Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.
Testing in the IM worldTesting in the IM world
Veselin Berov – Project Manager Adastra BulgariaVeselin Berov – Project Man...
The Challenge
2
You are selected to be a QA Lead in a project for
implementing Basel Capital Adequacy Reporting (BCAR)
sol...
Requirements
3
Project Plan
4
Module 1 ready
for testing
Module N ready
for testing
Design & Specifications
5
Downstream
Applications
External
users
Internal
users
Reporting
&
Analytics
Data
Access
Data
Int...
Test Strategy
6
Test Team and RolesTest Team and RolesTest Team and RolesTest Team and Roles
Exit CriteriaExit CriteriaExi...
SQLSQL SQLSQL SQLSQL SQLSQL
Functional Testing
7
SRCSRC EXPEXP EXPEXP EXPEXP EXPEXP
ETLETL ETLETL ETLETL BIBI
Actual Resul...
Test Execution
8
SIT, Performance, UAT
9
IM: Next Challenges
10
Thank you!
11
38B Cherni Vrah Blvd.
1407 Sofia
Bulgaria
Tel: +359-2-960-0030
infobg@adastragrp.com
www.bg.adastragrp.com
V...
Upcoming SlideShare
Loading in …5
×

Veselin Berov - Testing in the World of Information Management

521 views

Published on

The information management solutions are specific group of projects which standart testing methods are rarely applicable for. We are going to investigate a case study with a bank application that will put the QA team in front of many challenges: no user interface, big volume of information fetched, and a high speed of processing this data needed. Even more, the calculations made and the system security are critical as we are talking about a bank product.

Published in: Software
  • Be the first to comment

  • Be the first to like this

Veselin Berov - Testing in the World of Information Management

  1. 1. Testing in the IM worldTesting in the IM world Veselin Berov – Project Manager Adastra BulgariaVeselin Berov – Project Manager Adastra Bulgaria
  2. 2. The Challenge 2 You are selected to be a QA Lead in a project for implementing Basel Capital Adequacy Reporting (BCAR) solution in a big North American Bank with presence in USA, Canada and UK. The BCAR solution should be implemented following the Basel III regulation: International Framework for Capital Adequacy, Stress Testing & Market Liquidity Risk. Project duration is estimated as 10 months. Your team is located in Bulgaria and there are 12 QA-s.
  3. 3. Requirements 3
  4. 4. Project Plan 4 Module 1 ready for testing Module N ready for testing
  5. 5. Design & Specifications 5 Downstream Applications External users Internal users Reporting & Analytics Data Access Data Integration Data Acquisition Data Sources ODS Integration Layer Data MartsBatch Messaging Standardization Integration Transformations Cubes Services Semantic layer Database tables/views Dashboards & scorecards Self-service reporting OLAP Enterprise reporting Advanced analytics Internal External Structured Unstructured Data IntegrationData Integration Business IntelligenceBusiness Intelligence Key Cutting
  6. 6. Test Strategy 6 Test Team and RolesTest Team and RolesTest Team and RolesTest Team and Roles Exit CriteriaExit CriteriaExit CriteriaExit Criteria Test ObjectivesTest ObjectivesTest ObjectivesTest Objectives Test PlanTest Plan Test LevelsTest Levels Subjects for TestingSubjects for Testing Acceptance CriteriaAcceptance Criteria Test EnvironmentsTest Environments Test ApproachTest Approach
  7. 7. SQLSQL SQLSQL SQLSQL SQLSQL Functional Testing 7 SRCSRC EXPEXP EXPEXP EXPEXP EXPEXP ETLETL ETLETL ETLETL BIBI Actual Results Expected Results
  8. 8. Test Execution 8
  9. 9. SIT, Performance, UAT 9
  10. 10. IM: Next Challenges 10
  11. 11. Thank you! 11 38B Cherni Vrah Blvd. 1407 Sofia Bulgaria Tel: +359-2-960-0030 infobg@adastragrp.com www.bg.adastragrp.com Veselin Berov: e-mail: veselin.berov@adastragrp.com Tel: +359 2 960 0055 Mob: +359 885 429 956

×