STAGE-3 TURBINE SYSTEM SCHEMES
STAGE
STAGE-
-3 TURBINE SYSTEM SCHEMES
3 TURBINE SYSTEM SCHEMES
RAMAGUNDAM SUPER THERMAL POWER STATION
RAMAGUNDAM SUPER THERMAL POWER STATION
RAMAGUNDAM SUPER THERMAL POWER STATION
OPERATION DEPARTMENT
OPERATION DEPARTMENT
OPERATION DEPARTMENT
!"
!"
!"
!"
!"
!"
!"
!"
!"
!"
!"
!"
MESSAGE
I am glad to know that Operation department has prepared Stage-III Turbine
schematics in the form of booklet titled “LINE TRACE”.
Successful organizations understand that learning leads to business leverage.
This book is designed user friendly containing all the intricate details of schemes for
easy learning, efficient monitoring, safe isolation and normalization of systems. The
book is found to be very convenient for day to day jobs and users can easily understand
and visualize the systems and schemes. The schemes drawn in this booklet titled LINE
TRACE contain fine details of the schemes as erected in Unit-7 Turbine side.
I am sure that all employees and new entrants to Operation will make use of this book
as an immediate reference for improving their skills.
I convey my warmest greetings to all employees in Operation department and wish
them all success.
Date:22-12-2005
FOREWORD
Efficient and reliable operation of Thermal Power Station mainly depends upon the
awareness of various systems and schemes by operation & Maintenance personal about
the plant.
Operation department attaches great importance for training and development
interventions of all its employees technically by providing all the necessary material such
as schematics.
The compiler has immensely involved and drawn the schemes to lend a new edge for
achieving better operation practices.
The book will be useful in improving knowledge and skills of the operation fraternity.
I am confident that all the employees of Stage-III operation will make use of this
schematic booklet for immediate reference and enhancing their skills, thereby improving
productivity.
I hope this book will be of great help to one and all in operation & Maintenance
departments.
Date:22-12-2005
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”
LINE TRACE
LINE TRACE
LINE TRACE
DETAILED OPERATING SYSTEM SCHEMES
DETAILED OPERATING SYSTEM SCHEMES
STAGE
STAGE-
-3 TURBINE AND AUXILIARIES
3 TURBINE AND AUXILIARIES
TRACED, DRAWN AND COMPILED BY
TRACED, DRAWN AND COMPILED BY
V.BAL RAJESHAM
V.BAL RAJESHAM
V.BAL RAJESHAM
EMP.NO. 31744
EMP.NO. 31744
SR.OPERATOR GR.III
SR.OPERATOR GR.III
STAGE
STAGE-
-3 TURBINE OPERATOR
3 TURBINE OPERATOR
OPERATION DEPARTMENT
OPERATION DEPARTMENT
RAMAGUNDAM SUPER THERMAL POWER STATION
RAMAGUNDAM SUPER THERMAL POWER STATION
DISCLAIMER NOTE
Enough care was taken on drawing,compiling and printing. Even then any mistakes found or doubts faced, please
confirm and follow the instructions of experienced superior. Before operating any Equipment,don’t be in a hurry to
act.Always think before you act.
V.BAL RAJESHAM, Sr.Operator Gr.III
V.BAL RAJESHAM, Sr.Operator Gr.III
UNIT-7 TURBINE OPERATOR
UNIT-7 TURBINE OPERATOR OPERATION DEPARTMENT
OPERATION DEPARTMENT
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”
ACKNOWLEDGEMENTS
ACKNOWLEDGEMENTS
THANKS TO
THANKS TO
Sri. THOMAS JOSEPH, A.G.M. (O&M)
Sri. THOMAS JOSEPH,
Sri. THOMAS JOSEPH, A.G.M. (O&M)
A.G.M. (O&M)
Sri. PRAKASH TIWARI, D.G.M. (O)
Sri. PRAKASH TIWARI,
Sri. PRAKASH TIWARI, D.G.M. (O)
D.G.M. (O)
Sri. T.RANGANATHAN, Sr.Supdt. (O)
Sri. T.RANGANATHAN,
Sri. T.RANGANATHAN, Sr.Supdt. (O)
Sr.Supdt. (O)
SCRUITINY AND CORRECTION OF THIS BOOK BY
Sri. A.V.S. RAO, Sr.Supdt. (O)
Sri. A.V.S. RAO,
Sri. A.V.S. RAO, Sr.Supdt. (O)
Sr.Supdt. (O)
Sri. A.K.MANOHAR, Sr.Supdt. (T/M)
Sri. A.K.MANOHAR,
Sri. A.K.MANOHAR, Sr.Supdt. (T/M)
Sr.Supdt. (T/M) Sri. P.RAMA RAO, Engineer. (O)
Sri. P.RAMA RAO,
Sri. P.RAMA RAO, Engineer. (O)
Engineer. (O)
COLLEGUES AND FRIENDS
COLLEGUES AND FRIENDS
COLLEGUES AND FRIENDS
Sri. G.VENKATADRI, S.S-1(O)-Printing
Sri. G.VENKATADRI, S.S
Sri. G.VENKATADRI, S.S-
-1(O)
1(O)-
-Printing
Printing
AND
AND
BY
BY
OUR CORE VALUES
OUR VISION
CUSTOMER FOCUS
ORGANIZATIONAL PRIDE
MUTUAL RESPECT AND TRUST
INITIATIVE AND SPEED
TOTAL QUALITY
To be one of the world’s largest
and best power utilities, powering India’s growth
COMIT
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”
#
#
#
#
Please Visit:- e-departments O&M / operation / Vision Show Book
Self Explainer and User Friendly Show On Stage-1 Turbine Oil System
Compiled in the Year of - 2005
Schematic Book
Stage-3 Turbine Detailed Operating System Schemes
Compiled in the Year of - 2004
Stage-1 Turbine Detailed Operating System Schemes
Schematic Book
Compiled in the Year of - 2003
$ %
$ %
$ %
$ %
Animated Electronic Manual
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”
&
&
&
&
$' (
$' (
$' (
$' (
$' (
$' (
$' (
$' (
WATER SYSTEMS AND CONDENSER
PART-1 01 TO 15
STEAM SYSTEMS AND HEAT EXCHANGERS
PART-2 16 TO 30
BOILER FEED PUMPS AND CONNECTIONS
PART-3 31 TO 40
MAIN TURBINE MOT AND CFT OIL
PART-4 41TO 50
GENERATOR AND SEAL OIL SYSTEM
PART-5 51 TO 56
DOSING SYSTEMS AND FIRE WATER
PART-6 57 TO 63
MAIN CONTENTS
MAIN CONTENTS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”
TD BFP-A Feed Water System
33
HP Turbine Steam Circuit
16
MD BFP- Feed Water and Oil System
32
STEAM SYSTEMS AND HEAT EXCHANGERS
MD BFP- Seal and Cool Water Lines
31
Service Water System
15
BOILER FEED PUMPS AND CONNECTIONS
Condensate Polishing Unit
14
SVD Flash Tank Connections
30
Condenser Air Evacuation System (V/Pump)
13
SDFT and UFT Connections
29
Condenser Connections
12
LP Flash Tank Connections
28
C O L T C System
11
HP Flash Tank Connections
27
Circulating Water System
10
Mal Valves Flash Tank Connections
26
GSC Blower Connections
09
Auxiliary Steam System
25
Feed Water System
08
Deaerator Connections
24
Condensate System
07
Seal Steam System
23
CEP Connections
06
LP By Pass System
22
DM Makeup and CST Connections
05
HP By Pass System
21
ECW System (Full View)
04
LPH and HPH Air Vents and Drains
20
ECW Pumps and PHE System
03
LP Heaters Extractions and Drips
19
Auxiliary Cooling Water System
02
HP Heaters Extractions and Drips
18
Turbo Generator
01
IP Turbine and LP Turbine Steam Circuit
17
WATER SYSTEMS AND CONDENSER
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”
C O N T E N T S
CFT Cooler and Draining System
50
CFT Oil Purification System
49
Notes Page
64
Control Fluid Tank and Pumps
48
Fire Water Pump House
63
Central Lube Oil Storage Tanks- Centrifuge
47
Fire Water System-D.V.and WR Numbers
62
Central Lube Oil Storage Tanks Connections
46
Fire Water System (Spray & Hydrant)
61
Main Turbine- MOT Oil Purification System
45
Sodium Hydroxide Dosing System (NAOH)
60
Main Turbine- MOT Cooler and Filter
44
Phosphate Dosing System (PO4
59
Main Turbine- Jacking Oil System
43
Ammonia Dosing System (NH3)
58
Main Turbine- Lubricating Oil System
42
Hydrazine Dosing System (N2H4)
57
Main Turbine- MOT Connections
41
DOSING SYSTEMS AND FIRE WATER
MAIN TURBINE MOT AND CFT OIL
Generator Gas cooling Water System and LLD
56
TD BFP- MOT Cooler and Filter
40
Generator-BCVE Fans Connections
55
TD BFP- MOT Oil Purification System
39
Generator-Primary Water System
54
TD BFP- Jacking Oil System
38
Generator-H2 Drier Connections
53
TD BFP- Lubricating Oil System
37
Generator- Gas Fill and Vent System
52
TD BFP- MOT Connections
36
Generator-Seal Oil System
51
TD BFP- Seal and Cool Water Lines
35
GENERATOR AND SEAL OIL SYSTEM
TD BFP-A Turbine Steam Circuit
34
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”
C O N T E N T S
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”
Manual Operated Valve
Motor Operated Valve
M
S
Solenoid Operated Valve
H
Hydraulic Operated Valve
Pneumatic Operated Valve
Non Return Valve (NRV)
Motor Operated Butter Fly Valve
Butter Fly Valve (Damper)
Orifice
FC NRV
Throttle
Three Way Solenoid Valve
Drain Funnel
Vent to Pit
Nozzle Flow
Pressure Regulator
Pressure Relief Valve
Pressure Relief Valve
Steam Trap
Filter /Strainer
“Y” Type Strainer
Two Way Valve
Three Way Valve
Three Way Valve
View Glass
Power Cylinder Control Valve
Blower
Siphon
Blower
T
Motor and Pump
M
S
Differential Pressure
Regulating Valve ( DPRV )
S Y M B O L S
WATER SYSTEMS
AND CONDENSER
WATER SYSTEMS
WATER SYSTEMS
AND CONDENSER
AND CONDENSER
PART-1
PART
PART-
-1
1
CRH-NRV
HPCV
HPSV
HPCV
HPSV
BRG.NO1
BARRING GEAR
MOP
BRG.NO2 AND THRUST BRG
BRG.NO3 AND
COUPLING
BRG.NO-4 AND
COUPLING
BRG.NO-5 BRG.NO-6 AND COUPLING
BRG.NO-7
IPCV
IPSV
IPSV
IPCV
MAIN STEAM LINE TO HP TURBINE (MS)
COLD RE HEAT LINE TO RE HEATER (CRH)
HOT RE HEAT LINE TO IP TURBINE (HRH)
EXCITER
GENERATOR
LP TURBINE
IP TURBINE
HP TURBINE
CONDENSER
CROSS AROUND PIPE
CROSS AROUND PIPE
CW IN LINE FROM CW PUMPS
CW OUT LINE TO COOLING TOWERS
TURBO GENERATOR
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 01
EXTRACTION NO.1 LPT-STAGE NO.5 TO LPH-1
EXTRACTION NO.5
EXTRACTION NO.2 LPT-STAGE NO.3 TO LPH-2
EXTRACTION NO.3 LPT-STAGE NO.2 TO LPH-3
EXTRACTION NO.4.1 IPT-STAGE NO.12 TO DEAERATOR
EXTRACTION NO.4.2 IPT-STAGE NO.12 TO TD BFP A & B
IPT-STAGE NO.7 TO HPH-5A
IPT-STAGE NO.7 TO HPH-5B
EXTRACTION NO.6
CRH LINE TO HPH-6A
CRH LINE TO HPH-6B
CRH LINE TO TD BFP A&B
HP TURBINE - 17 STAGES IP TURBINE - 12+12 STAGES LP TURBINE - 06+06 STAGES
LP TURBINE
ACW-3
CW PUMP HOUSE
ACW PUMP HOUSE – UNIT-7
CONDENSER
COOLING
TOWER-7B
CW
INLET
CW
OUTLET
ACW-C
ACW-B
ACW-A
SCS - FLUSHING PUMPS
VACUUM PUMPS SEAL WATER COOLERS
M
M
SCS-GEAR
MOTOR
SCS-GEAR
MOTOR
SCS-STRAINER
SCS-STRAINER
ECW IN
ECW OUT
ECW OUT
ECW IN
PHE-A
(TG)
PHE-B
(TG)
PHE-C
(TG)
PHE-B
(SG)
PHE-A
(SG)
DRAIN
ACW-2
ACW-1
ACW-6
ACW-5
ACW-4
ACW-9
ACW-8
ACW-7
ACW-10
ACW-11
ACW-12
ACW-13
ACW-14
ACW-15
ACW-16
ACW-17
ACW-18
ACW-19
ACW-20
ACW-21
ACW-22
ACW-23
ACW-24
ACW-27
ACW-28
FOR VACUUM PUMP -A FOR VACUUM PUMP -B
ACW-29
ACW-30
ACW-31
TO CW SYSTEM
COOLING
TOWER-7A
LPH-1
FROM CW SYSTEM
M
M
M
ACW-25
ACW-26
AUXILIARY COOLING WATER SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 02
RIGHT
LEFT
DEBRIES VALVE-A
DEBRIES VALVE-B
M
M
M
M M
TG-A
TG-B
TG-C
SG-A
SG-B
ECW TANK -TG ECW TANK -SG
SODIUM HYDRAXIDE DOSING TANK
PHE-A
PHE-B
PHE-C
PHE-A
PHE-B
ACW OUT
ACW IN
TO VACUUM PUMP
HEAT EXCHANGERS
ECW RETURN HEADER(T.G)
ECW SUPPLY HEADER(T.G)
TO BFP COOLERS
LONG R/C LINE
SHORT R/C
SHORT
R/C
FROM BFP COOLERS
LONG
R/C
MAKEUP TO ECW SYSTEM
MAKEUP TO ECW SYSTEM
ALL ECW PUMPS SUCTION AND
DISCHARGE LINES HAVE DRAIN
LINES. AND DISCHARGE LINE
HAVE VENT LINE BEFORE VALVE
ECW-1
ECW-2
ECW-3
ECW-17
ECW-7
ECW-8
ECW-9
ECW-4
ECW-5
ECW-6
ECW-114
ECW-78
ECW-77
ECW-81
ECW-13
ECW-10
ECW-11
ECW-12
ECW-14
ECW-15
ECW-116
ECW-115
ECW-113
ECW-82
ECW-79 ECW-80
ECW-95
ECW-96
ECW-97
ECW-98
ECW-99
ECW-83
ECW-84
ECW-85
ECW-86
ECW-75
ECW-109
ECW RETURN
HEADER (S.G)
ECW SUPPLY
HEADER(S.G)
ALL PHE RAW WATER AND DM
WATER INLET OUTLET HAVE
DRAIN LINES AND ALL HEADERS
HAVE VENT LINES
ECW PUMPS AND PHE SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 03
M
M
M
P.W. COOLERS
SEAL OIL COOLERS (AIR)
SEAL OIL COOLERS (H2)
COMPRESSOR
M.D.BFP
T.D.BFP
T.D.BFP
ECW-A
ECW-B
ECW-C
PHE-C
(TG)
MD BFP-L/O
COOLERS
MD BFP-W/O
COOLERS
TD BFP MOT
COOLERS
TD BFP MOT
COOLERS
FROM ACW
SYSTEM
TO CW SYSTEM
EXCITER
V / PUMPS
GENERATOR H2
COOLERS
CFT COOLERS
MOT COOLERS
CEP-C
S S
M
M
M
PHE-B
(TG)
PHE-A
(TG)
PHE-A
(SG)
PHE-B
(SG)
TO EQUIPMENTS (SG)
FROM EQUIPMENTS (SG)
LONG R/C
SHORT R/C
ECW-A (SG) ECW-B (SG)
LONG
R/C
SHORT
R/C
TO
EQUIPMENTS
FROM EQUIPMENTS TO PUMPS
CEP-B CEP-A
TD BFP MOT
CENTRIFUGE
CEP BRG. COOLING LINE
MAKE UP
LINE FROM
ECW TANK
DOSING LINE
MAKE
UP
LINE
DOSING
LINE
TO COT /DOT CENTRIFUGE
ECW SYSTEM ( FULL VIEW )
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 04
MAKEUP /FILL LINE
TD BFP MOT
CENTRIFUGE
MOT
CENTRIFUGE
M
M
GSC
CEP DISCHARGE
HEADER
TO LP BY PASS
SPRAY
CONDENSATE SPILL LINE
HOTWELL NORMAL MAKEUP AND FILL
LINE FROM DM MAKEUP WATER PUMPS
HOTWELL EMERGENCY
MAKEUP AND FILL LINE
CTP-A
CTP-B
LP TURBINE
M
CEP- C , B , A
NAOH TANK FILL /MAKEUP LINE
R/C LINE TO CS TANK
CST FILL AND MAKEUP LINE FROM
DM WATER MAKEUP PUMPS
ECW TANK
TURBINE
ECW TANK
BOILER
M
CONDENSER
LPH-1
DM MAKEUP
WATER PUMPS
CONDENSATE LINE TO LPH-1
MAKEUP LINE TO
ECW SYSTEM (SG)
MAKEUP LINE TO
ECW SYSTEM (TG)
M
M
CONDENSATE
STORAGE
TANK
ECW
TANKS
NORMAL
FILL
AND
MAKEUP
LINE
M
SAMPLE LINE
SEAL POT
DMV-41
DMV-43
CDV-47
DMV-45
DMV-46
DMV-47
DMV-49
DMV-48 DMV-50
DMV-82
DMV-60
DMV-54
DMV-55
CDV-46
CDV-43
CDV-45
DMV-75
ECW-67
ECW-68
ECW-66
ECW-69
ECW-101
ECW-100
ECW-99
ECW-102
ECW-104
ECW-105
ECW-103
ECW-63
ECW-64
ECW-62
ECW-106
ECW-65
DMV-38
DMV-65
DMV-63
NaOH BREATHER
CST PUMP HOUSE /COMPRESSOR HOUSE
DMV-40
M
M
DMV-72
PRIMARY WATER
SYSTEM MAKEUP LNE
M
ECW TANKS EMERGENCY
MAKEUP LINE
GRAVITY MAKEUP
LINE TO CONDENSER
DM MAKEUP AND CST CONNECTIONS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 05
M
M
S
STRAINER EXPANSION BELLOW
CEP SEAL WATER LINE
CEP MIN R/C LINE
DISCHARGE VENT
CEP
DISCHARGE
HEADER
ECW IN
CEP CANSTER BOX
LPFT
CONDENSER
BALANCING LINE
(SUCTION VENT
/CANSTERVENT)
CEP-A CONNECTIONS
BEARING
MOTOR
CEP
SUCTION
HEADER
CDV-4
CDV-7
CDV-1
CDV-10
CDV-11
CSV-1
CEP-C
ECW OUT
CEP-A
TO CEP-B AND CEP-C
CEP MINIMUM RECIRCULATION LINE TO CONDENSER
CEP-B
TO
HEATERS
CEP CONNECTIONS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 06
VIEW GLASS
CEP-B DISCHARGE VENT
CEP-C DISCHARGE VENT
M
M
M
M
M
M
M
M
M M M
LPH-1
GSC MIN R/C
LPH-2
LPH-3
M
M
CEP-C
M
CDV-5
CDV-6
CDV-4
CDV-41
CDV-39
M
M
M
DUMP LINE
TO VALVE GLAND SEALING (CDV 151 TO 200)
CEP GLAND SEALING
CDV-8
CDV-7
CDV-9
CEP-B CEP-A
M
M
M
M
M
CONDENSER
FEED STORAGE
TANK
DEAERATOR
LP TURBINE
DRAIN COOLER
GSC
M
CDV-31
CDV-30
CDV-25
CDV-24
CDV-21
CDV-22
CDV-36
CDV-33
CDV-34
CDV-35
CDV-29
M
CDV-34 IBV
CDV-31 IBV
EXHAUSTHOOD
SPRAY
MAL VALVES FT SPRAY
CST
CDV-43
CDV-45
CDV-28 IBV
CDV-28
CDV-32
TO BOILER FILL LINE
SAMPLE LINE
CDV-27
CPU
TO SCAPH SPRAY
DRAIN TO UFT
M
CDV-12
CDV-14
CDV-10
N2H4 DOSING LINE
NH3 DOSING LINE
CSV-1
CSV-2
CSV-3
CDV-11
CDV-13
CDV-15
CDV-1
CDV-2
CDV-3
CDV-16 CDV-18
CDV-17
CDV-40 CDV-38
CDV-23
CDV-26
CDV-20 CDV-50
CDV-85
CDV-54
CDV-55
CDV-42
CDV-44
EXCESS
CONDENSATE
TO
CST
CEP SUCTION
HEADER
CEP-A MIN.R/C
TO NH3 AND N2H4 DOSING
CDV-60
OVERFLOW AND
DRAIN TO LPFT
DRV-48
CDV-37
CDV-49
CDV-46
CDV-47
CDV-71
CDV-72
LP BYPASS SPRAY LINES
CONDENSATE SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 07
CONDENSATE
FLOW
ORIFICE
M
M
M
M
TO BOILER FILL LINE
TO APRDS SPRAY
TO HP BYPASS SPRAY LINE
M
M
TO SUPER HEATER SPRAY
R/C LINE
TO RE HEATER SPRAY
M
M
M
M
M
M
DEAERATOR
FEED STORAGE TANK
TDBFP-B TDBFP-A
MDBFP-C
TD BFP-A R/C LINE TD BFP-B R/C LINE
HP HEATER –5A
HP HEATER –6A
HP HEATER –5B
HP HEATER –6B
BFP DISCHARGE HEADER
HYDRAZINE DOSING
AMMONIA DOSING
ECONOMISER
BOILER DRUM
TO BOILER DRUM
THROUGH
ECONOMISER
FDV-22
FCV-05
FCV-03 FCV-01
FCV-04
FCV02
FCV-06
FDV-15
M
FDV-13
FDV-14
M
M
FDV-16
M
M M
FDV-07
FDV-08 FDV-10
FDV-09
M
M
FDV-11 FDV-12
50%BYPASS
100%BYPASS
FSV-01
FSV-03
FSV-02
TURBINE MAIN PUMP
TURBINE
MAIN PUMP
MOTOR
MAIN PUMP
M
M
FDV-01
FDV-04
FDV-02
FDV-05
FDV-06
FDV-03
FDV-21
FDV-27
FDV-28
FDV-19
FDV-20
FDV-25
FDV-26
FDV-23
FDV-24
FDV-17
FDV-18
FCV-09 FCV-08
FCV-07
CHDV-13
CHDV-07 CHDV-12
CHDV-06
CHDV-11
CHDV-05
HD
AD
HD
AD
HD
AD
AD
HD
M
M
M
M
M M
M
M
100% FLOW LINE
30% FLOW LINE
FEED WATER SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 08
FOR BFP CONNECTIONS – SCHEME NO. 24 AND 25
ATMOSPHERE
M
M
ATMOSPHERE
LP
FLASH
TANK
TD BFP-B
TD BFP-A
TO HEATERS
CEP-B
CEP-C CEP-A
HPT IPT LPT
CONDENSER
M
M
GLAND STEAM
CONDENSER
TD BFP SEAL STEAM
EXHAUST TO GSC
SEAL STEAM EXHAUST TO GSC
DRIP LINE TO LPFT
LINE FOR INITIAL DRAINING (DRIP)
STRAINER
AIR AND UNCONDENSABLE
GASES TO ATMOSPHERE
GSC BYPASS TO
ATMOSPHERE
CEP DISCHARGE HEADER
GSC BLOWER-B
GSC BLOWER-A
M
CDV-16 CDV-18
CDV-17
MAW80 AA011
MAW80 AA012
MAW80 AA007
MAW80 AA007A
MAW80
AA001A
MAW80
AA
001
M
GSC BLOWER CONNECTIONS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 09
M M
M M
COLTCS LINE TO CW SYSTEM
CONDENSER
LPH-1
COLTCS = CONDENSER ONLINE TUBE CLEANING SYSTEM
CW-1
CW-2
CW-4
CW-3
M
M
M
M
ACW SYSTEM
VACUUM PUMP
COOLERS
ECW-PHE
CW LINE - CW PUMPS TO
CONDENSER
CW LINE CONDENSER TO CT
ACW
RETURN
WATER
TO
CW
RETURN
LINE
COLTCS LINE TO BALL MONITERING SYSTEM
COLTCS LINE TO CW SYSTEM
COLTCS LINE TO BALL MONITERING SYSTEM
ARV (CW-5)
PASS-A
PASS-B
MESH FOR
STOPPING
OLTCS BALLS
ARV (CW-6)
ARV=AIR RELIEF VALVE
CIRCULATING WATER SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 10
M
M
M
M
S
CW LINE TO CONDENSER
CW LINE FROM CONDENSER
BALL MONITER
BALL VESSEL
BALLS
BALLS
MESH
CW LINE PASS A IN /OUT
M
M
M
M
S
CW LINE TO CONDENSER
CW LINE FROM CONDENSER
BALL MONITER
BALL VESSEL
BALLS
BALLS
MESH
CW LINE PASS B IN /OUT
BALL SEPARATOR
MOTOR
BALL CIRCULATION
PUMP AND MOTOR
BALL CIRCULATION
PUMP AND MOTOR
COLTC SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 11
LPH-2 VENT
LPH-1 VENT
LPH-3 VENT
MAL VALVES FT VENT
MAL VALVES FT VENT
SDFT VENT
TD BFP-A EXHAUST
TD BFP-B EXHAUST
MAL VALVES FT DRAIN
MAL VALVES FT DRAIN
SDFT DRAIN
CEP SUCTION LINE
HPFT VENT
LPFT VENT
CEP –A RE CIRCULATION LINE
CEP –B RE CIRCULATION LINE
CEP –C RE CIRCULATION LINE
GSC MIN.RECIRCULATION LINE
HPFT DRAIN
LPFT DRAIN
CEP SUCTION LINE
LEAK STEAM DRAIN
HPT EVACUATION LINE
LPBP LINE
LPBP LINE
EXHAUST HOOD SPRAY
VACUUM BREAK LINE
VACUUM PUMP SUCTION LINE
CEP –A VACUUM BALANCING LINE
CEP –B VACUUM BALANCING LINE
CEP –C VACUUM BALANCING LINE
NORMAL HOTWEL MAKEUP LINE
EMER- HOTWEL MAKEUP LINE (CST)
LPH-1
VACUUM PUMP SUCTION LINE
HOTWEL LEVEL TRANSMITTER LINE
HOTWEL LEVEL TRANSMITTER LINE
FROM CPU SYSTEM
CONDENSER CONNECTIONS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 12
(RINSING LINE)
HOTWEL DRAINS HOTWEL DRAINS
LP TURBINE
S
S
S
HEAT EXCHANGER
SEPARATOR
TANK
MAKEUP LINE
( FROM ECW )
AIR EJECTOR
LEVEL GAUGE
ACW OUT
ACW IN
AIR FLOW MEASUREMENT
DEVICE
HEAT EXCHANGER OUTLET TO CW OUTLET(L) DUCT
EXHAUST WITH SILENCER
SEALING LIQUID IN
TO VACUUM PUMP-2
VACUUM
PUMP
SEAL WATER
CIRCULATION PUMP
VACUUM PUMP
MOTOR
CONDENSER
S
VACUUM BREAKER VALVE
SMV-25
SMV-26
SMV-24
SMV-23
TANK
OVERFLOW
CONDENSER AIR EVACUATION SYSTEM –V / PUMP
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 13
VENT AT NEAR LPBP(8.5)
HOTWEL LEVEL TRANSMITTER PIPES
M
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
CPU VESSEL-2
CPU VESSEL-1
FROM CEP DISCHARGE
TREATED CONDENSATE
TO
LP
HEATERS
TO CONDENSER HOTWEL
FROM DM PLANT
TO DM PLANT
S
S
S
S
MOTOR
COMPRESSOR
CDV-51
CONDENSATE POLISHING UNIT
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 14
TURBINE SIDE SERVICE WATER SYSTEM FOR CLEANING AND GENERAL PURPOSE
COMPRESSOR
HOUSE
CFT ROOM
STEPS
CONDENSER
STEPS
0
17
TO H2
FILL ROOM
17
0
0
8.5
17
0
8.5
17
0
8.5
CHILLER
ROOM
8.5
STEPS
STEPS
WAY
0
17
8.5
TO ABOVE
17 meters
TO ABOVE
17 meters
TO ABOVE
17 meters
TO ABOVE
17 meters
TO ABOVE
17 meters
SERVICE
WATER
PUMP
HOUSE
ECW
PUMPS
SERVICE WATER SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 15
8.5
FOR TOILET
ROOMS
FOR TOILET
ROOMS
CST
STEAM SYSTEMS AND
HEAT EXCHANGERS
STEAM SYSTEMS AND
STEAM SYSTEMS AND
HEAT EXCHANGERS
HEAT EXCHANGERS
PART-2
PART
PART-
-2
2
HPH-6A
TO A.S.HEADER (APRDS)
HPH-6B
TD BFP
TURBINE -A
TD BFP
TURBINE -B
DRAIN TO MAL VALVES FT
TO /FROM SEAL STEAM HEADER (SPINDLE LEAK)
DRAIN TO MAL VALVES FT
DRAIN TO SDFT
HPT EVACUATION LINE
TO CONDENSER
DRAIN TO MAL VALVES FT
HPCV-1
HPSV-1
HPSV-2
HPBP LINES
TO RE HEATER
HP TURBINE
EXTRACTION NO.6
TO APRDS
DRAIN TO SDFT
MS LINE TO HPT
CRH NRV
TO DEAERATOR
HPT CASING DRAIN TO
MAL VALVES FT
TO /FROM SEAL STEAM HEADER (SPINDLE LEAK)
TO /FROM SEAL STEAM HEADER (SPINDLE LEAK)
TO /FROM SEAL STEAM HEADER (SPINDLE LEAK)
HP TURBINE STEAM CIRCUIT
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 16
DRAIN
TO
UFT
DRAIN
TO
SDFT
DRAIN TO UFT
HPCV-2
U SEAL RING LEAK OFF LINES TO SS HEADER
I SEAL RING LEAK OFF LINE
TO SS HEADER
TO SEAL STEAM
BALANCING LINE TO
IP-LP CROSS AROUND
STRAINER
STRAINER
IP TURBINE LP TURBINE
IPSV-2
IPCV-2
IPSV-1
IPCV-1
TD BFP
TURBINE -A
TD BFP
TURBINE -B
EXTRACTION NO-4.1
TO DEAERATOR
STRAINER
HPH-5A HPH-5B
EXTRACTION NO.5
STRAINER
WARMUP LINE
DRAIN LINES
TO MALVALVES FT
DRAIN LINE TO
MALVALVES FT
EXTRACTION NO-4.2
LPBP VALVES
WARMUP LINE
EXTRACTION NO.1
(FOUR LINES)
EXTRACTION NO.2
EXTRACTION NO.3
LPH-2
LPH-3
CONDENSER
LPBP
LINE(R)
LPBP
LINE(L)
DRAIN LINE TO SDFT
WARMUP LINE
DRAIN
LINE
TO
SDFT
TO /FROM SEAL STEAM
HEADER (SPINDLE LEAK)
TO /FROM SEAL STEAM
HEADER (SPINDLE LEAK)
HRH LINE TO IPT
IP TURBINE AND LP TURBINE STEAM CIRCUIT
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 17
U SEAL RING LEAK OFF LINES TO SS HEADER
LPH-1
DRAIN
LINE
TO
UFT
DRAIN LINE TO UFT
DRAIN LINE TO MALVALVES FT
CROSS AROUND PIPE
BALANCE LINE TO IP-LP CROSS AROUND
CONDENSER
HPH-6B
M
M
HPH-5B
HPH-6A
HPH-5A
EXTRACTION
NO.
5
CRH LINE
TO TDBFP
ALTERNATE DRIP
HPH-6A TO HPFT
ALTERNATE DRIP
HPH-5A TO HPFT
ALTERNATE DRIP
HPH-5B TO HPFT
CRH NRV
HPFT
CRH
LINE
TO
REHEATER
M
M
NORMAL DRIP HPH-6A TO 5A
ALTERNATE DRIP
HPH-6B TO HPFT
NORMAL DRIP
HPH-5B TO D/A
NORMAL DRIP
HPH-5A TO D/A
FEED STORAGE
TANK
DEAERATOR
M
M
MAL
VALVES
FT
LINE DRAINS
LINE DRAIN
LINE DRAIN
NORMAL DRIP HPH-6B TO 5B
EXTRACTION NO.6
EXV-21
EXV-34
EXV-22
EXV-33
EXV-25
EXV-26
EXV-23
EXV-24
EXV-09
EXV-10
DRV-8 DRV-2
DRV-5
DRV-11
DRV-18
DRV-25
DRV-22
DRV-15
HP TURBINE IP TURBINE LP TURBINE
HP HEATERS EXTRACTIONS AND DRIPS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 18
EXV-147
M
EXV-101
M
EXV-102
MAL-47
LP TURBINE
LPH-2
LPH-1
LPH-3
EXTRACTION NO.3
EXTRACTION NO.2
DRAIN COOLER
LPFT
CONDENSER
EXTRACTION NO.1(FOUR LINES)
NORMAL DRIP
LPH-3 TO LPH-2
NORMAL DRIP
LPH-2 TO LPH-1
ALTERNATE DRIP
LPH-3 TO LPFT
ALTERNATE DRIP
LPH-2 TO LPFT
NORMAL DRIP LPH-1
TO DRAIN COOLER
M
M
M
EXTRACTION
LINE DRAINS
MAL
VALVES
FT
M
M
EXTRACTION
LINE DRAINS
EXV-12
EXV-11
EXV-01
EXV-02
EXV-03
EXV-04
DRV-28
DRV-34
DRV-37
DRV-31
M
MAL-55
MAL-54
LP HEATERS EXTRACTIONS AND DRIPS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 19
EXV-118
EXV-119
M
M
M
HPFT
M
M
M
M
CONDENSATE
INLET
CONDENSATE
INLET
CONDENSATE
OUTLET
FEED WATER LINES
HPH 5A
HPH 6A
HPH 5B
HPH 6B
LPH-3
LPH-2
LPH-1
LPH-1
TO ATM
DRAIN TO PIT
SVD
FT
SMV-07
SMV-08
SMV-01
SMV-02
SMV-05
SMV-04
SMV-10
SMV-11
SMV-13
SMV-14
SMV-16
SMV-17
SMV-15
SMV-18
SMV-12
SMV-06
SMV-03
SMV-09
SMV-19
ORIFICE
SMV-20
SMV-21
LPH AND HPH AIR VENTS AND DRAINS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 20
H
M
H
H
H
M
H
M
M
UFT
CONDENSER
MS LINE TO HP TURBINE
CRH LINE TO RE HEATER
HP BY PASS LINES TO CRH LINE
HP BY PASS VALVES
HP BY PASS ATTEMPRATION LINE
BFP DISCHARGE HEADER
FEED WATER TO HPHEATERS
DRAIN LINES TO UFT
HPCV-2
HPCV-1
CRH-NRV
TDBFP-A TDBFP-B MDBFP-C
HPSV-2
WARM UP LINES
BPV-03
BPV-04
BPV-06
BPV-05
BPE-01
BPE-02
BPV-101
BPV-102
BD-01
HP TURBINE IP TURBINE LP TURBINE
LPH-1
BP-1
BP-2
HP BY PASS SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 21
BPV-07
HPSV-1
DRAIN TO PIT
VENT TO ATM
IPCV
LPBP LINE
DRAINS
LP BY PASS SPRAY LINE
CEP DISCHARGE HEADER
CONDENSATE LINE TO CPU AND LPH-1
TO
EXHAUST
HOOD
SPRAY
LP BYPASS
SPRAY VALVES
CONTROL RACK
M
M
M
M
SEAL STEAM HEADER
M
LPBP VALVES SPINDLE
LEAKOFF LINES
GSC
CEP A,B,C
LPBP CV-SV(L)
LPBP CV-SV(R)
WARM
UP
LINE
WARM UP LINE
LINE DRAINS
M
TO MAL VALVES
F.T. SPRAY
LP BYPASS LINES
HRH LINE TO IP TURBINE
HP TURBINE IP TURBINE LP TURBINE
CONDENSER
CST
IPSV
IPCV
IPSV
HRHV-113
HRHV-114
HRHV-110
SDFT
HRHV-109
LP BY PASS SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 22
LP
BY
PASS
WATER
INJECTION
VALVES
FROM TD BFP TURBINE
SEAL STEAM EXHAUST
CONDENSER
SEAL STEAM HEADER
SEAL STEAM EXHAUST HEADER TO GSC BLOWER
HP TURBINE IP TURBINE LP TURBINE
LEAK STEAM TO
IPT EXHAUST
M
EXCESS SEAL STEAM TO CONDENSER
CRH LINE TO RH
HRH LINE TO IPT
MS LINE TO HPT
HPCV,SV AND IPCV ,SV
SPINDLE LEAK OFF LINES
LPBP CV AND SV
SPINDLE
LEAKOFF LINES
LPBP LINES TO CONDENSER
HPCV-2
HPSV-2
HPCV-1
HPSV-1
LEAK STEAM TO
IPT EXHAUST
GSC
LPBP CV, SV
IPSV,CV -1
IPSV,CV -2
HPT EVACUATION
VALVE
SEAL STEAM SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 23
U SEAL RING LEAKOFF LINES
MAW 15AA001
MAW 10AA010
MAW 55AA001
MAW 50AA010
U SEAL RING
LEAKOFF LINES
MAW 50AA001
MAW 10AA001
M
H
M
M
M H
A.S /CRH LINE TO SSH DRN TO HPFT DRN TO MAL FT
M
TDBFP-A
TDBFP-B
MDBFP
R/C LINE
R/C LINE
R/C LINE
CRH TAPPING TO D/A PEGGING
A.S.TO DEAERATOR PEGGING
CRH LINE TO REHEATER
FEED STORAGE TANK
DEAERATOR
HPH-5B HPH-5A
HPH-6B HPH-6A
LPH-1
CONDENSER
EXTRACTION NO.4.1 TO TDBFP A&B
EXTRACTION NO.4.2 TO DEAERATOR
CONDENSATE LINE TO
DEAERATOR
HPH-5A NORMAL DRIP TO D/A
HPH-5B NORMAL DRIP TO D/A
M
MAL VALVES FT
M
M
M
M
DRV-15
DRV-22
DRV-14 DRV-16
DRV-21 DRV-23
DRV-20 DRV-13
SMV-22
ASV-08
ASV-07 ASV-09
ASV-10
ASV-05
ASV-06
TO SVD FT
TO SVD FT
CRHV-05
CRHV-06
CRHV-07
CRHV-08
CRHV-09
M
TO LPFT
M
TO LPFT
EXV-13
EXV-05
EXV-06
FCV-04
FCV-01
FCV-03
FCV-05
FCV-02
FCV-08
FCV-07
FCV-06
FCV-09
ASV-11
FSV-01
FSV-02
FSV-03
DMV-34 DMV-35
DEAERATOR FILL LINE
CBD
TO UFT
TO LPFT
MAL-51
ASV-44
T
DRV-48
EXV-14
T
M
ASV-69
CRH LINE TO SEAL STEAM SYSTEM
M
TO HPFT
CRHV-115
CRHV-159
ASV-70
EXV-115
DEAERATOR CONNECTIONS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 24
VACUUM BREAKER LINE
D/A OVERFLOW
M
M
M
M
M
M
TO A/C PLANT
TO TD BFP
TO S.S SYSTEM
M
M
SPRAY LINE FROM BFP DISCHARGE HEADER
TO SCAP /ATOMIZATIOM
TO DEAERATOR PEGGING
TO FOPH
TO /FROM UNIT-6
TO MILL INERTING
TO AH SOOT BLOWING
UNIT HT AUX.STEAM HEADER
UNIT LT AUX.STEAM HEADER
STATION LT AUX.STEAM HEADER
TAPPING FROM M.S.LINE
TAPPING FROM CRH LINE
SPRAY LINE
MS LINE TO HPT
CRH LINE TO RH
HRH LINE TO IPT
ASV-25
ASV-26
ASV-27
ASV-28
ASV-29
ASV-30
ASV-22
ASV-23
ASV-24
ASV-31
ASV-32
ASV-33
ASV-34
ASV-67
ASV-68
ASV-56
ASV-41
ASV-39
ASV-40
ASV-48
ASV-44
ASV-37
ASV-36
ASV-49
ASV-50
ASV-51
SPRAY LINE
FDV-43
ASV-60
ASV-47
ASV-62
M
TO IBD
T
T
T
ASV-164
ASV-163
T
T
M M
M
M M M
M
FDV-37
FDV-33
FDV-38 FDV-39
FDV-34 FDV-35
FDV-40
FDV-36
FDV-29 FDV-30 FDV-31
FDV-32
FDV-46 FDV-47 FDV-48
FDV-49
ASV-21
FDV-42
FDV-41
M
ASV-35
T
M
ASV-69
ASV-70
CRH LINE TO
S.S HEADER
TO SVDFT
TO SVDFT
TO SVDFT
TO SVDFT
TO SVDFT
TO SVDFT
AUXILIARY STEAM SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 25
TO SVDFT
M
M
M M M M M
M M M M M M
M
A B
C D E G H
I J K L M N
F
CONDENSER
DRAIN BEFORE CRH NRV (MAL 65)
F
HPT CASING DRAIN (MAL22 AA011)
E
DRAIN AFTER IPCV-2 (MAL 32 AA011)
D
DRAIN AFTER IPCV-1 (MAL 31 AA011)
C
DRAIN BEFORE IPCV-1 (MAL 26 AA011)
B
DRAIN BEFORE HPCV-1 (MAL 11 AA011)
A
EXTRACTION NO-5 DRAIN (MAL 47 AA011)
N
EXTRACTION NO-4.1 DRAIN (MAL 51 AA011)
M
EXTRACTION NO-4.2 DRAIN (MAL 52 AA011)
L
EXTRACTION NO-3 DRAIN (MAL 54 AA011)
K
EXTRACTION NO-2 DRAIN (MAL 55 AA011)
J
SEAL STEAM DRAIN (MAL 81 AA011)
I
DRAIN BEFORE IPCV-2 (MAL 27 AA011)
H
DRAIN BEFORE HPCV-2 (MAL 12 AA011)
G
SPRAY LINE SPRAY LINE
FLASH BOX
(TANK) -1
MAL VALVES FLASH TANKS (BOX) CONNECTIONS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 26
FLASH BOX
(TANK) -2
16
17
17
17
16
16
16
17
23
19
19
34
24
18
( GT SIDE ) ( BOILER SIDE )
CRHV-122 ( CRH TO TDBFP-A LINE DRAIN BEFORE BLOCK VALVE )
L
HPH- 5B EMERGENCY DRIP
W
CRHV-115 ( CRH TO D/A PEGG. LINE DRAIN )
K
HPH- 5A EMERGENCY DRIP
V
CRHV-153 ( TDBFP-B LINE DRAIN BEFORE ESV )
J
HPH- 6B EMERGENCY DRIP
U
CRHV-145 ( STEAM DRAIN OF TDBFP-B TURBINE )
I
HPH- 6A EMERGENCY DRIP
T
CRHV-141 ( TDBFP-A LINE DRAIN BEFORE ESV )
H
AIR VENT OF HPH -5B
S
CRHV-135 ( STEAM DRAIN OF BFP-A TURBINE )
G
AIR VENT OF HPH- 5A
R
ASV-109 ( TDBFP-B AUX.STEAM LINE DRAIN BEFORE BLOCK VALVE)
F
AIR VENT OF HPH- 6B
Q
ASV-104 ( TDBFP-A AUX.STEAM LINE DRAIN BEFORE BLOCK VALVE)
E
AIR VENT OF HPH- 6A
P
ASV-152 (MAIN TURBINE GLAND SEAL STEAM LINE DRAIN )
D
EXV-102 (EXTRACTION NO.6B LINE DRAIN)
O
TDBFP-B GLAND SEAL STEAM LINE DRAIN (GS-20)
C
EXV-101 (EXTRACTION NO.6A LINE DRAIN)
N
TDBFP-A GLAND SEAL STEAM LINE DRAIN (GS-20)
B
CRHV-129 (CRH TO TDBFP-B LINE DRAIN BEFORE BLOCK VALVE)
M
EXV-147 ( EXTRACTION NO.5 LINE DRAIN )
A
HP FLASH TANK CONNECTIONS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 27
34
18
23
34
34
34
34
34
24
34
24
34
34
18
18
20
20
20
20
18
18
18
18
M
M
M
M M
M
M
M
M
M
M
M
M
CONDENSER
HPFT
K L M N O
A B C D E F G H I J
DRV-5
DRV-4
DRV-6
DRV-10
DRV-11
DRV-12
DRV-26
DRV-18
DRV-24
DRV-17
DRV-25
DRV-19
T
U
V
W
P Q R S
T T T T T T T
T T T
SPARE
SPARE
DRV-37
DRV-38
DRV-36
G
DRV-31
DRV-32
DRV-30
F
M M
M M
M
CONDENSER
LPFT
DRV-48
DRV-49
DRV-47
DRV-51
M DR-1
M DR-2
H
M
N
A B
C D E
M
M
O
P
Q
R
S
V
U
T
DR-01
DR-02
T T T
CEP-C DISCHARGE VENT LINE
CEP-B DISCHARGE VENT LINE
CEP-A DISCHARGE VENT LINE
A/C PLANT DRAIN LINE (STEAM)
DRAIN COOLER DRIP LINE
GSC DRIP LINE
V
U
T
S
R
Q
DR-02 (TDBFP-B TURBINE DRAIN )
P
DEAERATOR OVER FLOW AND DRAIN LINE
H
DR-01 (TDBFP-B TURBINE DRAIN )
O
LPH-2 EMERGENCY DRIP LINE
G
DR-2 ( TDBFP-A TURBINE DRAIN )
N
LPH-3 EMERGENCY DRIP LINE
F
DR-1 ( TDBFP-A TURBINE DRAIN )
M
EXV-119 ( EXTRACTION NO .2 LINE DRAIN )
E
SCAPH DRAIN LINE ( SECONDARY )
L
EXV-118 ( EXTRACTION NO. 3 LINE DRAIN )
D
SCAPH DRAIN LINE ( PRIMARY )
K
EXV-105 ( EXTRACTION NO 4.1 LINE DRAIN )
C
TD BFP-B LEAK STEAM LINE
J
EXV-109 ( EXTRACTION NO 4.2 LINE DRAIN )
B
TD BFP-A LEAK STEAM LINE
I
CRHV-159 ( CRH TO D/A PEGGING LINE DRAIN )
A
LP FLASH TANK CONNECTIONS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 28
I
J
K
L
24
34
24
19
19
19
19
24
34
34
34
34
34
34
09
19
06
06
06
M
CRH
101
M
HRHV
106
M
HRHV
110
M
HRHV
114
M
HRHV
105
M
HRHV
109
M
HRHV
113
M
MSV
109
M
MSV
110
M
HRHV
102
M
HRHV
101
M
MSV
106
M
MSV
105
M
BPV
102
M
BPV
101
SPRAY LINE
MS LINE STRAINER
DRAIN (LEFT)
MS LINE STRAINER
DRAIN (RIGHT)
VENT TO
ATMOSPHERE
DEAERATOR
DRAIN
HRH LINE STRAINER DRAIN (RIGHT)
HRH LINE STRAINER DRAIN (LEFT)
CRH NRV AND AFTER NRV LINE DRAIN
LP BYPASS LINE DRAIN (LEFT)
LP BYPASS VALVE WARM UP
LINE DRAIN (RIGHT)
LP BYPASS VALVE WARM UP
LINE DRAIN (LEFT)
LP BYPASS LINE
DRAIN (RIGHT)
HPBP WARMUP
LINE DRAIN (LEFT)
HPBP WARMUP LINE
DRAIN (RIGHT)
CONDENSER
SDFT
UFT
UFT =UNIT FLASH TANK SDFT =STEAM DRAIN FLASH TANK
DRAIN
STEAM VENT
SPRAY LINE
SDFT AND UFT CONNECTIONS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 29
DRAIN LINE TO PIT
C
A
B
D
E
F
DRAIN TO PIT
VENT TO ATMOSPHERE
SVDFT
AUX.STEAM DRAIN
MANIFOLD
K
J
I
H
L M N O P
SVD FLASH TANK CONNECTIONS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 30
25 DRAIN LINES
P
HT PRDS D/S LINE DRAIN
H
LT PRDS D/S LINE DRAIN
O
LT PRDS SAFETY VALVE DISCHARGE LINE
G
HT UNIT A.S. HEADER LINE DRAIN
N
HPH-6B SAFETY VALVE DISCHARGE LINE
F
LT UNIT A.S. HEADER LINE DRAIN
M
HPH-6A SAFETY VALVE DISCHARGE LINE
E
LT HEADER INTERCONNECTION LINE DRAIN
L
HPH-5B SAFETY VALVE DISCHARGE LINE
D
A.S. TO D/A PEGGING LINE DRAIN
K
HPH-5A SAFETY VALVE DISCHARGE LINE
C
A.S. TO D/A PEGGING LINE DRAIN
J
LPH-3 SAFETY VALVE DISCHARGE LINE
B
LT STATION HEADER DRAIN
I
LPH-2 SAFETY VALVE DISCHARGE LINE
A
24
24
25
25
25
25
25
25
20
20
20
20
20
20
SVDFT = SAVETY VALVE DISCHARGE FLASH TANK
G
25
BOILER FEED PUMPS
BOILER FEED PUMPS
BOILER FEED PUMPS
PART-3
PART
PART-
-3
3
MAGNETIC FILTERS
SEAL
WATER
COOLERS
ECW OUT
ECW IN ECW IN
ECW OUT
ECW IN
MOTOR
HYDRAULIC
COUPLING
BOOSTER PUMP
MAIN PUMP
SEAL WATER
COOLERS
MAGNETIC FILTERS
COOLER
COOLER
JACKET
COOLING
LINES
MD BFP - SEAL AND COOL WATER LINES
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 31
SEAL
WATER
LINES
JACKET COOLING LINES
ECW-51
ECW-52 ECW-37
ECW-36
ECW-45
ECW-43
ECW-44
ECW-46 ECW IN
ECW OUT
M
M
M
M
M
CONICAL FILTER
LUB OIL FILTERS
LUB OIL PUMP
MOTOR
HYDRAULIC
COUPLING
BOOSTER PUMP
BOOSTER PUMP SUCTION LINE FROM DEAERATOR
AMMONIA DOSING
HYDRAZINE DOSING
STRAINER
MAIN PUMP DISCHARGE
RE HEATER ATTEMPRATION
SUPER
HEATER
ATTEMPRATION
RE CIRCULATION LINE TO DEAERATOR
COUPLING COUPLING
MAIN PUMP
BALANCING LINE
W/O COOLER
W/O COOLER L/O COOLER
L/O COOLER
ECW IN TO COOLER
ECW OUT FROM
COOLER
ECW IN TO COOLER
ECW OUT FROM COOLER
CHDV-13
CHDV-07
VIEW GLASS
ECW-38
MD BFP – FEED WATER AND OIL SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 32
FSV-03
FDV-22
FDV-06
FCV-05
FDV-28
M
M
M
M
BOOSTER PUMP
GEAR BOX
TURBINE
MAIN PUMP
AMMONIA DOSING
HYDRAZINE DOSING
CONICAL STRAINER
STRAINER
TO BFP DISCHARGE HEADER
RECIRCULATION LINE TO DEAERATOR
SUPER HEATER SPRAY
RE HEATER SPRAY
BALANCING LINE
BARRING GEAR
TD BFP-A FEED WATER SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 33
FDV-18
FDV-24
FCV-01
FDV-04
FSV-01
CHDV-11
CHDV-05
FSV-01 = FSV-02
TD BFP-A = TD BFP-B VALVE NUMBERS
FCV-01 = FCV-03
FDV-04 = FCV-05 FDV-18= FCV-20
FDV-24= FCV-26 CHDV-11 = CHDV-12
CHDV-05 = CHDV-06
TO HPH-6A
M
M
M
TO HPH-6B
CRH LINE TO
RE HEATER
M
M
TO
GSC
ACV
ESV
MCV
M
FROM
A.S.HEADER
TO HPFT
VENT TO ATM
M
TO ATM
EXHAUSTHOOD SPRAY
GLAND SEAL STEAM
LEAK SEAL STEAM
CONDENSER
SEAL STEAM EXHAUST LINE
RUPTURE DIAPHRM TO ATMOSPHERE
TO TD BFP-B
TO HPFT
TO HPFT
TO LPFT
TO LPFT
TO LPFT
TO HPFT
TO HPFT
TO MAL FT
TO LPFT
EXV-31
CRHV-141
CRHV-122
CRHV-01
CRHV-12
ASV-104
CRHV-135
DR-2
DR-1
GS-03
GSCV
GS-20
GS-10
LSCV
EXT.NO-4.1
MAL-52
EXV-15
EXT.NO-6
EXT.NO-4.2
EXV-109
EXV-27
M
M
M
M
M
M
M
M
M
M
EXHAUST LINE TO CONDENSER
FROM
TDBFP-B
SEAL
STEAM
EXHAUST
SEAL
STEAM
EXHAUST
LINE
CRHV-141 = CRHV -153
CRHV-135 = CRHV -145
CRHV-01 = CRHV -03
CRHV-12 = CRHV-13
CRHV-122 = CRHV-129
EXV-27 = EXV -28
EXV-31 = EXV -32
ASV-104 = ASV-109
DR-1 = DR-01
DR-2 = DR-02
G.S=03 = G.S-03
GS-20 = G.S-20
GSCV = GSCV
LSCV = LSCV
-
TD BFP-A = TD BFP-B VALVE NUMBERS
TO TD BFP-B
TO TD BFP-B
TD BFP-A TURBINE STEAM CIRCUIT
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 34
JACKET COOLING LINES
MAGNETIC FILTERS
ECW OUT
ECW IN
SEAL WATER
COOLERS
SEAL
WATER
COOLERS
MAGNETIC FILTERS
JACKET
COOLING
LINES
JACKET COOLING LINES
BOOSTER PUMP
MAIN PUMP
TURBINE
TD BFP-SEAL AND COOL WATER LINES
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 35
ECW-24
ECW-25
ECW-26
ECW-27
FOR TDBFP-B ECW 24=ECW 30, ECW 25=ECW 31,
ECW 26=ECW 32, ECW 27=ECW 33
S
AOP-A
AOP-B
EOP
FILTER
LUB OIL HEADER
TO BEARINGS
COOLER-TOP
COOLER-BOTTOM
DEFOAMER
FILTER
FILTER
COP
TD BFP - MOT
VEF
TO
GOVERNING
OIL
AND
BARRING
GEAR
OIL
TO RESERVE OIL TANK (COT /DOT)
JACKING
OIL
PRESSURE REGULATING VALVE
SIMPLEX FILTER
EMERGENCY OIL TO BEARINGS
LUB OIL TO BEARINGS
FROM RESERVE OIL TANK
RETURN OIL FROM BEARINGS TO MOT
COOLER VENT LINE
OIL TRAP
TO ATMOSPHERE
VIEW GLASS
TD BFP – MOT CONNECTIONS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 36
S
LUB OIL CONTROL VALVE
LUB OIL CV BYPASS LINE
LUB OIL HEADER TO BEARINGS
JOP
TOP
RECIRCULATION CV
BYPASS LINE
RECIRCULATION
CONTROL VALVE
S
S
S
S
FILTER
TD BFP-MOT
AOP-A
AOP-B
EOP
DRAIN TRIP OIL TO MOT
BARRING GEAR
M
LUB
OIL
HEADER
EMERGENCY OIL TO LUB OIL HEADER
FILTER
DUMPWELL
BARRING GEAR ROTATING OIL LINE
DEFOAMER
MAIN PUMP
TURBINE
GEAR
BOX
BOOSTER
PUMP
TO CONTROL OIL AND
BARRING GEAR
SIMPLEX FILTER
CONTROL
OIL
TRIP OIL
COOLER
COOLER
TD BFP – LUBRICATING OIL SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 37
S
S
S
S
TD BFP-MOT
AOP-A
AOP-B
EOP
LUB
OIL
HEADER
DEFOAMER
MAIN PUMP
TURBINE
GEAR BOX
BOOSTER PUMP
COOLER
COOLER
FILTER
JOP
RETURN OIL FROM
BEARINGS TO MOT JACKING OIL PRESSURE
REGULATOR
JACKING
OIL
PRESSURE
REGULATOR
TD BFP – JACKING OIL SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 38
THROTTLES
S
MOT
GEAR BOX
CENTRIFUGE
MOTOR
FEED PUMP
ECW FOR BOWL
SEALING
ANTI FLOOD TANK
BOOSTER PUMP
FLOW METER
FINE FILTER
HEATER BOX
VIEW GLASS
“Y” TYPE STRAINER
REGULATOR
VIEW GLASS
RECIRCULATION
LINE
CENTRIFUGE
VIEW
GLASS
ECW FOR
HEATER BOX VENT LINE
TD BFP – MOT OIL PURIFICATION SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 39
ECW OVER FLOW AND DRAIN
ECW INLET
ECW OUTLET
ECW TO TDBFP SEAL AND COOL WATER
ECW TO TDBFP MOT CENTRIFUGE
TDBFP MOT
COOLER -TOP
TDBFP MOT
COOLER -BOTTOM
ECW TO COOLERS
ECW FROM COOLERS
ECW FROM TDBFP SEAL
AND COOL WATER
TDBFP MOT FILTERS TDBFP MOT
VENT LINE
LUB OIL INLET TO
COOLER FROM AOP
LUB OIL TO TDBFP BEARINGS
VENT LINE
ORIFICE
VIEW GLASS
TD BFP MOT COOLER AND FILTER
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 40
ECW-29
ECW-28
CV-1
CV-2
FOR TD BFP-B
ECW-28 = ECW 34
ECW-29 = ECW 35
MAIN TURBINE
MOT AND CFT OIL
MAIN TURBINE
MAIN TURBINE
MOT AND CFT OIL
MOT AND CFT OIL
PART-4
PART
PART-
-4
4
JACKING OIL LINE
LUB OIL HEADER TO BEARINGS
RETURN OIL FROM BEARINGS
MOP /AOP DISCHARGE
MOP SUCTION
JOP PRESSURE REGULATOR
CENTRIFUGE
OIL
PUMP
TO RESERVE OIL TANK
FROM RESERVE OIL TANK
EMERGENCY OIL TO BEARINGS
FILTERS COOLERS
VAPOUR
EXTRACTION FANS
TO
DRAIN
OIL
TANK
TO ATMOSPHERE
FROM BEARING CHAMBERS OIL VENT
AOP-1 AOP-2 EOP JOP DCJOP
FILTERS
FILTERS
VENT
COOLERS
VENT
LUB
OIL
DRAIN
FROM
DOP
OIL SEPARATOR
MAIN TURBINE – MOT CONNECTIONS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 41
SAMPLE LINE
S
INJECTOR
FILTERS
TEMPERATURE CONTROL VALVE
SOST
COOLERS
VEF
AOP-1 AOP-2 EOP JOP DCJOP
MOP
INJECTOR
BARRING GEAR
1 2 3 4 5 6 7
TO ATMOSPHERE
RETURN OIL HEADER TO MOT
LUB OIL TO BEARINGS
EOP DISCHARGE
ONLY TO BEARINGS
MOP
SUCTION
MOP /AOP
DISCHARGE
HPT IPT LPT GENERATOR EXITER
M
BARRING
GEAR
VALVE
–MAV-51
TO
DRAIN
OIL
TANK
MAIN TURBINE – LUBRICATING OIL SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 42
S
PRESSURE
REGULATOR
FILTERS
JOP DCJOP
AOP-1 AOP-2 EOP
JACKING OIL RETURNED
THROUGH BEARING OIL
RETURN LINE
HPT IPT LPT GENERATOR EXITER
TO DRAIN OIL TANK
RETURN OIL HEADER
FROM BEARINGS
THROTTLERS
MAIN TURBINE – JACKING OIL SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 43
AOP AOP-1
ECW IN
ECW OUT
MOT VEF OIL SEPARATOR DRAIN
JACKING OIL FILTER DRAIN
TO CENTRIFUGE
SEALWATER
COOLER
-A
COOLER
-B
GAUGE
RACK
DRAIN
MOT
FILTERS
LUB OIL TO BEARINGS
CENTRIFUGE
OIL PUMP
GAUGE
RACK
DRAIN
LINE FROM
MOP/AOP
RETURN OIL FROM BEARINGS
FROM
RESERVE
OIL TANK
MAIN OIL TANK
DRAIN OIL PUMP
CFT ROOM
SOST AND SOST SYPHON DRAIN
MAIN TURBINE – MOT COOLER AND FILTER
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 44
EOP JOP
JOP-1
DOP
DRAIN OIL
TANK /CLEAN
OIL TANK
S
HEATER BOX
MAIN TURBINE
MOT
RETURN OIL HEADER FROM
BEARINGS
PURIFIED OIL CENTRIFUGE TO MOT
SOLONOID VALVE
‘Y’ TYPE STRAINER
VIEW GLASS
COP MOTOR
COP GEAR BOX
FEED PUMP
ANTI FLOOD
TANK
FLOW METER
REGULATOR
ECW TO HEATER BOX
TO COT /DOT
SEAL WATER
LINE (ECW)
MAIN TURBINE – MOT OIL PURIFICATION SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 45
DRAIN LINE TO
DRAIN OIL TANK
FROM FILTER,COOLER AND
GAUGE RACK DRAINS
DRAIN TO DIRTY OIL TANK
(WASTE FLUID TANK) OR TO PIT
DRAIN TO DIRTY OIL TANK
(WASTE FLUID TANK) OR TO PIT
ECW LINE
TD MOT-B
TD MOT-A
DOT
COT
MOT
TOP TOP
OIL UNLOADING VESSEL
MAIN TURBINE
CENTRIFUGE OIL PUMP
DOP
FILTER
RETUTN OIL FROM TURBINE BEARINGS
LOV-03
LOV-01
LOV-02
LOV-04
LOV-17
COP
LOV-16 LOV-15
LOV-23
LOV-24
LOV-33
LOV-34
LOV-35
LOV-12
LOV-19
LOV-18
LOV-11
LOV-14
LOV-13
LOV-21
LOV-22
LOV-25
LOV-26
LOV-30
LOV-32
LOV-27 LOV-28 LOV-29
VENT FLAME ARRESTER
VENT FLAME ARRESTER
FOR BARREL
FILLING LINE
CENTRAL LUBE OIL STORAGE TANKS CONNECTIONS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 46
S
DOT
COT
ANTI FLOOD TANK
VENT LINE
HEATER BOX
FLOW METER
CENTRIFUGE
GEAR BOX
MOTOR
INEGRAL PUMP
VIEW GLASS
‘Y’ TYPE STRAINER
SEAL WATER(ECW)
ECW TO HEATER BOX
RECIRCULATION LINE
BOWL
SAMPLE LINE
SAMPLE LINE
REGULATOR
FROM OIL TANKS
TO OIL TANKS
CENTRAL LUBE OIL STORAGE TANKS - CENTRIFUGE
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 47
ECW LINE
ECW OVER FLOW AND DRAIN
VAPOUR
EXTRACTION FANS
ECW IN
ECW OUT
32 BAR CONTROL OIL LINE
8 BAR CONTROL OIL LINE
PUMP-1 PUMP-2
CONTROL
FLUID TANK
AIR
FILTER
RETURN OIL LINE FROM SYSTEM
AIR LINE FROM SYSTEM
ACCUMULATERS TEMPERATURE CONTROL VALVE
TO WFT
S
TO
DPT
TO ATMOSPHERE
COOLER
COOLER
CONTROL FLUID TANK AND PUMPS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 48
OIL STIPPER
HEATER
FULLERS EARTH FILTERS
R/C PUMP-1 R/C PUMP-2
CONTROL FLUID TANK
A B C D E F
A-COOLER VENT(A)
B-ACUUMULATOR LINE RELIEF
C- 8 BAR DRAIN LINE, AFTER
TEMP. CONTROL VALVE
D-32 BAR LINE DRAIN
E-COOLER VENT(B)
F-COOLER OUTLET LINE DRAIN
FROM ACUMULATOR AND 8 BAR LINE DRAIN
FROM VALVES CONTROL RACK FILTERS DRAIN
FROM COOLERS DRAIN
RETURN OIL FROM SYSTEM
SAMPLE LINE
DPT
CFT OIL PURIFICATION SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 49
DRY PROTECTION TANK
MECHANICAL
FILTER
FINE FILTER
FILTERS
DRAIN
CONTROL
FLUID TANK
DPT
MOT ROOM FLOOR DRAIN
OIL CANAL DRAIN
OIL STIPPER
DRAIN
RETURN OIL
FROM CFT
SYSTEMS
S
32 BAR CONTROL OIL
TEMPERATURE CONTROL VALVE
FROM EARTH FILTERS DRAIN
FROM SYSTEM DRAINS
TO GOVERNING SYSTEMS
R/C LINE TO CFT
THROUGH
FILTERS
ECW IN
ECW OUT
CFT COOLER AND DRAINING SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 50
CIRCULATING PUMP-1
CIRCULATING PUMP-2
C.F. RACK
DRAIN
WASTE
FLUID TANK
/ DIRTY OIL
TANK
GENERATOR
AND SEAL OIL SYSTEM
GENERATOR
GENERATOR
AND SEAL OIL SYSTEM
AND SEAL OIL SYSTEM
PART-5
PART
PART-
-5
5
GENERATOR PRE CHAMBERS
LLD STATION
GENERATOR
FILTERS
H2 SIDE SOP AIR SIDE SOP-1 DCSOP
AIR SIDE SOP-2
FILTERS
TO MOT
SOST
SOT
H2 SIDE SO COOLERS
ECW OUT
ECW IN
AIR SIDE SO COOLERS
H
2
SIDE
EQUALISING
VALVES
5 6
H
2
SIDE
SEAL
OIL
RING
RELIEF
OIL
AIR
SIDE
SEAL
OIL
DPRV
DPRV DPRV
AIR
SIDE
SEAL
OIL
RING
RELIEF
OIL
H
2
SIDE
SEAL
OIL
SOT MAKEUP
OIL IMPULSE LINE
H2 IMPULSE LINE
SOST- SEAL OIL STORAGE TANK
OIL IMPULSE LINE
H2 IMPULSE LINE
SOT- SEAL OIL TANK
DPRV- DIFFERENTIAL PRE.REG.VALVE
VENT TO ATM
THROUGH BCVEF
GENERATOR – SEAL OIL SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 51
ATMOSPHERE
100.00
TO ATMOSPHERE
THROUGH BCVE FANS
ATMOSPHERE
PRIMARY WATER TANK
GENERATOR
COMPRESED AIR LINE
PRESSURE
REGULATORS
PRESSURE REGULATORS
GAS PURITY DIGITAL
DISPLAY DEVICE
SAMPLE LINE
SAFETY VALVE
H2 FILLING LINE
CO2 FILLING
LINE
N2 FILLING
LINE
N2 PRESSURE
REGULATOR
H2 FILLING RACK CO2 FILLING RACK N2 CYLINDER
FLASH EVAPORATOR
H2 FILL AND VENT BOARD
GENERATOR – GAS FILL AND VENT SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 52
PRESSURE
GAUGE
TOWER-A LIMIT SWITCH TOWER-B
H2 DRIER H2 DRIER
CHANGEOVER HANDLE
PRIMARY WATER TANK
HEATER
BLOWER
TO ATMOSPHERE
THROUGH BCVE FANS
BLOWER AIR IN FOR REGENERATION
VIEW GLASS
H2 GAS TO DRIER
H2 GAS TO GENERATOR FROM DRIER
GENERATOR
WASTE GAS LINE TO
ATMOSPHERE
OIL TRAP
H2 DRIER TOWER-A IS IN SERVICE
AND H2 DRIER TOWER-B IS IN
REGENERATION POSITION
GENERATOR – H2 DRIER CONNECTIONS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 53
ALKALISER
ATMOSPHERE
NAOH
STORAGE
TANK
MOTOR
&PUMP
MAGNETIC
FILTERS
N2 CYLINDER
ECW OUT
PUMP-A PUMP-B
TEMP.CONTROL VALVE
ECW IN
TO ATMOSPHERE
THROUGH BCVE FANS
MAKEUP WATER LINE, TAPPING FROM
DM MAKEUP WATER PUMPS
STATOR BUSH IN
STATOR COOLING WATER INLET
PRIMARY WATER TANK
EXCESS GAS REMOVE LINE (H2)
GENERATOR
RECIRCULATION LINE
REGULATOR
FINE
FILTER
ION
EXCHANGER
STATOR BUSH OUT
N2 CHARGING LINE TO
PRIMARY WATER TANK
FLOW METER
COOLER
COOLER
S
GENERATOR – PRIMARY WATER SYSTEM
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 54
FILTER /MESH
PRIMARY WATER TANK
SOST
H2 DRIERS
BCVEF-1
BCVEF-2
GENERATOR
DRAIN LINE FROM H2
DRIER OIL TRAP
DRAIN LINE FROM AIR SIDE
SOP SUCTION SYPHON
GENERATOR – BCVE FANS CONNECTIONS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 55
TO ATMOSPHERE
OIL TANK
OIL SEPARATOR
LINE
OIL SEPARATOR LINE
A
B C
D
E
F
G
GENERATOR
VIEW
GLASS
ECW IN
ECW OUT
ECW IN
ECW OUT
EXCITER
ECW IN
HEADER
ECW OUT
HEADER
COOLER-A
COOLER-B
ECW-16
ECW-17
ECW-18
ECW-19
H2 GAS
COOLERS
H2 GAS
COOLERS
TEMPERATURE
CONTROL VALVE
GENERATOR – GAS COOLING WATER SYSTEM AND LLD
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 56
A,B = T.BOX BOTTOM LEAK C = T.BOX TOP LEAK D = GENERATOR CENTER LEAK E,F,G = T.E. LEAKAGE
DOSING SYSTEMS
DOSING SYSTEMS
DOSING SYSTEMS
PART-6
PART
PART-
-6
6
AND
AND
AND
FIRE WATER
FIRE WATER
FIRE WATER
20.0
20.0
PUMP-A PUMP-B
TO AMMONIA DOSING
DOSING STROKE SETTING
AND DISPLAY BOARD
STIRRER MOTOR
CONDENSATE TAPPING LINE
HYDRAZINE MIXING CUM
STORAGE TANK
HYDRAZINE MEASURING TANK
DOSING PUMP -1 DOSING PUMP -2
DOSING PUMP
MAXIMUM DISCHARGE
PRESSURE IS 45 Kg/cm2
TO CEP DISCHARGE LINE
TO BOILER INITIAL FILL LINE
D.M.WATER TAPPING LINE
BREATHER TANK
BFP-A
S /LINE
M
BFP-B
S /LINE
BFP-C
S /LINE
M
M
AMMONIA DOSING
TO BFP SUCTION LINE CHDV-05
CHDV-06
CHDV-07
CHDV-17
CHDV-18
CHDV-19
CHDV-20
HYDRAZINE DOSING SYSTEM (N2H4)
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 57
FLUSHING LINE
20.0
20.0
PUMP-A PUMP-B
TO HYDRAZINE DOSING
DOSING STROKE SETTING
AND DISPLAY BOARD
STIRRER MOTOR
CONDENSATE TAPPING LINE
AMMONIA MIXING CUM
STORAGE TANK
AMMONIA MEASURING TANK
DOSING PUMP -1 DOSING PUMP -2
DOSING PUMP
MAXIMUM DISCHARGE
PRESSURE IS 45 Kg/cm2
TO CEP DISCHARGE LINE
TO BOILER INITIAL FILL LINE
D.M.WATER TAPPING LINE
BREATHER TANK
BFP-A
S /LINE
M
BFP-B
S /LINE
BFP-C
S /LINE
M
M
HYDRAZINE DOSING
TO BFP SUCTION LINE CHDV-11
CHDV-12
CHDV-13
CHDV-19
CHDV-20
CHDV-17
CHDV-18
AMMONIA DOSING SYSTEM (NH3)
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 58
FLUSHING LINE
DM WATER TAPPING LINE
CONDENSATE TAPPING LINE
TO BOILER DRUM
DOSING PUMP-2
DOSING PUMP-1
MEASURING TANK
MIXING TANK
STIRRER MOTOR
STIRRER MOTOR
40.0
40.0
PUMP-A PUMP-B
DOSING STROKE SETTING
AND DISPLAY BOARD
PHOSPHATE DOSING SYSTEM (PO4)
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 59
SODIUM HYDRAXIDE MIXING
CUM STORAGE TANK
BREATHER TANK
STIRRER MOTOR
ECW TANK-TURBINE
ECW TANK-BOILER
TO ECW PUMPS SUCTION LINE
ECW TANKS NORMAL FILLING LINE
FROM DM PLANT
T.G.SIDE S.G.SIDE
SODIUM HYDRAXIDE DOSING SYSTEM (NAOH)
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 60
DMV-75
D.M. WATER MAKEUP AND FILL LINE
ASH
SLURRY
UCB
BOILER
TURBINE
TP-30
WR-1
WR-5
WR-2
WR-3
WR-4
WR-6
WR-7
WR-8
WR-9
WR-10
WR-11
WR-12
WR-13
WR-14
R1SH-1
R1BF-2
R1BF-3
R1BF-4
R1BF-5
R1BF-6
R1BF-7
R1BF-8
R1BF-9
R1BF-10
R1BF-11
R1BF-12
R1BF-13
R1BF-14
R1BF-16
R1BF-17
E
S
P
CHIMNY
FOPH
DV-72,71,70
DV-76
DV-66
DV-75
DV-74
DV-89
DV-67
DV-77
DV-69
DV-68
DV-81,82,83
DV-85
DV-84
DV-62,56,57,58
DV-59
DV-61 DV-60
DV-55
DV-54
DV- --
DV-53
DV-52
DV-65
DV-51 , 50 , 49 , 48
DV-64
R1BF-15
R1BF-1
R1SH-2
R1SH-3
R1SH-4
R1SH-5
INTER CONNECTION
LINE (STAGE-2)
R1SH-6
R1SH-7
R1SH-9
R1SH-18
R2BF-1
R3BF-1
R3BF-2
R3SH-2
R3BF-3
R3SH-1
R3SH-7
R3SH-3
R3SH-4
R3SH-5
R3BF-4
R3SH-8
R3SH-15
R3SH-16
R3SH-9
R3BF-5
R3BF-6
R3SH-10
R3SH-11
R3SH-12
R3SH-13
R3SH-14
R2SH-1 R2SH-2
R1SH-12
R2BF-2
R2BF-4
R2BF-3
FMSH-1
FMSH-2
FMSH-3
R2WM-1 R2WM-2
R2SH-3
R1BF-21
R1WM-1 R1WM-2 R1WM-3
R1WM-5
R1WM-4
R1SH-13
R1SH-14
R1SH-16
R1WM-11
R1BF-20
R1BF-19
R1WM-10
R1WM-9
R1WM-8 R1BF-18
R1SH-15
R2BF-16
R1DH-1
R1DH-2
R1SH-17
R2BF-5
FOAM PH
LDO
TP-28
TP-31
VACUUM
PH
SER-WATER
PH FIRE
WATER
PUMP
HOUSE
CW
PH
DV-63
ASH
WATER
PH
TP-29
CPU
REGEN
UNIT
R1WM-7
R1SH-10
R1SH-11
R1WM-6
ASH WATER
RECIRCULATION
UAT-1
UAT-2
GT-R
GT-Y
GT-B
ACW PH
ST-TR
DG
YARD
BOOSTER PH
R1SH-8
FWT-2
FWT-1
FACILITIES
I
D
C
T
-
7
A
DV-79
DV-80
DV-47,46 DV-45
DV-44
DV-43
DV-90
LDO UNLOAD PH
CL.BLDG
ESP
C/R
SH = SINGLE HYDRANT
DH = DOUBLE HYDRANT
WR = WET RAISER
WM = WATER MONITER
BF = BUTTER FLY VALVE
DV = DELUGE VALVE
PH = PUMP HOUSE FM = FOAM
FEH = FIRE ESCAPE HYDRANT FWT= FIRE WATER TANK
FIRE WATER SYSTEM –SPRAY AND HYDRANT
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 61
RING-1 HYDRANT
LINE
SPRAY
LINE
RING-3 HYDRANT LINE
RING-2 HYDRANT LINE
TO CHP
SPRAY LINE
R1SH- --
FEH11 EL(+) 9.5M
FEH10 EL(+) 5.25M
WR-13 (ESP C/R)
WR-9 (BLR)
WR-7(BLR)
WR-4 (UCB)
C FEH = FIRE ESCAPE HYDRANT
FEH52 EL(+) 17.70M
FEH51 EL(+) 12.20M
FEH50EL(+) 9.40M
FEH44 EL(+) 66.20M
FEH43 EL(+) 57.50M
WR-12 (TP-29)
FEH42 EL(+) 68.00M
FEH49 EL(+) 4.70M
FEH25 EL(+) 69.05M
FEH23 EL(+) 56.75M
FEH09 EL(+) 37.00M
FEH08 EL(+) 32.75M
FEH07 EL(+) 25.00M
FEH06 EL(+) 14.50M
WR-3(TG)
FEH04 EL(+) 18M
FEH03 EL(+) 9.5M
FEH02 EL(+) 18M
FEH41 EL(+) 60.50M
FEH40 EL(+) 54.50M
WR-11 (TP-30)
FEH39 EL(+) 60.50M
FEH38 EL(+) 54.50M
WR-10 (TP-31)
FEH32 EL(+) 44.30M
FEH31 EL(+) 37.80M
FEH30 EL(+) 30.00M
FEH29 EL(+) 26.00M
FEH28 EL(+) 19.00M
FEH27 EL(+) 10.00M
FEH37 EL(+) 75.55M
FEH36 EL(+) 69.05M
FEH35 EL(+) 62.50M
WR-8 BLR)
FEH26 EL(+) 75.55M
FEH24 EL(+) 62.50M
WR-14 (ESP C/R)
FEH48 EL(+) 17.70M
FEH47 EL(+) 12.20M
FEH46EL(+) 9.40M
FEH45 EL(+) 4.70M
FEH34 EL(+) 56.75M
FEH33 EL(+) 50.50M
FEH22 EL(+) 50.50M
BFP LUB OIL CONSOLE AT EL(+) 0.00 M
HVWS
DV-74
FEH20 EL(+) 37.80M
FEH18 EL(+) 26.00M
FEH21 EL(+)44.30M
DV-73
FEH19 EL(+) 33.00M
FRONT SIDE OF BOILER BURNER FRONT AT EL
(+) 27.25 M, EL(+) 30.40 M, EL(+) 33.60 M, 36.70 M
C
HVWS
DV-72
FEH17 EL(+) 19.00M
FRONT SIDE OF BOILER BURNER FRONT AT EL
(+) 27.25 M, EL(+) 30.40 M, EL(+) 33.60 M, 36.70 M
C
HVWS
DV-71
FEH16 EL(+) 10.00M
BOILER BURNER FRONT EL(+) 24.00 M
C
HVWS
DV-70
WR-6 (BLR)
EL(+)00.00 M IN A-B BAY ( CABLE GALLERY )
B
MVWS
DV-69
FEH15 EL(+) 18M
FEH05 EL(+) 6.10M
EL(+)08.50 M IN A-B BAY ( CABLE GALLERY )
B
MVWS
DV-68
FEH12 EL(+) 14.5M
ESP CONTROL ROOM
FUEL OIL PUMP HOUSE
5.1 M CABLE GALLERY MAIN PLANT
T.G-EL(+) 9.5M, 18M
DIESEL TANK AT D.G.ROOM
STATION TRANSFORMER
GENERATOR TRANSFORMER - B
GENERATOR TRANSFORMER - Y
GENERATOR TRANSFORMER - R
UNIT AUX.TRANSFORMER A / B
TURBINE LUB OIL CANAL PIPING AT EL(+) 17.00 M
TURBINE LUB OIL UNIT AT EL(+) 8.50 M
SEAL OIL OIL UNIT AT EL(+) 0.00 M
CENTRAL LUB OIL UNIT AT EL(+) 0.00 M
EQUIPMENT /AREA PROTECTED
-
C
B
-
-
-
A
C
C
C
C
C
C
C
C
C
WR-2 (TG)
FEH01 EL(+) 9.5M
WR-1 (TG)
WET RAISERS
-
DV-90
DV-89
DV-88
DV-87
DV-86
DV-85
DV-84
DV-83
DV-82
DV-81
DV-80
DV-79
DV-78
DV-77
DV-76
DV-75
DV NO
FEH14 EL(+) 9.5M
EL(+)13.50 M IN C-E BAY ( CABLE.GALLERY )
B
MVWS
DV-67
WR-5 (TG)
EL(+)24.00 M IN B-C BAY (MCC CABLE GALLERY)
B
MVWS
DV-66
FEH13 EL(+) 18M
ESP CONTROL ROOM
B
MVWS
DV-65
LDO UNLOAD PUMP HOUSE
A
MVWS
DV-64
LDO TANK
A
MVWS
DV-63
TP-31-EL(+)53.50M BUNKER 34 A
A
MVWS
DV-62
SYS
EQUIPMENT /AREA PROTECTED
SYS
DV NO
DV-61
DV-60
DV-59
DV-58
DV-57
DV-56
DV-55
DV-54
DV-53
DV-52
DV-51
DV-50
DV-49
DV-48
DV-47
DV-46
DV-45
DV-44
DV-43
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
TP-31-EL(+)53.50M BUNKER 34 B
MVWS
TP-31-EL(+)59.00M
MVWS
-
CONV.33 A/B
MVWS
HVWS
CONV.33 A/B
MVWS
MVWS
TP-30-EL(+)65.50M,67.00M
MVWS
-
CONV.32 A/B
MVWS
-
CONV.32 A/B
MVWS
-
TP-29-(EL) (+) 65.00M
MVWS
MVWS
TP-29-(EL) (+) 57.00M
MVWS
HVWS
CONV.31 A/B
MVWS
MVWS
MVWS
MVWS
MVWS
MVWS
MVWS
MVWS
MVWS
MVWS
HVWS
CONV.31 A/B
HVWS
HVWS
HVWS
HVWS
HVWS
HVWS
HVWS
CONV.31 A/B
CONV.31 A/B
CONV.31 A/B
CONV.31 A/B
CONV.31 A/B
CONV.31 A/B
CONV.31 A/B
CONV.31 A/B
FIRE WATER SYSTEM – D.V AND WR NUMBERS
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 62
SPRAY PUMP-1
SPRAY DIESEL
PUMP-1
HYDRAUNT
DIESEL PUMP-1
HYDRAUNT
PUMP-1
HYDRAUNT
PUMP-2
HYDRAUNT
PUMP-3
JACKY
PUMP-1
JACKY
PUMP-2
COMPRESSOR-2
COMPRESSOR-1
SPRAY
LINE
TO
CHP
HYDRANT
LINE
TO
RING
-3
HYDRANT
LINE
TO
RING
-2
SPRAY LINE TO
TURBINE AND BOILER
HYDRANT LINE RING -1
FIRE WATER TANK
FILL LINE
FIRE WATER
TANK - 1
FIRE WATER
TANK - 2
FIRE WATER PUMPS
SUCTION HEADER
FIRE WATER PUMPS
DISCHARGE HEADER
FIRE
WATER
CONTROL
ROOM
FIRE WATER PUMP HOUSE
STRAINERS
R/C LINE
M
M
HPT
PS
PS
FIRE WATER PUMP HOUSE (STAGE-3)
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 63
NOTES PAGE
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 64
STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”
THANKYOU
FOR USING AND CHOOSING
THANKYOU
THANKYOU
FOR USING AND CHOOSING
FOR USING AND CHOOSING
V.BAL RAJESHAM
V.BAL RAJESHAM
V.BAL RAJESHAM
balrajesham@rediffmail.com
balrajesham@rediffmail.com
STAGE-3 TURBINE OPERATOR
STAGE
STAGE-
-3 TURBINE OPERATOR
3 TURBINE OPERATOR
!"
!"
!"
!"
!"
!"
!"
!"
!"
!"
!"
!"
(A Government of India Enterprise)
(A Government of India Enterprise)
Ramagundam Super Thermal Power Station
Ramagundam Super Thermal Power Station
P.O.Jyothinagar,Dist.Karimnagar
P.O.Jyothinagar,Dist.Karimnagar-
-505215 (A.P)
505215 (A.P)

More Related Content

Similar to LINE_TRACE-1.pdf

CLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxCLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxAnkan Dey
 
LIFTING PLAN FLARE-KRB.pdf
LIFTING PLAN FLARE-KRB.pdfLIFTING PLAN FLARE-KRB.pdf
LIFTING PLAN FLARE-KRB.pdfNanangArief2
 
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-102015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10Carl S. Johnson II - ACE
 
Catálogo Williams _ X series
Catálogo Williams _ X series Catálogo Williams _ X series
Catálogo Williams _ X series Vibropac
 
BOOK OF TRAINING UK 2012
BOOK OF TRAINING   UK 2012BOOK OF TRAINING   UK 2012
BOOK OF TRAINING UK 2012Sotiris Alexiou
 

Similar to LINE_TRACE-1.pdf (8)

Utkarsh Bhargava - Thesis
Utkarsh Bhargava - ThesisUtkarsh Bhargava - Thesis
Utkarsh Bhargava - Thesis
 
CLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxCLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptx
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
LIFTING PLAN FLARE-KRB.pdf
LIFTING PLAN FLARE-KRB.pdfLIFTING PLAN FLARE-KRB.pdf
LIFTING PLAN FLARE-KRB.pdf
 
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-102015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10
 
Catálogo Williams _ X series
Catálogo Williams _ X series Catálogo Williams _ X series
Catálogo Williams _ X series
 
BOOK OF TRAINING UK 2012
BOOK OF TRAINING   UK 2012BOOK OF TRAINING   UK 2012
BOOK OF TRAINING UK 2012
 
Senior Design Project
Senior Design ProjectSenior Design Project
Senior Design Project
 

Recently uploaded

prodtion diary updated.pptxyyghktyuitykiyu
prodtion diary updated.pptxyyghktyuitykiyuprodtion diary updated.pptxyyghktyuitykiyu
prodtion diary updated.pptxyyghktyuitykiyuLeonBraley
 
Rustampura ℂall Girls Service WhatsApp: 8527049040 High Class Esℂorts Serviℂe...
Rustampura ℂall Girls Service WhatsApp: 8527049040 High Class Esℂorts Serviℂe...Rustampura ℂall Girls Service WhatsApp: 8527049040 High Class Esℂorts Serviℂe...
Rustampura ℂall Girls Service WhatsApp: 8527049040 High Class Esℂorts Serviℂe...NightLaila
 
Norco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdf
Norco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdfNorco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdf
Norco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdfRebeccaPontieri
 
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样aqwaz
 
Tagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdf
Tagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdfTagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdf
Tagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdferintagarino1
 
Gloria Marquez Resume 2024pdf.pdf pdfpdf
Gloria Marquez Resume 2024pdf.pdf pdfpdfGloria Marquez Resume 2024pdf.pdf pdfpdf
Gloria Marquez Resume 2024pdf.pdf pdfpdfgmarquez046
 
一比一原版(Drexel毕业证书)美国芝加哥城市学院毕业证如何办理
一比一原版(Drexel毕业证书)美国芝加哥城市学院毕业证如何办理一比一原版(Drexel毕业证书)美国芝加哥城市学院毕业证如何办理
一比一原版(Drexel毕业证书)美国芝加哥城市学院毕业证如何办理Fir
 
Captain america painting competition -- 13
Captain america painting competition -- 13Captain america painting competition -- 13
Captain america painting competition -- 13Su Yan-Jen
 
Tagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdf
Tagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdfTagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdf
Tagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdferintagarino1
 
一比一定制英国赫特福德大学毕业证学位证书
一比一定制英国赫特福德大学毕业证学位证书一比一定制英国赫特福德大学毕业证学位证书
一比一定制英国赫特福德大学毕业证学位证书AS
 
Russian ℂall Girls Vijay Nagar Hire Me Neha 96XXXXXXX Top Class ℂall Girl Ser...
Russian ℂall Girls Vijay Nagar Hire Me Neha 96XXXXXXX Top Class ℂall Girl Ser...Russian ℂall Girls Vijay Nagar Hire Me Neha 96XXXXXXX Top Class ℂall Girl Ser...
Russian ℂall Girls Vijay Nagar Hire Me Neha 96XXXXXXX Top Class ℂall Girl Ser...Mumbai Escorts
 
Big Mouth Season 7 Layout Storyboards by Morgan Pabst
Big Mouth Season 7 Layout Storyboards by Morgan PabstBig Mouth Season 7 Layout Storyboards by Morgan Pabst
Big Mouth Season 7 Layout Storyboards by Morgan PabstMorgan Pabst
 
Tagarino_14510147_Design Communication Document AS1.pdf
Tagarino_14510147_Design Communication Document AS1.pdfTagarino_14510147_Design Communication Document AS1.pdf
Tagarino_14510147_Design Communication Document AS1.pdferintagarino1
 
Our great adventures in Warsaw - On arrival training
Our great adventures in Warsaw - On arrival trainingOur great adventures in Warsaw - On arrival training
Our great adventures in Warsaw - On arrival trainingAngelaHakobjanyan
 
Tagarino_14510147_Assessment 3 Pavillion_Process Journal FINAL.pdf
Tagarino_14510147_Assessment 3 Pavillion_Process Journal FINAL.pdfTagarino_14510147_Assessment 3 Pavillion_Process Journal FINAL.pdf
Tagarino_14510147_Assessment 3 Pavillion_Process Journal FINAL.pdferintagarino1
 
Museum Quality | PrintAction.pdf
Museum Quality | PrintAction.pdfMuseum Quality | PrintAction.pdf
Museum Quality | PrintAction.pdfVictoria Gaitskell
 
Laplace Transforms 2 Questionjjjjjjjs.pptx
Laplace Transforms 2 Questionjjjjjjjs.pptxLaplace Transforms 2 Questionjjjjjjjs.pptx
Laplace Transforms 2 Questionjjjjjjjs.pptxjoshuaclack73
 
obat aborsi Cibitung wa 082223595321 jual obat aborsi cytotec asli di Cibitung
obat aborsi Cibitung wa 082223595321 jual obat aborsi cytotec asli di Cibitungobat aborsi Cibitung wa 082223595321 jual obat aborsi cytotec asli di Cibitung
obat aborsi Cibitung wa 082223595321 jual obat aborsi cytotec asli di Cibitungsiskavia916
 

Recently uploaded (20)

prodtion diary updated.pptxyyghktyuitykiyu
prodtion diary updated.pptxyyghktyuitykiyuprodtion diary updated.pptxyyghktyuitykiyu
prodtion diary updated.pptxyyghktyuitykiyu
 
Rustampura ℂall Girls Service WhatsApp: 8527049040 High Class Esℂorts Serviℂe...
Rustampura ℂall Girls Service WhatsApp: 8527049040 High Class Esℂorts Serviℂe...Rustampura ℂall Girls Service WhatsApp: 8527049040 High Class Esℂorts Serviℂe...
Rustampura ℂall Girls Service WhatsApp: 8527049040 High Class Esℂorts Serviℂe...
 
Norco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdf
Norco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdfNorco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdf
Norco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdf
 
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
 
Tagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdf
Tagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdfTagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdf
Tagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdf
 
Gloria Marquez Resume 2024pdf.pdf pdfpdf
Gloria Marquez Resume 2024pdf.pdf pdfpdfGloria Marquez Resume 2024pdf.pdf pdfpdf
Gloria Marquez Resume 2024pdf.pdf pdfpdf
 
一比一原版(Drexel毕业证书)美国芝加哥城市学院毕业证如何办理
一比一原版(Drexel毕业证书)美国芝加哥城市学院毕业证如何办理一比一原版(Drexel毕业证书)美国芝加哥城市学院毕业证如何办理
一比一原版(Drexel毕业证书)美国芝加哥城市学院毕业证如何办理
 
Apotik Jual Obat Aborsi asli Malang, Wa : 085180626899 - Penjual obat Cytotec...
Apotik Jual Obat Aborsi asli Malang, Wa : 085180626899 - Penjual obat Cytotec...Apotik Jual Obat Aborsi asli Malang, Wa : 085180626899 - Penjual obat Cytotec...
Apotik Jual Obat Aborsi asli Malang, Wa : 085180626899 - Penjual obat Cytotec...
 
Captain america painting competition -- 13
Captain america painting competition -- 13Captain america painting competition -- 13
Captain america painting competition -- 13
 
Tagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdf
Tagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdfTagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdf
Tagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdf
 
一比一定制英国赫特福德大学毕业证学位证书
一比一定制英国赫特福德大学毕业证学位证书一比一定制英国赫特福德大学毕业证学位证书
一比一定制英国赫特福德大学毕业证学位证书
 
Russian ℂall Girls Vijay Nagar Hire Me Neha 96XXXXXXX Top Class ℂall Girl Ser...
Russian ℂall Girls Vijay Nagar Hire Me Neha 96XXXXXXX Top Class ℂall Girl Ser...Russian ℂall Girls Vijay Nagar Hire Me Neha 96XXXXXXX Top Class ℂall Girl Ser...
Russian ℂall Girls Vijay Nagar Hire Me Neha 96XXXXXXX Top Class ℂall Girl Ser...
 
Big Mouth Season 7 Layout Storyboards by Morgan Pabst
Big Mouth Season 7 Layout Storyboards by Morgan PabstBig Mouth Season 7 Layout Storyboards by Morgan Pabst
Big Mouth Season 7 Layout Storyboards by Morgan Pabst
 
Tagarino_14510147_Design Communication Document AS1.pdf
Tagarino_14510147_Design Communication Document AS1.pdfTagarino_14510147_Design Communication Document AS1.pdf
Tagarino_14510147_Design Communication Document AS1.pdf
 
Our great adventures in Warsaw - On arrival training
Our great adventures in Warsaw - On arrival trainingOur great adventures in Warsaw - On arrival training
Our great adventures in Warsaw - On arrival training
 
Tagarino_14510147_Assessment 3 Pavillion_Process Journal FINAL.pdf
Tagarino_14510147_Assessment 3 Pavillion_Process Journal FINAL.pdfTagarino_14510147_Assessment 3 Pavillion_Process Journal FINAL.pdf
Tagarino_14510147_Assessment 3 Pavillion_Process Journal FINAL.pdf
 
Museum Quality | PrintAction.pdf
Museum Quality | PrintAction.pdfMuseum Quality | PrintAction.pdf
Museum Quality | PrintAction.pdf
 
Laplace Transforms 2 Questionjjjjjjjs.pptx
Laplace Transforms 2 Questionjjjjjjjs.pptxLaplace Transforms 2 Questionjjjjjjjs.pptx
Laplace Transforms 2 Questionjjjjjjjs.pptx
 
Kiff
KiffKiff
Kiff
 
obat aborsi Cibitung wa 082223595321 jual obat aborsi cytotec asli di Cibitung
obat aborsi Cibitung wa 082223595321 jual obat aborsi cytotec asli di Cibitungobat aborsi Cibitung wa 082223595321 jual obat aborsi cytotec asli di Cibitung
obat aborsi Cibitung wa 082223595321 jual obat aborsi cytotec asli di Cibitung
 

LINE_TRACE-1.pdf

  • 1. LINE TRACE LINE TRACE LINE TRACE BAL RAJESHAM BAL RAJESHAM BAL RAJESHAM STAGE-3 TURBINE SYSTEM SCHEMES STAGE STAGE- -3 TURBINE SYSTEM SCHEMES 3 TURBINE SYSTEM SCHEMES RAMAGUNDAM SUPER THERMAL POWER STATION RAMAGUNDAM SUPER THERMAL POWER STATION RAMAGUNDAM SUPER THERMAL POWER STATION OPERATION DEPARTMENT OPERATION DEPARTMENT OPERATION DEPARTMENT
  • 3. MESSAGE I am glad to know that Operation department has prepared Stage-III Turbine schematics in the form of booklet titled “LINE TRACE”. Successful organizations understand that learning leads to business leverage. This book is designed user friendly containing all the intricate details of schemes for easy learning, efficient monitoring, safe isolation and normalization of systems. The book is found to be very convenient for day to day jobs and users can easily understand and visualize the systems and schemes. The schemes drawn in this booklet titled LINE TRACE contain fine details of the schemes as erected in Unit-7 Turbine side. I am sure that all employees and new entrants to Operation will make use of this book as an immediate reference for improving their skills. I convey my warmest greetings to all employees in Operation department and wish them all success. Date:22-12-2005
  • 4. FOREWORD Efficient and reliable operation of Thermal Power Station mainly depends upon the awareness of various systems and schemes by operation & Maintenance personal about the plant. Operation department attaches great importance for training and development interventions of all its employees technically by providing all the necessary material such as schematics. The compiler has immensely involved and drawn the schemes to lend a new edge for achieving better operation practices. The book will be useful in improving knowledge and skills of the operation fraternity. I am confident that all the employees of Stage-III operation will make use of this schematic booklet for immediate reference and enhancing their skills, thereby improving productivity. I hope this book will be of great help to one and all in operation & Maintenance departments. Date:22-12-2005
  • 5. STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” LINE TRACE LINE TRACE LINE TRACE DETAILED OPERATING SYSTEM SCHEMES DETAILED OPERATING SYSTEM SCHEMES STAGE STAGE- -3 TURBINE AND AUXILIARIES 3 TURBINE AND AUXILIARIES TRACED, DRAWN AND COMPILED BY TRACED, DRAWN AND COMPILED BY V.BAL RAJESHAM V.BAL RAJESHAM V.BAL RAJESHAM EMP.NO. 31744 EMP.NO. 31744 SR.OPERATOR GR.III SR.OPERATOR GR.III STAGE STAGE- -3 TURBINE OPERATOR 3 TURBINE OPERATOR OPERATION DEPARTMENT OPERATION DEPARTMENT RAMAGUNDAM SUPER THERMAL POWER STATION RAMAGUNDAM SUPER THERMAL POWER STATION DISCLAIMER NOTE Enough care was taken on drawing,compiling and printing. Even then any mistakes found or doubts faced, please confirm and follow the instructions of experienced superior. Before operating any Equipment,don’t be in a hurry to act.Always think before you act.
  • 6. V.BAL RAJESHAM, Sr.Operator Gr.III V.BAL RAJESHAM, Sr.Operator Gr.III UNIT-7 TURBINE OPERATOR UNIT-7 TURBINE OPERATOR OPERATION DEPARTMENT OPERATION DEPARTMENT STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” ACKNOWLEDGEMENTS ACKNOWLEDGEMENTS THANKS TO THANKS TO Sri. THOMAS JOSEPH, A.G.M. (O&M) Sri. THOMAS JOSEPH, Sri. THOMAS JOSEPH, A.G.M. (O&M) A.G.M. (O&M) Sri. PRAKASH TIWARI, D.G.M. (O) Sri. PRAKASH TIWARI, Sri. PRAKASH TIWARI, D.G.M. (O) D.G.M. (O) Sri. T.RANGANATHAN, Sr.Supdt. (O) Sri. T.RANGANATHAN, Sri. T.RANGANATHAN, Sr.Supdt. (O) Sr.Supdt. (O) SCRUITINY AND CORRECTION OF THIS BOOK BY Sri. A.V.S. RAO, Sr.Supdt. (O) Sri. A.V.S. RAO, Sri. A.V.S. RAO, Sr.Supdt. (O) Sr.Supdt. (O) Sri. A.K.MANOHAR, Sr.Supdt. (T/M) Sri. A.K.MANOHAR, Sri. A.K.MANOHAR, Sr.Supdt. (T/M) Sr.Supdt. (T/M) Sri. P.RAMA RAO, Engineer. (O) Sri. P.RAMA RAO, Sri. P.RAMA RAO, Engineer. (O) Engineer. (O) COLLEGUES AND FRIENDS COLLEGUES AND FRIENDS COLLEGUES AND FRIENDS Sri. G.VENKATADRI, S.S-1(O)-Printing Sri. G.VENKATADRI, S.S Sri. G.VENKATADRI, S.S- -1(O) 1(O)- -Printing Printing AND AND BY BY
  • 7. OUR CORE VALUES OUR VISION CUSTOMER FOCUS ORGANIZATIONAL PRIDE MUTUAL RESPECT AND TRUST INITIATIVE AND SPEED TOTAL QUALITY To be one of the world’s largest and best power utilities, powering India’s growth COMIT STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”
  • 8. # # # # Please Visit:- e-departments O&M / operation / Vision Show Book Self Explainer and User Friendly Show On Stage-1 Turbine Oil System Compiled in the Year of - 2005 Schematic Book Stage-3 Turbine Detailed Operating System Schemes Compiled in the Year of - 2004 Stage-1 Turbine Detailed Operating System Schemes Schematic Book Compiled in the Year of - 2003 $ % $ % $ % $ % Animated Electronic Manual STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” & & & & $' ( $' ( $' ( $' ( $' ( $' ( $' ( $' (
  • 9. WATER SYSTEMS AND CONDENSER PART-1 01 TO 15 STEAM SYSTEMS AND HEAT EXCHANGERS PART-2 16 TO 30 BOILER FEED PUMPS AND CONNECTIONS PART-3 31 TO 40 MAIN TURBINE MOT AND CFT OIL PART-4 41TO 50 GENERATOR AND SEAL OIL SYSTEM PART-5 51 TO 56 DOSING SYSTEMS AND FIRE WATER PART-6 57 TO 63 MAIN CONTENTS MAIN CONTENTS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”
  • 10. TD BFP-A Feed Water System 33 HP Turbine Steam Circuit 16 MD BFP- Feed Water and Oil System 32 STEAM SYSTEMS AND HEAT EXCHANGERS MD BFP- Seal and Cool Water Lines 31 Service Water System 15 BOILER FEED PUMPS AND CONNECTIONS Condensate Polishing Unit 14 SVD Flash Tank Connections 30 Condenser Air Evacuation System (V/Pump) 13 SDFT and UFT Connections 29 Condenser Connections 12 LP Flash Tank Connections 28 C O L T C System 11 HP Flash Tank Connections 27 Circulating Water System 10 Mal Valves Flash Tank Connections 26 GSC Blower Connections 09 Auxiliary Steam System 25 Feed Water System 08 Deaerator Connections 24 Condensate System 07 Seal Steam System 23 CEP Connections 06 LP By Pass System 22 DM Makeup and CST Connections 05 HP By Pass System 21 ECW System (Full View) 04 LPH and HPH Air Vents and Drains 20 ECW Pumps and PHE System 03 LP Heaters Extractions and Drips 19 Auxiliary Cooling Water System 02 HP Heaters Extractions and Drips 18 Turbo Generator 01 IP Turbine and LP Turbine Steam Circuit 17 WATER SYSTEMS AND CONDENSER STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” C O N T E N T S
  • 11. CFT Cooler and Draining System 50 CFT Oil Purification System 49 Notes Page 64 Control Fluid Tank and Pumps 48 Fire Water Pump House 63 Central Lube Oil Storage Tanks- Centrifuge 47 Fire Water System-D.V.and WR Numbers 62 Central Lube Oil Storage Tanks Connections 46 Fire Water System (Spray & Hydrant) 61 Main Turbine- MOT Oil Purification System 45 Sodium Hydroxide Dosing System (NAOH) 60 Main Turbine- MOT Cooler and Filter 44 Phosphate Dosing System (PO4 59 Main Turbine- Jacking Oil System 43 Ammonia Dosing System (NH3) 58 Main Turbine- Lubricating Oil System 42 Hydrazine Dosing System (N2H4) 57 Main Turbine- MOT Connections 41 DOSING SYSTEMS AND FIRE WATER MAIN TURBINE MOT AND CFT OIL Generator Gas cooling Water System and LLD 56 TD BFP- MOT Cooler and Filter 40 Generator-BCVE Fans Connections 55 TD BFP- MOT Oil Purification System 39 Generator-Primary Water System 54 TD BFP- Jacking Oil System 38 Generator-H2 Drier Connections 53 TD BFP- Lubricating Oil System 37 Generator- Gas Fill and Vent System 52 TD BFP- MOT Connections 36 Generator-Seal Oil System 51 TD BFP- Seal and Cool Water Lines 35 GENERATOR AND SEAL OIL SYSTEM TD BFP-A Turbine Steam Circuit 34 STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” C O N T E N T S
  • 12. STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” Manual Operated Valve Motor Operated Valve M S Solenoid Operated Valve H Hydraulic Operated Valve Pneumatic Operated Valve Non Return Valve (NRV) Motor Operated Butter Fly Valve Butter Fly Valve (Damper) Orifice FC NRV Throttle Three Way Solenoid Valve Drain Funnel Vent to Pit Nozzle Flow Pressure Regulator Pressure Relief Valve Pressure Relief Valve Steam Trap Filter /Strainer “Y” Type Strainer Two Way Valve Three Way Valve Three Way Valve View Glass Power Cylinder Control Valve Blower Siphon Blower T Motor and Pump M S Differential Pressure Regulating Valve ( DPRV ) S Y M B O L S
  • 13. WATER SYSTEMS AND CONDENSER WATER SYSTEMS WATER SYSTEMS AND CONDENSER AND CONDENSER PART-1 PART PART- -1 1
  • 14. CRH-NRV HPCV HPSV HPCV HPSV BRG.NO1 BARRING GEAR MOP BRG.NO2 AND THRUST BRG BRG.NO3 AND COUPLING BRG.NO-4 AND COUPLING BRG.NO-5 BRG.NO-6 AND COUPLING BRG.NO-7 IPCV IPSV IPSV IPCV MAIN STEAM LINE TO HP TURBINE (MS) COLD RE HEAT LINE TO RE HEATER (CRH) HOT RE HEAT LINE TO IP TURBINE (HRH) EXCITER GENERATOR LP TURBINE IP TURBINE HP TURBINE CONDENSER CROSS AROUND PIPE CROSS AROUND PIPE CW IN LINE FROM CW PUMPS CW OUT LINE TO COOLING TOWERS TURBO GENERATOR STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 01 EXTRACTION NO.1 LPT-STAGE NO.5 TO LPH-1 EXTRACTION NO.5 EXTRACTION NO.2 LPT-STAGE NO.3 TO LPH-2 EXTRACTION NO.3 LPT-STAGE NO.2 TO LPH-3 EXTRACTION NO.4.1 IPT-STAGE NO.12 TO DEAERATOR EXTRACTION NO.4.2 IPT-STAGE NO.12 TO TD BFP A & B IPT-STAGE NO.7 TO HPH-5A IPT-STAGE NO.7 TO HPH-5B EXTRACTION NO.6 CRH LINE TO HPH-6A CRH LINE TO HPH-6B CRH LINE TO TD BFP A&B HP TURBINE - 17 STAGES IP TURBINE - 12+12 STAGES LP TURBINE - 06+06 STAGES
  • 15. LP TURBINE ACW-3 CW PUMP HOUSE ACW PUMP HOUSE – UNIT-7 CONDENSER COOLING TOWER-7B CW INLET CW OUTLET ACW-C ACW-B ACW-A SCS - FLUSHING PUMPS VACUUM PUMPS SEAL WATER COOLERS M M SCS-GEAR MOTOR SCS-GEAR MOTOR SCS-STRAINER SCS-STRAINER ECW IN ECW OUT ECW OUT ECW IN PHE-A (TG) PHE-B (TG) PHE-C (TG) PHE-B (SG) PHE-A (SG) DRAIN ACW-2 ACW-1 ACW-6 ACW-5 ACW-4 ACW-9 ACW-8 ACW-7 ACW-10 ACW-11 ACW-12 ACW-13 ACW-14 ACW-15 ACW-16 ACW-17 ACW-18 ACW-19 ACW-20 ACW-21 ACW-22 ACW-23 ACW-24 ACW-27 ACW-28 FOR VACUUM PUMP -A FOR VACUUM PUMP -B ACW-29 ACW-30 ACW-31 TO CW SYSTEM COOLING TOWER-7A LPH-1 FROM CW SYSTEM M M M ACW-25 ACW-26 AUXILIARY COOLING WATER SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 02 RIGHT LEFT DEBRIES VALVE-A DEBRIES VALVE-B
  • 16. M M M M M TG-A TG-B TG-C SG-A SG-B ECW TANK -TG ECW TANK -SG SODIUM HYDRAXIDE DOSING TANK PHE-A PHE-B PHE-C PHE-A PHE-B ACW OUT ACW IN TO VACUUM PUMP HEAT EXCHANGERS ECW RETURN HEADER(T.G) ECW SUPPLY HEADER(T.G) TO BFP COOLERS LONG R/C LINE SHORT R/C SHORT R/C FROM BFP COOLERS LONG R/C MAKEUP TO ECW SYSTEM MAKEUP TO ECW SYSTEM ALL ECW PUMPS SUCTION AND DISCHARGE LINES HAVE DRAIN LINES. AND DISCHARGE LINE HAVE VENT LINE BEFORE VALVE ECW-1 ECW-2 ECW-3 ECW-17 ECW-7 ECW-8 ECW-9 ECW-4 ECW-5 ECW-6 ECW-114 ECW-78 ECW-77 ECW-81 ECW-13 ECW-10 ECW-11 ECW-12 ECW-14 ECW-15 ECW-116 ECW-115 ECW-113 ECW-82 ECW-79 ECW-80 ECW-95 ECW-96 ECW-97 ECW-98 ECW-99 ECW-83 ECW-84 ECW-85 ECW-86 ECW-75 ECW-109 ECW RETURN HEADER (S.G) ECW SUPPLY HEADER(S.G) ALL PHE RAW WATER AND DM WATER INLET OUTLET HAVE DRAIN LINES AND ALL HEADERS HAVE VENT LINES ECW PUMPS AND PHE SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 03
  • 17. M M M P.W. COOLERS SEAL OIL COOLERS (AIR) SEAL OIL COOLERS (H2) COMPRESSOR M.D.BFP T.D.BFP T.D.BFP ECW-A ECW-B ECW-C PHE-C (TG) MD BFP-L/O COOLERS MD BFP-W/O COOLERS TD BFP MOT COOLERS TD BFP MOT COOLERS FROM ACW SYSTEM TO CW SYSTEM EXCITER V / PUMPS GENERATOR H2 COOLERS CFT COOLERS MOT COOLERS CEP-C S S M M M PHE-B (TG) PHE-A (TG) PHE-A (SG) PHE-B (SG) TO EQUIPMENTS (SG) FROM EQUIPMENTS (SG) LONG R/C SHORT R/C ECW-A (SG) ECW-B (SG) LONG R/C SHORT R/C TO EQUIPMENTS FROM EQUIPMENTS TO PUMPS CEP-B CEP-A TD BFP MOT CENTRIFUGE CEP BRG. COOLING LINE MAKE UP LINE FROM ECW TANK DOSING LINE MAKE UP LINE DOSING LINE TO COT /DOT CENTRIFUGE ECW SYSTEM ( FULL VIEW ) STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 04 MAKEUP /FILL LINE TD BFP MOT CENTRIFUGE MOT CENTRIFUGE
  • 18. M M GSC CEP DISCHARGE HEADER TO LP BY PASS SPRAY CONDENSATE SPILL LINE HOTWELL NORMAL MAKEUP AND FILL LINE FROM DM MAKEUP WATER PUMPS HOTWELL EMERGENCY MAKEUP AND FILL LINE CTP-A CTP-B LP TURBINE M CEP- C , B , A NAOH TANK FILL /MAKEUP LINE R/C LINE TO CS TANK CST FILL AND MAKEUP LINE FROM DM WATER MAKEUP PUMPS ECW TANK TURBINE ECW TANK BOILER M CONDENSER LPH-1 DM MAKEUP WATER PUMPS CONDENSATE LINE TO LPH-1 MAKEUP LINE TO ECW SYSTEM (SG) MAKEUP LINE TO ECW SYSTEM (TG) M M CONDENSATE STORAGE TANK ECW TANKS NORMAL FILL AND MAKEUP LINE M SAMPLE LINE SEAL POT DMV-41 DMV-43 CDV-47 DMV-45 DMV-46 DMV-47 DMV-49 DMV-48 DMV-50 DMV-82 DMV-60 DMV-54 DMV-55 CDV-46 CDV-43 CDV-45 DMV-75 ECW-67 ECW-68 ECW-66 ECW-69 ECW-101 ECW-100 ECW-99 ECW-102 ECW-104 ECW-105 ECW-103 ECW-63 ECW-64 ECW-62 ECW-106 ECW-65 DMV-38 DMV-65 DMV-63 NaOH BREATHER CST PUMP HOUSE /COMPRESSOR HOUSE DMV-40 M M DMV-72 PRIMARY WATER SYSTEM MAKEUP LNE M ECW TANKS EMERGENCY MAKEUP LINE GRAVITY MAKEUP LINE TO CONDENSER DM MAKEUP AND CST CONNECTIONS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 05
  • 19. M M S STRAINER EXPANSION BELLOW CEP SEAL WATER LINE CEP MIN R/C LINE DISCHARGE VENT CEP DISCHARGE HEADER ECW IN CEP CANSTER BOX LPFT CONDENSER BALANCING LINE (SUCTION VENT /CANSTERVENT) CEP-A CONNECTIONS BEARING MOTOR CEP SUCTION HEADER CDV-4 CDV-7 CDV-1 CDV-10 CDV-11 CSV-1 CEP-C ECW OUT CEP-A TO CEP-B AND CEP-C CEP MINIMUM RECIRCULATION LINE TO CONDENSER CEP-B TO HEATERS CEP CONNECTIONS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 06 VIEW GLASS CEP-B DISCHARGE VENT CEP-C DISCHARGE VENT
  • 20. M M M M M M M M M M M LPH-1 GSC MIN R/C LPH-2 LPH-3 M M CEP-C M CDV-5 CDV-6 CDV-4 CDV-41 CDV-39 M M M DUMP LINE TO VALVE GLAND SEALING (CDV 151 TO 200) CEP GLAND SEALING CDV-8 CDV-7 CDV-9 CEP-B CEP-A M M M M M CONDENSER FEED STORAGE TANK DEAERATOR LP TURBINE DRAIN COOLER GSC M CDV-31 CDV-30 CDV-25 CDV-24 CDV-21 CDV-22 CDV-36 CDV-33 CDV-34 CDV-35 CDV-29 M CDV-34 IBV CDV-31 IBV EXHAUSTHOOD SPRAY MAL VALVES FT SPRAY CST CDV-43 CDV-45 CDV-28 IBV CDV-28 CDV-32 TO BOILER FILL LINE SAMPLE LINE CDV-27 CPU TO SCAPH SPRAY DRAIN TO UFT M CDV-12 CDV-14 CDV-10 N2H4 DOSING LINE NH3 DOSING LINE CSV-1 CSV-2 CSV-3 CDV-11 CDV-13 CDV-15 CDV-1 CDV-2 CDV-3 CDV-16 CDV-18 CDV-17 CDV-40 CDV-38 CDV-23 CDV-26 CDV-20 CDV-50 CDV-85 CDV-54 CDV-55 CDV-42 CDV-44 EXCESS CONDENSATE TO CST CEP SUCTION HEADER CEP-A MIN.R/C TO NH3 AND N2H4 DOSING CDV-60 OVERFLOW AND DRAIN TO LPFT DRV-48 CDV-37 CDV-49 CDV-46 CDV-47 CDV-71 CDV-72 LP BYPASS SPRAY LINES CONDENSATE SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 07 CONDENSATE FLOW ORIFICE
  • 21. M M M M TO BOILER FILL LINE TO APRDS SPRAY TO HP BYPASS SPRAY LINE M M TO SUPER HEATER SPRAY R/C LINE TO RE HEATER SPRAY M M M M M M DEAERATOR FEED STORAGE TANK TDBFP-B TDBFP-A MDBFP-C TD BFP-A R/C LINE TD BFP-B R/C LINE HP HEATER –5A HP HEATER –6A HP HEATER –5B HP HEATER –6B BFP DISCHARGE HEADER HYDRAZINE DOSING AMMONIA DOSING ECONOMISER BOILER DRUM TO BOILER DRUM THROUGH ECONOMISER FDV-22 FCV-05 FCV-03 FCV-01 FCV-04 FCV02 FCV-06 FDV-15 M FDV-13 FDV-14 M M FDV-16 M M M FDV-07 FDV-08 FDV-10 FDV-09 M M FDV-11 FDV-12 50%BYPASS 100%BYPASS FSV-01 FSV-03 FSV-02 TURBINE MAIN PUMP TURBINE MAIN PUMP MOTOR MAIN PUMP M M FDV-01 FDV-04 FDV-02 FDV-05 FDV-06 FDV-03 FDV-21 FDV-27 FDV-28 FDV-19 FDV-20 FDV-25 FDV-26 FDV-23 FDV-24 FDV-17 FDV-18 FCV-09 FCV-08 FCV-07 CHDV-13 CHDV-07 CHDV-12 CHDV-06 CHDV-11 CHDV-05 HD AD HD AD HD AD AD HD M M M M M M M M 100% FLOW LINE 30% FLOW LINE FEED WATER SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 08 FOR BFP CONNECTIONS – SCHEME NO. 24 AND 25
  • 22. ATMOSPHERE M M ATMOSPHERE LP FLASH TANK TD BFP-B TD BFP-A TO HEATERS CEP-B CEP-C CEP-A HPT IPT LPT CONDENSER M M GLAND STEAM CONDENSER TD BFP SEAL STEAM EXHAUST TO GSC SEAL STEAM EXHAUST TO GSC DRIP LINE TO LPFT LINE FOR INITIAL DRAINING (DRIP) STRAINER AIR AND UNCONDENSABLE GASES TO ATMOSPHERE GSC BYPASS TO ATMOSPHERE CEP DISCHARGE HEADER GSC BLOWER-B GSC BLOWER-A M CDV-16 CDV-18 CDV-17 MAW80 AA011 MAW80 AA012 MAW80 AA007 MAW80 AA007A MAW80 AA001A MAW80 AA 001 M GSC BLOWER CONNECTIONS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 09
  • 23. M M M M COLTCS LINE TO CW SYSTEM CONDENSER LPH-1 COLTCS = CONDENSER ONLINE TUBE CLEANING SYSTEM CW-1 CW-2 CW-4 CW-3 M M M M ACW SYSTEM VACUUM PUMP COOLERS ECW-PHE CW LINE - CW PUMPS TO CONDENSER CW LINE CONDENSER TO CT ACW RETURN WATER TO CW RETURN LINE COLTCS LINE TO BALL MONITERING SYSTEM COLTCS LINE TO CW SYSTEM COLTCS LINE TO BALL MONITERING SYSTEM ARV (CW-5) PASS-A PASS-B MESH FOR STOPPING OLTCS BALLS ARV (CW-6) ARV=AIR RELIEF VALVE CIRCULATING WATER SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 10
  • 24. M M M M S CW LINE TO CONDENSER CW LINE FROM CONDENSER BALL MONITER BALL VESSEL BALLS BALLS MESH CW LINE PASS A IN /OUT M M M M S CW LINE TO CONDENSER CW LINE FROM CONDENSER BALL MONITER BALL VESSEL BALLS BALLS MESH CW LINE PASS B IN /OUT BALL SEPARATOR MOTOR BALL CIRCULATION PUMP AND MOTOR BALL CIRCULATION PUMP AND MOTOR COLTC SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 11
  • 25. LPH-2 VENT LPH-1 VENT LPH-3 VENT MAL VALVES FT VENT MAL VALVES FT VENT SDFT VENT TD BFP-A EXHAUST TD BFP-B EXHAUST MAL VALVES FT DRAIN MAL VALVES FT DRAIN SDFT DRAIN CEP SUCTION LINE HPFT VENT LPFT VENT CEP –A RE CIRCULATION LINE CEP –B RE CIRCULATION LINE CEP –C RE CIRCULATION LINE GSC MIN.RECIRCULATION LINE HPFT DRAIN LPFT DRAIN CEP SUCTION LINE LEAK STEAM DRAIN HPT EVACUATION LINE LPBP LINE LPBP LINE EXHAUST HOOD SPRAY VACUUM BREAK LINE VACUUM PUMP SUCTION LINE CEP –A VACUUM BALANCING LINE CEP –B VACUUM BALANCING LINE CEP –C VACUUM BALANCING LINE NORMAL HOTWEL MAKEUP LINE EMER- HOTWEL MAKEUP LINE (CST) LPH-1 VACUUM PUMP SUCTION LINE HOTWEL LEVEL TRANSMITTER LINE HOTWEL LEVEL TRANSMITTER LINE FROM CPU SYSTEM CONDENSER CONNECTIONS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 12 (RINSING LINE) HOTWEL DRAINS HOTWEL DRAINS
  • 26. LP TURBINE S S S HEAT EXCHANGER SEPARATOR TANK MAKEUP LINE ( FROM ECW ) AIR EJECTOR LEVEL GAUGE ACW OUT ACW IN AIR FLOW MEASUREMENT DEVICE HEAT EXCHANGER OUTLET TO CW OUTLET(L) DUCT EXHAUST WITH SILENCER SEALING LIQUID IN TO VACUUM PUMP-2 VACUUM PUMP SEAL WATER CIRCULATION PUMP VACUUM PUMP MOTOR CONDENSER S VACUUM BREAKER VALVE SMV-25 SMV-26 SMV-24 SMV-23 TANK OVERFLOW CONDENSER AIR EVACUATION SYSTEM –V / PUMP STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 13 VENT AT NEAR LPBP(8.5) HOTWEL LEVEL TRANSMITTER PIPES
  • 27. M S S S S S S S S S S S S S S S S S S S S S S S CPU VESSEL-2 CPU VESSEL-1 FROM CEP DISCHARGE TREATED CONDENSATE TO LP HEATERS TO CONDENSER HOTWEL FROM DM PLANT TO DM PLANT S S S S MOTOR COMPRESSOR CDV-51 CONDENSATE POLISHING UNIT STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 14
  • 28. TURBINE SIDE SERVICE WATER SYSTEM FOR CLEANING AND GENERAL PURPOSE COMPRESSOR HOUSE CFT ROOM STEPS CONDENSER STEPS 0 17 TO H2 FILL ROOM 17 0 0 8.5 17 0 8.5 17 0 8.5 CHILLER ROOM 8.5 STEPS STEPS WAY 0 17 8.5 TO ABOVE 17 meters TO ABOVE 17 meters TO ABOVE 17 meters TO ABOVE 17 meters TO ABOVE 17 meters SERVICE WATER PUMP HOUSE ECW PUMPS SERVICE WATER SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 15 8.5 FOR TOILET ROOMS FOR TOILET ROOMS CST
  • 29. STEAM SYSTEMS AND HEAT EXCHANGERS STEAM SYSTEMS AND STEAM SYSTEMS AND HEAT EXCHANGERS HEAT EXCHANGERS PART-2 PART PART- -2 2
  • 30. HPH-6A TO A.S.HEADER (APRDS) HPH-6B TD BFP TURBINE -A TD BFP TURBINE -B DRAIN TO MAL VALVES FT TO /FROM SEAL STEAM HEADER (SPINDLE LEAK) DRAIN TO MAL VALVES FT DRAIN TO SDFT HPT EVACUATION LINE TO CONDENSER DRAIN TO MAL VALVES FT HPCV-1 HPSV-1 HPSV-2 HPBP LINES TO RE HEATER HP TURBINE EXTRACTION NO.6 TO APRDS DRAIN TO SDFT MS LINE TO HPT CRH NRV TO DEAERATOR HPT CASING DRAIN TO MAL VALVES FT TO /FROM SEAL STEAM HEADER (SPINDLE LEAK) TO /FROM SEAL STEAM HEADER (SPINDLE LEAK) TO /FROM SEAL STEAM HEADER (SPINDLE LEAK) HP TURBINE STEAM CIRCUIT STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 16 DRAIN TO UFT DRAIN TO SDFT DRAIN TO UFT HPCV-2 U SEAL RING LEAK OFF LINES TO SS HEADER I SEAL RING LEAK OFF LINE TO SS HEADER TO SEAL STEAM BALANCING LINE TO IP-LP CROSS AROUND STRAINER STRAINER
  • 31. IP TURBINE LP TURBINE IPSV-2 IPCV-2 IPSV-1 IPCV-1 TD BFP TURBINE -A TD BFP TURBINE -B EXTRACTION NO-4.1 TO DEAERATOR STRAINER HPH-5A HPH-5B EXTRACTION NO.5 STRAINER WARMUP LINE DRAIN LINES TO MALVALVES FT DRAIN LINE TO MALVALVES FT EXTRACTION NO-4.2 LPBP VALVES WARMUP LINE EXTRACTION NO.1 (FOUR LINES) EXTRACTION NO.2 EXTRACTION NO.3 LPH-2 LPH-3 CONDENSER LPBP LINE(R) LPBP LINE(L) DRAIN LINE TO SDFT WARMUP LINE DRAIN LINE TO SDFT TO /FROM SEAL STEAM HEADER (SPINDLE LEAK) TO /FROM SEAL STEAM HEADER (SPINDLE LEAK) HRH LINE TO IPT IP TURBINE AND LP TURBINE STEAM CIRCUIT STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 17 U SEAL RING LEAK OFF LINES TO SS HEADER LPH-1 DRAIN LINE TO UFT DRAIN LINE TO UFT DRAIN LINE TO MALVALVES FT CROSS AROUND PIPE BALANCE LINE TO IP-LP CROSS AROUND
  • 32. CONDENSER HPH-6B M M HPH-5B HPH-6A HPH-5A EXTRACTION NO. 5 CRH LINE TO TDBFP ALTERNATE DRIP HPH-6A TO HPFT ALTERNATE DRIP HPH-5A TO HPFT ALTERNATE DRIP HPH-5B TO HPFT CRH NRV HPFT CRH LINE TO REHEATER M M NORMAL DRIP HPH-6A TO 5A ALTERNATE DRIP HPH-6B TO HPFT NORMAL DRIP HPH-5B TO D/A NORMAL DRIP HPH-5A TO D/A FEED STORAGE TANK DEAERATOR M M MAL VALVES FT LINE DRAINS LINE DRAIN LINE DRAIN NORMAL DRIP HPH-6B TO 5B EXTRACTION NO.6 EXV-21 EXV-34 EXV-22 EXV-33 EXV-25 EXV-26 EXV-23 EXV-24 EXV-09 EXV-10 DRV-8 DRV-2 DRV-5 DRV-11 DRV-18 DRV-25 DRV-22 DRV-15 HP TURBINE IP TURBINE LP TURBINE HP HEATERS EXTRACTIONS AND DRIPS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 18 EXV-147 M EXV-101 M EXV-102 MAL-47
  • 33. LP TURBINE LPH-2 LPH-1 LPH-3 EXTRACTION NO.3 EXTRACTION NO.2 DRAIN COOLER LPFT CONDENSER EXTRACTION NO.1(FOUR LINES) NORMAL DRIP LPH-3 TO LPH-2 NORMAL DRIP LPH-2 TO LPH-1 ALTERNATE DRIP LPH-3 TO LPFT ALTERNATE DRIP LPH-2 TO LPFT NORMAL DRIP LPH-1 TO DRAIN COOLER M M M EXTRACTION LINE DRAINS MAL VALVES FT M M EXTRACTION LINE DRAINS EXV-12 EXV-11 EXV-01 EXV-02 EXV-03 EXV-04 DRV-28 DRV-34 DRV-37 DRV-31 M MAL-55 MAL-54 LP HEATERS EXTRACTIONS AND DRIPS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 19 EXV-118 EXV-119
  • 34. M M M HPFT M M M M CONDENSATE INLET CONDENSATE INLET CONDENSATE OUTLET FEED WATER LINES HPH 5A HPH 6A HPH 5B HPH 6B LPH-3 LPH-2 LPH-1 LPH-1 TO ATM DRAIN TO PIT SVD FT SMV-07 SMV-08 SMV-01 SMV-02 SMV-05 SMV-04 SMV-10 SMV-11 SMV-13 SMV-14 SMV-16 SMV-17 SMV-15 SMV-18 SMV-12 SMV-06 SMV-03 SMV-09 SMV-19 ORIFICE SMV-20 SMV-21 LPH AND HPH AIR VENTS AND DRAINS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 20
  • 35. H M H H H M H M M UFT CONDENSER MS LINE TO HP TURBINE CRH LINE TO RE HEATER HP BY PASS LINES TO CRH LINE HP BY PASS VALVES HP BY PASS ATTEMPRATION LINE BFP DISCHARGE HEADER FEED WATER TO HPHEATERS DRAIN LINES TO UFT HPCV-2 HPCV-1 CRH-NRV TDBFP-A TDBFP-B MDBFP-C HPSV-2 WARM UP LINES BPV-03 BPV-04 BPV-06 BPV-05 BPE-01 BPE-02 BPV-101 BPV-102 BD-01 HP TURBINE IP TURBINE LP TURBINE LPH-1 BP-1 BP-2 HP BY PASS SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 21 BPV-07 HPSV-1 DRAIN TO PIT VENT TO ATM
  • 36. IPCV LPBP LINE DRAINS LP BY PASS SPRAY LINE CEP DISCHARGE HEADER CONDENSATE LINE TO CPU AND LPH-1 TO EXHAUST HOOD SPRAY LP BYPASS SPRAY VALVES CONTROL RACK M M M M SEAL STEAM HEADER M LPBP VALVES SPINDLE LEAKOFF LINES GSC CEP A,B,C LPBP CV-SV(L) LPBP CV-SV(R) WARM UP LINE WARM UP LINE LINE DRAINS M TO MAL VALVES F.T. SPRAY LP BYPASS LINES HRH LINE TO IP TURBINE HP TURBINE IP TURBINE LP TURBINE CONDENSER CST IPSV IPCV IPSV HRHV-113 HRHV-114 HRHV-110 SDFT HRHV-109 LP BY PASS SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 22 LP BY PASS WATER INJECTION VALVES
  • 37. FROM TD BFP TURBINE SEAL STEAM EXHAUST CONDENSER SEAL STEAM HEADER SEAL STEAM EXHAUST HEADER TO GSC BLOWER HP TURBINE IP TURBINE LP TURBINE LEAK STEAM TO IPT EXHAUST M EXCESS SEAL STEAM TO CONDENSER CRH LINE TO RH HRH LINE TO IPT MS LINE TO HPT HPCV,SV AND IPCV ,SV SPINDLE LEAK OFF LINES LPBP CV AND SV SPINDLE LEAKOFF LINES LPBP LINES TO CONDENSER HPCV-2 HPSV-2 HPCV-1 HPSV-1 LEAK STEAM TO IPT EXHAUST GSC LPBP CV, SV IPSV,CV -1 IPSV,CV -2 HPT EVACUATION VALVE SEAL STEAM SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 23 U SEAL RING LEAKOFF LINES MAW 15AA001 MAW 10AA010 MAW 55AA001 MAW 50AA010 U SEAL RING LEAKOFF LINES MAW 50AA001 MAW 10AA001 M H M M M H A.S /CRH LINE TO SSH DRN TO HPFT DRN TO MAL FT
  • 38. M TDBFP-A TDBFP-B MDBFP R/C LINE R/C LINE R/C LINE CRH TAPPING TO D/A PEGGING A.S.TO DEAERATOR PEGGING CRH LINE TO REHEATER FEED STORAGE TANK DEAERATOR HPH-5B HPH-5A HPH-6B HPH-6A LPH-1 CONDENSER EXTRACTION NO.4.1 TO TDBFP A&B EXTRACTION NO.4.2 TO DEAERATOR CONDENSATE LINE TO DEAERATOR HPH-5A NORMAL DRIP TO D/A HPH-5B NORMAL DRIP TO D/A M MAL VALVES FT M M M M DRV-15 DRV-22 DRV-14 DRV-16 DRV-21 DRV-23 DRV-20 DRV-13 SMV-22 ASV-08 ASV-07 ASV-09 ASV-10 ASV-05 ASV-06 TO SVD FT TO SVD FT CRHV-05 CRHV-06 CRHV-07 CRHV-08 CRHV-09 M TO LPFT M TO LPFT EXV-13 EXV-05 EXV-06 FCV-04 FCV-01 FCV-03 FCV-05 FCV-02 FCV-08 FCV-07 FCV-06 FCV-09 ASV-11 FSV-01 FSV-02 FSV-03 DMV-34 DMV-35 DEAERATOR FILL LINE CBD TO UFT TO LPFT MAL-51 ASV-44 T DRV-48 EXV-14 T M ASV-69 CRH LINE TO SEAL STEAM SYSTEM M TO HPFT CRHV-115 CRHV-159 ASV-70 EXV-115 DEAERATOR CONNECTIONS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 24 VACUUM BREAKER LINE D/A OVERFLOW
  • 39. M M M M M M TO A/C PLANT TO TD BFP TO S.S SYSTEM M M SPRAY LINE FROM BFP DISCHARGE HEADER TO SCAP /ATOMIZATIOM TO DEAERATOR PEGGING TO FOPH TO /FROM UNIT-6 TO MILL INERTING TO AH SOOT BLOWING UNIT HT AUX.STEAM HEADER UNIT LT AUX.STEAM HEADER STATION LT AUX.STEAM HEADER TAPPING FROM M.S.LINE TAPPING FROM CRH LINE SPRAY LINE MS LINE TO HPT CRH LINE TO RH HRH LINE TO IPT ASV-25 ASV-26 ASV-27 ASV-28 ASV-29 ASV-30 ASV-22 ASV-23 ASV-24 ASV-31 ASV-32 ASV-33 ASV-34 ASV-67 ASV-68 ASV-56 ASV-41 ASV-39 ASV-40 ASV-48 ASV-44 ASV-37 ASV-36 ASV-49 ASV-50 ASV-51 SPRAY LINE FDV-43 ASV-60 ASV-47 ASV-62 M TO IBD T T T ASV-164 ASV-163 T T M M M M M M M FDV-37 FDV-33 FDV-38 FDV-39 FDV-34 FDV-35 FDV-40 FDV-36 FDV-29 FDV-30 FDV-31 FDV-32 FDV-46 FDV-47 FDV-48 FDV-49 ASV-21 FDV-42 FDV-41 M ASV-35 T M ASV-69 ASV-70 CRH LINE TO S.S HEADER TO SVDFT TO SVDFT TO SVDFT TO SVDFT TO SVDFT TO SVDFT AUXILIARY STEAM SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 25 TO SVDFT
  • 40. M M M M M M M M M M M M M M A B C D E G H I J K L M N F CONDENSER DRAIN BEFORE CRH NRV (MAL 65) F HPT CASING DRAIN (MAL22 AA011) E DRAIN AFTER IPCV-2 (MAL 32 AA011) D DRAIN AFTER IPCV-1 (MAL 31 AA011) C DRAIN BEFORE IPCV-1 (MAL 26 AA011) B DRAIN BEFORE HPCV-1 (MAL 11 AA011) A EXTRACTION NO-5 DRAIN (MAL 47 AA011) N EXTRACTION NO-4.1 DRAIN (MAL 51 AA011) M EXTRACTION NO-4.2 DRAIN (MAL 52 AA011) L EXTRACTION NO-3 DRAIN (MAL 54 AA011) K EXTRACTION NO-2 DRAIN (MAL 55 AA011) J SEAL STEAM DRAIN (MAL 81 AA011) I DRAIN BEFORE IPCV-2 (MAL 27 AA011) H DRAIN BEFORE HPCV-2 (MAL 12 AA011) G SPRAY LINE SPRAY LINE FLASH BOX (TANK) -1 MAL VALVES FLASH TANKS (BOX) CONNECTIONS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 26 FLASH BOX (TANK) -2 16 17 17 17 16 16 16 17 23 19 19 34 24 18 ( GT SIDE ) ( BOILER SIDE )
  • 41. CRHV-122 ( CRH TO TDBFP-A LINE DRAIN BEFORE BLOCK VALVE ) L HPH- 5B EMERGENCY DRIP W CRHV-115 ( CRH TO D/A PEGG. LINE DRAIN ) K HPH- 5A EMERGENCY DRIP V CRHV-153 ( TDBFP-B LINE DRAIN BEFORE ESV ) J HPH- 6B EMERGENCY DRIP U CRHV-145 ( STEAM DRAIN OF TDBFP-B TURBINE ) I HPH- 6A EMERGENCY DRIP T CRHV-141 ( TDBFP-A LINE DRAIN BEFORE ESV ) H AIR VENT OF HPH -5B S CRHV-135 ( STEAM DRAIN OF BFP-A TURBINE ) G AIR VENT OF HPH- 5A R ASV-109 ( TDBFP-B AUX.STEAM LINE DRAIN BEFORE BLOCK VALVE) F AIR VENT OF HPH- 6B Q ASV-104 ( TDBFP-A AUX.STEAM LINE DRAIN BEFORE BLOCK VALVE) E AIR VENT OF HPH- 6A P ASV-152 (MAIN TURBINE GLAND SEAL STEAM LINE DRAIN ) D EXV-102 (EXTRACTION NO.6B LINE DRAIN) O TDBFP-B GLAND SEAL STEAM LINE DRAIN (GS-20) C EXV-101 (EXTRACTION NO.6A LINE DRAIN) N TDBFP-A GLAND SEAL STEAM LINE DRAIN (GS-20) B CRHV-129 (CRH TO TDBFP-B LINE DRAIN BEFORE BLOCK VALVE) M EXV-147 ( EXTRACTION NO.5 LINE DRAIN ) A HP FLASH TANK CONNECTIONS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 27 34 18 23 34 34 34 34 34 24 34 24 34 34 18 18 20 20 20 20 18 18 18 18 M M M M M M M M M M M M M CONDENSER HPFT K L M N O A B C D E F G H I J DRV-5 DRV-4 DRV-6 DRV-10 DRV-11 DRV-12 DRV-26 DRV-18 DRV-24 DRV-17 DRV-25 DRV-19 T U V W P Q R S T T T T T T T T T T SPARE SPARE
  • 42. DRV-37 DRV-38 DRV-36 G DRV-31 DRV-32 DRV-30 F M M M M M CONDENSER LPFT DRV-48 DRV-49 DRV-47 DRV-51 M DR-1 M DR-2 H M N A B C D E M M O P Q R S V U T DR-01 DR-02 T T T CEP-C DISCHARGE VENT LINE CEP-B DISCHARGE VENT LINE CEP-A DISCHARGE VENT LINE A/C PLANT DRAIN LINE (STEAM) DRAIN COOLER DRIP LINE GSC DRIP LINE V U T S R Q DR-02 (TDBFP-B TURBINE DRAIN ) P DEAERATOR OVER FLOW AND DRAIN LINE H DR-01 (TDBFP-B TURBINE DRAIN ) O LPH-2 EMERGENCY DRIP LINE G DR-2 ( TDBFP-A TURBINE DRAIN ) N LPH-3 EMERGENCY DRIP LINE F DR-1 ( TDBFP-A TURBINE DRAIN ) M EXV-119 ( EXTRACTION NO .2 LINE DRAIN ) E SCAPH DRAIN LINE ( SECONDARY ) L EXV-118 ( EXTRACTION NO. 3 LINE DRAIN ) D SCAPH DRAIN LINE ( PRIMARY ) K EXV-105 ( EXTRACTION NO 4.1 LINE DRAIN ) C TD BFP-B LEAK STEAM LINE J EXV-109 ( EXTRACTION NO 4.2 LINE DRAIN ) B TD BFP-A LEAK STEAM LINE I CRHV-159 ( CRH TO D/A PEGGING LINE DRAIN ) A LP FLASH TANK CONNECTIONS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 28 I J K L 24 34 24 19 19 19 19 24 34 34 34 34 34 34 09 19 06 06 06
  • 43. M CRH 101 M HRHV 106 M HRHV 110 M HRHV 114 M HRHV 105 M HRHV 109 M HRHV 113 M MSV 109 M MSV 110 M HRHV 102 M HRHV 101 M MSV 106 M MSV 105 M BPV 102 M BPV 101 SPRAY LINE MS LINE STRAINER DRAIN (LEFT) MS LINE STRAINER DRAIN (RIGHT) VENT TO ATMOSPHERE DEAERATOR DRAIN HRH LINE STRAINER DRAIN (RIGHT) HRH LINE STRAINER DRAIN (LEFT) CRH NRV AND AFTER NRV LINE DRAIN LP BYPASS LINE DRAIN (LEFT) LP BYPASS VALVE WARM UP LINE DRAIN (RIGHT) LP BYPASS VALVE WARM UP LINE DRAIN (LEFT) LP BYPASS LINE DRAIN (RIGHT) HPBP WARMUP LINE DRAIN (LEFT) HPBP WARMUP LINE DRAIN (RIGHT) CONDENSER SDFT UFT UFT =UNIT FLASH TANK SDFT =STEAM DRAIN FLASH TANK DRAIN STEAM VENT SPRAY LINE SDFT AND UFT CONNECTIONS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 29 DRAIN LINE TO PIT
  • 44. C A B D E F DRAIN TO PIT VENT TO ATMOSPHERE SVDFT AUX.STEAM DRAIN MANIFOLD K J I H L M N O P SVD FLASH TANK CONNECTIONS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 30 25 DRAIN LINES P HT PRDS D/S LINE DRAIN H LT PRDS D/S LINE DRAIN O LT PRDS SAFETY VALVE DISCHARGE LINE G HT UNIT A.S. HEADER LINE DRAIN N HPH-6B SAFETY VALVE DISCHARGE LINE F LT UNIT A.S. HEADER LINE DRAIN M HPH-6A SAFETY VALVE DISCHARGE LINE E LT HEADER INTERCONNECTION LINE DRAIN L HPH-5B SAFETY VALVE DISCHARGE LINE D A.S. TO D/A PEGGING LINE DRAIN K HPH-5A SAFETY VALVE DISCHARGE LINE C A.S. TO D/A PEGGING LINE DRAIN J LPH-3 SAFETY VALVE DISCHARGE LINE B LT STATION HEADER DRAIN I LPH-2 SAFETY VALVE DISCHARGE LINE A 24 24 25 25 25 25 25 25 20 20 20 20 20 20 SVDFT = SAVETY VALVE DISCHARGE FLASH TANK G 25
  • 45. BOILER FEED PUMPS BOILER FEED PUMPS BOILER FEED PUMPS PART-3 PART PART- -3 3
  • 46. MAGNETIC FILTERS SEAL WATER COOLERS ECW OUT ECW IN ECW IN ECW OUT ECW IN MOTOR HYDRAULIC COUPLING BOOSTER PUMP MAIN PUMP SEAL WATER COOLERS MAGNETIC FILTERS COOLER COOLER JACKET COOLING LINES MD BFP - SEAL AND COOL WATER LINES STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 31 SEAL WATER LINES JACKET COOLING LINES ECW-51 ECW-52 ECW-37 ECW-36 ECW-45 ECW-43 ECW-44 ECW-46 ECW IN ECW OUT
  • 47. M M M M M CONICAL FILTER LUB OIL FILTERS LUB OIL PUMP MOTOR HYDRAULIC COUPLING BOOSTER PUMP BOOSTER PUMP SUCTION LINE FROM DEAERATOR AMMONIA DOSING HYDRAZINE DOSING STRAINER MAIN PUMP DISCHARGE RE HEATER ATTEMPRATION SUPER HEATER ATTEMPRATION RE CIRCULATION LINE TO DEAERATOR COUPLING COUPLING MAIN PUMP BALANCING LINE W/O COOLER W/O COOLER L/O COOLER L/O COOLER ECW IN TO COOLER ECW OUT FROM COOLER ECW IN TO COOLER ECW OUT FROM COOLER CHDV-13 CHDV-07 VIEW GLASS ECW-38 MD BFP – FEED WATER AND OIL SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 32 FSV-03 FDV-22 FDV-06 FCV-05 FDV-28
  • 48. M M M M BOOSTER PUMP GEAR BOX TURBINE MAIN PUMP AMMONIA DOSING HYDRAZINE DOSING CONICAL STRAINER STRAINER TO BFP DISCHARGE HEADER RECIRCULATION LINE TO DEAERATOR SUPER HEATER SPRAY RE HEATER SPRAY BALANCING LINE BARRING GEAR TD BFP-A FEED WATER SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 33 FDV-18 FDV-24 FCV-01 FDV-04 FSV-01 CHDV-11 CHDV-05 FSV-01 = FSV-02 TD BFP-A = TD BFP-B VALVE NUMBERS FCV-01 = FCV-03 FDV-04 = FCV-05 FDV-18= FCV-20 FDV-24= FCV-26 CHDV-11 = CHDV-12 CHDV-05 = CHDV-06
  • 49. TO HPH-6A M M M TO HPH-6B CRH LINE TO RE HEATER M M TO GSC ACV ESV MCV M FROM A.S.HEADER TO HPFT VENT TO ATM M TO ATM EXHAUSTHOOD SPRAY GLAND SEAL STEAM LEAK SEAL STEAM CONDENSER SEAL STEAM EXHAUST LINE RUPTURE DIAPHRM TO ATMOSPHERE TO TD BFP-B TO HPFT TO HPFT TO LPFT TO LPFT TO LPFT TO HPFT TO HPFT TO MAL FT TO LPFT EXV-31 CRHV-141 CRHV-122 CRHV-01 CRHV-12 ASV-104 CRHV-135 DR-2 DR-1 GS-03 GSCV GS-20 GS-10 LSCV EXT.NO-4.1 MAL-52 EXV-15 EXT.NO-6 EXT.NO-4.2 EXV-109 EXV-27 M M M M M M M M M M EXHAUST LINE TO CONDENSER FROM TDBFP-B SEAL STEAM EXHAUST SEAL STEAM EXHAUST LINE CRHV-141 = CRHV -153 CRHV-135 = CRHV -145 CRHV-01 = CRHV -03 CRHV-12 = CRHV-13 CRHV-122 = CRHV-129 EXV-27 = EXV -28 EXV-31 = EXV -32 ASV-104 = ASV-109 DR-1 = DR-01 DR-2 = DR-02 G.S=03 = G.S-03 GS-20 = G.S-20 GSCV = GSCV LSCV = LSCV - TD BFP-A = TD BFP-B VALVE NUMBERS TO TD BFP-B TO TD BFP-B TD BFP-A TURBINE STEAM CIRCUIT STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 34
  • 50. JACKET COOLING LINES MAGNETIC FILTERS ECW OUT ECW IN SEAL WATER COOLERS SEAL WATER COOLERS MAGNETIC FILTERS JACKET COOLING LINES JACKET COOLING LINES BOOSTER PUMP MAIN PUMP TURBINE TD BFP-SEAL AND COOL WATER LINES STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 35 ECW-24 ECW-25 ECW-26 ECW-27 FOR TDBFP-B ECW 24=ECW 30, ECW 25=ECW 31, ECW 26=ECW 32, ECW 27=ECW 33
  • 51. S AOP-A AOP-B EOP FILTER LUB OIL HEADER TO BEARINGS COOLER-TOP COOLER-BOTTOM DEFOAMER FILTER FILTER COP TD BFP - MOT VEF TO GOVERNING OIL AND BARRING GEAR OIL TO RESERVE OIL TANK (COT /DOT) JACKING OIL PRESSURE REGULATING VALVE SIMPLEX FILTER EMERGENCY OIL TO BEARINGS LUB OIL TO BEARINGS FROM RESERVE OIL TANK RETURN OIL FROM BEARINGS TO MOT COOLER VENT LINE OIL TRAP TO ATMOSPHERE VIEW GLASS TD BFP – MOT CONNECTIONS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 36 S LUB OIL CONTROL VALVE LUB OIL CV BYPASS LINE LUB OIL HEADER TO BEARINGS JOP TOP RECIRCULATION CV BYPASS LINE RECIRCULATION CONTROL VALVE S S
  • 52. S S FILTER TD BFP-MOT AOP-A AOP-B EOP DRAIN TRIP OIL TO MOT BARRING GEAR M LUB OIL HEADER EMERGENCY OIL TO LUB OIL HEADER FILTER DUMPWELL BARRING GEAR ROTATING OIL LINE DEFOAMER MAIN PUMP TURBINE GEAR BOX BOOSTER PUMP TO CONTROL OIL AND BARRING GEAR SIMPLEX FILTER CONTROL OIL TRIP OIL COOLER COOLER TD BFP – LUBRICATING OIL SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 37 S S
  • 53. S S TD BFP-MOT AOP-A AOP-B EOP LUB OIL HEADER DEFOAMER MAIN PUMP TURBINE GEAR BOX BOOSTER PUMP COOLER COOLER FILTER JOP RETURN OIL FROM BEARINGS TO MOT JACKING OIL PRESSURE REGULATOR JACKING OIL PRESSURE REGULATOR TD BFP – JACKING OIL SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 38 THROTTLES
  • 54. S MOT GEAR BOX CENTRIFUGE MOTOR FEED PUMP ECW FOR BOWL SEALING ANTI FLOOD TANK BOOSTER PUMP FLOW METER FINE FILTER HEATER BOX VIEW GLASS “Y” TYPE STRAINER REGULATOR VIEW GLASS RECIRCULATION LINE CENTRIFUGE VIEW GLASS ECW FOR HEATER BOX VENT LINE TD BFP – MOT OIL PURIFICATION SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 39 ECW OVER FLOW AND DRAIN
  • 55. ECW INLET ECW OUTLET ECW TO TDBFP SEAL AND COOL WATER ECW TO TDBFP MOT CENTRIFUGE TDBFP MOT COOLER -TOP TDBFP MOT COOLER -BOTTOM ECW TO COOLERS ECW FROM COOLERS ECW FROM TDBFP SEAL AND COOL WATER TDBFP MOT FILTERS TDBFP MOT VENT LINE LUB OIL INLET TO COOLER FROM AOP LUB OIL TO TDBFP BEARINGS VENT LINE ORIFICE VIEW GLASS TD BFP MOT COOLER AND FILTER STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 40 ECW-29 ECW-28 CV-1 CV-2 FOR TD BFP-B ECW-28 = ECW 34 ECW-29 = ECW 35
  • 56. MAIN TURBINE MOT AND CFT OIL MAIN TURBINE MAIN TURBINE MOT AND CFT OIL MOT AND CFT OIL PART-4 PART PART- -4 4
  • 57. JACKING OIL LINE LUB OIL HEADER TO BEARINGS RETURN OIL FROM BEARINGS MOP /AOP DISCHARGE MOP SUCTION JOP PRESSURE REGULATOR CENTRIFUGE OIL PUMP TO RESERVE OIL TANK FROM RESERVE OIL TANK EMERGENCY OIL TO BEARINGS FILTERS COOLERS VAPOUR EXTRACTION FANS TO DRAIN OIL TANK TO ATMOSPHERE FROM BEARING CHAMBERS OIL VENT AOP-1 AOP-2 EOP JOP DCJOP FILTERS FILTERS VENT COOLERS VENT LUB OIL DRAIN FROM DOP OIL SEPARATOR MAIN TURBINE – MOT CONNECTIONS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 41 SAMPLE LINE S
  • 58. INJECTOR FILTERS TEMPERATURE CONTROL VALVE SOST COOLERS VEF AOP-1 AOP-2 EOP JOP DCJOP MOP INJECTOR BARRING GEAR 1 2 3 4 5 6 7 TO ATMOSPHERE RETURN OIL HEADER TO MOT LUB OIL TO BEARINGS EOP DISCHARGE ONLY TO BEARINGS MOP SUCTION MOP /AOP DISCHARGE HPT IPT LPT GENERATOR EXITER M BARRING GEAR VALVE –MAV-51 TO DRAIN OIL TANK MAIN TURBINE – LUBRICATING OIL SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 42 S
  • 59. PRESSURE REGULATOR FILTERS JOP DCJOP AOP-1 AOP-2 EOP JACKING OIL RETURNED THROUGH BEARING OIL RETURN LINE HPT IPT LPT GENERATOR EXITER TO DRAIN OIL TANK RETURN OIL HEADER FROM BEARINGS THROTTLERS MAIN TURBINE – JACKING OIL SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 43
  • 60. AOP AOP-1 ECW IN ECW OUT MOT VEF OIL SEPARATOR DRAIN JACKING OIL FILTER DRAIN TO CENTRIFUGE SEALWATER COOLER -A COOLER -B GAUGE RACK DRAIN MOT FILTERS LUB OIL TO BEARINGS CENTRIFUGE OIL PUMP GAUGE RACK DRAIN LINE FROM MOP/AOP RETURN OIL FROM BEARINGS FROM RESERVE OIL TANK MAIN OIL TANK DRAIN OIL PUMP CFT ROOM SOST AND SOST SYPHON DRAIN MAIN TURBINE – MOT COOLER AND FILTER STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 44 EOP JOP JOP-1 DOP DRAIN OIL TANK /CLEAN OIL TANK
  • 61. S HEATER BOX MAIN TURBINE MOT RETURN OIL HEADER FROM BEARINGS PURIFIED OIL CENTRIFUGE TO MOT SOLONOID VALVE ‘Y’ TYPE STRAINER VIEW GLASS COP MOTOR COP GEAR BOX FEED PUMP ANTI FLOOD TANK FLOW METER REGULATOR ECW TO HEATER BOX TO COT /DOT SEAL WATER LINE (ECW) MAIN TURBINE – MOT OIL PURIFICATION SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 45 DRAIN LINE TO DRAIN OIL TANK FROM FILTER,COOLER AND GAUGE RACK DRAINS DRAIN TO DIRTY OIL TANK (WASTE FLUID TANK) OR TO PIT DRAIN TO DIRTY OIL TANK (WASTE FLUID TANK) OR TO PIT ECW LINE
  • 62. TD MOT-B TD MOT-A DOT COT MOT TOP TOP OIL UNLOADING VESSEL MAIN TURBINE CENTRIFUGE OIL PUMP DOP FILTER RETUTN OIL FROM TURBINE BEARINGS LOV-03 LOV-01 LOV-02 LOV-04 LOV-17 COP LOV-16 LOV-15 LOV-23 LOV-24 LOV-33 LOV-34 LOV-35 LOV-12 LOV-19 LOV-18 LOV-11 LOV-14 LOV-13 LOV-21 LOV-22 LOV-25 LOV-26 LOV-30 LOV-32 LOV-27 LOV-28 LOV-29 VENT FLAME ARRESTER VENT FLAME ARRESTER FOR BARREL FILLING LINE CENTRAL LUBE OIL STORAGE TANKS CONNECTIONS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 46
  • 63. S DOT COT ANTI FLOOD TANK VENT LINE HEATER BOX FLOW METER CENTRIFUGE GEAR BOX MOTOR INEGRAL PUMP VIEW GLASS ‘Y’ TYPE STRAINER SEAL WATER(ECW) ECW TO HEATER BOX RECIRCULATION LINE BOWL SAMPLE LINE SAMPLE LINE REGULATOR FROM OIL TANKS TO OIL TANKS CENTRAL LUBE OIL STORAGE TANKS - CENTRIFUGE STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 47 ECW LINE ECW OVER FLOW AND DRAIN
  • 64. VAPOUR EXTRACTION FANS ECW IN ECW OUT 32 BAR CONTROL OIL LINE 8 BAR CONTROL OIL LINE PUMP-1 PUMP-2 CONTROL FLUID TANK AIR FILTER RETURN OIL LINE FROM SYSTEM AIR LINE FROM SYSTEM ACCUMULATERS TEMPERATURE CONTROL VALVE TO WFT S TO DPT TO ATMOSPHERE COOLER COOLER CONTROL FLUID TANK AND PUMPS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 48 OIL STIPPER
  • 65. HEATER FULLERS EARTH FILTERS R/C PUMP-1 R/C PUMP-2 CONTROL FLUID TANK A B C D E F A-COOLER VENT(A) B-ACUUMULATOR LINE RELIEF C- 8 BAR DRAIN LINE, AFTER TEMP. CONTROL VALVE D-32 BAR LINE DRAIN E-COOLER VENT(B) F-COOLER OUTLET LINE DRAIN FROM ACUMULATOR AND 8 BAR LINE DRAIN FROM VALVES CONTROL RACK FILTERS DRAIN FROM COOLERS DRAIN RETURN OIL FROM SYSTEM SAMPLE LINE DPT CFT OIL PURIFICATION SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 49 DRY PROTECTION TANK MECHANICAL FILTER FINE FILTER FILTERS DRAIN
  • 66. CONTROL FLUID TANK DPT MOT ROOM FLOOR DRAIN OIL CANAL DRAIN OIL STIPPER DRAIN RETURN OIL FROM CFT SYSTEMS S 32 BAR CONTROL OIL TEMPERATURE CONTROL VALVE FROM EARTH FILTERS DRAIN FROM SYSTEM DRAINS TO GOVERNING SYSTEMS R/C LINE TO CFT THROUGH FILTERS ECW IN ECW OUT CFT COOLER AND DRAINING SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 50 CIRCULATING PUMP-1 CIRCULATING PUMP-2 C.F. RACK DRAIN WASTE FLUID TANK / DIRTY OIL TANK
  • 67. GENERATOR AND SEAL OIL SYSTEM GENERATOR GENERATOR AND SEAL OIL SYSTEM AND SEAL OIL SYSTEM PART-5 PART PART- -5 5
  • 68. GENERATOR PRE CHAMBERS LLD STATION GENERATOR FILTERS H2 SIDE SOP AIR SIDE SOP-1 DCSOP AIR SIDE SOP-2 FILTERS TO MOT SOST SOT H2 SIDE SO COOLERS ECW OUT ECW IN AIR SIDE SO COOLERS H 2 SIDE EQUALISING VALVES 5 6 H 2 SIDE SEAL OIL RING RELIEF OIL AIR SIDE SEAL OIL DPRV DPRV DPRV AIR SIDE SEAL OIL RING RELIEF OIL H 2 SIDE SEAL OIL SOT MAKEUP OIL IMPULSE LINE H2 IMPULSE LINE SOST- SEAL OIL STORAGE TANK OIL IMPULSE LINE H2 IMPULSE LINE SOT- SEAL OIL TANK DPRV- DIFFERENTIAL PRE.REG.VALVE VENT TO ATM THROUGH BCVEF GENERATOR – SEAL OIL SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 51
  • 69. ATMOSPHERE 100.00 TO ATMOSPHERE THROUGH BCVE FANS ATMOSPHERE PRIMARY WATER TANK GENERATOR COMPRESED AIR LINE PRESSURE REGULATORS PRESSURE REGULATORS GAS PURITY DIGITAL DISPLAY DEVICE SAMPLE LINE SAFETY VALVE H2 FILLING LINE CO2 FILLING LINE N2 FILLING LINE N2 PRESSURE REGULATOR H2 FILLING RACK CO2 FILLING RACK N2 CYLINDER FLASH EVAPORATOR H2 FILL AND VENT BOARD GENERATOR – GAS FILL AND VENT SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 52 PRESSURE GAUGE
  • 70. TOWER-A LIMIT SWITCH TOWER-B H2 DRIER H2 DRIER CHANGEOVER HANDLE PRIMARY WATER TANK HEATER BLOWER TO ATMOSPHERE THROUGH BCVE FANS BLOWER AIR IN FOR REGENERATION VIEW GLASS H2 GAS TO DRIER H2 GAS TO GENERATOR FROM DRIER GENERATOR WASTE GAS LINE TO ATMOSPHERE OIL TRAP H2 DRIER TOWER-A IS IN SERVICE AND H2 DRIER TOWER-B IS IN REGENERATION POSITION GENERATOR – H2 DRIER CONNECTIONS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 53
  • 71. ALKALISER ATMOSPHERE NAOH STORAGE TANK MOTOR &PUMP MAGNETIC FILTERS N2 CYLINDER ECW OUT PUMP-A PUMP-B TEMP.CONTROL VALVE ECW IN TO ATMOSPHERE THROUGH BCVE FANS MAKEUP WATER LINE, TAPPING FROM DM MAKEUP WATER PUMPS STATOR BUSH IN STATOR COOLING WATER INLET PRIMARY WATER TANK EXCESS GAS REMOVE LINE (H2) GENERATOR RECIRCULATION LINE REGULATOR FINE FILTER ION EXCHANGER STATOR BUSH OUT N2 CHARGING LINE TO PRIMARY WATER TANK FLOW METER COOLER COOLER S GENERATOR – PRIMARY WATER SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 54 FILTER /MESH
  • 72. PRIMARY WATER TANK SOST H2 DRIERS BCVEF-1 BCVEF-2 GENERATOR DRAIN LINE FROM H2 DRIER OIL TRAP DRAIN LINE FROM AIR SIDE SOP SUCTION SYPHON GENERATOR – BCVE FANS CONNECTIONS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 55 TO ATMOSPHERE OIL TANK OIL SEPARATOR LINE OIL SEPARATOR LINE
  • 73. A B C D E F G GENERATOR VIEW GLASS ECW IN ECW OUT ECW IN ECW OUT EXCITER ECW IN HEADER ECW OUT HEADER COOLER-A COOLER-B ECW-16 ECW-17 ECW-18 ECW-19 H2 GAS COOLERS H2 GAS COOLERS TEMPERATURE CONTROL VALVE GENERATOR – GAS COOLING WATER SYSTEM AND LLD STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 56 A,B = T.BOX BOTTOM LEAK C = T.BOX TOP LEAK D = GENERATOR CENTER LEAK E,F,G = T.E. LEAKAGE
  • 74. DOSING SYSTEMS DOSING SYSTEMS DOSING SYSTEMS PART-6 PART PART- -6 6 AND AND AND FIRE WATER FIRE WATER FIRE WATER
  • 75. 20.0 20.0 PUMP-A PUMP-B TO AMMONIA DOSING DOSING STROKE SETTING AND DISPLAY BOARD STIRRER MOTOR CONDENSATE TAPPING LINE HYDRAZINE MIXING CUM STORAGE TANK HYDRAZINE MEASURING TANK DOSING PUMP -1 DOSING PUMP -2 DOSING PUMP MAXIMUM DISCHARGE PRESSURE IS 45 Kg/cm2 TO CEP DISCHARGE LINE TO BOILER INITIAL FILL LINE D.M.WATER TAPPING LINE BREATHER TANK BFP-A S /LINE M BFP-B S /LINE BFP-C S /LINE M M AMMONIA DOSING TO BFP SUCTION LINE CHDV-05 CHDV-06 CHDV-07 CHDV-17 CHDV-18 CHDV-19 CHDV-20 HYDRAZINE DOSING SYSTEM (N2H4) STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 57 FLUSHING LINE
  • 76. 20.0 20.0 PUMP-A PUMP-B TO HYDRAZINE DOSING DOSING STROKE SETTING AND DISPLAY BOARD STIRRER MOTOR CONDENSATE TAPPING LINE AMMONIA MIXING CUM STORAGE TANK AMMONIA MEASURING TANK DOSING PUMP -1 DOSING PUMP -2 DOSING PUMP MAXIMUM DISCHARGE PRESSURE IS 45 Kg/cm2 TO CEP DISCHARGE LINE TO BOILER INITIAL FILL LINE D.M.WATER TAPPING LINE BREATHER TANK BFP-A S /LINE M BFP-B S /LINE BFP-C S /LINE M M HYDRAZINE DOSING TO BFP SUCTION LINE CHDV-11 CHDV-12 CHDV-13 CHDV-19 CHDV-20 CHDV-17 CHDV-18 AMMONIA DOSING SYSTEM (NH3) STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 58 FLUSHING LINE
  • 77. DM WATER TAPPING LINE CONDENSATE TAPPING LINE TO BOILER DRUM DOSING PUMP-2 DOSING PUMP-1 MEASURING TANK MIXING TANK STIRRER MOTOR STIRRER MOTOR 40.0 40.0 PUMP-A PUMP-B DOSING STROKE SETTING AND DISPLAY BOARD PHOSPHATE DOSING SYSTEM (PO4) STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 59
  • 78. SODIUM HYDRAXIDE MIXING CUM STORAGE TANK BREATHER TANK STIRRER MOTOR ECW TANK-TURBINE ECW TANK-BOILER TO ECW PUMPS SUCTION LINE ECW TANKS NORMAL FILLING LINE FROM DM PLANT T.G.SIDE S.G.SIDE SODIUM HYDRAXIDE DOSING SYSTEM (NAOH) STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 60 DMV-75 D.M. WATER MAKEUP AND FILL LINE
  • 79. ASH SLURRY UCB BOILER TURBINE TP-30 WR-1 WR-5 WR-2 WR-3 WR-4 WR-6 WR-7 WR-8 WR-9 WR-10 WR-11 WR-12 WR-13 WR-14 R1SH-1 R1BF-2 R1BF-3 R1BF-4 R1BF-5 R1BF-6 R1BF-7 R1BF-8 R1BF-9 R1BF-10 R1BF-11 R1BF-12 R1BF-13 R1BF-14 R1BF-16 R1BF-17 E S P CHIMNY FOPH DV-72,71,70 DV-76 DV-66 DV-75 DV-74 DV-89 DV-67 DV-77 DV-69 DV-68 DV-81,82,83 DV-85 DV-84 DV-62,56,57,58 DV-59 DV-61 DV-60 DV-55 DV-54 DV- -- DV-53 DV-52 DV-65 DV-51 , 50 , 49 , 48 DV-64 R1BF-15 R1BF-1 R1SH-2 R1SH-3 R1SH-4 R1SH-5 INTER CONNECTION LINE (STAGE-2) R1SH-6 R1SH-7 R1SH-9 R1SH-18 R2BF-1 R3BF-1 R3BF-2 R3SH-2 R3BF-3 R3SH-1 R3SH-7 R3SH-3 R3SH-4 R3SH-5 R3BF-4 R3SH-8 R3SH-15 R3SH-16 R3SH-9 R3BF-5 R3BF-6 R3SH-10 R3SH-11 R3SH-12 R3SH-13 R3SH-14 R2SH-1 R2SH-2 R1SH-12 R2BF-2 R2BF-4 R2BF-3 FMSH-1 FMSH-2 FMSH-3 R2WM-1 R2WM-2 R2SH-3 R1BF-21 R1WM-1 R1WM-2 R1WM-3 R1WM-5 R1WM-4 R1SH-13 R1SH-14 R1SH-16 R1WM-11 R1BF-20 R1BF-19 R1WM-10 R1WM-9 R1WM-8 R1BF-18 R1SH-15 R2BF-16 R1DH-1 R1DH-2 R1SH-17 R2BF-5 FOAM PH LDO TP-28 TP-31 VACUUM PH SER-WATER PH FIRE WATER PUMP HOUSE CW PH DV-63 ASH WATER PH TP-29 CPU REGEN UNIT R1WM-7 R1SH-10 R1SH-11 R1WM-6 ASH WATER RECIRCULATION UAT-1 UAT-2 GT-R GT-Y GT-B ACW PH ST-TR DG YARD BOOSTER PH R1SH-8 FWT-2 FWT-1 FACILITIES I D C T - 7 A DV-79 DV-80 DV-47,46 DV-45 DV-44 DV-43 DV-90 LDO UNLOAD PH CL.BLDG ESP C/R SH = SINGLE HYDRANT DH = DOUBLE HYDRANT WR = WET RAISER WM = WATER MONITER BF = BUTTER FLY VALVE DV = DELUGE VALVE PH = PUMP HOUSE FM = FOAM FEH = FIRE ESCAPE HYDRANT FWT= FIRE WATER TANK FIRE WATER SYSTEM –SPRAY AND HYDRANT STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 61 RING-1 HYDRANT LINE SPRAY LINE RING-3 HYDRANT LINE RING-2 HYDRANT LINE TO CHP SPRAY LINE R1SH- --
  • 80. FEH11 EL(+) 9.5M FEH10 EL(+) 5.25M WR-13 (ESP C/R) WR-9 (BLR) WR-7(BLR) WR-4 (UCB) C FEH = FIRE ESCAPE HYDRANT FEH52 EL(+) 17.70M FEH51 EL(+) 12.20M FEH50EL(+) 9.40M FEH44 EL(+) 66.20M FEH43 EL(+) 57.50M WR-12 (TP-29) FEH42 EL(+) 68.00M FEH49 EL(+) 4.70M FEH25 EL(+) 69.05M FEH23 EL(+) 56.75M FEH09 EL(+) 37.00M FEH08 EL(+) 32.75M FEH07 EL(+) 25.00M FEH06 EL(+) 14.50M WR-3(TG) FEH04 EL(+) 18M FEH03 EL(+) 9.5M FEH02 EL(+) 18M FEH41 EL(+) 60.50M FEH40 EL(+) 54.50M WR-11 (TP-30) FEH39 EL(+) 60.50M FEH38 EL(+) 54.50M WR-10 (TP-31) FEH32 EL(+) 44.30M FEH31 EL(+) 37.80M FEH30 EL(+) 30.00M FEH29 EL(+) 26.00M FEH28 EL(+) 19.00M FEH27 EL(+) 10.00M FEH37 EL(+) 75.55M FEH36 EL(+) 69.05M FEH35 EL(+) 62.50M WR-8 BLR) FEH26 EL(+) 75.55M FEH24 EL(+) 62.50M WR-14 (ESP C/R) FEH48 EL(+) 17.70M FEH47 EL(+) 12.20M FEH46EL(+) 9.40M FEH45 EL(+) 4.70M FEH34 EL(+) 56.75M FEH33 EL(+) 50.50M FEH22 EL(+) 50.50M BFP LUB OIL CONSOLE AT EL(+) 0.00 M HVWS DV-74 FEH20 EL(+) 37.80M FEH18 EL(+) 26.00M FEH21 EL(+)44.30M DV-73 FEH19 EL(+) 33.00M FRONT SIDE OF BOILER BURNER FRONT AT EL (+) 27.25 M, EL(+) 30.40 M, EL(+) 33.60 M, 36.70 M C HVWS DV-72 FEH17 EL(+) 19.00M FRONT SIDE OF BOILER BURNER FRONT AT EL (+) 27.25 M, EL(+) 30.40 M, EL(+) 33.60 M, 36.70 M C HVWS DV-71 FEH16 EL(+) 10.00M BOILER BURNER FRONT EL(+) 24.00 M C HVWS DV-70 WR-6 (BLR) EL(+)00.00 M IN A-B BAY ( CABLE GALLERY ) B MVWS DV-69 FEH15 EL(+) 18M FEH05 EL(+) 6.10M EL(+)08.50 M IN A-B BAY ( CABLE GALLERY ) B MVWS DV-68 FEH12 EL(+) 14.5M ESP CONTROL ROOM FUEL OIL PUMP HOUSE 5.1 M CABLE GALLERY MAIN PLANT T.G-EL(+) 9.5M, 18M DIESEL TANK AT D.G.ROOM STATION TRANSFORMER GENERATOR TRANSFORMER - B GENERATOR TRANSFORMER - Y GENERATOR TRANSFORMER - R UNIT AUX.TRANSFORMER A / B TURBINE LUB OIL CANAL PIPING AT EL(+) 17.00 M TURBINE LUB OIL UNIT AT EL(+) 8.50 M SEAL OIL OIL UNIT AT EL(+) 0.00 M CENTRAL LUB OIL UNIT AT EL(+) 0.00 M EQUIPMENT /AREA PROTECTED - C B - - - A C C C C C C C C C WR-2 (TG) FEH01 EL(+) 9.5M WR-1 (TG) WET RAISERS - DV-90 DV-89 DV-88 DV-87 DV-86 DV-85 DV-84 DV-83 DV-82 DV-81 DV-80 DV-79 DV-78 DV-77 DV-76 DV-75 DV NO FEH14 EL(+) 9.5M EL(+)13.50 M IN C-E BAY ( CABLE.GALLERY ) B MVWS DV-67 WR-5 (TG) EL(+)24.00 M IN B-C BAY (MCC CABLE GALLERY) B MVWS DV-66 FEH13 EL(+) 18M ESP CONTROL ROOM B MVWS DV-65 LDO UNLOAD PUMP HOUSE A MVWS DV-64 LDO TANK A MVWS DV-63 TP-31-EL(+)53.50M BUNKER 34 A A MVWS DV-62 SYS EQUIPMENT /AREA PROTECTED SYS DV NO DV-61 DV-60 DV-59 DV-58 DV-57 DV-56 DV-55 DV-54 DV-53 DV-52 DV-51 DV-50 DV-49 DV-48 DV-47 DV-46 DV-45 DV-44 DV-43 A A A A A A A A A A A A A A A A A A A TP-31-EL(+)53.50M BUNKER 34 B MVWS TP-31-EL(+)59.00M MVWS - CONV.33 A/B MVWS HVWS CONV.33 A/B MVWS MVWS TP-30-EL(+)65.50M,67.00M MVWS - CONV.32 A/B MVWS - CONV.32 A/B MVWS - TP-29-(EL) (+) 65.00M MVWS MVWS TP-29-(EL) (+) 57.00M MVWS HVWS CONV.31 A/B MVWS MVWS MVWS MVWS MVWS MVWS MVWS MVWS MVWS MVWS HVWS CONV.31 A/B HVWS HVWS HVWS HVWS HVWS HVWS HVWS CONV.31 A/B CONV.31 A/B CONV.31 A/B CONV.31 A/B CONV.31 A/B CONV.31 A/B CONV.31 A/B CONV.31 A/B FIRE WATER SYSTEM – D.V AND WR NUMBERS STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 62
  • 81. SPRAY PUMP-1 SPRAY DIESEL PUMP-1 HYDRAUNT DIESEL PUMP-1 HYDRAUNT PUMP-1 HYDRAUNT PUMP-2 HYDRAUNT PUMP-3 JACKY PUMP-1 JACKY PUMP-2 COMPRESSOR-2 COMPRESSOR-1 SPRAY LINE TO CHP HYDRANT LINE TO RING -3 HYDRANT LINE TO RING -2 SPRAY LINE TO TURBINE AND BOILER HYDRANT LINE RING -1 FIRE WATER TANK FILL LINE FIRE WATER TANK - 1 FIRE WATER TANK - 2 FIRE WATER PUMPS SUCTION HEADER FIRE WATER PUMPS DISCHARGE HEADER FIRE WATER CONTROL ROOM FIRE WATER PUMP HOUSE STRAINERS R/C LINE M M HPT PS PS FIRE WATER PUMP HOUSE (STAGE-3) STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 63
  • 82. NOTES PAGE STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” 64
  • 83. STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ” THANKYOU FOR USING AND CHOOSING THANKYOU THANKYOU FOR USING AND CHOOSING FOR USING AND CHOOSING V.BAL RAJESHAM V.BAL RAJESHAM V.BAL RAJESHAM balrajesham@rediffmail.com balrajesham@rediffmail.com STAGE-3 TURBINE OPERATOR STAGE STAGE- -3 TURBINE OPERATOR 3 TURBINE OPERATOR
  • 84. !" !" !" !" !" !" !" !" !" !" !" !" (A Government of India Enterprise) (A Government of India Enterprise) Ramagundam Super Thermal Power Station Ramagundam Super Thermal Power Station P.O.Jyothinagar,Dist.Karimnagar P.O.Jyothinagar,Dist.Karimnagar- -505215 (A.P) 505215 (A.P)