©RTE 2004
235
A.2.1 The "Power System Reliability" policy
A.2.2 The "Quality" policy
A2 Annex 2
RTE Policies
A2 Annex 2
RTE Policies
©RTE 2004
236
Renault - Flins Plant
©RTE 2004
237
Annex 2 - RTE PoliciesA
For the benefit of all the stakeholders concerned, RTE management defines and
pledges to implement policies, including two which are particularly conducive
to power system reliability:
• the "Power System Reliability" policy,
• the "Quality" policy.
These policies are set forth hereafter in their current application version.
A.2.1 THE "POWER SYSTEM RELIABILITY" POLICY
(version signed by the Chief Executive Officer of RTE on 17 November 2003)
Controlling power system operating reliability is at the core of the
responsibilities entrusted to RTE. It is defined as the ability to:
• Ensure the normal operation of the power system,
• Limit the number of incidents and avoid major incidents,
• Limit the consequences of major incidents whenever they do occur.
Controlling reliability comes within a constantly changing context marked by:
- the mesh and complexity of the power system: RTE, responsible for reliability
under all circumstances, must ensure the extensive coordination of all those
concerned, i.e. producers, distributors and consumers in France, so as to
prevent and control major incidents;
- a large number of stakeholders in an open market: the combined concern for
the economic performance of all and reliability requires that contributions be
contracted in addition to having an adapted regulatory framework;
- the increased number of international transactions and the reduced clarity of
physical exchanges related to the development of intraday markets: a high
level of coordination between RTE and foreignTSOs is indispensable so as to
avoid the spread of large-scale incidents.
Reliability is based on in-depth defence, the implementation of which involves
equipment (structure of the power system and performances of its
components) and organisational (quality assurance, management of the human
factor, training, operating reference guide, feedback) domains.
RTE’s actions are structured around the following major themes:
©RTE 2004
⇒ A KNOWN AND APPLIED RELIABILITY REFERENCE GUIDE
- revised and supplemented regularly to take into account the technical,
contractual and institutional changes, it benefits from feedback organised
systematically to ensure its application and efficiency;
- expressed or transposed by the Units;
- supported in activity coordination actions;
- applied by operators who have received centralised training and training in
the Units.
⇒ CONTRACTS AT THE BASIS OF RELATIONS WITH EXTERNAL STAKEHOLDERS
CONTRIBUTING TO RELIABILITY
- entered into by including the needs of the power system for reliability and
by specifying the commitments of each party and how these commitments
are to be monitored;
- followed up to make sure of compliance with all commitments.
⇒ FEEDBACK, PERFORMANCE MONITORING, RELIABILITY AUDITS
- basic actions of the system to improve the processes which support
reliability.
⇒ ANNUAL POWER SYSTEM RELIABILITY REPORTS
- benchmark giving an overview at the national and regional levels of all the
components of reliability and providing information both internally and
externally communicating on the level of reliability obtained.
The Chief Executive Officer of RTE pledges to implement this policy to develop
the reliability culture and maintain the reliability level of the French power
system.
A.2.2 THE "QUALITY" POLICY
(version signed by the Chief Executive Officer of RTE on 24 February 2004)
The European electricity market is experiencing rapid development. The
expectations of those using the French public transmission network, RTE’s
customers, are now considerable.
RTE has defined its project for the future.The company’s goal is to provide all
its customers with the services they expect, in compliance with mutual
obligations. It aims to ensure that they benefit from reliable and economical
access to the network, under conditions featuring transparency, confidentiality
and non-discrimination.
RTE’s goal is to be acknowledged by the players of the electricity market as the
benchmark Transmission System Operator in Europe for its ability to meet its
customers’ expectations and for the efficiency of its technical and economic
management.
238
Annex 2 - RTE PoliciesA
©RTE 2004
239
Annex 2 - RTE PoliciesA
This ambitious progress programme, integrating all of the contractual,
regulatory and legal obligations, placed within a cost reduction context, is
based on three complementary main lines:
- satisfying our customers by meeting our commitments, listening carefully to
their expectations and improving the quality of the services we offer them,
- optimising the performance of our transmission network, while taking into
account all environmental requirements,
- mobilising each RTE staff member on a day-to-day basis, because quality is
everybody’s concern.
The sound quality of our services, perceived and verified on a day-to-day basis,
is definitely a priority for RTE and will ensure our success. Our aim is for 85% of
our customers to express their satisfaction in the next three years and for 20%
of them to state that they are highly satisfied.
Making a success of this goal and reaching the related objectives rely on the
steering of all the processes and business lines concerned.This steering must
be efficient, based on an analysis of the risks and stakes, as well as feature
ongoing improvement.
RTE places its Quality, Safety and Environment Management System under
external scrutiny by maintaining certification according to the international
standard ISO 9001/ 2000 for all of the company’s activities and entities.
The Chief Executive Officer of RTE and the members of the management staff
organise improvement focused on the efficiency of the Quality, Safety and
Environment Management System. The Head of the Quality, Safety,
Environment Section, responsible for its architecture, ensures the coordination
of this system.
The success of this approach depends on the involvement of the management
as a whole and the concrete, everyday efforts of the entire staff of RTE.
The proper application of the quality policy is checked by monitoring a certain
number of performance indicators, such as for example: the customer
satisfaction rate, the number of Significant System Events (operating
reliability), the average interruption time, the cost of the transmitted kilowatt-
hour, etc.
©RTE 2004
240
2 x 400 kV line between Albertville (France) and Rondissone (Italy)
The international interconnection to everyone’s
advantage:
• emergency assistance between adjacent systems,
• pooling of the primary frequency reserve.

More Related Content

Similar to The "Power System Reliability" policy

DEVELOPMENT OF RELIABILITY STANDARDS AND MARKET RULES
DEVELOPMENT OF RELIABILITY STANDARDS AND MARKET RULESDEVELOPMENT OF RELIABILITY STANDARDS AND MARKET RULES
DEVELOPMENT OF RELIABILITY STANDARDS AND MARKET RULESPower System Operation
 
Alan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC PresentationAlan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC PresentationNAES Corporation
 
WorkTric Business Overview (EN)
WorkTric Business Overview (EN)WorkTric Business Overview (EN)
WorkTric Business Overview (EN)LeninMartinez32
 
intro to maint management systems
intro to maint management systemsintro to maint management systems
intro to maint management systemsBill Sheppard
 
1 - Introduction to Computerized Systems Validation - for review.pptx
1 - Introduction to Computerized Systems Validation - for review.pptx1 - Introduction to Computerized Systems Validation - for review.pptx
1 - Introduction to Computerized Systems Validation - for review.pptxpatemalabanan
 
EMA Energy Manager’s Guide to Building Controls
EMA Energy Manager’s Guide to Building ControlsEMA Energy Manager’s Guide to Building Controls
EMA Energy Manager’s Guide to Building ControlsEMEX
 
R rep-m.2134-2008-pdf-e
R rep-m.2134-2008-pdf-eR rep-m.2134-2008-pdf-e
R rep-m.2134-2008-pdf-ePfedya
 
CIGRE WG “Network of the Future” Electricity Supply Systems of the future
CIGRE WG “Network of the Future” Electricity Supply Systems of the futureCIGRE WG “Network of the Future” Electricity Supply Systems of the future
CIGRE WG “Network of the Future” Electricity Supply Systems of the futurePower System Operation
 
E-ssentials MS_Vol2_October2013_Final
E-ssentials MS_Vol2_October2013_FinalE-ssentials MS_Vol2_October2013_Final
E-ssentials MS_Vol2_October2013_FinalMike Raicik
 
Iso 50001 certification
Iso 50001 certificationIso 50001 certification
Iso 50001 certificationSifiso Nxele
 
TMC Quality Manual
TMC Quality ManualTMC Quality Manual
TMC Quality ManualDoug Taber
 
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...Mike Poland, CMRP
 
Guidelines on energy_audit_2007
Guidelines on energy_audit_2007Guidelines on energy_audit_2007
Guidelines on energy_audit_2007Nitin Ivare
 
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...Steelhenge
 
ScottMadden's 51st State Roadmap
ScottMadden's 51st State RoadmapScottMadden's 51st State Roadmap
ScottMadden's 51st State RoadmapScottMadden, Inc.
 
presentation (1).pptx
presentation (1).pptxpresentation (1).pptx
presentation (1).pptxRKViral
 
IRJET- Building Life Cycle Cost
IRJET- Building Life Cycle CostIRJET- Building Life Cycle Cost
IRJET- Building Life Cycle CostIRJET Journal
 

Similar to The "Power System Reliability" policy (20)

DEVELOPMENT OF RELIABILITY STANDARDS AND MARKET RULES
DEVELOPMENT OF RELIABILITY STANDARDS AND MARKET RULESDEVELOPMENT OF RELIABILITY STANDARDS AND MARKET RULES
DEVELOPMENT OF RELIABILITY STANDARDS AND MARKET RULES
 
Alan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC PresentationAlan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC Presentation
 
WorkTric Business Overview (EN)
WorkTric Business Overview (EN)WorkTric Business Overview (EN)
WorkTric Business Overview (EN)
 
AVK ENERTECH 2016
AVK ENERTECH 2016AVK ENERTECH 2016
AVK ENERTECH 2016
 
intro to maint management systems
intro to maint management systemsintro to maint management systems
intro to maint management systems
 
1 - Introduction to Computerized Systems Validation - for review.pptx
1 - Introduction to Computerized Systems Validation - for review.pptx1 - Introduction to Computerized Systems Validation - for review.pptx
1 - Introduction to Computerized Systems Validation - for review.pptx
 
EMA Energy Manager’s Guide to Building Controls
EMA Energy Manager’s Guide to Building ControlsEMA Energy Manager’s Guide to Building Controls
EMA Energy Manager’s Guide to Building Controls
 
R rep-m.2134-2008-pdf-e
R rep-m.2134-2008-pdf-eR rep-m.2134-2008-pdf-e
R rep-m.2134-2008-pdf-e
 
CIGRE WG “Network of the Future” Electricity Supply Systems of the future
CIGRE WG “Network of the Future” Electricity Supply Systems of the futureCIGRE WG “Network of the Future” Electricity Supply Systems of the future
CIGRE WG “Network of the Future” Electricity Supply Systems of the future
 
E-ssentials MS_Vol2_October2013_Final
E-ssentials MS_Vol2_October2013_FinalE-ssentials MS_Vol2_October2013_Final
E-ssentials MS_Vol2_October2013_Final
 
Iso 50001 certification
Iso 50001 certificationIso 50001 certification
Iso 50001 certification
 
TMC Quality Manual
TMC Quality ManualTMC Quality Manual
TMC Quality Manual
 
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
 
Guidelines on energy_audit_2007
Guidelines on energy_audit_2007Guidelines on energy_audit_2007
Guidelines on energy_audit_2007
 
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
 
The 51st State Initiative
The 51st State InitiativeThe 51st State Initiative
The 51st State Initiative
 
ScottMadden's 51st State Roadmap
ScottMadden's 51st State RoadmapScottMadden's 51st State Roadmap
ScottMadden's 51st State Roadmap
 
presentation (1).pptx
presentation (1).pptxpresentation (1).pptx
presentation (1).pptx
 
CV
CVCV
CV
 
IRJET- Building Life Cycle Cost
IRJET- Building Life Cycle CostIRJET- Building Life Cycle Cost
IRJET- Building Life Cycle Cost
 

More from Power System Operation

Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panelsPower System Operation
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsPower System Operation
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action SchemePower System Operation
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...Power System Operation
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePower System Operation
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)Power System Operation
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & PartsPower System Operation
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools Power System Operation
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy SystemPower System Operation
 

More from Power System Operation (20)

ENERGY TRANSITION OUTLOOK 2021
ENERGY TRANSITION OUTLOOK  2021ENERGY TRANSITION OUTLOOK  2021
ENERGY TRANSITION OUTLOOK 2021
 
Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panels
 
What does peak shaving mean
What does peak shaving meanWhat does peak shaving mean
What does peak shaving mean
 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
 
Power System Restoration Guide
Power System Restoration Guide  Power System Restoration Guide
Power System Restoration Guide
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid Operations
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action Scheme
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground Resistance
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & Parts
 
What is load management
What is load managementWhat is load management
What is load management
 
What does merit order mean
What does merit order meanWhat does merit order mean
What does merit order mean
 
What are Balancing Services ?
What are  Balancing Services ?What are  Balancing Services ?
What are Balancing Services ?
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
 
Harmonic study and analysis
Harmonic study and analysisHarmonic study and analysis
Harmonic study and analysis
 
What is leakage current testing
What is leakage current testingWhat is leakage current testing
What is leakage current testing
 

Recently uploaded

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 

Recently uploaded (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 

The "Power System Reliability" policy

  • 1. ©RTE 2004 235 A.2.1 The "Power System Reliability" policy A.2.2 The "Quality" policy A2 Annex 2 RTE Policies A2 Annex 2 RTE Policies
  • 3. ©RTE 2004 237 Annex 2 - RTE PoliciesA For the benefit of all the stakeholders concerned, RTE management defines and pledges to implement policies, including two which are particularly conducive to power system reliability: • the "Power System Reliability" policy, • the "Quality" policy. These policies are set forth hereafter in their current application version. A.2.1 THE "POWER SYSTEM RELIABILITY" POLICY (version signed by the Chief Executive Officer of RTE on 17 November 2003) Controlling power system operating reliability is at the core of the responsibilities entrusted to RTE. It is defined as the ability to: • Ensure the normal operation of the power system, • Limit the number of incidents and avoid major incidents, • Limit the consequences of major incidents whenever they do occur. Controlling reliability comes within a constantly changing context marked by: - the mesh and complexity of the power system: RTE, responsible for reliability under all circumstances, must ensure the extensive coordination of all those concerned, i.e. producers, distributors and consumers in France, so as to prevent and control major incidents; - a large number of stakeholders in an open market: the combined concern for the economic performance of all and reliability requires that contributions be contracted in addition to having an adapted regulatory framework; - the increased number of international transactions and the reduced clarity of physical exchanges related to the development of intraday markets: a high level of coordination between RTE and foreignTSOs is indispensable so as to avoid the spread of large-scale incidents. Reliability is based on in-depth defence, the implementation of which involves equipment (structure of the power system and performances of its components) and organisational (quality assurance, management of the human factor, training, operating reference guide, feedback) domains. RTE’s actions are structured around the following major themes:
  • 4. ©RTE 2004 ⇒ A KNOWN AND APPLIED RELIABILITY REFERENCE GUIDE - revised and supplemented regularly to take into account the technical, contractual and institutional changes, it benefits from feedback organised systematically to ensure its application and efficiency; - expressed or transposed by the Units; - supported in activity coordination actions; - applied by operators who have received centralised training and training in the Units. ⇒ CONTRACTS AT THE BASIS OF RELATIONS WITH EXTERNAL STAKEHOLDERS CONTRIBUTING TO RELIABILITY - entered into by including the needs of the power system for reliability and by specifying the commitments of each party and how these commitments are to be monitored; - followed up to make sure of compliance with all commitments. ⇒ FEEDBACK, PERFORMANCE MONITORING, RELIABILITY AUDITS - basic actions of the system to improve the processes which support reliability. ⇒ ANNUAL POWER SYSTEM RELIABILITY REPORTS - benchmark giving an overview at the national and regional levels of all the components of reliability and providing information both internally and externally communicating on the level of reliability obtained. The Chief Executive Officer of RTE pledges to implement this policy to develop the reliability culture and maintain the reliability level of the French power system. A.2.2 THE "QUALITY" POLICY (version signed by the Chief Executive Officer of RTE on 24 February 2004) The European electricity market is experiencing rapid development. The expectations of those using the French public transmission network, RTE’s customers, are now considerable. RTE has defined its project for the future.The company’s goal is to provide all its customers with the services they expect, in compliance with mutual obligations. It aims to ensure that they benefit from reliable and economical access to the network, under conditions featuring transparency, confidentiality and non-discrimination. RTE’s goal is to be acknowledged by the players of the electricity market as the benchmark Transmission System Operator in Europe for its ability to meet its customers’ expectations and for the efficiency of its technical and economic management. 238 Annex 2 - RTE PoliciesA
  • 5. ©RTE 2004 239 Annex 2 - RTE PoliciesA This ambitious progress programme, integrating all of the contractual, regulatory and legal obligations, placed within a cost reduction context, is based on three complementary main lines: - satisfying our customers by meeting our commitments, listening carefully to their expectations and improving the quality of the services we offer them, - optimising the performance of our transmission network, while taking into account all environmental requirements, - mobilising each RTE staff member on a day-to-day basis, because quality is everybody’s concern. The sound quality of our services, perceived and verified on a day-to-day basis, is definitely a priority for RTE and will ensure our success. Our aim is for 85% of our customers to express their satisfaction in the next three years and for 20% of them to state that they are highly satisfied. Making a success of this goal and reaching the related objectives rely on the steering of all the processes and business lines concerned.This steering must be efficient, based on an analysis of the risks and stakes, as well as feature ongoing improvement. RTE places its Quality, Safety and Environment Management System under external scrutiny by maintaining certification according to the international standard ISO 9001/ 2000 for all of the company’s activities and entities. The Chief Executive Officer of RTE and the members of the management staff organise improvement focused on the efficiency of the Quality, Safety and Environment Management System. The Head of the Quality, Safety, Environment Section, responsible for its architecture, ensures the coordination of this system. The success of this approach depends on the involvement of the management as a whole and the concrete, everyday efforts of the entire staff of RTE. The proper application of the quality policy is checked by monitoring a certain number of performance indicators, such as for example: the customer satisfaction rate, the number of Significant System Events (operating reliability), the average interruption time, the cost of the transmitted kilowatt- hour, etc.
  • 6. ©RTE 2004 240 2 x 400 kV line between Albertville (France) and Rondissone (Italy) The international interconnection to everyone’s advantage: • emergency assistance between adjacent systems, • pooling of the primary frequency reserve.