Grupo Delphi, S. A. de C. V. PROJECT: Balcones de la Loma LOCATION: Construction Management of: 82 Residential Apartments CONSTRUCTION: Monterrey, Nuevo León. TERM: May 2002 to November 2003 PHONE: 83-35-55-76 RESPONSIBLE: Ing. Keneth Cruz Acosta. COST: $50,000,000.00
  • 39. 39 RESIDENTIALRÉSUMÉ 26) CLIENT: Ing. Eduardo Cantú Segovia PROJECT: Bosques de Linda Vista LOCATION: Construction of 25 Habitation Houses CONSTRUCTION: San Nicolás de los Garza TERM: May 2003. PHONE: 83-90-70-50 RESPONSIBLE: Ing. Eduardo Cantú Segovia COST: $ 7'500,000.00 27) CLIENT: Familia Cantú Segovia PROJECT: Fraccionamiento Los Encinos LOCATION: Project Management and Construction of 19 Residential Houses CONSTRUCTION: San Pedro Garza García, Nuevo León TERM: October 2003 PHONE: 83-90-70-50 RESPONSIBLE: Ing. Eduardo Cantú Segovia COST: $ 25'000,000.00 28) CLIENT: Grupo Atlas PROJECT: Pedregal de Valle Alto LOCATION: 5 Acre Development in: Fraccionamiento Residencial CONSTRUCTION: Monterrey, Nuevo León, Zona Valle Alto TERM: October 2003 PHONE: 83-78-45-18 RESPONSIBLE: Lic. Estanislao Martínez Paz COST: $4,000,000.00 29) CLIENT: Nadiex, S. A. de C. V. PROJECT: Residencial Miravalle LOCATION: 17 apartments CONSTRUCTION: Av. San Jerónimo No. 200, Col. Miravalle, Monterrey, N. L. TERM: November 2003 PHONE: 83-45-88-45 RESPONSIBLE: Lic. Javier Delgado Navarro COST: $ 18'000,000.00 30) CLIENT: Constructora Milimex PROJECT: Balcones de Satélite DESCRIPTION: Vertical Construction, 10 floors for 486 low-cost housing in 16 Acres LOCATION: Monterrey, Nuevo León TERM: January 2004 PHONE: 83-78-46-00 RESPONSIBLE: Lic. Estanislao Martínez Martínez COST: $ 24'000,000.00
  • 40. 40 RESIDENTIALRÉSUMÉ 31) CLIENT: Acuña Bienes Raíces PROJECT: Benetton Tower LOCATION: Project Direction and Construction CONSTRUCTION: Monterrey, N.L. TERM: April 2005 to October 2006. PHONE: 83-35-70-15 RESPONSIBLE: Lic. Rafael Acuña COST: $40,000,000.00 32) CLIENT: Gamo Bienes Raíces PROJECT: Fraccionamiento La Silla LOCATION: Project Management and Construction CONSTRUCTION: Monterrey, N.L. TERM: August 2005 to December 2006 PHONE: 83-35-23-20 RESPONSIBLE: Lic. Raúl Garza COST: $20,000,000.00 33) CLIENT: Quail Construction PROJECT: Fraccionamiento Codornices LOCATION: Direction and Supervision CONSTRUCTION: Monterrey, N.L. TERM: April 2006 PHONE: 83-56-84-10 RESPONSIBLE: Ing. Eugenio Nájera COST: $10,000,000.00 34) CLIENT: Desarrollos Sierra Madre PROJECT: Fraccionamiento La Silla LOCATION: Direction and Supervision CONSTRUCTION: Monterrey, N.L. TERM: April 2006 PHONE: 83-38-10-30 RESPONSIBLE: Sra. Lila Garza COST: $110,000,000.00 35) CLIENT: Quail Construction PROJECT: Fraccionamiento Los Aldama LOCATION: Direction and Supervision CONSTRUCTION: Monterrey, N.L. TERM: Septiember 2006 PHONE: 83-56-84-10 RESPONSIBLE: Ing. Eugenio Nájera Padilla COST: $8,500,000.00
  • 41. 41 RESIDENTIALRÉSUMÉ 36) CLIENT: Fam. Argüelles PROJECT: Casa - Club LOCATION: Direction and Supervision CONSTRUCTION: San Pedro Garza García TERM: December 2006 PHONE: 81-52-42-49 RESPONSIBLE: Lic. Sergio Argüelles COST: $ 5'000,000.00 37) CLIENT: Empresas Santos PROJECT: Fracc. Los Ángeles LOCATION: Direction and Supervision CONSTRUCTION: San Pedro Garza García, N.L. TERM: February 2007 PHONE: 81-14-20-20 RESPONSIBLE: Ing. Fernando Moreno COST: $ 26'000,000.00 38) CLIENT: Empresas Ese PROJECT: Fracc. Santa Catarina LOCATION: Direction and Supervision CONSTRUCTION: Santa Catarina, N.L. TERM: April 2007 PHONE: 81-80-10-60-50 RESPONSIBLE: Lic. Salvador Alanís COST: $ 5'500,000.00 39) CLIENT: Grupo Gentor PROJECT: Fracc. Las Fuentes LOCATION: Internal Audit CONSTRUCTION: San Pedro Garza García, N.L. TERM: April 2007 PHONE: 83-44-75-65 RESPONSIBLE: Lic. Luis Alberto Ruiz COST: $ 206'000,000.00 40) CLIENT: Lic. Ernesto Santos PROJECT: Residencial LOCATION: Direction and Supervision CONSTRUCTION: San Pedro Garza García, N.L. TERM: January 2008 PHONE: 81-73-53-53 RESPONSIBLE: Lic. Ernesto Santos COST: $ 206'000,000.00 41) CLIENT: Lic. Angel Galván PROJECT: Residentiall DESCRIPTION: Direction and Supervision LOCATION: San Pedro Garza García, N.L. TERM: October 2008 to May 2009 PHONE: 15-94-27-61 RESPONSIBLE: Lic. Angel Galván
  • 42. 42 RESIDENTIALRÉSUMÉ 42) CLIENT: Inmobiliaria Cañón del Huajuco PROJECT: Fracc. Los Azulejos LOCATION: Direction CONSTRUCTION: Monterrey, N. L. TERM: 2008 PHONE: 83-63-38-88 RESPONSIBLE: C.P. Artemio Garza COST: 43) CLIENT: Ing. Jorge Llaguno PROJECT: Fam . Llaguno’s Residence LOCATION: Direction and Supervision CONSTRUCTION: San Pedro Garza García TERM: July 2009 PHONE: 83-31-77-01 RESPONSIBLE: Ing. Jorge Llaguno COST: 44) CLIENT: Lic. Armando Vejar PROJECT: Fracc. Puerto Bahía Villas LOCATION: Direction and Supervision CONSTRUCTION: Puerto Vallarta TERM: July 2010 PHONE: 81-55-65-05 RESPONSIBLE: Lic. Armando Vejar COST:
  • 43. 43 RESIDENTIALRÉSUMÉ 45) CLIENT: Grupo Corporativo BATAB, S.A. de C.V. (NURBAN) PROJECT: Fraccionamiento de Lotes Urbanizados con Campos de Golf LOCATION: Ave. Patria 1300 Col. Villa Universidad, Zapopan, Jalisco. CONSTRUCTION: Fraccionamiento de Lotes Urbanizados con Campos de Golf TERM: 2014. PHONE: 122-917-94444 RESPONSIBLE: Ing. Ernesto Bortoni COST: $264,000,000.00 46) CLIENT: GESTA Desarrollos, S.A. de C.V. PROJECT: Habitation Building LOCATION: Av. Eugenio Garza Sada No. 800 sur Col. Mas Palomas, Monterrey, NL. CONSTRUCTION: Edificio de Usos Multiples 2 niveles comercial, 9 niveles de departamentos y sotano 4 niveles. TERM: 2014 PHONE: 81-5536-54 RESPONSIBLE: Ing. Oscar de la Garza Clariond COST: $360,000,000.00 47) CLIENT: El Molino PROJECT: Internal Audit LOCATION: Leon, Guanajuato CONSTRUCTION: Fraccionamiento Residencial con Campo de Gold y Casa Club TERM: 2014 PHONE: 477-7811-016 RESPONSIBLE: Ing. Ernesto Bortoni COST: $200,000,000.00 48) CLIENT: La Reserva PROJECT: Internal Audit LOCATION: Queretaro, Qro CONSTRUCTION: Fraccionamiento con Edificios Multifamiliares TERM: 2014 PHONE: 442-1927-700 RESPONSIBLE: Yolanda Hernandez COST: $400,000,000.00
  • 44. GENERAL INFORMATION  Enterprise: VEGA CONSULTORES S.A. de C.V.  Location: Distrito B-4 #397 Col. Leones, Monterrey, N.L.  Phone/Fax: (81)-83333-6400, 8333-8818  Executive Director: Ing. Manuel Ventosa Gzz.  Webpage: www.vegagerencia.com.mx 44 AUTHOR: RANDY DE LA ROSA RUBALCAVA