SlideShare a Scribd company logo
1 of 6
L&T Technology Services Confidential Page 1 of 1
DSS RAJESH
Work Summary
Experience Summary
Key Expertise:
 8+ Years of experience in Control Instrumentation & Automation, Design and
Development of Power Electronics, Verification and Validation of Electrical Systems
Viz, AC Power Drives, Battery Chargers, AC UPS, IGBT based Power Electronic Drives
and Harmonic Analysis of Single Line Electrical Systems.
 6 months experience working in Qatar, Oman and Srilanka
 Currently working as a Control& Instrumentation Engineer in L&T Technology Services,
Mumbai from Mar 2011 to till date.
 Worked as a Power Electronics (Rockwell Drives) Design & Development
 Worked as a Power Electronics (DC Systems, AC UPS & Industrial Battery Chargers)
Design & Development Engineer in HBL Power Systems Ltd, Hyderabad from Feb 2007
to Feb 2011.
 Good and extensive experience in Field Instrumentation & Control System
 Good and extensive experience in Design & Development& Testing & Validation of
Power Electronics
 6 months experience working in Qatar, Oman and Srilanka for Validation of DC UPS, AC
UPS and unit testing Approval from QP, PDO and Electrical Detail Engineering of
Shipyard Construction
 Testing of Electrical Systems As per UL, CE and EMI/EMC standards.
 Involved in Functional Testing & Regression Testing.
 Signal Integrating Testing of individual Modules
 Documentation, Reporting.
 Good communication and interpersonal skills, exceptional ability to learn new
technologies.
 Quick learner with the ability to grasp new technologies and software.
 Reviews of requirements and design & implementation
L&T Technology Services Confidential Page 2 of 2
DSS RAJESH
Project Details
Skills
Project 1:
Project Name
Lenana(FEED),Liquid-Pondy(CE+DED)
Ethiopia CE+FEED+DED
Duration
April 2014
to Till date
Description Home Care & Personal Care Soap & Powder Plants, Spread & Savory
Role &
Contribution
Role : Team Lead
Contribution:
 Design Construction of Instrument Layouts of all Plants
 FEED Engineering
 Prepare Instrumentation List As per P& ID Diagrams.
 Datasheets Preparation
 List Out All Instruments List
 Cable Schedule Preparation
 BOM Preparation For Installation
 I/O List Preparation
 Control Architecture Preparation
 Location Drawings Preparation
 Junction Box Schedule
 Control System Specification
 Control Philosophy
 Hook-up Drawing Support
 Request For Quotation & Technical Bid Analysis For all Instruments &
Control System
Domain Power Electronics, Control Automation &Instrumentation
Tools Orcad, AutoCAD, IT SKILLS in MS Office, C language,
Programming/Simulation
Tools MATLAB/Simulink, ETAP
L&T Technology Services Confidential Page 3 of 3
DSS RAJESH
Project 2:
Project Name Tea Plants-Vietnam , NSD Srilanka Duration
April 2012
to Mar 2014
Description Food Category & Soap Bar
Role &
Contribution
Role: Team Lead
Contribution:
 Design Construction of Instrument Layouts of all Plants
 Core Design Of Tea Modules
 FEED Engineering
 Prepare Instrumentation List As per P& ID Diagrams.
 Datasheets Preparation
 List Out All Instruments List
 Cable Schedule Preparation
 BOM Preparation
 I/O List Preparation
 Control Architecture Preparation
 Location Drawings Preparation
 Junction Box Schedule To maintain the system hardware & timely
detection of hardware fault to ensure optimum utilization of the
network resources and to increase the network uptime.
Project 3:
Project Name
Archirodon Construction (Overseas)
Co.SA(Doha,QATAR): (ONSITE)
Duration
Feb 2012
to May
2012
Description Shipyard Construction
Role&
Contribution
Role: Team Lead
Responsibilities:
 Design Construction of Electrical Layouts of all Shipyard, Schematic
and control schematic designing as per client requirement.
 Earthing Layout, Lightning Layout, Small Power Layout, Lighting
Layout, Control Drawings of Lighting Power.
 Proper Tagging and Cable schedules All Electrical Drawings
 Review Drawings
 Designing using AutoCAD 2011 tool
 Design according to QP(Qatar Petroleum) Standards
 Prepare the Documentation as per Revisions.
Technologies Auto-Cad
L&T Technology Services Confidential Page 4 of 4
DSS RAJESH
Project 4:
Project Name Rockwell Automation Duration
Dec 2011
to Feb
2012
Description HARMONIC ANALYSIS Of Distribution Loads Using ETAP Tool.
Role&
Contribution
Role:
Hardware Electrical Engineer
Responsibilities:
 Single line Diagram Preparation as per customer requirement
 Simulate using ETAP tool
 Filter selection according to IEEE Standards
 Prepare the report
Technologies ETAB
Project 5:
Project Name Rockwell Automation Duration
Mar 2011
to Dec
2011
Description
Industrial AC Drives Frame 2 to 7
Role&
Contribution
Role:
Hardware Electrical Engineer
Responsibilities:
 Analysis of existing circuit diagram for Frame 4,5.
 Identify the components which are likely to be affected due to
migration from 480V to 600V
 Signal Integrity Testing
 Verification and Validation
 Torque regulation testing
Technologies Matlab, Test Bench
Project 6:
Project Name A.O.Smith Duration
Dec 2011
to Feb
2012
Description
AC Drives: Less than 1HP Drives Design and Development.
L&T Technology Services Confidential Page 5 of 5
DSS RAJESH
Role&
Contribution
Role:
Hardware Electrical Engineer
Responsibilities:
 Analysis of existing circuit diagram for comfort select 1 HP
 Identify the component which are likely to be affected due to
change 1 HP to 1/4 ,1/8 and 1/15 HP
 EMI/EMC Filter Calculation
 Testing of Drives As per functional requirements
 Testing of Drives As per UL and EMI/EMC standards
Project 7:
Project Name
AC UPS and Active Power Filter
Duration
Dec 2011
to Feb
2012
Description Uninterruptable Power Supply (UPS) is used at the loads where there is a
need of continuous power supply without any interruption.
Role&
Contribution
Role:
Hardware Electrical Engineer
Responsibilities:
 My role in this project is to verify the designed circuits and making
schematics of the circuits. Testing of complete system and its
validation, also involved in DSP programming.
 Active Power Filter: It is a 3-phase Inverter used across non-linear
loads in power system to compensate the Harmonic currents and to
improve the power factor of the system.
 Role: Design of Power circuit & its components rating and designed
the control flow for programming, involved in DSP Programming,
testing and validation
Project 8:
Project Name
Industrial Battery Chargers Testing
Duration
Dec 2011
to Feb
2012
Description Testing and Validation Engineer
L&T Technology Services Confidential Page 6 of 6
DSS RAJESH
Educational Qualification & Certifications
Role&
Contribution
Role:
Testing and Validation Engineer
Responsibilities:
 Testing of Thyristor Control Battery Chargers
 Checking of all chargers as per the scheme, schematic drawings and
ensuring that all the customer requirements are met
 Offering the chargers for inspectors for their Witness
 Offering the chargers for Type Test and getting Type Test approvals
 Preparation of Type Test Reports and Routine Test Reports
 Proper documentation of all design related information and
maintenance of records
 Preparing proper testing and QA certification to enable and to
proceed with inspection call
 Correctness of as built of drawings
 Attending to all inspection points pointed out by the inspector and
subsequently getting inspection clearance through CSD.
 Training of service engineers with various charger designs and
testing procedures.
 Participating in design review and design review activities
 Interacting with production, QA and Engineering for any
discrepancy
B.Tech Electrical & Electronics, Completed in 2004

More Related Content

What's hot

Resume for the Instrumentation Engineer
Resume for the Instrumentation EngineerResume for the Instrumentation Engineer
Resume for the Instrumentation EngineerAkash Patel
 
Sudheer instrumentation engineer Resume
Sudheer instrumentation engineer ResumeSudheer instrumentation engineer Resume
Sudheer instrumentation engineer ResumeSudheer B
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)Khalid Eltahir
 
Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)Janardhan Reddy
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVmohammed zameel zainudheen
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Eng Samer Ali CV
Eng Samer Ali CVEng Samer Ali CV
Eng Samer Ali CVSamer Ali
 
Automation Engineer r3 2-2015
Automation Engineer r3 2-2015Automation Engineer r3 2-2015
Automation Engineer r3 2-2015Todd Calvert
 
Resume instrumentation engineer
Resume instrumentation engineer Resume instrumentation engineer
Resume instrumentation engineer zahirtec
 
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
CV Electrical Engineer - Emad  Ahmed Mohamed SabekCV Electrical Engineer - Emad  Ahmed Mohamed Sabek
CV Electrical Engineer - Emad Ahmed Mohamed SabekEmad Ahmed Mohamed Sabek
 
Electronics Engineer Resume Foramt
Electronics Engineer Resume ForamtElectronics Engineer Resume Foramt
Electronics Engineer Resume ForamtMohammed Irshad S K
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)jobby Thomas
 

What's hot (20)

Resume for the Instrumentation Engineer
Resume for the Instrumentation EngineerResume for the Instrumentation Engineer
Resume for the Instrumentation Engineer
 
Achyuta_CV
Achyuta_CVAchyuta_CV
Achyuta_CV
 
Cv electrical
Cv electricalCv electrical
Cv electrical
 
Sudheer instrumentation engineer Resume
Sudheer instrumentation engineer ResumeSudheer instrumentation engineer Resume
Sudheer instrumentation engineer Resume
 
Electrical site Engineer
Electrical site EngineerElectrical site Engineer
Electrical site Engineer
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)Janardhan (Power Electronics resume)
Janardhan (Power Electronics resume)
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CV
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Eng Samer Ali CV
Eng Samer Ali CVEng Samer Ali CV
Eng Samer Ali CV
 
Ishantshrivastava resume
Ishantshrivastava resumeIshantshrivastava resume
Ishantshrivastava resume
 
Bala electl engineer-cv
Bala electl engineer-cvBala electl engineer-cv
Bala electl engineer-cv
 
Automation Engineer r3 2-2015
Automation Engineer r3 2-2015Automation Engineer r3 2-2015
Automation Engineer r3 2-2015
 
Resume instrumentation engineer
Resume instrumentation engineer Resume instrumentation engineer
Resume instrumentation engineer
 
DGK - Resume (Final)
DGK - Resume (Final)DGK - Resume (Final)
DGK - Resume (Final)
 
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
CV Electrical Engineer - Emad  Ahmed Mohamed SabekCV Electrical Engineer - Emad  Ahmed Mohamed Sabek
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
 
Electronics Engineer Resume Foramt
Electronics Engineer Resume ForamtElectronics Engineer Resume Foramt
Electronics Engineer Resume Foramt
 
Resume
ResumeResume
Resume
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)
 

Viewers also liked

Secondary Education
Secondary EducationSecondary Education
Secondary EducationMohsin Rauf
 
FdSc Mechanical Engineering
FdSc Mechanical EngineeringFdSc Mechanical Engineering
FdSc Mechanical Engineeringbwcelearning
 
Project Procurment Management
Project Procurment ManagementProject Procurment Management
Project Procurment ManagementSaad Al Jabri
 
Press conference on 21st August 2015
Press conference on 21st August 2015Press conference on 21st August 2015
Press conference on 21st August 2015dutb
 
CV OF KHALILI ABDELMELEK ENG.(1)
CV OF KHALILI ABDELMELEK ENG.(1)CV OF KHALILI ABDELMELEK ENG.(1)
CV OF KHALILI ABDELMELEK ENG.(1)abdelmalek khalili
 
Tutorial ci
Tutorial ciTutorial ci
Tutorial ciWira Hul
 
香蕉的學問飯前吃香蕉健康無限
香蕉的學問飯前吃香蕉健康無限香蕉的學問飯前吃香蕉健康無限
香蕉的學問飯前吃香蕉健康無限佩貞 林
 
Interdisciplinary GIS Applications in Challenging RISK
Interdisciplinary GIS Applications in Challenging RISKInterdisciplinary GIS Applications in Challenging RISK
Interdisciplinary GIS Applications in Challenging RISKPatrick Rickles
 
Rec+Letter+Misty+Craig
Rec+Letter+Misty+CraigRec+Letter+Misty+Craig
Rec+Letter+Misty+CraigMisty Craig
 
Facebook for business
Facebook for businessFacebook for business
Facebook for businessAkash Nayan
 
அள்ளி விடுதல்
அள்ளி விடுதல்அள்ளி விடுதல்
அள்ளி விடுதல்Gaya Thri
 
Knee Pain Treatment In Irving, TX
Knee Pain Treatment In Irving, TXKnee Pain Treatment In Irving, TX
Knee Pain Treatment In Irving, TXkneepainirving
 
Sertifikat - Total Quality Management
Sertifikat - Total Quality ManagementSertifikat - Total Quality Management
Sertifikat - Total Quality ManagementRobi Pandunusa
 
Crystal Wong_Letter of Recommendation
Crystal Wong_Letter of RecommendationCrystal Wong_Letter of Recommendation
Crystal Wong_Letter of RecommendationCrystal Wong
 

Viewers also liked (16)

Secondary Education
Secondary EducationSecondary Education
Secondary Education
 
FdSc Mechanical Engineering
FdSc Mechanical EngineeringFdSc Mechanical Engineering
FdSc Mechanical Engineering
 
HE Welcome
HE WelcomeHE Welcome
HE Welcome
 
Project Procurment Management
Project Procurment ManagementProject Procurment Management
Project Procurment Management
 
Press conference on 21st August 2015
Press conference on 21st August 2015Press conference on 21st August 2015
Press conference on 21st August 2015
 
CV OF KHALILI ABDELMELEK ENG.(1)
CV OF KHALILI ABDELMELEK ENG.(1)CV OF KHALILI ABDELMELEK ENG.(1)
CV OF KHALILI ABDELMELEK ENG.(1)
 
Tutorial ci
Tutorial ciTutorial ci
Tutorial ci
 
香蕉的學問飯前吃香蕉健康無限
香蕉的學問飯前吃香蕉健康無限香蕉的學問飯前吃香蕉健康無限
香蕉的學問飯前吃香蕉健康無限
 
Interdisciplinary GIS Applications in Challenging RISK
Interdisciplinary GIS Applications in Challenging RISKInterdisciplinary GIS Applications in Challenging RISK
Interdisciplinary GIS Applications in Challenging RISK
 
Rec+Letter+Misty+Craig
Rec+Letter+Misty+CraigRec+Letter+Misty+Craig
Rec+Letter+Misty+Craig
 
Facebook for business
Facebook for businessFacebook for business
Facebook for business
 
அள்ளி விடுதல்
அள்ளி விடுதல்அள்ளி விடுதல்
அள்ளி விடுதல்
 
Knee Pain Treatment In Irving, TX
Knee Pain Treatment In Irving, TXKnee Pain Treatment In Irving, TX
Knee Pain Treatment In Irving, TX
 
Unece charter NAG
Unece charter NAGUnece charter NAG
Unece charter NAG
 
Sertifikat - Total Quality Management
Sertifikat - Total Quality ManagementSertifikat - Total Quality Management
Sertifikat - Total Quality Management
 
Crystal Wong_Letter of Recommendation
Crystal Wong_Letter of RecommendationCrystal Wong_Letter of Recommendation
Crystal Wong_Letter of Recommendation
 

Similar to DSS RAJESH

Cv renny mathew_hw engineer (2)
Cv renny mathew_hw engineer (2)Cv renny mathew_hw engineer (2)
Cv renny mathew_hw engineer (2)Rnny Mthew
 
Cv renny mathew_hw engineer (3)
Cv renny mathew_hw engineer (3)Cv renny mathew_hw engineer (3)
Cv renny mathew_hw engineer (3)Rnny Mthew
 
Cv renny mathew_hw engineer
Cv renny mathew_hw engineerCv renny mathew_hw engineer
Cv renny mathew_hw engineerRnny Mthew
 
Cv renny mathew_hw engineer
Cv renny mathew_hw engineerCv renny mathew_hw engineer
Cv renny mathew_hw engineerRnny Mthew
 
CV_Mazhar_Ali_F-1.docx
CV_Mazhar_Ali_F-1.docxCV_Mazhar_Ali_F-1.docx
CV_Mazhar_Ali_F-1.docxMazhar Ali
 
Anmol rattan shergill resume m.s.electrical engineering
Anmol rattan shergill resume m.s.electrical engineeringAnmol rattan shergill resume m.s.electrical engineering
Anmol rattan shergill resume m.s.electrical engineeringAnmol Rattan Shergill
 
Rajeev_Resume
Rajeev_ResumeRajeev_Resume
Rajeev_ResumeRajeev N
 
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram NarayanaSr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram NarayanaChandram Narayana
 
Anmol Rattan Shergill info Resume M.S.Electrical Engineering
Anmol Rattan Shergill info Resume M.S.Electrical  EngineeringAnmol Rattan Shergill info Resume M.S.Electrical  Engineering
Anmol Rattan Shergill info Resume M.S.Electrical EngineeringAnmol Rattan Shergill
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh newkaptan singh
 
Anmol rattan shergill info resume m.s.electrical engineering
Anmol rattan shergill info resume m.s.electrical engineeringAnmol rattan shergill info resume m.s.electrical engineering
Anmol rattan shergill info resume m.s.electrical engineeringAnmol Rattan Shergill
 

Similar to DSS RAJESH (20)

Cv renny mathew_hw engineer (2)
Cv renny mathew_hw engineer (2)Cv renny mathew_hw engineer (2)
Cv renny mathew_hw engineer (2)
 
Cv renny mathew_hw engineer (3)
Cv renny mathew_hw engineer (3)Cv renny mathew_hw engineer (3)
Cv renny mathew_hw engineer (3)
 
Cv renny mathew_hw engineer
Cv renny mathew_hw engineerCv renny mathew_hw engineer
Cv renny mathew_hw engineer
 
Cv renny mathew_hw engineer
Cv renny mathew_hw engineerCv renny mathew_hw engineer
Cv renny mathew_hw engineer
 
CV_Mazhar_Ali_F-1.docx
CV_Mazhar_Ali_F-1.docxCV_Mazhar_Ali_F-1.docx
CV_Mazhar_Ali_F-1.docx
 
Guru_Resume EEE
Guru_Resume EEEGuru_Resume EEE
Guru_Resume EEE
 
Sandeep cv
Sandeep cvSandeep cv
Sandeep cv
 
Anmol rattan shergill resume m.s.electrical engineering
Anmol rattan shergill resume m.s.electrical engineeringAnmol rattan shergill resume m.s.electrical engineering
Anmol rattan shergill resume m.s.electrical engineering
 
Final Resume
Final Resume Final Resume
Final Resume
 
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
 
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
 
resume_Ravi Kumar_
resume_Ravi Kumar_resume_Ravi Kumar_
resume_Ravi Kumar_
 
Jituranjan lenka
Jituranjan lenkaJituranjan lenka
Jituranjan lenka
 
Rajeev_Resume
Rajeev_ResumeRajeev_Resume
Rajeev_Resume
 
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram NarayanaSr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
Sr Electrical Designer Engineer_wiring harness (EWIS) _Chandram Narayana
 
Anmol Rattan Shergill info Resume M.S.Electrical Engineering
Anmol Rattan Shergill info Resume M.S.Electrical  EngineeringAnmol Rattan Shergill info Resume M.S.Electrical  Engineering
Anmol Rattan Shergill info Resume M.S.Electrical Engineering
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh new
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Anmol rattan shergill info resume m.s.electrical engineering
Anmol rattan shergill info resume m.s.electrical engineeringAnmol rattan shergill info resume m.s.electrical engineering
Anmol rattan shergill info resume m.s.electrical engineering
 

DSS RAJESH

  • 1. L&T Technology Services Confidential Page 1 of 1 DSS RAJESH Work Summary Experience Summary Key Expertise:  8+ Years of experience in Control Instrumentation & Automation, Design and Development of Power Electronics, Verification and Validation of Electrical Systems Viz, AC Power Drives, Battery Chargers, AC UPS, IGBT based Power Electronic Drives and Harmonic Analysis of Single Line Electrical Systems.  6 months experience working in Qatar, Oman and Srilanka  Currently working as a Control& Instrumentation Engineer in L&T Technology Services, Mumbai from Mar 2011 to till date.  Worked as a Power Electronics (Rockwell Drives) Design & Development  Worked as a Power Electronics (DC Systems, AC UPS & Industrial Battery Chargers) Design & Development Engineer in HBL Power Systems Ltd, Hyderabad from Feb 2007 to Feb 2011.  Good and extensive experience in Field Instrumentation & Control System  Good and extensive experience in Design & Development& Testing & Validation of Power Electronics  6 months experience working in Qatar, Oman and Srilanka for Validation of DC UPS, AC UPS and unit testing Approval from QP, PDO and Electrical Detail Engineering of Shipyard Construction  Testing of Electrical Systems As per UL, CE and EMI/EMC standards.  Involved in Functional Testing & Regression Testing.  Signal Integrating Testing of individual Modules  Documentation, Reporting.  Good communication and interpersonal skills, exceptional ability to learn new technologies.  Quick learner with the ability to grasp new technologies and software.  Reviews of requirements and design & implementation
  • 2. L&T Technology Services Confidential Page 2 of 2 DSS RAJESH Project Details Skills Project 1: Project Name Lenana(FEED),Liquid-Pondy(CE+DED) Ethiopia CE+FEED+DED Duration April 2014 to Till date Description Home Care & Personal Care Soap & Powder Plants, Spread & Savory Role & Contribution Role : Team Lead Contribution:  Design Construction of Instrument Layouts of all Plants  FEED Engineering  Prepare Instrumentation List As per P& ID Diagrams.  Datasheets Preparation  List Out All Instruments List  Cable Schedule Preparation  BOM Preparation For Installation  I/O List Preparation  Control Architecture Preparation  Location Drawings Preparation  Junction Box Schedule  Control System Specification  Control Philosophy  Hook-up Drawing Support  Request For Quotation & Technical Bid Analysis For all Instruments & Control System Domain Power Electronics, Control Automation &Instrumentation Tools Orcad, AutoCAD, IT SKILLS in MS Office, C language, Programming/Simulation Tools MATLAB/Simulink, ETAP
  • 3. L&T Technology Services Confidential Page 3 of 3 DSS RAJESH Project 2: Project Name Tea Plants-Vietnam , NSD Srilanka Duration April 2012 to Mar 2014 Description Food Category & Soap Bar Role & Contribution Role: Team Lead Contribution:  Design Construction of Instrument Layouts of all Plants  Core Design Of Tea Modules  FEED Engineering  Prepare Instrumentation List As per P& ID Diagrams.  Datasheets Preparation  List Out All Instruments List  Cable Schedule Preparation  BOM Preparation  I/O List Preparation  Control Architecture Preparation  Location Drawings Preparation  Junction Box Schedule To maintain the system hardware & timely detection of hardware fault to ensure optimum utilization of the network resources and to increase the network uptime. Project 3: Project Name Archirodon Construction (Overseas) Co.SA(Doha,QATAR): (ONSITE) Duration Feb 2012 to May 2012 Description Shipyard Construction Role& Contribution Role: Team Lead Responsibilities:  Design Construction of Electrical Layouts of all Shipyard, Schematic and control schematic designing as per client requirement.  Earthing Layout, Lightning Layout, Small Power Layout, Lighting Layout, Control Drawings of Lighting Power.  Proper Tagging and Cable schedules All Electrical Drawings  Review Drawings  Designing using AutoCAD 2011 tool  Design according to QP(Qatar Petroleum) Standards  Prepare the Documentation as per Revisions. Technologies Auto-Cad
  • 4. L&T Technology Services Confidential Page 4 of 4 DSS RAJESH Project 4: Project Name Rockwell Automation Duration Dec 2011 to Feb 2012 Description HARMONIC ANALYSIS Of Distribution Loads Using ETAP Tool. Role& Contribution Role: Hardware Electrical Engineer Responsibilities:  Single line Diagram Preparation as per customer requirement  Simulate using ETAP tool  Filter selection according to IEEE Standards  Prepare the report Technologies ETAB Project 5: Project Name Rockwell Automation Duration Mar 2011 to Dec 2011 Description Industrial AC Drives Frame 2 to 7 Role& Contribution Role: Hardware Electrical Engineer Responsibilities:  Analysis of existing circuit diagram for Frame 4,5.  Identify the components which are likely to be affected due to migration from 480V to 600V  Signal Integrity Testing  Verification and Validation  Torque regulation testing Technologies Matlab, Test Bench Project 6: Project Name A.O.Smith Duration Dec 2011 to Feb 2012 Description AC Drives: Less than 1HP Drives Design and Development.
  • 5. L&T Technology Services Confidential Page 5 of 5 DSS RAJESH Role& Contribution Role: Hardware Electrical Engineer Responsibilities:  Analysis of existing circuit diagram for comfort select 1 HP  Identify the component which are likely to be affected due to change 1 HP to 1/4 ,1/8 and 1/15 HP  EMI/EMC Filter Calculation  Testing of Drives As per functional requirements  Testing of Drives As per UL and EMI/EMC standards Project 7: Project Name AC UPS and Active Power Filter Duration Dec 2011 to Feb 2012 Description Uninterruptable Power Supply (UPS) is used at the loads where there is a need of continuous power supply without any interruption. Role& Contribution Role: Hardware Electrical Engineer Responsibilities:  My role in this project is to verify the designed circuits and making schematics of the circuits. Testing of complete system and its validation, also involved in DSP programming.  Active Power Filter: It is a 3-phase Inverter used across non-linear loads in power system to compensate the Harmonic currents and to improve the power factor of the system.  Role: Design of Power circuit & its components rating and designed the control flow for programming, involved in DSP Programming, testing and validation Project 8: Project Name Industrial Battery Chargers Testing Duration Dec 2011 to Feb 2012 Description Testing and Validation Engineer
  • 6. L&T Technology Services Confidential Page 6 of 6 DSS RAJESH Educational Qualification & Certifications Role& Contribution Role: Testing and Validation Engineer Responsibilities:  Testing of Thyristor Control Battery Chargers  Checking of all chargers as per the scheme, schematic drawings and ensuring that all the customer requirements are met  Offering the chargers for inspectors for their Witness  Offering the chargers for Type Test and getting Type Test approvals  Preparation of Type Test Reports and Routine Test Reports  Proper documentation of all design related information and maintenance of records  Preparing proper testing and QA certification to enable and to proceed with inspection call  Correctness of as built of drawings  Attending to all inspection points pointed out by the inspector and subsequently getting inspection clearance through CSD.  Training of service engineers with various charger designs and testing procedures.  Participating in design review and design review activities  Interacting with production, QA and Engineering for any discrepancy B.Tech Electrical & Electronics, Completed in 2004