This résumé outlines Randy De La Rosa Rubalcava's experience in internal auditing, management, and administration of construction projects from 1992-2014. It provides details on 35 commercial construction projects involving clients such as Walmart Mexico, HEB, and the University of Monterrey. The résumé emphasizes VEGA's project methodology and benefits of construction supervision for completing projects on time, within budget, and to a high quality.
2. MISSION
PHILOSOPHY
We are an organization which purpose is to satisfy and overcome the common
expectative of the national and international industry of construction, by always
achieving excellence in the management of construction work.
To integrate all the tasks involved in Planning and Controlling Construction Work, with
the priority goal of finishing the project within time, cost and quality.
2
3. PROJECT MANAGEMENT SYSTEM
3
Procedure Manual
Control System
Not Failing Guarantee
VEGA has developed a methodology
which allows us guarantee the complete
satisfaction of our client achieving from a
20% to a 30% either is an industrial,
commercial or residential project.
4. SERVICES OFFERED BY VEGA
VEGAConstruction
Management
Project
Management
Engineering
Development
Internal Audit
Redesign
Procedure
Manual
Strategy
Supervision in
Maintenance
Personal
Services for
Administration
4
5. 5
FOCUS ON OUR SERVICES
VEGA
Hotels
Working
Offices
Malls
IndustriesTourism
Development
Infrastructure
Urbanization
School
and
Institution
s
Residenti
al
6. 6
BENEFITS OF SUPERVISION
MORE($)INVESTEMENT
TIME MORELESS
VEGA
• Continuous presence at
construction site
• Strict control of quality
• Organized budget control
• Direct coordination with
companies specialists
• 25% guaranteed savings and
on in
TIME and COST
TRADITIONAL SYSTEM
• Lack of supervision
• Lack of time and cost
control
• No budget control
• Poor quality
• Extra Costs and Overhead
Costs
• Generally a 25% more than
planned
7. 7
PROJECT METHODOLOGY
We rely on our system that
assures the best quality in our
service provided based on
the experienced
workmanship and the
procedure of our
methodology that certifies
our service quality. This is
supported by specialists in
different areas of
construction, guarantying an
excellent project closure.
General
Statement
Financial Budget
Control
Resource
Estimation
1. Generate the Conceptual
Project
II. Select Project
Direction
III. Develop the Preliminary
Project
IV. Develop the Executive
Project
V. Invitation to
Tender
VI. Management and
Supervision
VII. Start Up and
Tests
VIII. Settlement of Building
Site
Tracking and Monitoring of
Progress
13. 13
COMMERCIALRÉSUMÉ 1) CLIENT: Cigarrera La Moderna 1. Rectangular and Semicircular Stables.
PROJECT: Desarrollo Hípico “El Diente” 2. Food Storage
LOCATION: Monterrey, Nuevo León 3. Roofed Riding School
CONSTRUCTION: 100 Hectáreas 4. Roads
TERM: 1992 - 1995 5. High and Low Tension System
PHONE: 83-47-78-07 6. Tracks
RESPONSIBLE: Ing. Gustavo Romo 7. International Stables
COST: $ 73,000,000.00
2) CLIENT: Propiedad de la Inmobiliaria INVEC, S. A. de C. V. (Fina Factor)
PROJECT: Mall “Plaza Carranza”
DESCRIPTION: Project Management and Mall Construction
LOCATION: Monterrey, Nuevo León
CONSTRUCTION: 4,950 m2
TERM: July-December 1992
PHONE: 83-35-21-63/83-35-49-30
RESPONSIBLE: Ing. Hugo Chapa
COST: $10,500,000.00
3) CLIENT: Propiedad de Inversiones Safi, S. A. de C. V.
PROJECT: Best Western Royal Hotel
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 7,500 m2
TERM: November 1992.
PHONE: 83-40-11-88/83-43-81-00
RESPONSIBLE: Sr. Jorge Safi.
COST: $8,500,000.00
4) CLIENT: Internacional de Inversiones, S.A. De C. V.
PROJECT: San Agustín Medical Center
DESCRIPTION: Project Direction, Development of Preliminary Project, Permits and Engineering
LOCATION: San Pedro, Garza García, Nuevo León.
CONSTRUCTION: 18,000 m2
TERM: From March to July 1993
PHONE: 83-63-24-34/83-63-30-70
RESPONSIBLE: Lic. Octavio Hinojosa
COST: $30,000.00
5) CLIENT: Planeación Inmobiliaria Capital.
PROJECT: Santa Elena Building
DESCRIPTION: Engineering Direction
LOCATION: San Pedro, Garza García, Nuevo León.
CONSTRUCTION: 3,000 m2
TERM: May 1995
RESPONSIBLE: Lic. Luis Oseguera.
COST: $6,000,000.00
14. 14
6) CLIENT: Galáz, Gómez, Mortin, Chavero, Yamazaki, S.C.
PROJECT: Corp. Torres Kumay.
DESCRIPTION: Project Direction, Development of Preliminary Project, Permits and Engineering
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 21,000 m2
TERM: August de 1995.
PHONE: 83-33-10-33 / 83-48-68-92
RESPONSIBLE: C.P. Ma. Estela Imamura, C.P. Celso Javier Treviño.
COST: $30,000,000.00
7) CLIENT: Comercial América.
PROJECT: Remodel of Cash Registers.
LOCATION: San Pedro, Garza García, Nuevo León.
CONSTRUCTION: 150 m2
TERM: March to April 1996.
PHONE: 83-68-40-78
RESPONSIBLE: C.P. Armando Fernández.
COST: $200,000.00
8) CLIENT: Restaurante Remembers.
PROJECT: Remodeling and construction of the new construction of the Restaurant Remembers.
LOCATION: Monterrey, Nuevo León.
TERM: April 1996
PHONE: 83-78-44-14
RESPONSIBLE: Arq. Felipe Mier.
COST: $1,000,000.00
9) CLIENT: Comercial América.
PROJECT: Office Remodeling of: Promotoría en Seguros.
LOCATION: San Pedro, Garza García, Nuevo León.
CONSTRUCTION: 400 m2
TERM: November1996.
PHONE: 83-68-40-78
RESPONSIBLE: C.P. Armando Fernández.
COST: $900,000.00
10) CLIENT: Comercial América.
PROJECT: Employee Dinning Room.
LOCATION: San Pedro, Garza García, Nuevo León.
CONSTRUCTION: 180 m2
TERM: January 1997.
PHONE: 83-68-40-78
RESPONSIBLE: C.P. Armando Fernández.
COST: $550,000.00
COMMERCIALRÉSUMÉ
15. 15
11) CLIENT: Bueno Alimentos, S.A. de C.V.
PROJECT: Corp. for Bueno Alimentos, S.A. de C.V.
DESCRIPTION: Direction of the Engineering and the Construction of the Office Building
UBICATION: Monterrey, Nuevo León.
TERM: December 1997 to January 1999.
PHONE: 83-33-34-43
RESPONSIBLE: Lic. Guillermo Bueno.
COST: $500,000.00
12) CLIENT: Lic. Alejandro Bueno, Arq. Felipe Mier, Lic. Alfonso Guzmán.
PROJECT: Apartments in the Project: Torre Blanca.
LOCATION: San Pedro, Garza García, Nuevo León.
TERM: May 1998.
PHONE: 83-48-63-55
RESPONSIBLE: Lic. Alejandro Bueno.
COST: $2,500,000.00
13) CLIENT: Superficies Decorativas, S. A. de C.V.
PROJECT: Construction of Distribution Center
LOCATION: Direction of the Engineering, the Construction of the Office Building and the Industrial Warehouse
CONSTRUCTION: Monterrey, Nuevo León.
TERM: June 2000
PHONE: 86-25-50-00
RESPONSIBLE: Lic. Luis de la Garza.
COST: $15,000,000.00
14) CLIENT: Chrysler.
PROJECT: Chrysler Poza Rica Chrysler Agency
DESCRIPTION: Direction of the Engineering, the Construction of the Office Building, exposure area, industrial workshop, stock and maneuver
UBICATION: Poza Rica, Veracruz.
TERM: July 2000
PHONE: (138) 2-22-42
RESPONSIBLE: Lic. Ramón Caballero.
COST: $ 18'000,000.00
15) CLIENT: Supermercados Internacionales HEB.
PROJECT: HEB
DESCRIPTION: Store and Mall Construction
UBICATION: Santa Catarina, Nuevo León.
TERM: January 15 of 2001 to August 29 of 2001.
PHONE: 81-53-11-61
RESPONSIBLE: Arq. Irene Padilla
COST: $150,000,000.00
COMMERCIALRÉSUMÉ
16. 16
16) CLIENT: Super Mercados Internacionales HEB.
PROJECT: HEB Tampico.
DESCRIPTION: Mall and Store Construction
LOCATION: Tampico, Tamaulipas.
TERM: October 2001
PHONE: 81-53-11-61
RESPONSIBLE: Arq. Mauricio Toloumsis.
COST: $150,000,000.00
17) CLIENT: Internet por Fibra, S. A. de C. V.
PROJECT: Celda S5.
DESCRIPTION: Project Direction, Permits, Engineering and Fiber Optic Network Construction.
LOCATION: San Pedro Garza García, Nuevo León.
TERM: April 2002
PHONE: 84-79-55-10
RESPONSIBLE: Ing. Jorge Eugenio Ortíz.
COST: $3,000,000.00
18) CLIENT: Parroquia Santa Engracia
PROJECT: Centro Pastoral San Agustín
DESCRIPTION: Temple Construction including chapel, offices, salons and parking lot. (20,000 m2)
LOCATION: Sendero de las Privanzas 402, Col. Las Privanzas, San Pedro Garza García
TERM: November 2003
PHONE: 80-40-28-95
RESPONSIBLE: Pbro. Marcelo Varela
COST: $ 16'000,000.00
19) CLIENT: Grupo Acosta Verde
PROJECT: Mall: Plaza Periférico
DESCRIPTION: Construction Management of: High Category Mall Center
LOCATION: Reynosa, Tamaulipas
TERM: January 2004 to December de 2004
PHONE: 10-01-98-00
RESPONSIBLE: Arq. Miguel Reyes Vidales
COST: $ 280'000,000.00
20) CLIENT: Corporación Control
PROJECT: Woolworth Monterrey
DESCRIPTION: Construction Management of the Departmental Store.
LOCATION: Monterrey, N.L.
TERM: September 2004 to December 2004
PHONE: 83-29-55-00
RESPONSIBLE: Arq. Javier Ibarra
COST: $ 20'000,000.00
COMMERCIALRÉSUMÉ
17. 17
21) CLIENT: Lic. Javier Delgado
PROJECT: Centro Comercial Las Lajas
DESCRIPTION: Construction Management of the Mall
LOCATION: Monterrey, N.L.
TERM: January 2005.
PHONE: 83-45-88-45
RESPONSIBLE: Ing. Javier Delgado
COST: $ 5'000,000.00
22) CLIENT: G y H de Juárez
PROJECT: Plaza Galería TEC (Multimedios)
DESCRIPTION: Project and Construction Management
LOCATION: Cd. Juárez, Chihuahua.
TERM: January 2005 to November 2006
PHONE: 83-56-20-99
RESPONSIBLE: Lic. Marco Martínez
COST: $ 60'000,000.00
23) CLIENT: Wal Mart de México
PROYECT: Supercenter Miguel Alemán Remodeling
DESCRIPTION: Direction and Supervision
LOCATION: Monterrey, N.L.
TERM: May 2005 to August 2005
PHONE: 83-18-04-34
RESPONSIBLE: Ing. Luis Eduardo Ochoa
COSTO: $3,000,000.00
24) CLIENT: Wal Mart de México
PROJECT: Supercenter Las Torres Remodeling
DESCRIPTION: Direction and Supervision
LOCATION: Monterrey, N.L.
TERM: May 2005 a August 2005
PHONE: 83-18-04-34
RESPONSIBLE: Ing. Luis Eduardo Ochoa
COST: $3,000,000.00
25) CLIENT: Wal Mart de México
PROJECT: Bodega Aurrera Saltillo (Change of A/C Equipment)
DESCRIPTION: Direction and Supervision
LOCATION: Saltillo, Coah.
TERM: January 2006 to March 2006
PHONE: 83-18-04-34
RESPONSIBLE: Ing. Luis Eduardo Ochoa
COST: $1,500,000.00
COMMERCIALRÉSUMÉ
18. 18
26) CLIENT: Grupo Soriana
PROJECT: Soriana Tangamanga
DESCRIPTION: Direction and Supervision
LOCATION: San Luis Potosí, S.L.P.
TERM: February 2006 to July 2006
PHONE: 83-29-90-00
RESPONSIBLE: Ing. Sergio Díaz
COST: $ 85'000,000.00
27) CLIENT: Fideicomiso Paque Fundidora
PROJECT: Fundidora Park Expansion Phase 1
DESCRIPTION: Direction and Supervision
LOCATION: Monterrey, N.L.
TERM: March 2006 to June 2006
PHONE: 83-40-52-50
RESPONSIBLE: Ing. Sergio Cantú
COST: $140,000,000.00
28) CLIENT: Fundación Monterrey 2007 A.C
PROJECT: Fundidora Park Expansion Phase 2
DESCRIPTION: Direction and Supervision
LOCATION: Monterrey, N.L.
TERM: April 2006 to December 2006
PHONE: 83-40-52-50
RESPONSIBLE: Ing. Sergio Cantú
COST: $120,000,000.00
29) CLIENT: Wal Mart de México
PROJECT: Suburbia La Silla (Remodeling)
DESCRIPTION: Direction and Supervision
LOCATION: Monterrey, N.L.
TERM: April 2006 a July 2006
PHONE: 83-18-04-34
RESPONSIBLE: Ing. Carlos Acevedo
COST: $3,000,000.00
30) CLIENT: Wal Mart de México
PROJECT: Bodega Aurrera Construction
DESCRIPTION: Direction and Supervision
LOCATION: Río Grande, Zacatecas
TERM: June 2006 to September 2006
PHONE: 83-56-84-10
RESPONSIBLE: Arq. Rodrigo Mariscal
COST: $13,500,000.00
COMMERCIALRÉSUMÉ
19. 19
31) CLIENT: Universidad de Monterrey
PROJECT: Internal Audit UDEM Residences
DESCRIPTION: Internal Audit
LOCATION: San Pedro Garza García, N.L.
TERM: September 2006 to December 2006
PHONE: 81-24-11-21
RESPONSIBLE: Lic. Luis Miranda
COST:
32) CLIENT: Lic. Luis Alberto Troncoso / Arq. José Carlos Villanueva
PROJECT: La Cima Apartment Building
DESCRIPTION: Management and Supervision
LOCATION: San Pedro Garza García, N.L.
TERM: September 2006
PHONE: 80-40-20-05
RESPONSIBLE: Lic. Luis Alberto Troncoso / Arq. José Carlos Villanueva
COST: $16,500,000.00
33) CLIENT: Wal Mart de México
PROJECT: Mi Bodega Aurrera
DESCRIPTION: Direction and Supervision
LOCATION: Madero, Coahuila
TERM: January 2007 a March 2007
PHONE: 01-55-53-70-30-00
RESPONSIBLE: Arq. Federico Díaz
COST: $8,000,000.00
34) CLIENT: Wal Mart de México
PROJECT: Bodega Aurrera
DESCRIPTION: Direction and Supervision
LOCATION: Villa de García, N.L.
TERM: March 2007
PHONE: 01-55-53-71-30-00
RESPONSIBLE: Arq. Rodrigo Mariscal
COST: $ 34'000,000.00
35) CLIENT: Desarrolladora M
PROJECT: School Classrooms
DESCRIPTION: Direction and Supervision
LOCATION: Monterrey, N.L. y su área Metropolitana
TERM: April 2007 -
PHONE: (55) 52-57-17-56
RESPONSIBLE: Ing. Joaquín Martínez del Campo
COST: $ 100'000,000.00
COMMERCIALRÉSUMÉ
20. 20
36) CLIENT: Motores Competitivos SA de CV
PROJECT: Agency Pro-shop Suzuki
DESCRIPTION: Direction and Supervision
LOCATION: Monterrey, N.L. y su área Metropolitana
TERM: October 2007- February 2008
PHONE: 12-33-00-00
RESPONSIBLE: Ing. Humberto Guzmán
COST: $3,500,000.00
37) CLIENT: Trebotti SA de CV
PROJECT: Torre de Departamentos y Oficinas
LOCATION: Torreón Coahuila
TERMN: Octubre 2007
PHONE: 01-871) 719-10-00
RESPONSIBLE: Lic. Luis Treviño Botti
38) CLIENT: Max Construcciones de Arenas y Parques SA de CV
PROJECT: Estacionamiento Oriente Arena Monterrey
DESCRIPTION: Direction and Construction
LOCATION: Monterrey, N. L.
TERM: May 2008 – July 2009
PHONE: 82-21-20-20
RESPONSIBLE: C.P. Guillermo Garza Mercado
COST:
39) CLIENT: Inversity Desarrollo Inmobiliario
PROJECT: Habitation Apartments in: Campo de Golf
LOCATION: San Miguel de Allende, Gto.
TERM: May to September 2008
PHONE: 83-63-86-32
RESPONSIBLE: Arq, Marco Garza
COST:
COMMERCIALRÉSUMÉ
21. 21
40) CLIENT: Century 21 Marcos & Assad
PROJECT: Apartment Tower
DESCRIPTION: Direction and Construction
LOCATION: Monterrey. N. L.
TERM: August 2008 to May 2009
PHONE: 50-00-21-00
RESPONSIBLE: Lic. Marco Garza Mercado
COST:
41) CLIENT: Ing. Rogelio Sada Zambrano
PROJECT: Fraccionamiento Canoas
DESCRIPTION: Parametric Budget Elaboration
LOCATION: Montemorelos Nuevo León
TERM: June to July 2009
PHONE: 83-65-02-21
RESPONSIBLE: Ing. Rogelio Sada Zambrano
42) CLIENT: Arq. Eudelio Garza
PROJECT: Plaza Fiesta Anáhuac
DESCRIPTION: Internal Audit
LOCATION: San Nicolás de los Garza Nuevo León
TERM: August 2009 to January 2010
PHONE: 83-63-31-08
RESPONSIBLE: Arq. Eudelio Garza
43) CLIENT: Inmobiliaria Celer SA de CV
PROJECT: Hidalgo Tower
DESCRIPTION: Direction and Construction
LOCATION: Monterrey, Nuevo León
TERM: October 2010
PHONE: 83-99-88-00
RESPONSIBLE: Arq. Alick Amador
COMMERCIALRÉSUMÉ
22. 22
44) CLIENT: Deportivo Alpino Chipinque
PROJECT: Parking lot, Golf Practice Camp, Elevator Installation and Internal Remodel
DESCRIPTION: Diagnose and Internal Audit
LOCATION: Av. San Ángel No. 118 Col. Chipinque, CP 66290, San Pedro Garza García . N. L.
TERM: 2014
PHONE: 81-15-00-00
RESPONSIBLE: Ing. Sergio Unger
COST: $30,300,000.00
45) CLIENT: Trazzo Desarrollos Verticales, S.A. de C.V.
PROJECT: SAQQARA
DESCRIPTION: Diagnose and Internal Audit
LOCATION: Batallon de San Patricio 109 Col. Valle Oriente, San Pedro Garza García . N. L.
TERM: 2014
PHONE:
RESPONSIBLE: Matias Kreifler
COST: $685,000,000.00
46) CLIENT: IDEI
PROJECT: KOI Sky Residences
DESCRIPTION: Diagnose and Internal Audit
LOCATION: Av. Fundadores Esq. Con David Alfaro Siqueiros Valle Oriente, San Pedro Garza García . N. L.
TERM: 2014
PHONE:
RESPONSIBLE: Abelardo Garza Evia
COST: $1,726,382,951.00
COMMERCIALRÉSUMÉ
24. 24
1) CLIENT: Abogados Garza O’farrill y Asociados.
PROJECT: Abogados Garza O’farrill y Asociados Headquarters
LOCATION: Monterrey, Nuevo León.
TERM: 1987
PHONE: 83-45-70-16
RESPONSIBLE: Lic. Antonio O'farril
COST: $5,000,000.00
2) PROJECT: Bolsa Profesional Building.
UBICACIÓN: Los Ángeles, California, USA.
TERM: 1998-1990
COST: $3,000,000.00 U.S. Dlls.
3) CLIENT: Ing. Cecilio Villanueva.
PROJECT: Villanueva Industrial Storage
DESCRIPTION: Two Level Storage Construction
LOCATION: Monterrey, Nuevo, León.
CONSTRUCTION: 1,500 m2
TERM: March1993 to January de 1994.
PHONE: 83-51-88-86
RESPONSIBLE: Ing. Cecilio Villanueva.
COST: $1,400,000.00
4) CLIENT: Fama, S. A. de C. V.
PROJECT: New Roof for: Nave Maquinaria of Vitro Group
LOCATION: Monterrey, Nuevo León.
TERM: 1996
RESPONSIBLE: Ing. Juan Manuel Arrieta.
COST: $800,000.00
5) CLIENT: Vidriera Monterrey, S. A. de C. V.
PROJECT: Horno No. 6. Remodel
DESCRIPTION: Demolition, Survey for new installations
LOCATION: Monterrey, Nuevo León.
TERM: 1997
PHONE: 83-29-10-00
RESPONSIBLE: Ing. Ramiro Sánchez.
COST: $52,663,810.00
6) CLIENT: Promapi, S. A. de C. V.
PROJECT: (WWTP) Waste Water Treatment Plant Construction.
LOCATION: México, D.F.
TERM: 1997
PHONE: (55) 58-55-30-33
RESPONSIBLE: C.P. Justo Gómez.
COST: $4,800,000.00
INDUSTRIALRÉSUMÉ
25. 25
INDUSTRIALRÉSUMÉ
7) CLIENT: Auto Templex, S. A. de C. V.
PROJECT: Horno T-11 Auto Templex.
DESCRIPTION: Production line construction, fans and warehouse
LOCATION: Villa de García, Nuevo León.
TERM: 1997 to 1998
PHONE: 83-29-36-00
RESPONSIBLE: Ing. Sergio Martínez.
COST: $108,576,000.00
8) CLIENT: Lic. Patricio O’farrill.
PROJECT: Titanium Almacenaje y Maquila.
DESCRIPTION: 6 warehouses construction for storage for light industry.
LOCATION: 10,000 m2.
CONSTRUCTION: Apodaca, Nuevo, León.
TERM: March to September 1997.
PHONE: 83-40-32-48
RESPONSIBLE: Lic. Antonio O’farrill.
COST: $5,850,000.00
9) CLIENT: Bueno Alimentos, S.A. de C.V.
PROJECT: Warehouse Reconstruction
DESCRIPTION: Demolition and Construction.
LOCATION: Santa Catarina, Nuevo, León.
CONSTRUCTION: 1,680 m2
TERM: January 1998.
PHONE: 83-33-34-43
RESPONSIBLE: Lic. Eugenio Bueno.
COST: $ 800,000.00.
10) CLIENT: Cervecería Cuauhtémoc Moctezuma.
PROJECT: Project MP Phase I.
DESCRIPTION: Orizaba, Veracruz.
LOCATION: 2,500 m2
TERM: February 1998 to August 1999.
PHONE: 83-28-50-00 / 83-28-54-93
RESPONSIBLE: Ing. Eduardo Saldaña.
COST: $80,000,000.00
11) CLIENT: Seguros Comercial América.
PROJECT: Valuation área stands
LOCATION: Monterrey, Nuevo León.
TERM: April to May 1998.
PHONE: 83-68-40-78
RESPONSIBLE: C.P. Armando Fernández.
COST: $15,000,000.00
12) CLIENT: Metalsa, S.A, de C.V.
PROJECT: Thermic Treatment Warehouse
DESCRIPTION: Apodaca, Nuevo, León.
LOCATION: 17,200 m2
TERM: August de 1998.
PHONE: 83-69-74-00
RESPONSIBLE: Ing. Ignacio Prieto
COST: $30,000,000.00
26. 26
INDUSTRIALRÉSUMÉ
13) CLIENT: Vitro Supermatic, S. A. de C. V.
PROJECT: Storage Warehouse Roofing
DESCRIPTION: Apodaca, Nuevo León.
LOCATION: 17,000 m2
TERM: August 1998.
PHONE: 83-29-23-00
RESPONSIBLE: Ing. Juan Antonio Villarreal.
COST: $6,500,000.00
14) CLIENT: Vidriera Monterrey, S. A.
PROJECT: Remodeling Historic Hallway
DESCRIPTION: Monterrey, Nuevo León.
LOCATION: 6,000 m2
TERM: Augusto 1998.
PHONE: 83-29-10-00
RESPONSIBLE: Arq. Eduardo Carrillo.
COST: $3,200,000.00
15) CLIENT: Vidriera Monterrey, S. A.
PROJECT: Remodeling Horno No.7.
DESCRIPTION: Demolition and Construction of production line, fans and warehouse
LOCATION: Monterrey, Nuevo León.
TERM: Septiember 1998 to Junr 1999.
PHONE: 83-29-10-00
RESPONSIBLE: Ing. Jesús García.
COST: $98,000,000.00
16) CLIENT: Perrigo de México.
PROJECT: Warehouse for: Reempaque de Perrigo de México.
DESCRIPTION: Ramos Arizpe, Coahuila.
LOCATION: 2,500 m2
TERM: December 1998 to September 1999.
PHONE: 83-88-36-46
RESPONSIBLE: Ing. Vicente Saro.
COST: $ 1,592,000.00 Dlls.
17) CLIENT: Supermatic.
PROJECT: New roof for Supermatic Warehouse.
DESCRIPTION: Metallic cover installation for the existing warehouse, while plant was still working and producing.
LOCATION: Apodaca, Nuevo León.
TERM: December1998 to September 1999.
PHONE: 83-29-23-00
RESPONSIBLE: Ing. Alfonso Campos
COST: $15,000,000.00
18) CLIENT: Ampolletas, S. A. de C. V.
PROJECT: Warehouse for: Frascos y Cuarto Limpio.
LOCATION: Querétaro, Querétaro.
TERM: 1999
PHONE: (442) 2-11-11-65
RESPONSIBLE: Ing. Jesús Delgado.
COST: $3,765,000.00
27. 27
INDUSTRIALRÉSUMÉ 19) CLIENT: Cervecería Cuauhtémoc Moctezuma.
PROYECT: Carbonic Gas Line Modification
LOCATION: Navojoa, Sonora.
TERM: March a December de 1999.
RESPONSIBLE: Ing. Cristóbal Cantú.
COST: $56,000,000.00
20) CLIENT: Simeprodeso.
PROJECT: Processing Plant of Solid Wastes from the Landfill
DESCRIPTION: Construction of a Processing Plant of Solid Wastes
LOCATION: Monterrey, Nuevo León.
TERM: April1999 to March 2000.
PHONE: 83-44-54-30
RESPONSIBLE: Lic. Guillermo Castillo.
COST: $35,000,000.00
21) CLIENT: Cervecería Cuauhtémoc Moctezuma.
PROJECT: Carta Blanca de Hidalgo Agency
LOCATIONN: Parral, Chihuahua.
TERM: May to July 1999.
RESPONSIBLE: Ing. Javier Marroquín.
COST: $10,000,000.00
22) CLIENT: Pepsi Gemex.
PROJECT: Warehouse of: Llenos y Vacíos.
DESCRIPTION: Warehouse and maneuver patio construction
LOCATION: Apodaca, Nuevo León.
TERM: June1999 to January 2000
PHONE: 83-86-37-55
RESPONSIBLE: Arq. Enrique de la Jara
COST: $4,200,000.00
23) CLIENT: Industrial Power Counting.
PROJECT: Línea de Polvos, Largueros de Camión en Metalsa.
DESCRIPTION: Civil Work and Equipment installation for painting rooms
LOCATION: Apodaca, Nuevo León.
TERM: July 1999 February 2000.
PHONE: 83-69-75-61
RESPONSIBLE: Ing. Luis Carlos Carranza.
COST: $ 2,300,000.00 Dlls
24) CLIENT: Transportes Tamaulipas, S.A de C.V.
PROJECT: Box Office, Service Workshops, Dorm rooms Project
LOCATION: Various places at the North-East of Mexico
TERM: July 1999 to 2001.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller.
COST: $11,000,000.00
28. 28
INDUSTRIALRÉSUMÉ
25) CLIENT: Autobuses del Noreste, S. A. de C. V.
PROJECT:: Box Office, Service Workshops, Dorm rooms Project
LOCATION: Various places at the North-East of Mexico
TERM: July 1999 to 2001.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller.
COST: $6,000,000.00
26) CLIENT: Prefabricados Monterrey, S. A. de C. V.
PROJECT: Plant II
DESCRIPTION: Construction of a Prefabricated Block Plant
LOCATION: México, D. F.
TERM: September 1999 to August 2000.
PHONE: 83-84-85-40
RESPONSIBLE: Ing. Mauricio Flores.
COST: $16,000,000.00
27) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V.
PROJECT: Construction of Pensión S.I.R. F
DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio
LOCATION: Guadalupe, Nuevo León.
TERM: November 1999 to April 2000.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.
COST: $5,500,000.00
28) CLIENT: Pepsi Gemex.
PROJECT: Centro de Distribución Monclova. CEDIS.
DESCRIPTION: Warehouse Construction and Office Remodel
LOCATION: Monclova, Coahuila.
TERM: 2000
PHONE: 83-86-37-55
RESPONSIBLE: Arq. Enrique de la Jara.
COST: $900,000.00
29) CLIENT: Autobuses del Noreste, S. A. de C. V.
PROJECT: North-East Villagrán Headquarters
DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio
LOCATION: Noreste Villagrán.
TERM: Janury to October 2000.
PHONE: Ing. Rodolfo Siller.
RESPONSIBLE: 81-51-44-00
COST: $ 20,500'000.00
30) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V.
PROJECT: Workshop, Dorm Rooms and Warehouse Extension
DESCRIPTION: ConsConstruction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio
LOCATION: Monterrey, Nuevo León.
TERM: February to June 2000.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.
COST: $2,000,000.00
29. 29
INDUSTRIALRÉSUMÉ 31) CLIENT: Grupo Toluca S.A de C.V.
PROJECT: Bus Station Morelia.
DESCRIPTION: 18 hour Project of 13,000 m2
LOCATION: Morelia, Michoacán.
TERM: April 2000 to August 2002
PHONE: (5) 273-30-09
RESPONSIBLE: C.P. Rodolfo Flores.
COST: $150,000,000.00
32) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V.
PROJECT: Dinning Room Construction S.I.R. B
LOCATION: San Nicolás de los Garza, Nuevo León.
TERM: April to June 2000.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.
COST: $250,000.00
33) CLIENT: Servicio Industrial Regiomontano, S. A. de C. V.
PROJECT: Pension Construction S.I.R. G
DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio
LOCATION: Escobedo, Nuevo León.
TERM: October 2000
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller / Lic. Enrique Sánchez.
COST: $ 3, 000,000.00
34) CLIENT: Transportes Tamaulipas, S.A de C.V.
PROJECT: Workshop and Dorm Rooms for: Autobuses Coahuilenses y Transportes Tamaulipas.
DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio
LOCATION: Monterrey, N.L.
TERM: January to August 2001.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller.
COST: $13,500,000.00
35) CLIENT: Autobuses Coahuilenses S.A. De C.V.
PROJECT: Dorm Rooms, Bus wash, Workshop and Offices.
DESCRIPTION: Construction of Dorm Rooms, Offices, Commodores, Workshops, Warehouse and Maneuver Patio
LOCATION: Monclova, Coahuila.
TERM: January to September 2001.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller.
COST: $3,000,000.00
36) CLIENT: Transportes Tamaulipas, S.A. de C.V.
PROJECT: Polyvalent Classroom Construction in: Centro de Desarrollo Senda.
LOCATION: Monterrey, Nuevo León.
TERM: February to July 2001.
PHONE: 81-51-44-00
RESPONSIBLE: Ing. Rodolfo Siller.
COST: $1,200,000.00
30. 30
INDUSTRIALRÉSUMÉ 37) CLIENTE: Vidriera Querétaro, S. A. de C. V.
PROYECTO: Line VQ-34.
DESCRIPCIÓN: Warehouse Construction, Remodel and Line VQ-34 Installation of Glass Bottle Production.
UBICACIÓN: Querétaro, Querétaro.
CONSTRUCCIÓN: 750 m2
FECHA: June 2002 February 2003
TELÉFONO: 88-63-10-00
RESPONSABLE: Ing. Humberto Calderón.
COSTO: $10,000,000.00 Dlls.
38) CLIENT: Franklin Electric.
PROJECT: Phase I Offices and Plant.
DESCRIPTION: 700 m2 construction: Office, 2200 m2 construction: Warehouse
LOCATION: Linares, Nuevo León.
TERM: August 2002 to March 2003
RESPONSIBLE: Mr. Dan Cross
COST: $14,000,000.00
39) CLIENT: Franklin Electric.
PROJECT: Phase II Offices and Plant.
DESCRIPTION: Production Warehouse of 9000 m2 Construction.
LOCATION: Linares, Nuevo León.
TERM: September 2003
RESPONSIBLE: Mr. Dan Cross
COST: $46,000,000.00
40) CLIENT: Grupo Empresarial Logistik
PROJECT: Urban Master Plan and Multimodal Terminal
DESCRIPTION: Project Management and Industrial Park Construction
LOCATION: San Luis Potosí, S.L.P.
TERM: September 2004
PHONE: 82-62-35-17
RESPONSIBLE: C.P. Félix García
COST: $ 120'000,000.00
41) CLIENT: Alcoa Wheel Products México
PROJECT: Industrial Warehouse
DESCRIPTION: Project and Construction Management
LOCATION: Ciénega de Flores, N.L.
TERM: February 2005.
PHONE: 81-54-64-32
RESPONSIBLE: Rodrigo Cortés
COST: $ 5'500,000.00
42) CLIENT: Fortacero, S.A. de C.V:
PROJECT: Industrial Warehouse
DESCRIPTION: Direction and Supervision
LOCATION: Gómez Palacio, Durango.
TERM: October 2006
PHONE: 81-56-52-00
RESPONSIBLE: Ing. Luis Treviño Guajardo
COST: $16,000,000.00
31. 31
INDUSTRIALRÉSUMÉ 43) CLIENT: Adhoc Bienes Raíces
PROJECT: GonherMex Warehouse
DESCRIPTION: Direction and Construction
LOCATION: León, Guanajuato
TERM: November 2008 to August 2009
PHONE: 81-74-40-00
RESPONSIBLE: C.P. Patricia Ramírez
COST:
44) CLIENT: Industrias Alen SA de CV
PROJECT: Preforma Industril Warehouse
DESCRIPTION: Direction and Construction
LOCATION: Santa Catarina, N. L.
TERM: March 2010
PHONE: 81-22-10-00
RESPONSIBLE: Pedro Alejandro Salas Marmolejo
COST:
45) CLIENT: Adhoc Bienes Raíces
PROJECT: Warehouse GonherMex
DESCRIPTION: Direction and Construction
LOCATION: Pachuca, Los Mochis y San Luis Potosí
TERM: June 2010
PHONE: 81-74-40-00
RESPONSIBLE: C.P. Patricia Ramírez
COST:
46) CLIENT: Industrias Alen SA de CV
PROJECT: Office Construction and Remodel.
DESCRIPTION: Direction and Construction
LOCATION: Santa Catarina, N. L.
TERM: May 2010
PHONE: 81-22-10-00
RESPONSIBLE: Pedro Alejandro Salas Marmolejo
COST:
32. 32
INDUSTRIALRÉSUMÉ
47) CLIENT: Plásticos Industriales Monterrey, S.A. de C.V.
PROJECT: Industrial Warehouse
DESCRIPTION: Internal Audit
LOCATION: 25 de Mayo 153 Col. Trabajadores, CP. 66149 Santa Catarina, NL.
TERM: 2014
PHONE: 83-3601-99
RESPONSIBLE: Ing. Jorge García
COST: $27,000,000.00
48) CLIENT: FORTACERO Jalisco
PROJECT: Industrial Warehouse
DESCRIPTION: Internal Audit
LOCATION: El Salto, Jalisco
TERM: 2014
PHONE:
RESPONSIBLE: Luis Treviño
COST: $46,000,000.00
34. 34
RESIDENTIALRÉSUMÉ 1) CLIENT: Ing. Reynaldo Reina.
PROJECT: Ing. Reynaldo Reina’s Residence , Director of Cervecería Cuauhtémoc.
LOCATION: San Pedro Garza García, Nuevo León.
TERM: 1986
RESPONSIBLE: Ing. Reynaldo Reina.
COST: $4,500,000.00
2) CLIENT: Lic. Antonio O’farrill.
PROJECT: Lic. Antonio O’farrill’s Residence
LOCATION: San Pedro Garza García, Nuevo León.
TERM: 1987
PHONE: 83-40-32-48
RESPONSIBLE: Lic. Antonio O’farrill.
COST: $7,000,000.00
3) CLIENT: Sr. Don David Garza Lagüera.
PROJECT: Sr. Don David Garza Lagüera’s Residence Remodel
LOCATION: San Pedro Garza García, Nuevo León.
TERM: 1988
RESPONSIBLE: Sr. Don David Garza Lagüera.
COST: $1,000,000.00
4) CLIENT: Ing. Alejandro O’farrill.
PROJECT: Ing. Alejandro O’farrill Residence
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 450 m2
TERM: February to December 1992.
PHONE: 83-56-68-27 83-56-35-85
RESPONSIBLE: Ing. Alejandro O’farrill.
COST: $4,500,000.00
5) CLIENT: Lic. Sergio Tapia C.
PROJECT: Lic. Sergio Tapia C.’s Residence Phase I
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 150 m2
TERM: March to August 1992.
PHONE: 83-78-96-30 / 83-78-97-36
RESPONSIBLE: Lic. Sergio Tapia C.
COST: $180,000.00
35. 35
RESIDENTIALRÉSUMÉ 6) CLIENT: Ing. Alejandro Torres Q.
PROJECT: Residence Remodel.
LOCATION: San Pedro Garza García, Nuevo León.
TERM: March to October 1992.
PHONE: 83-03-38-74
RESPONSIBLE: Ing. Alejandro Torres Q.
COST: $1,600,000.00
7) CLIENT: Omega.
PROJECT: Phase I Urbanization of: “Residencial Valle Alto”
LOCATION: Monterrey, Nuevo León.
TERM: March to December 1992.
PHONE: 83-48-21-77
RESPONSIBLE: Lic. Mateo Mazal.
COST: $25,500,000.00
8) CLIENT: Ing. Alejandro Torres Q.
PROJECT: “Villa las Flores” neighborhood
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 15 Acres.
TERM: May to July 1992.
PHONE: 83-99-56-72
RESPONSIBLE: Ing. Alejandro Torres Q.
COST: $5,000,000.00
9) CLIENT: Arq. Agustín Landa.
PROJECT: 3 level residence construction, including pool, yard construction.
LOCATION: San Pedro Garza García, Nuevo León.
CONSTRUCTION: 600 m2
TERM: September1992 to October 1993.
PHONE: 83-46-95-29
RESPONSIBLE: Arq. Agustín Landa.
COST: $2,000,000.00
10) CLIENT: Ing. Alejandro Lamothe.
PROJECT: Ing. Alejandro Lamothe’s Residence
LOCATION: San Pedro Garza García, Nuevo León.
CONSTRUCTION: 750 m2
TERM: April 1993 to June 1994.
PHONE: 83-56-65-50
RESPONSIBLE: Ing. Alejandro Lamothe.
COST: $3,500,000.00
36. 36
RESIDENTIALRÉSUMÉ 11) CLIENT: Lic. Bruno Ferrari de Alba.
PROJECT: Lic. Bruno Ferrari’s Residence
LOCATION: San Pedro Garza García, Nuevo León.
CONSTRUCTION: 650 m2
TERM: March 1994 to October 1995.
PHONE: 83-63-15-10
RESPONSIBLE: Lic. Bruno Ferrari de Alba.
COST: $5,000,000.00
12) CLIENT: C.P. Raúl Farías.
PROJECT: Torreón located inFracc. Villa Las Flores.
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 10,000 m2
TERM: January 1995.
PHONE: 83-99-56-00
RESPONSIBLE: C.P. Raúl Farías.
COST: $350,000.00
13) CLIENT: Ing. Rubén Alanís.
PROJECT: Ing. Rubén Alanis's Residence
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 300 m2
TERM: January 1995.
PHONE: 83-48-80-85
RESPONSIBLE: Ing. Rubén Alanís.
COST: $500,000.00
14) CLIENT: Ing. Eugenio Nájera.
PROJECT: Construction and Urbanization of: Fraccionamiento Villa las Flores.
LOCATION: Monterrey, Nuevo León.
CONSTRUCTION: 10,000 m2
TERM: July 1995 to August 1996.
PHONE: 83-33-46-46
RESPONSIBLE: Ing. Eugenio Nájera.
COST: $1,500,000.00
15) CLIENT: Sra. Roberta Brittingham.
PROJECT: Construction and Urbanization of: pista y redondel for Mrs. Roberta Brittingham.
LOCATION: Villa de Santiago, Nuevo León.
CONSTRUCTION: 3,000 m2
TERM: January 1996.
PHONE: 83-65-52-39
RESPONSIBLE: Lic. Daniel Milmo.
COST: $700,000.00
37. 37
RESIDENTIALRÉSUMÉ 16) CLIENT: Fideicomiso Desarrollado por Confia, S. A.
PROJECT: Supervision of 24 habitation houses of: INFONAVIT Line III.
LOCATION: Reynosa, Tamaulipas.
CONSTRUCTION: 2,000 m2
TERM: January to June 1996.
PHONE: 83-99-60-70
RESPONSIBLE: Lic. Horacio Tijerina.
COST: $2,500,000.00
17) CLIENT: Lic. María Elena Chapa.
PROJECT: Remodel and Last Details in Misiones Residence.
LOCATION: Villa de Santiago, Nuevo León.
CONSTRUCTION: 600 m2
TERM: March to June 1996.
PHONE: 83-43-88-16
RESPONSIBLE: Lic. María Elena Chapa.
COST: $150,000.00
18) CLIENT: Ing. Alejandro Torres Q.
PROJECT: Palapa Construction in San José de la Montaña.
LOCATION: Villa de Santiago, Nuevo León.
CONSTRUCTION: 150 m2
TERM: March 1996 to March de 1997.
PHONE: 83-99-56-72
RESPONSIBLE: Ing. Alejandro Torres Q.
COST: $450,000.00
19) CLIENT: Ing. Carlos Rosenzweig.
PROJECT: Structural Development and Project for Ing. Carlos Rosenzweig’s Residence
LOCATION: San Pedro Garza García, Nuevo León.
CONSTRUCTION: 450 m2
TERM: April to June 1996.
PHONE: 83-90-09-32
RESPONSIBLE: Ing. Carlos Rosenzweig.
COST: $15,000.00
20) CLIENT: Sra. Eugenia Rodríguez.
PROJECT: Mrs. Eugenia Rodríguez’s Residence
LOCATION: San Pedro Garza García, Nuevo León.
TERM: August 1997.
PHONE: 83-18-35-69
RESPONSIBLE: Sra. Eugenia Rodríguez.
COST: $1,000,000.00
38. 38
RESIDENTIALRÉSUMÉ 21) CLIENT: Libra Alimentos, S. A. de C. V.
PROJECT: Two Habitation Houses in: Fraccionamiento la Muralla.
LOCATION: Monterrey, Nuevo León.
TERM: 750 m2
PHONE: June 1998.
RESPONSIBLE: 83-50-09-21
COST: $1,050,000.00
22) CLIENT: Ing. Bernardo Garza de la Fuente.
PROJECT: Garza de la Fuente Familiar Residence
LOCATION: San Pedro Garza García, Nuevo León.
TERM: August 2000.
PHONE: 83-99-90-02
RESPONSIBLE: Ing. Bernardo Garza de la Fuente.
COST: $ 20'000,000.00
23) CLIENT: Cap. Enrique Vázquez.
PROJECT: Residence in: Fraccionamiento Las Misiones.
LOCATION: Villa de Santiago, Nuevo León.
TERM: January 2001 to July 2002.
PHONE: 83-86-25-33
RESPONSIBLE: Cap. Enrique Vázquez.
COST: $10,000,000.00
24) CLIENT: Inversiones Trim.
PROJECT: Las Palmas Residential Condos
LOCATION: Construction of 60 departments.
CONSTRUCTION: Monterrey, Nuevo León.
TERM: June 2001 to December 2002
PHONE: 83-33-00-19
RESPONSIBLE: C.P. Celso Javier Treviño.
COST: $50,000,000.00
25) CLIENT: Grupo Delphi, S. A. de C. V.
PROJECT: Balcones de la Loma
LOCATION: Construction Management of: 82 Residential Apartments
CONSTRUCTION: Monterrey, Nuevo León.
TERM: May 2002 to November 2003
PHONE: 83-35-55-76
RESPONSIBLE: Ing. Keneth Cruz Acosta.
COST: $50,000,000.00
39. 39
RESIDENTIALRÉSUMÉ 26) CLIENT: Ing. Eduardo Cantú Segovia
PROJECT: Bosques de Linda Vista
LOCATION: Construction of 25 Habitation Houses
CONSTRUCTION: San Nicolás de los Garza
TERM: May 2003.
PHONE: 83-90-70-50
RESPONSIBLE: Ing. Eduardo Cantú Segovia
COST: $ 7'500,000.00
27) CLIENT: Familia Cantú Segovia
PROJECT: Fraccionamiento Los Encinos
LOCATION: Project Management and Construction of 19 Residential Houses
CONSTRUCTION: San Pedro Garza García, Nuevo León
TERM: October 2003
PHONE: 83-90-70-50
RESPONSIBLE: Ing. Eduardo Cantú Segovia
COST: $ 25'000,000.00
28) CLIENT: Grupo Atlas
PROJECT: Pedregal de Valle Alto
LOCATION: 5 Acre Development in: Fraccionamiento Residencial
CONSTRUCTION: Monterrey, Nuevo León, Zona Valle Alto
TERM: October 2003
PHONE: 83-78-45-18
RESPONSIBLE: Lic. Estanislao Martínez Paz
COST: $4,000,000.00
29) CLIENT: Nadiex, S. A. de C. V.
PROJECT: Residencial Miravalle
LOCATION: 17 apartments
CONSTRUCTION: Av. San Jerónimo No. 200, Col. Miravalle, Monterrey, N. L.
TERM: November 2003
PHONE: 83-45-88-45
RESPONSIBLE: Lic. Javier Delgado Navarro
COST: $ 18'000,000.00
30) CLIENT: Constructora Milimex
PROJECT: Balcones de Satélite
DESCRIPTION: Vertical Construction, 10 floors for 486 low-cost housing in 16 Acres
LOCATION: Monterrey, Nuevo León
TERM: January 2004
PHONE: 83-78-46-00
RESPONSIBLE: Lic. Estanislao Martínez Martínez
COST: $ 24'000,000.00
40. 40
RESIDENTIALRÉSUMÉ 31) CLIENT: Acuña Bienes Raíces
PROJECT: Benetton Tower
LOCATION: Project Direction and Construction
CONSTRUCTION: Monterrey, N.L.
TERM: April 2005 to October 2006.
PHONE: 83-35-70-15
RESPONSIBLE: Lic. Rafael Acuña
COST: $40,000,000.00
32) CLIENT: Gamo Bienes Raíces
PROJECT: Fraccionamiento La Silla
LOCATION: Project Management and Construction
CONSTRUCTION: Monterrey, N.L.
TERM: August 2005 to December 2006
PHONE: 83-35-23-20
RESPONSIBLE: Lic. Raúl Garza
COST: $20,000,000.00
33) CLIENT: Quail Construction
PROJECT: Fraccionamiento Codornices
LOCATION: Direction and Supervision
CONSTRUCTION: Monterrey, N.L.
TERM: April 2006
PHONE: 83-56-84-10
RESPONSIBLE: Ing. Eugenio Nájera
COST: $10,000,000.00
34) CLIENT: Desarrollos Sierra Madre
PROJECT: Fraccionamiento La Silla
LOCATION: Direction and Supervision
CONSTRUCTION: Monterrey, N.L.
TERM: April 2006
PHONE: 83-38-10-30
RESPONSIBLE: Sra. Lila Garza
COST: $110,000,000.00
35) CLIENT: Quail Construction
PROJECT: Fraccionamiento Los Aldama
LOCATION: Direction and Supervision
CONSTRUCTION: Monterrey, N.L.
TERM: Septiember 2006
PHONE: 83-56-84-10
RESPONSIBLE: Ing. Eugenio Nájera Padilla
COST: $8,500,000.00
41. 41
RESIDENTIALRÉSUMÉ 36) CLIENT: Fam. Argüelles
PROJECT: Casa - Club
LOCATION: Direction and Supervision
CONSTRUCTION: San Pedro Garza García
TERM: December 2006
PHONE: 81-52-42-49
RESPONSIBLE: Lic. Sergio Argüelles
COST: $ 5'000,000.00
37) CLIENT: Empresas Santos
PROJECT: Fracc. Los Ángeles
LOCATION: Direction and Supervision
CONSTRUCTION: San Pedro Garza García, N.L.
TERM: February 2007
PHONE: 81-14-20-20
RESPONSIBLE: Ing. Fernando Moreno
COST: $ 26'000,000.00
38) CLIENT: Empresas Ese
PROJECT: Fracc. Santa Catarina
LOCATION: Direction and Supervision
CONSTRUCTION: Santa Catarina, N.L.
TERM: April 2007
PHONE: 81-80-10-60-50
RESPONSIBLE: Lic. Salvador Alanís
COST: $ 5'500,000.00
39) CLIENT: Grupo Gentor
PROJECT: Fracc. Las Fuentes
LOCATION: Internal Audit
CONSTRUCTION: San Pedro Garza García, N.L.
TERM: April 2007
PHONE: 83-44-75-65
RESPONSIBLE: Lic. Luis Alberto Ruiz
COST: $ 206'000,000.00
40) CLIENT: Lic. Ernesto Santos
PROJECT: Residencial
LOCATION: Direction and Supervision
CONSTRUCTION: San Pedro Garza García, N.L.
TERM: January 2008
PHONE: 81-73-53-53
RESPONSIBLE: Lic. Ernesto Santos
COST: $ 206'000,000.00
41) CLIENT: Lic. Angel Galván
PROJECT: Residentiall
DESCRIPTION: Direction and Supervision
LOCATION: San Pedro Garza García, N.L.
TERM: October 2008 to May 2009
PHONE: 15-94-27-61
RESPONSIBLE: Lic. Angel Galván
42. 42
RESIDENTIALRÉSUMÉ
42) CLIENT: Inmobiliaria Cañón del Huajuco
PROJECT: Fracc. Los Azulejos
LOCATION: Direction
CONSTRUCTION: Monterrey, N. L.
TERM: 2008
PHONE: 83-63-38-88
RESPONSIBLE: C.P. Artemio Garza
COST:
43) CLIENT: Ing. Jorge Llaguno
PROJECT: Fam . Llaguno’s Residence
LOCATION: Direction and Supervision
CONSTRUCTION: San Pedro Garza García
TERM: July 2009
PHONE: 83-31-77-01
RESPONSIBLE: Ing. Jorge Llaguno
COST:
44) CLIENT: Lic. Armando Vejar
PROJECT: Fracc. Puerto Bahía Villas
LOCATION: Direction and Supervision
CONSTRUCTION: Puerto Vallarta
TERM: July 2010
PHONE: 81-55-65-05
RESPONSIBLE: Lic. Armando Vejar
COST:
43. 43
RESIDENTIALRÉSUMÉ 45) CLIENT: Grupo Corporativo BATAB, S.A. de C.V. (NURBAN)
PROJECT: Fraccionamiento de Lotes Urbanizados con Campos de Golf
LOCATION: Ave. Patria 1300 Col. Villa Universidad, Zapopan, Jalisco.
CONSTRUCTION: Fraccionamiento de Lotes Urbanizados con Campos de Golf
TERM: 2014.
PHONE: 122-917-94444
RESPONSIBLE: Ing. Ernesto Bortoni
COST: $264,000,000.00
46) CLIENT: GESTA Desarrollos, S.A. de C.V.
PROJECT: Habitation Building
LOCATION: Av. Eugenio Garza Sada No. 800 sur Col. Mas Palomas, Monterrey, NL.
CONSTRUCTION: Edificio de Usos Multiples 2 niveles comercial, 9 niveles de departamentos y sotano 4 niveles.
TERM: 2014
PHONE: 81-5536-54
RESPONSIBLE: Ing. Oscar de la Garza Clariond
COST: $360,000,000.00
47) CLIENT: El Molino
PROJECT: Internal Audit
LOCATION: Leon, Guanajuato
CONSTRUCTION: Fraccionamiento Residencial con Campo de Gold y Casa Club
TERM: 2014
PHONE: 477-7811-016
RESPONSIBLE: Ing. Ernesto Bortoni
COST: $200,000,000.00
48) CLIENT: La Reserva
PROJECT: Internal Audit
LOCATION: Queretaro, Qro
CONSTRUCTION: Fraccionamiento con Edificios Multifamiliares
TERM: 2014
PHONE: 442-1927-700
RESPONSIBLE: Yolanda Hernandez
COST: $400,000,000.00
44. GENERAL INFORMATION
Enterprise: VEGA CONSULTORES S.A. de C.V.
Location: Distrito B-4 #397 Col. Leones, Monterrey, N.L.
Phone/Fax: (81)-83333-6400, 8333-8818
Executive Director: Ing. Manuel Ventosa Gzz.
Webpage: www.vegagerencia.com.mx
44
AUTHOR: RANDY DE LA ROSA RUBALCAVA