SlideShare a Scribd company logo
1 of 41
MATERIAL MANAGEMENT
By
DR.I.SELVARAJ, I.R.M.S
Sr.D.M.O (Selection Grade Officer) (on study leave),
INDIAN RAILWAYS MEDICAL SERVICE
B.Sc., M.B.B.S., D.P.H (Madras medical college, Recognized by MCI).,
D.I.H., PGCH&FW (NIHFW, New Delhi)
III rd year Post graduate student in M.D Community medicine
Department of Community medicine
Sree Ramachandra Medical College,
Porur,Chennai
Definition
It is concerned with planning, organizing and
controlling the flow of materials from their initial
purchase through internal operations to the service
point through distribution.
OR
Material management is a scientific technique,
concerned with Planning, Organizing &Control of flow
of materials, from their initial purchase to destination.
AIM OF MATERIAL MANAGEMENT
To get
1. The Right quality
2. Right quantity of supplies
3. At the Right time
4. At the Right place
5. For the Right cost
PURPOSE OF MATERIAL MANAGEMENT
•To gain economy in purchasing
•To satisfy the demand during period of replenishment
•To carry reserve stock to avoid stock out
•To stabilize fluctuations in consumption
•To provide reasonable level of client services
Primary
•Right price
•High turnover
•Low procurement
•& storage cost
•Continuity of supply
•Consistency in quality
•Good supplier
relations
•Development of
personnel
•Good information
system
Objective of material management
Secondary
•Forecasting
•Inter-departmental
harmony
•Product improvement
•Standardization
•Make or buy decision
•New materials & products
•Favorable reciprocal
relationships
Economy in material management
•Containing the costs
•Instilling efficiency in all activities
Four basic needs of Material
management
1. To have adequate materials on hand when needed
2. To pay the lowest possible prices, consistent with
quality and value requirement for purchases
materials
3. To minimize the inventory investment
4. To operate efficiently
Basic principles of material management
1. Effective management & supervision
It depends on managerial functions of
• Planning
• Organizing
• Staffing
• Directing
• Controlling
• Reporting
• Budgeting
2. Sound purchasing methods
3.Skillful & hard poised negotiations
4.Effective purchase system
5.Should be simple
6.Must not increase other costs
7.Simple inventory control programme
Elements of material management
1. Demand estimation
2. Identify the needed items
3. Calculate from the trends in Consumption during last
2 years.
4. Review with resource constraints
Functional areas of material management
1. Purchasing
2. Central service supply
3. Central stores
4. The print shops
5. The pharmacy
6. Dietary
& Linen services
PROCUREMENT
1. Directorate general of supply & disposal
(DGS & D, Govt. Of India]
2. Medical stores depot (M. S.D. Government
of India, Ministry of H & FW]
3. Private or public sector undertakings.
4. Receiving donations.
Procurement cycle
• Review selection
• Determine needed quantities
• Reconcile needs & funds
• Choose procurement method
• Select suppliers
• Specify contract terms
• Monitor order status
• Receipt & inspection
Objectives of procurement system
•Acquire needed supplies as inexpensively as possible
•Obtain high quality supplies
•Assure prompt & dependable delivery
•Distribute the procurement workload to avoid period of
idleness & overwork
•Optimize inventory management through scientific
procurement procedures
CALL FOR
OFFERS
CALL FOR
OFFERS
YES
YES
DETERMINE DRUGS & DRUG
REQUIREMENTS
DETERMINE DRUGS & DRUG
REQUIREMENTS
DRUG REQUIREMENTS
DRUG REQUIREMENTS
DONATION
SOURCE
DONATION
SOURCE
GOVERNMENT
PRODUCTION
GOVERNMENT
PRODUCTION
DETERMINE DRUGS & DRUG
REQUIREMENTS
DETERMINE DRUGS & DRUG
REQUIREMENTS
PURCHASE
REQUIREMENTS
PURCHASE
REQUIREMENTS
OPEN TENDER
OPEN TENDER RESTRICTED
TENDER
RESTRICTED
TENDER
NEGOTIATED
TENDER
NEGOTIATED
TENDER
DIRECT
PURCHASE
DIRECT
PURCHASE
REQUEST OFFERS FROM
ELIGIBLE SUPPLIERS
REQUEST OFFERS FROM
ELIGIBLE SUPPLIERS
LOCATE
RELIABLE
SUPPLIERS
LOCATE
RELIABLE
SUPPLIERS
CONTACT
RELIABLE
SUPPLIER
CONTACT
RELIABLE
SUPPLIER
EVALUATE &
SELECT SUPPLIER
EVALUATE &
SELECT SUPPLIER
EVALUATE OFFERS
& SELECT
SUPPLIERS
EVALUATE OFFERS
& SELECT
SUPPLIERS
NEGOTIATE PRICE &
SUPPLY CONDITIONS
NEGOTIATE PRICE &
SUPPLY CONDITIONS
ESTABLISH
PRICE
ESTABLISH
PRICE
PURCHASE ORDER
/ CONTRACT
PURCHASE ORDER
/ CONTRACT
PURCHASE ORDER /
CONTRACT
PURCHASE ORDER /
CONTRACT
PURCHASE
ORDER /
CONTRACT
PURCHASE
ORDER /
CONTRACT
PURCHASE
ORDER /
CONTRACT
PURCHASE
ORDER /
CONTRACT
DRUGS RECEIVED, CHECKED AGAINST PURCHASE ORDER / CONTRACT SPECIFICATIONS & CLEARED
FOR DISTRIBUTION
DRUGS RECEIVED, CHECKED AGAINST PURCHASE ORDER / CONTRACT SPECIFICATIONS & CLEARED
FOR DISTRIBUTION
ADJUST
QUANTITIES
ADJUST
QUANTITIES
ADJUST
QUANTITIES
ADJUST
QUANTITIES
YES
NO
YES
NO
NO NO NO
YES YES
FLOW OF PROCUREMENT DECISIONS
FLOW OF PROCUREMENT DECISIONS
Open tender
•Public bidding, resulting in low prices
•Published in newspapers
•Term - 4 weeks
•Quotations must be sent in the specific forms
that are sold, before the time &date mentioned in
the tender form
•In technical items, ‘two packets or two bins’
system is followed. Offers are given in two
separate packets.
•Technical bid
•Financial bid
Cont……
•First technical bid is opened & short listed
•Then financial bid of selected companies are
opened & lowest is selected
•Delayed tenders & late tenders are not accepted.
But if, in case of delayed tenders, if the rate quoted is
very less, then it can be accepted.
•Quotations are opened in presence of indenting
department, accounts & authorized persons of party
•Validity of tenders – generally 90 days
Earnest money
2 % of the tender amount or as decided has to be paid
along with all quotations. In case of default 1/5 is withheld
Restricted or limited tender
From limited suppliers (about 10)
Lead-time is reduced
Better quality
Negotiated procurement
Buyer approaches selected potential Suppliers & bargain
directly
Used in long time supply contracts
Direct procurement
Purchased from single supplier, at his quoted price
Prices may be high
Reserved for proprietary materials, or low priced, small
quantity & emergency purchases
Rate contract
Firms are asked to supply stores at specified Rates
during the period covered by the Contract
Spot purchase
It is done by a committee, which includes an officer
from stores, accounts & purchasing departments
Risk purchase
If supplier fails, the item is purchased from other
agencies & the difference in cost is recovered from
the first supplier
Points to remember while purchasing
•Proper specification
•Invite quotations from reputed firms
•Comparison of offers based on basic price, freight & insurance,
taxes and levies
•Quantity & payment discounts
•Payment terms
•Delivery period, guarantee
•Vendor reputation
(reliability, technical capabilities, Convenience, Availability, after-
sales service, sales assistance)
•Short listing for better negotiation terms
•Seek order acknowledgement
Storage
• Store must be of adequate space
• Materials must be stored in an appropriate place
• in a correct way
• Group wise & alphabetical arrangement helps in
• identification & retrieval
• First-in, first-out principle to be followed
• Monitor expiry date
• Follow two bin or double shelf system, to avoid
• Stock outs
• Reserve bin should contain stock that will cover
• lead time and a small safety stock
Issue & use
Can be centralized or decentralized
Inventory control
It means stocking adequate number and
kind of stores, so that the materials are
available whenever required and wherever
required. Scientific inventory control results
in optimal balance
Functions of inventory control
•To provide maximum supply service,
consistent with maximum efficiency &
optimum investment.
•To provide cushion between forecasted &
actual demand for a material
Economic order of quantity
EOQ = Average Monthly Consumption X Lead Time [in
months] + Buffer Stock – Stock on hand
CARRYING
COST
PURCHASING
COST
ECONOMIC ORDER OF
QUANTITY(EOQ)
•Re-order level: stock level at which fresh
order is placed.
•Average consumption per day x lead time +
buffer stock
•Lead time: Duration time between placing
an order & receipt of material
•Ideal – 2 to 6 weeks.
ABC ANALYSIS
(ABC = Always Better Control)
This is based on cost criteria.
It helps to exercise selective control when confronted
with large number of items it rationalizes the number of
orders, number of items & reduce the inventory.
About 10 % of materials consume 70 % of resources
About 20 % of materials consume 20 % of resources
About 70 % of materials consume 10 % of resources
‘A’ ITEMS
Small in number, but consume large amount
of resources
Must have:
•Tight control
•Rigid estimate of requirements
•Strict & closer watch
•Low safety stocks
•Managed by top management
‘C’ ITEMS
Larger in number, but consume lesser amount of
resources
Must have:
•Ordinary control measures
•Purchase based on usage estimates
•High safety stocks
ABC analysis does not stress on items those are
less costly but may be vital
200000
500
20
199500
500
19
199000
500
18
198500
500
17
198000
500
16
197500
500
15
197000
500
14
196500
500
13
196000
1500
12
194500
1500
11
193000
1750
10
191250
2750
9
188500
4000
8
184500
4500
7
180000
5000
6
175000
7500
5
167500
7500
4
160000
20000
3
140000
50000
2
90000
90000
1
CUMMULATIVE
CUMMULATIVE
COST
COST [Rs.]
ANNUAL COST
ANNUAL COST
[Rs.]
ITEM
ITEM COST %
COST %
ITEM %
ITEM %
70 %
70 %
20 %
20 %
10 %
10 %
10 %
10 %
20 %
20 %
70 %
70 %
ABC
A
N
A
L
Y
S
I
S
WORK
SHEET
‘B’ ITEM
Intermediate
Must have:
•Moderate control
•Purchase based on rigid requirements
•Reasonably strict watch & control
•Moderate safety stocks
•Managed by middle level management
VED ANALYSIS
• Based on critical value & shortage cost of an item
–It is a subjective analysis.
•Items are classified into:
Vital:
•Shortage cannot be tolerated.
Essential:
•Shortage can be tolerated for a short period.
Desirable:
Shortage will not adversely affect, but may be using more
resources. These must be strictly Scrutinized
V E D ITEM COST
A AV AE AD CATEGORY 1 10 70%
B BV BE BD CATEGORY 2 20 20%
C CV CE CD CATEGORY 3 70 10%
CATEGORY 1 - NEEDS CLOSE MONITORING & CONTROL
CATEGORY 2 - MODERATE CONTROL.
CATEGORY 3 - NO NEED FOR CONTROL
SDE ANALYIS
Based on availability
Scarce
Managed by top level management
Maintain big safety stocks
Difficult
Maintain sufficient safety stocks
Easily available
Minimum safety stocks
FSN ANALYSIS
Based on utilization.
Fast moving.
Slow moving.
Non-moving.
Non-moving items must be periodically reviewed to prevent
expiry
& obsolescence
HML ANALYSIS
Based on cost per unit
Highest
Medium
Low
This is used to keep control over consumption
at departmental level for deciding the frequency of physical verification.
PROCURMENT OF EQUIPMENT
Points to be noted before purchase of an
equipment:
•Latest technology
•Availability of maintenance & repair facility,
with minimum down time
•Post warranty repair at reasonable cost
•Upgradeability
•Reputed manufacturer
•Availability of consumables
•Low operating costs
•Installation
•Proper installation as per guidelines
HISTORY SHEET OF EQUIPMENT:
History sheet
Name of equipment
Code number
Date of purchase
Name of supplier
Name of manufacturer
Date of installation
Place of installation
Date of commissioning
Environmental control
Spare parts inventory
Techn. Manual / circuit
diagrams / literatures
After sales arrangement
Guarantee period
Warranty period
Life of equipment
Down time / up time
Cost of maintenance
Unserviceable date
Date of condemnation
Date of replacement
Maintenance sheet:
Annual maintenance contract [AMC]
Starting date
Expiry date
Service / repair description
Materials / spares used
Cost of repairs
In-house
Outside agency
EQUIPMENT MAINTENANCE & CONDEMNATION
Maintenance & repairs:
Preventive maintenance
Master maintenance plan
Repair of equipment
PREVENTIVE MAINTENANCE
•Purchase with warranty & spares.
•Safeguard the electronic equipments with: (as per
guidelines)
•Voltage stabilizer, UPS
•Automatic switch over generator
•Requirement of electricity, water, space, atmospheric
conditions, etc. Must be taken into consideration
•Well equipped maintenance cell must be available
•All equipment must be operated as per instructions with
trained staff
•Monitoring annual maintenance contracts. (AMC)
•Maintenance cell
•Communications between maintenance cell & suppliers of
the equipment.
•Follow-up of maintenance & repair services
•Repair of equipment
•Outside agencies
•In-house facility
CONDEMNATION & DISPOSAL
Criteria for condemnation:
The equipment has become:
1. Non-functional & beyond economical repair
2. Non-functional & obsolete
3. Functional, but obsolete
4. Functional, but hazardous
5. Functional, but no longer required
PROCEDURE FOR CONDEMNATION
1. Verify records.
2. History sheet of equipment
3. Log book of maintenance & repairs
4. Performance record of equipment
5. Put up in proper form & to the proper authority
DISPOSAL
1. Circulate to other units, where it is needed
2. Return to the vendor, if willing to accept
3. Sell to agencies, scrap dealers, etc
4. Auction
5. Local destruction
CONCLUSION
Material management is an important management tool which will be
very useful in getting the right quality & right quantity of supplies at
right time, having good inventory control & adopting sound methods
of condemnation & disposal will improve the efficiency of the
organization & also make the working atmosphere healthy any type
of organization, whether it is Private, Government ,Small
organization, Big organization and Household.
Even a common man must know the basics of material management
so that he can get the best of the available resources and make it a
habit to adopt the principles of material management in all our daily
activities
Acknowledgement
National institute of Health & Family Welfare (NIHFW, New Delhi)

More Related Content

Similar to material management.ppt

Material management
Material managementMaterial management
Material managementvruti patel
 
Presentation slide for material mgmt copy
Presentation slide for material mgmt   copyPresentation slide for material mgmt   copy
Presentation slide for material mgmt copykavitha krishnan
 
MATERIAL MANAGEMENT IN SUPPLY CHAIN.pptx
MATERIAL MANAGEMENT IN SUPPLY CHAIN.pptxMATERIAL MANAGEMENT IN SUPPLY CHAIN.pptx
MATERIAL MANAGEMENT IN SUPPLY CHAIN.pptxKULDEEPSINGH637195
 
powerpoint presentation material management.pptx
powerpoint presentation material management.pptxpowerpoint presentation material management.pptx
powerpoint presentation material management.pptxSimran Kaur
 
Material Managament in Hospital.pptx
Material Managament in Hospital.pptxMaterial Managament in Hospital.pptx
Material Managament in Hospital.pptxZulfiquer Ahmed Amin
 
material management- inventory control in NSG management
material management- inventory control in NSG managementmaterial management- inventory control in NSG management
material management- inventory control in NSG managementThangamjayarani
 
Material management presentation
Material management presentationMaterial management presentation
Material management presentationAshaEk
 
INVENTORYCONTROL. definition and methods
INVENTORYCONTROL. definition and methodsINVENTORYCONTROL. definition and methods
INVENTORYCONTROL. definition and methodsjesmitha2740
 
material mngmnt.ppt
material mngmnt.pptmaterial mngmnt.ppt
material mngmnt.pptSandy Kaur
 
MATERIALS MANAGEMENT
MATERIALS MANAGEMENTMATERIALS MANAGEMENT
MATERIALS MANAGEMENTMADHUR VERMA
 
MATERIAL MANAGEMENT
MATERIAL MANAGEMENT MATERIAL MANAGEMENT
MATERIAL MANAGEMENT HagwaneAkshay
 
Material management
Material management Material management
Material management Harpreet Kaur
 
supply chain management in hospitality and tourism industry
supply chain management in hospitality and tourism industrysupply chain management in hospitality and tourism industry
supply chain management in hospitality and tourism industryMerlynCasem
 

Similar to material management.ppt (20)

Material management
Material managementMaterial management
Material management
 
Presentation slide for material mgmt copy
Presentation slide for material mgmt   copyPresentation slide for material mgmt   copy
Presentation slide for material mgmt copy
 
MATERIAL MANAGEMENT IN SUPPLY CHAIN.pptx
MATERIAL MANAGEMENT IN SUPPLY CHAIN.pptxMATERIAL MANAGEMENT IN SUPPLY CHAIN.pptx
MATERIAL MANAGEMENT IN SUPPLY CHAIN.pptx
 
powerpoint presentation material management.pptx
powerpoint presentation material management.pptxpowerpoint presentation material management.pptx
powerpoint presentation material management.pptx
 
Material management
Material managementMaterial management
Material management
 
Material managemet ppt
Material managemet pptMaterial managemet ppt
Material managemet ppt
 
Material Managament in Hospital.pptx
Material Managament in Hospital.pptxMaterial Managament in Hospital.pptx
Material Managament in Hospital.pptx
 
L1.ppt
L1.pptL1.ppt
L1.ppt
 
material management- inventory control in NSG management
material management- inventory control in NSG managementmaterial management- inventory control in NSG management
material management- inventory control in NSG management
 
Material management presentation
Material management presentationMaterial management presentation
Material management presentation
 
Materail Management
Materail ManagementMaterail Management
Materail Management
 
UNT - V MATERIAL MANAGEMENT.pptx
UNT - V MATERIAL MANAGEMENT.pptxUNT - V MATERIAL MANAGEMENT.pptx
UNT - V MATERIAL MANAGEMENT.pptx
 
INVENTORYCONTROL. definition and methods
INVENTORYCONTROL. definition and methodsINVENTORYCONTROL. definition and methods
INVENTORYCONTROL. definition and methods
 
Material Management
Material ManagementMaterial Management
Material Management
 
material mngmnt.ppt
material mngmnt.pptmaterial mngmnt.ppt
material mngmnt.ppt
 
Inventory control ppt
Inventory control pptInventory control ppt
Inventory control ppt
 
MATERIALS MANAGEMENT
MATERIALS MANAGEMENTMATERIALS MANAGEMENT
MATERIALS MANAGEMENT
 
MATERIAL MANAGEMENT
MATERIAL MANAGEMENT MATERIAL MANAGEMENT
MATERIAL MANAGEMENT
 
Material management
Material management Material management
Material management
 
supply chain management in hospitality and tourism industry
supply chain management in hospitality and tourism industrysupply chain management in hospitality and tourism industry
supply chain management in hospitality and tourism industry
 

Recently uploaded

Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 

Recently uploaded (20)

Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 

material management.ppt

  • 1. MATERIAL MANAGEMENT By DR.I.SELVARAJ, I.R.M.S Sr.D.M.O (Selection Grade Officer) (on study leave), INDIAN RAILWAYS MEDICAL SERVICE B.Sc., M.B.B.S., D.P.H (Madras medical college, Recognized by MCI)., D.I.H., PGCH&FW (NIHFW, New Delhi) III rd year Post graduate student in M.D Community medicine Department of Community medicine Sree Ramachandra Medical College, Porur,Chennai
  • 2. Definition It is concerned with planning, organizing and controlling the flow of materials from their initial purchase through internal operations to the service point through distribution. OR Material management is a scientific technique, concerned with Planning, Organizing &Control of flow of materials, from their initial purchase to destination.
  • 3. AIM OF MATERIAL MANAGEMENT To get 1. The Right quality 2. Right quantity of supplies 3. At the Right time 4. At the Right place 5. For the Right cost
  • 4. PURPOSE OF MATERIAL MANAGEMENT •To gain economy in purchasing •To satisfy the demand during period of replenishment •To carry reserve stock to avoid stock out •To stabilize fluctuations in consumption •To provide reasonable level of client services
  • 5. Primary •Right price •High turnover •Low procurement •& storage cost •Continuity of supply •Consistency in quality •Good supplier relations •Development of personnel •Good information system Objective of material management Secondary •Forecasting •Inter-departmental harmony •Product improvement •Standardization •Make or buy decision •New materials & products •Favorable reciprocal relationships
  • 6. Economy in material management •Containing the costs •Instilling efficiency in all activities
  • 7. Four basic needs of Material management 1. To have adequate materials on hand when needed 2. To pay the lowest possible prices, consistent with quality and value requirement for purchases materials 3. To minimize the inventory investment 4. To operate efficiently
  • 8. Basic principles of material management 1. Effective management & supervision It depends on managerial functions of • Planning • Organizing • Staffing • Directing • Controlling • Reporting • Budgeting 2. Sound purchasing methods 3.Skillful & hard poised negotiations 4.Effective purchase system 5.Should be simple 6.Must not increase other costs 7.Simple inventory control programme
  • 9. Elements of material management 1. Demand estimation 2. Identify the needed items 3. Calculate from the trends in Consumption during last 2 years. 4. Review with resource constraints
  • 10. Functional areas of material management 1. Purchasing 2. Central service supply 3. Central stores 4. The print shops 5. The pharmacy 6. Dietary & Linen services
  • 11. PROCUREMENT 1. Directorate general of supply & disposal (DGS & D, Govt. Of India] 2. Medical stores depot (M. S.D. Government of India, Ministry of H & FW] 3. Private or public sector undertakings. 4. Receiving donations.
  • 12. Procurement cycle • Review selection • Determine needed quantities • Reconcile needs & funds • Choose procurement method • Select suppliers • Specify contract terms • Monitor order status • Receipt & inspection
  • 13. Objectives of procurement system •Acquire needed supplies as inexpensively as possible •Obtain high quality supplies •Assure prompt & dependable delivery •Distribute the procurement workload to avoid period of idleness & overwork •Optimize inventory management through scientific procurement procedures
  • 14. CALL FOR OFFERS CALL FOR OFFERS YES YES DETERMINE DRUGS & DRUG REQUIREMENTS DETERMINE DRUGS & DRUG REQUIREMENTS DRUG REQUIREMENTS DRUG REQUIREMENTS DONATION SOURCE DONATION SOURCE GOVERNMENT PRODUCTION GOVERNMENT PRODUCTION DETERMINE DRUGS & DRUG REQUIREMENTS DETERMINE DRUGS & DRUG REQUIREMENTS PURCHASE REQUIREMENTS PURCHASE REQUIREMENTS OPEN TENDER OPEN TENDER RESTRICTED TENDER RESTRICTED TENDER NEGOTIATED TENDER NEGOTIATED TENDER DIRECT PURCHASE DIRECT PURCHASE REQUEST OFFERS FROM ELIGIBLE SUPPLIERS REQUEST OFFERS FROM ELIGIBLE SUPPLIERS LOCATE RELIABLE SUPPLIERS LOCATE RELIABLE SUPPLIERS CONTACT RELIABLE SUPPLIER CONTACT RELIABLE SUPPLIER EVALUATE & SELECT SUPPLIER EVALUATE & SELECT SUPPLIER EVALUATE OFFERS & SELECT SUPPLIERS EVALUATE OFFERS & SELECT SUPPLIERS NEGOTIATE PRICE & SUPPLY CONDITIONS NEGOTIATE PRICE & SUPPLY CONDITIONS ESTABLISH PRICE ESTABLISH PRICE PURCHASE ORDER / CONTRACT PURCHASE ORDER / CONTRACT PURCHASE ORDER / CONTRACT PURCHASE ORDER / CONTRACT PURCHASE ORDER / CONTRACT PURCHASE ORDER / CONTRACT PURCHASE ORDER / CONTRACT PURCHASE ORDER / CONTRACT DRUGS RECEIVED, CHECKED AGAINST PURCHASE ORDER / CONTRACT SPECIFICATIONS & CLEARED FOR DISTRIBUTION DRUGS RECEIVED, CHECKED AGAINST PURCHASE ORDER / CONTRACT SPECIFICATIONS & CLEARED FOR DISTRIBUTION ADJUST QUANTITIES ADJUST QUANTITIES ADJUST QUANTITIES ADJUST QUANTITIES YES NO YES NO NO NO NO YES YES FLOW OF PROCUREMENT DECISIONS FLOW OF PROCUREMENT DECISIONS
  • 15. Open tender •Public bidding, resulting in low prices •Published in newspapers •Term - 4 weeks •Quotations must be sent in the specific forms that are sold, before the time &date mentioned in the tender form •In technical items, ‘two packets or two bins’ system is followed. Offers are given in two separate packets. •Technical bid •Financial bid Cont……
  • 16. •First technical bid is opened & short listed •Then financial bid of selected companies are opened & lowest is selected •Delayed tenders & late tenders are not accepted. But if, in case of delayed tenders, if the rate quoted is very less, then it can be accepted. •Quotations are opened in presence of indenting department, accounts & authorized persons of party •Validity of tenders – generally 90 days
  • 17. Earnest money 2 % of the tender amount or as decided has to be paid along with all quotations. In case of default 1/5 is withheld Restricted or limited tender From limited suppliers (about 10) Lead-time is reduced Better quality Negotiated procurement Buyer approaches selected potential Suppliers & bargain directly Used in long time supply contracts Direct procurement Purchased from single supplier, at his quoted price Prices may be high Reserved for proprietary materials, or low priced, small quantity & emergency purchases
  • 18. Rate contract Firms are asked to supply stores at specified Rates during the period covered by the Contract Spot purchase It is done by a committee, which includes an officer from stores, accounts & purchasing departments Risk purchase If supplier fails, the item is purchased from other agencies & the difference in cost is recovered from the first supplier
  • 19. Points to remember while purchasing •Proper specification •Invite quotations from reputed firms •Comparison of offers based on basic price, freight & insurance, taxes and levies •Quantity & payment discounts •Payment terms •Delivery period, guarantee •Vendor reputation (reliability, technical capabilities, Convenience, Availability, after- sales service, sales assistance) •Short listing for better negotiation terms •Seek order acknowledgement
  • 20. Storage • Store must be of adequate space • Materials must be stored in an appropriate place • in a correct way • Group wise & alphabetical arrangement helps in • identification & retrieval • First-in, first-out principle to be followed • Monitor expiry date • Follow two bin or double shelf system, to avoid • Stock outs • Reserve bin should contain stock that will cover • lead time and a small safety stock Issue & use Can be centralized or decentralized
  • 21. Inventory control It means stocking adequate number and kind of stores, so that the materials are available whenever required and wherever required. Scientific inventory control results in optimal balance
  • 22. Functions of inventory control •To provide maximum supply service, consistent with maximum efficiency & optimum investment. •To provide cushion between forecasted & actual demand for a material
  • 23. Economic order of quantity EOQ = Average Monthly Consumption X Lead Time [in months] + Buffer Stock – Stock on hand CARRYING COST PURCHASING COST ECONOMIC ORDER OF QUANTITY(EOQ)
  • 24. •Re-order level: stock level at which fresh order is placed. •Average consumption per day x lead time + buffer stock •Lead time: Duration time between placing an order & receipt of material •Ideal – 2 to 6 weeks.
  • 25. ABC ANALYSIS (ABC = Always Better Control) This is based on cost criteria. It helps to exercise selective control when confronted with large number of items it rationalizes the number of orders, number of items & reduce the inventory. About 10 % of materials consume 70 % of resources About 20 % of materials consume 20 % of resources About 70 % of materials consume 10 % of resources
  • 26. ‘A’ ITEMS Small in number, but consume large amount of resources Must have: •Tight control •Rigid estimate of requirements •Strict & closer watch •Low safety stocks •Managed by top management
  • 27. ‘C’ ITEMS Larger in number, but consume lesser amount of resources Must have: •Ordinary control measures •Purchase based on usage estimates •High safety stocks ABC analysis does not stress on items those are less costly but may be vital
  • 29. ‘B’ ITEM Intermediate Must have: •Moderate control •Purchase based on rigid requirements •Reasonably strict watch & control •Moderate safety stocks •Managed by middle level management
  • 30. VED ANALYSIS • Based on critical value & shortage cost of an item –It is a subjective analysis. •Items are classified into: Vital: •Shortage cannot be tolerated. Essential: •Shortage can be tolerated for a short period. Desirable: Shortage will not adversely affect, but may be using more resources. These must be strictly Scrutinized V E D ITEM COST A AV AE AD CATEGORY 1 10 70% B BV BE BD CATEGORY 2 20 20% C CV CE CD CATEGORY 3 70 10% CATEGORY 1 - NEEDS CLOSE MONITORING & CONTROL CATEGORY 2 - MODERATE CONTROL. CATEGORY 3 - NO NEED FOR CONTROL
  • 31. SDE ANALYIS Based on availability Scarce Managed by top level management Maintain big safety stocks Difficult Maintain sufficient safety stocks Easily available Minimum safety stocks FSN ANALYSIS Based on utilization. Fast moving. Slow moving. Non-moving. Non-moving items must be periodically reviewed to prevent expiry & obsolescence HML ANALYSIS Based on cost per unit Highest Medium Low This is used to keep control over consumption at departmental level for deciding the frequency of physical verification.
  • 32. PROCURMENT OF EQUIPMENT Points to be noted before purchase of an equipment: •Latest technology •Availability of maintenance & repair facility, with minimum down time •Post warranty repair at reasonable cost •Upgradeability •Reputed manufacturer •Availability of consumables •Low operating costs •Installation •Proper installation as per guidelines
  • 33. HISTORY SHEET OF EQUIPMENT: History sheet Name of equipment Code number Date of purchase Name of supplier Name of manufacturer Date of installation Place of installation Date of commissioning Environmental control Spare parts inventory Techn. Manual / circuit diagrams / literatures After sales arrangement Guarantee period Warranty period Life of equipment Down time / up time Cost of maintenance Unserviceable date Date of condemnation Date of replacement
  • 34. Maintenance sheet: Annual maintenance contract [AMC] Starting date Expiry date Service / repair description Materials / spares used Cost of repairs In-house Outside agency
  • 35. EQUIPMENT MAINTENANCE & CONDEMNATION Maintenance & repairs: Preventive maintenance Master maintenance plan Repair of equipment
  • 36. PREVENTIVE MAINTENANCE •Purchase with warranty & spares. •Safeguard the electronic equipments with: (as per guidelines) •Voltage stabilizer, UPS •Automatic switch over generator •Requirement of electricity, water, space, atmospheric conditions, etc. Must be taken into consideration •Well equipped maintenance cell must be available •All equipment must be operated as per instructions with trained staff •Monitoring annual maintenance contracts. (AMC) •Maintenance cell •Communications between maintenance cell & suppliers of the equipment. •Follow-up of maintenance & repair services •Repair of equipment •Outside agencies •In-house facility
  • 37. CONDEMNATION & DISPOSAL Criteria for condemnation: The equipment has become: 1. Non-functional & beyond economical repair 2. Non-functional & obsolete 3. Functional, but obsolete 4. Functional, but hazardous 5. Functional, but no longer required
  • 38. PROCEDURE FOR CONDEMNATION 1. Verify records. 2. History sheet of equipment 3. Log book of maintenance & repairs 4. Performance record of equipment 5. Put up in proper form & to the proper authority
  • 39. DISPOSAL 1. Circulate to other units, where it is needed 2. Return to the vendor, if willing to accept 3. Sell to agencies, scrap dealers, etc 4. Auction 5. Local destruction
  • 40. CONCLUSION Material management is an important management tool which will be very useful in getting the right quality & right quantity of supplies at right time, having good inventory control & adopting sound methods of condemnation & disposal will improve the efficiency of the organization & also make the working atmosphere healthy any type of organization, whether it is Private, Government ,Small organization, Big organization and Household. Even a common man must know the basics of material management so that he can get the best of the available resources and make it a habit to adopt the principles of material management in all our daily activities
  • 41. Acknowledgement National institute of Health & Family Welfare (NIHFW, New Delhi)