SlideShare a Scribd company logo
1 of 6
Curriculum Vitae
Peter J E Jackson
Principal Consultant
Date: July 2015
Date of Birth: 1953
Nationality: British
Education: St. John's College, Cambridge
Henley Management College
Qualifications: Bachelor of Arts (Mechanical Sciences)
Fellowship: Engineering Industry Training Board
Member of the Institution of Mechanical Engineers
Professional Summary:
Peter is an Engineer with over forty years experience in the power and process industry. His core
specialist knowledge includes design of thermal power plant covering fuels, phases and control of
combustion, flue gas chemistry, heat transfer, steam and water loop, generating systems and
abatement technology,
He is currently an independent Biomass Energy Consultant.
He was previously Vice President & Chief Engineer of HRE Services Ltd, a UK based specialist
engineering subsidiary of the US based Fibrowatt LLC, a company specialising in the development
of biomass power plant in the US and internationally.
Within the last ten years he has been responsible for the preparation of the front end engineering
design of Fibrowatt Apeldoorn 33MW and Minnesota (Benson) 55MW(s.o.) poultry litter biomass
power plants. He was author of the project design basis for the project critical biomass handling,
combustion, heat recovery, ash handling, and emissions control sections of these plants. The
Minnesota plant was commissioned in mid 2007 and is now in commercial operation.
Between 1995 and 2000 he held senior design responsibility for the Thetford 38MW (mixed poultry)
biomass plant. His responsibility with Thetford included the project control of Thetford power station
through the design, construct, commission, performance testing and early operation phases. This
work continued with the owner to 2006 full time and until present part time, advising on all design
related operational matters.
During the last twenty five years he has held engineering and management positions both in UK and
overseas, including those of Technical Manager for the Drax Power Station Completion Phase,
Construction Manager at the Thorp Reprocessing facility, BNFL Sellafield and Site Project Manager
at BP Grangemouth KG Ethylene. Experience abroad includes supervision of power station
refurbishment in Sudan, sugar mill plant installation in Pakistan ,management of high pressure
pipework installation at Hwange Power Station Zimbabwe and boiler assessment and design review in
a number of countries in South America, Africa and Europe
He has also attended the EITB management course at Henley Management College and has been
awarded Fellowship of the Engineering Industry Training Board.
His experience with Babcock in power plant engineering and thermal process design was followed in
1995 by a new assignment with Foster Wheeler Energy UK as Employer’s Representative and
Project Engineering Manager on behalf of the developer of the Thetford Biomass Power Station
Project, Fibrowatt Ltd.
Following completion of the Thetford project Peter was recruited as a direct employee of the
Curriculum Vitae
Peter J E Jackson
Principal Consultant
Date: July 2015
Fibrowatt group as Group Engineering Manager, and focussed on development of the two projects in
the Netherlands and Minnesota USA. From February 2006 to 2007 he worked independently whilst
continuing his design advisory work with both the UK and US projects. He joined HRE Services Ltd
as Chief Engineer in February 2007.
His roles included the provision of technical support to operating biomass plants including fuel
handling from receipt through to the combustion zone, combustion conditions and control, failure
mode analysis, plant performance including steam cycle and combustion modelling, reliability and
availability assessment, assessment of proposals and engineering of plant modifications through all
stages of project execution and operation.
Experience:
2012 – present Biomass Energy Consultant
Peter resumed his activities as an independent consultant in October 2012.
He has since undertaken, amongst other, the following activities:
Energy Power Resources Ltd
EPRL Ely: Combustion optimisation and conceptual redesign of fuel handling
and feeding system.
EPRL Thetford: Advice on methodology for reducing incidence of pressure part
tube leaks and associated down time
EPRL Westfield: Combustion optimisation and conceptual redesign of heat
recovery system.
British Sugar (ABS)
Investigation of boiler failure of new plant in China, involving a site visit to
Mongolia, together with combustion optimisation of two further plants in
China.
Advice on greenhouse gas emissions
Futurbio
Advice regarding combustion of wastes and gasification technology
Estover Energy
Project and technical consultancy services associated with development of a
number of wood fired CHP plants in England and Scotland.
Emvertec Ltd
Assistance in the commissioning of a novel condensing economiser at a
biomass CHP plant at Cameronbridge, Scotland.
J.G.Pears Ltd
Assistance to a rendering operation in the process design aspects of a combined
heat and power (CHP) plant fuelled by poultry litter and cattle meat and bone
meal (MBM), approximately 12MWe capacity. Newark, England
Veolia Ltd
Review and recommendations relating to modification requirements to a biomass
plant during commissioning in order to achieve design operating levels.
Heat Recovery Systems Ltd
Critical review of a novel biomass combustion and heat recovery system (in
confidence)
2007 – 2012 HRE Services Ltd
Vice President & Chief Engineer
Specification development for future biomass plant in the US by Fibrowatt LLC.
This to date includes definition of the steam/water circuit, heat balance and
overall efficiency projection, detailed development of the boiler design jointly
with the boiler vendor, development of the overall project specification including
all equipment, plant layout, feedstock specification and environmental
Curriculum Vitae
Peter J E Jackson
Principal Consultant
Date: July 2015
compliance requirements.
Engineering support of the recently (2007) completed 55MW biomass plant in
Minnesota through commissioning, witnessing of performance testing,
operation including ongoing fixes of teething problems.
Investigation into feasibility of plant conversions from fossil fuel to biomass
firing using a circulating fluidised bed combustion system (600,000lb/hr plant,
Berlin, New Hampshire), and the engineering input into subsequent project
execution.
Investigation into re-powering of existing turbine / generator sets using steam
generated in a biomass boiler operating at steam conditions of 1500psi, 980F &
500,000lb/hr at the main steam stop valve.
Technical due diligence associated with the acquisition of a company
specialising in anaerobic digestion of cattle and other wastes and subsequent gas
refining to produce pipeline quality gas.
Redesign of boiler air quality control system (AQCS) utilising dry sorbent
injection (DSI), high integrity bag filter, NOx SCR and energy recovery utilising
a condensing economiser for a boiler utilising difficult biomass fuel high in alkali,
phosphorous, sulphur and fuel bound nitrogen. This design is the subject of a
patent application.
The maintenance of ongoing provision of consultancy services to external
clients as below:
Energy Power Resources Ltd (EPRL)
Eye(12.7MW): Modifications to the combustion system for improved output and
emissions control.
Ely(38MW): Review of plant operation and recommendations for plant
modifications to enhance output and emissions.
Thetford(38MW): Review of plant operation and recommendations for
improvement of plant emissions and capacity factor.
W.S.Atkins
Technical due diligence associated with a new project proposal for a 160,000
ton/annum Waste to Energy plant in UK.
Verus Energy
Weir Turbomachinery
Consultancy to both companies in connection with UK developments of biomass
Waste to Energy plants using Gasification technology.
J.G.Pears / Futurbio
Consultancy to a process company for development of a combined heat and
power (CHP) plant extension using a range of biomasses as feedstock.
2006 – 2007 Independent Consultant
Activities included:
Specialist Consultancy support to Burns & Roe, the US based Owners Engineer
in the development of the first poultry litter fired biomass plant in the US.
Consultancy support to the five existing EPR Ltd thermal biomass plants:
Thetford (38MW): Development of improved fuel dosing system, now installed.
Optimisation of combustion gas emission levels through operational practice
Curriculum Vitae
Peter J E Jackson
Principal Consultant
Date: July 2015
and control system enhancement. Development and implementation of improved
start up procedure. Development of improved anti-fouling techniques.
Glanford (13.5MW): Investigation of premature superheater tube failures.
Investigation of boiler heat balance, fouling and alterations to tube spacing
geometry.
Ely(38MW): Modifications to fuel handling and combustion systems for
improved output and emissions control.
Eye(12.7MW): Investigation of premature filter bag failures
Westfield(10MW):Investigation into agglomeration and defluidisation of the
bubbling bed boiler..Investigation of repeat tube failures in the economiser and
roof tubes together with provision of successful remedies for all.
British Sugar: Trials using a sugar manufacture bi-product for Flue Gas
Desulphurisation by furnace sorbent injection method; Combustion optimisation
for British Sugar plant in Poland. Conceptual design for new biomass fired plant
for British Sugar factories in China. Assistance in commissioning coal fired CFB
plant at a British Sugar plant in China
Prosper de Mulder (PDM): Optimising existing biomass plant combustion and
plant availability. Consultancy for future plant development in boiler
configuration, combustion system and steam conditions.
Scottish Power in an economic assessment of a biomass project development at
Longannet Power Station.
AES in combustion optimisation of a biomass conversion from coal in Hungary.
2000 – 2006 Fibrowatt Ltd & EPR Ltd
Engineering Manager:
Heading a team providing technical support to the operating plants in the
Fibrowatt and subsequently EPR groups and heading the engineering
development of biomass power projects in Holland and the U.S.
1995 - 2000 Foster Wheeler Energy Ltd
Principal Engineer: Thetford Power Station
Project engineering management of a main contractor during his proposal
development and execution of a "turnkey" contract for the engineering,
procurement, construction, commissioning and testing of a 38.5MW (s.o.)
biomass fired power station.
1992 - 1995 Babcock Energy Ltd
Technical Manager (Overseas)
Inspection and technical reporting of operating steam raising plant condition.
Originating technical proposals for steam plant modifications and refurbishment
of plant up to 250MW capacity in a variety of countries including Argentina,
Venezuela, Nigeria, Ghana, Portugal and Cyprus
1986 - 1992 Babcock Energy Ltd
Construction and Project Manager
Installation of plant and high integrity pipework for BNFL Thorp Project,
Sellafield, and at BP KG Ethylene project, Grangemouth.
1985 - 1986 Babcock Power Ltd
Technical Services Manager
Curriculum Vitae
Peter J E Jackson
Principal Consultant
Date: July 2015
Quality and technical acceptability through performance testing of 660mw
boilers for Drax Power Station Completion, working in conjunction with
Babcock Service (Commissioning) Department.
Re-furbishment of 660MW boilers from original 1972|-5 installation; Re-
furbishment of 500MW boiler at Ferrybridge and combustion trials of original
Lo-Nox PF burners.
1984 - 1985 Babcock Power Ltd
Henley Management College
E.I.T.B. sponsored Management Course
1982 - 1983 Babcock Power Ltd
Site Manager
Installation of 220MW boiler plant at Hwange Power Station, Zimbabwe.
1981 - 1982 Babcock Power Ltd
Section Engineer
Boiler Plant installation, Drax Power Station Completion Phase.
1981 Babcock Power Ltd
Section Engineer
Refurbishment of 100MW anthracite fuelled boilers at Aberthaw, Wales
1980 - 1981 Babcock (Australia) Pte
Section Engineer
Supervision of expanded tube sugar mill plant installation in Pakistan by local
contractor.
1980 - 1980 Babcock & Wilcox
Section Engineer
Supervision of installation of expanded tube waste heat recovery unit at Slough
Estates.
Supervision of refurbishment of expanded tube boilers at Burri Power Station,
Khartoum, Sudan.
1977 - 1980 Babcock & Wilcox
Section Engineer
Supervision of draft plant installation at Grain Power Station, Kent.
1975 - 1977 Babcock & Wilcox
Graduate Trainee
Industrial experience for membership of IMechE, including boiler design,
combustion technology, project engineering and manufacture processes
including high integrity welding.
Contact Details
6 Whitehill Place
Laurelhill
Stirling
Scotland
Curriculum Vitae
Peter J E Jackson
Principal Consultant
Date: July 2015
FK8 2JL
Tel: +44 1786 44 65 46
mob: +44 7804 868941
pjjackson123@btinternet.com

More Related Content

Viewers also liked

Viewers also liked (7)

CV- Kuldeep Sharma (1)
CV- Kuldeep Sharma (1)CV- Kuldeep Sharma (1)
CV- Kuldeep Sharma (1)
 
161016 CV Johann Otto
161016 CV Johann Otto161016 CV Johann Otto
161016 CV Johann Otto
 
ian rasberry cv
ian rasberry cvian rasberry cv
ian rasberry cv
 
CV Nene Acad
CV Nene AcadCV Nene Acad
CV Nene Acad
 
Cv Agung Sri Hendarsa
Cv Agung Sri HendarsaCv Agung Sri Hendarsa
Cv Agung Sri Hendarsa
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
CV-Berhanu Haileselassie- April 2015
CV-Berhanu Haileselassie- April 2015CV-Berhanu Haileselassie- April 2015
CV-Berhanu Haileselassie- April 2015
 

Similar to Peter J E Jackson CV highlights biomass experience

Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13Moore Sarah
 
Keller, Keith MULTIPURPOSE RESUME
Keller, Keith MULTIPURPOSE RESUMEKeller, Keith MULTIPURPOSE RESUME
Keller, Keith MULTIPURPOSE RESUMEKeith H. Keller
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering ResumeStephen Davidson
 
Energy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel ExperienceEnergy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel Experiencenatalyabelmont
 
Energy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel ExperienceEnergy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel ExperienceLink Resources
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P. Henderson
 
Webinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingWebinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingGlobal CCS Institute
 
Resume Dr T Stephen Wittrig
Resume Dr T Stephen WittrigResume Dr T Stephen Wittrig
Resume Dr T Stephen WittrigSteve Wittrig
 
Jack Allen Industrial Resume
Jack Allen Industrial ResumeJack Allen Industrial Resume
Jack Allen Industrial ResumeJack Allen
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15Joe Fain
 
Rong_21May2015
Rong_21May2015Rong_21May2015
Rong_21May2015Rong Dong
 
NRRI Presentation on Biomass and Deployable Housing
NRRI Presentation on Biomass and Deployable HousingNRRI Presentation on Biomass and Deployable Housing
NRRI Presentation on Biomass and Deployable HousingUniversity of Minnesota
 
Khan Nasir1-6-16
Khan Nasir1-6-16Khan Nasir1-6-16
Khan Nasir1-6-16Nasir Khan
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)John Adams
 

Similar to Peter J E Jackson CV highlights biomass experience (20)

Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13
 
Keller, Keith MULTIPURPOSE RESUME
Keller, Keith MULTIPURPOSE RESUMEKeller, Keith MULTIPURPOSE RESUME
Keller, Keith MULTIPURPOSE RESUME
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
 
Trebble CV 2016
Trebble CV 2016Trebble CV 2016
Trebble CV 2016
 
Energy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel ExperienceEnergy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel Experience
 
Energy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel ExperienceEnergy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel Experience
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
Webinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingWebinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modelling
 
Resume_current
Resume_currentResume_current
Resume_current
 
Resume Dr T Stephen Wittrig
Resume Dr T Stephen WittrigResume Dr T Stephen Wittrig
Resume Dr T Stephen Wittrig
 
Jack Allen Industrial Resume
Jack Allen Industrial ResumeJack Allen Industrial Resume
Jack Allen Industrial Resume
 
NS_CV_2016_7122016
NS_CV_2016_7122016NS_CV_2016_7122016
NS_CV_2016_7122016
 
ACR Resume June 2012
ACR Resume June 2012ACR Resume June 2012
ACR Resume June 2012
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
Life-ECOELECTRICITY Project
Life-ECOELECTRICITY ProjectLife-ECOELECTRICITY Project
Life-ECOELECTRICITY Project
 
Rong_21May2015
Rong_21May2015Rong_21May2015
Rong_21May2015
 
NRRI Presentation on Biomass and Deployable Housing
NRRI Presentation on Biomass and Deployable HousingNRRI Presentation on Biomass and Deployable Housing
NRRI Presentation on Biomass and Deployable Housing
 
Khan Nasir1-6-16
Khan Nasir1-6-16Khan Nasir1-6-16
Khan Nasir1-6-16
 
Leslie Banks 2016
Leslie Banks 2016Leslie Banks 2016
Leslie Banks 2016
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 

Peter J E Jackson CV highlights biomass experience

  • 1. Curriculum Vitae Peter J E Jackson Principal Consultant Date: July 2015 Date of Birth: 1953 Nationality: British Education: St. John's College, Cambridge Henley Management College Qualifications: Bachelor of Arts (Mechanical Sciences) Fellowship: Engineering Industry Training Board Member of the Institution of Mechanical Engineers Professional Summary: Peter is an Engineer with over forty years experience in the power and process industry. His core specialist knowledge includes design of thermal power plant covering fuels, phases and control of combustion, flue gas chemistry, heat transfer, steam and water loop, generating systems and abatement technology, He is currently an independent Biomass Energy Consultant. He was previously Vice President & Chief Engineer of HRE Services Ltd, a UK based specialist engineering subsidiary of the US based Fibrowatt LLC, a company specialising in the development of biomass power plant in the US and internationally. Within the last ten years he has been responsible for the preparation of the front end engineering design of Fibrowatt Apeldoorn 33MW and Minnesota (Benson) 55MW(s.o.) poultry litter biomass power plants. He was author of the project design basis for the project critical biomass handling, combustion, heat recovery, ash handling, and emissions control sections of these plants. The Minnesota plant was commissioned in mid 2007 and is now in commercial operation. Between 1995 and 2000 he held senior design responsibility for the Thetford 38MW (mixed poultry) biomass plant. His responsibility with Thetford included the project control of Thetford power station through the design, construct, commission, performance testing and early operation phases. This work continued with the owner to 2006 full time and until present part time, advising on all design related operational matters. During the last twenty five years he has held engineering and management positions both in UK and overseas, including those of Technical Manager for the Drax Power Station Completion Phase, Construction Manager at the Thorp Reprocessing facility, BNFL Sellafield and Site Project Manager at BP Grangemouth KG Ethylene. Experience abroad includes supervision of power station refurbishment in Sudan, sugar mill plant installation in Pakistan ,management of high pressure pipework installation at Hwange Power Station Zimbabwe and boiler assessment and design review in a number of countries in South America, Africa and Europe He has also attended the EITB management course at Henley Management College and has been awarded Fellowship of the Engineering Industry Training Board. His experience with Babcock in power plant engineering and thermal process design was followed in 1995 by a new assignment with Foster Wheeler Energy UK as Employer’s Representative and Project Engineering Manager on behalf of the developer of the Thetford Biomass Power Station Project, Fibrowatt Ltd. Following completion of the Thetford project Peter was recruited as a direct employee of the
  • 2. Curriculum Vitae Peter J E Jackson Principal Consultant Date: July 2015 Fibrowatt group as Group Engineering Manager, and focussed on development of the two projects in the Netherlands and Minnesota USA. From February 2006 to 2007 he worked independently whilst continuing his design advisory work with both the UK and US projects. He joined HRE Services Ltd as Chief Engineer in February 2007. His roles included the provision of technical support to operating biomass plants including fuel handling from receipt through to the combustion zone, combustion conditions and control, failure mode analysis, plant performance including steam cycle and combustion modelling, reliability and availability assessment, assessment of proposals and engineering of plant modifications through all stages of project execution and operation. Experience: 2012 – present Biomass Energy Consultant Peter resumed his activities as an independent consultant in October 2012. He has since undertaken, amongst other, the following activities: Energy Power Resources Ltd EPRL Ely: Combustion optimisation and conceptual redesign of fuel handling and feeding system. EPRL Thetford: Advice on methodology for reducing incidence of pressure part tube leaks and associated down time EPRL Westfield: Combustion optimisation and conceptual redesign of heat recovery system. British Sugar (ABS) Investigation of boiler failure of new plant in China, involving a site visit to Mongolia, together with combustion optimisation of two further plants in China. Advice on greenhouse gas emissions Futurbio Advice regarding combustion of wastes and gasification technology Estover Energy Project and technical consultancy services associated with development of a number of wood fired CHP plants in England and Scotland. Emvertec Ltd Assistance in the commissioning of a novel condensing economiser at a biomass CHP plant at Cameronbridge, Scotland. J.G.Pears Ltd Assistance to a rendering operation in the process design aspects of a combined heat and power (CHP) plant fuelled by poultry litter and cattle meat and bone meal (MBM), approximately 12MWe capacity. Newark, England Veolia Ltd Review and recommendations relating to modification requirements to a biomass plant during commissioning in order to achieve design operating levels. Heat Recovery Systems Ltd Critical review of a novel biomass combustion and heat recovery system (in confidence) 2007 – 2012 HRE Services Ltd Vice President & Chief Engineer Specification development for future biomass plant in the US by Fibrowatt LLC. This to date includes definition of the steam/water circuit, heat balance and overall efficiency projection, detailed development of the boiler design jointly with the boiler vendor, development of the overall project specification including all equipment, plant layout, feedstock specification and environmental
  • 3. Curriculum Vitae Peter J E Jackson Principal Consultant Date: July 2015 compliance requirements. Engineering support of the recently (2007) completed 55MW biomass plant in Minnesota through commissioning, witnessing of performance testing, operation including ongoing fixes of teething problems. Investigation into feasibility of plant conversions from fossil fuel to biomass firing using a circulating fluidised bed combustion system (600,000lb/hr plant, Berlin, New Hampshire), and the engineering input into subsequent project execution. Investigation into re-powering of existing turbine / generator sets using steam generated in a biomass boiler operating at steam conditions of 1500psi, 980F & 500,000lb/hr at the main steam stop valve. Technical due diligence associated with the acquisition of a company specialising in anaerobic digestion of cattle and other wastes and subsequent gas refining to produce pipeline quality gas. Redesign of boiler air quality control system (AQCS) utilising dry sorbent injection (DSI), high integrity bag filter, NOx SCR and energy recovery utilising a condensing economiser for a boiler utilising difficult biomass fuel high in alkali, phosphorous, sulphur and fuel bound nitrogen. This design is the subject of a patent application. The maintenance of ongoing provision of consultancy services to external clients as below: Energy Power Resources Ltd (EPRL) Eye(12.7MW): Modifications to the combustion system for improved output and emissions control. Ely(38MW): Review of plant operation and recommendations for plant modifications to enhance output and emissions. Thetford(38MW): Review of plant operation and recommendations for improvement of plant emissions and capacity factor. W.S.Atkins Technical due diligence associated with a new project proposal for a 160,000 ton/annum Waste to Energy plant in UK. Verus Energy Weir Turbomachinery Consultancy to both companies in connection with UK developments of biomass Waste to Energy plants using Gasification technology. J.G.Pears / Futurbio Consultancy to a process company for development of a combined heat and power (CHP) plant extension using a range of biomasses as feedstock. 2006 – 2007 Independent Consultant Activities included: Specialist Consultancy support to Burns & Roe, the US based Owners Engineer in the development of the first poultry litter fired biomass plant in the US. Consultancy support to the five existing EPR Ltd thermal biomass plants: Thetford (38MW): Development of improved fuel dosing system, now installed. Optimisation of combustion gas emission levels through operational practice
  • 4. Curriculum Vitae Peter J E Jackson Principal Consultant Date: July 2015 and control system enhancement. Development and implementation of improved start up procedure. Development of improved anti-fouling techniques. Glanford (13.5MW): Investigation of premature superheater tube failures. Investigation of boiler heat balance, fouling and alterations to tube spacing geometry. Ely(38MW): Modifications to fuel handling and combustion systems for improved output and emissions control. Eye(12.7MW): Investigation of premature filter bag failures Westfield(10MW):Investigation into agglomeration and defluidisation of the bubbling bed boiler..Investigation of repeat tube failures in the economiser and roof tubes together with provision of successful remedies for all. British Sugar: Trials using a sugar manufacture bi-product for Flue Gas Desulphurisation by furnace sorbent injection method; Combustion optimisation for British Sugar plant in Poland. Conceptual design for new biomass fired plant for British Sugar factories in China. Assistance in commissioning coal fired CFB plant at a British Sugar plant in China Prosper de Mulder (PDM): Optimising existing biomass plant combustion and plant availability. Consultancy for future plant development in boiler configuration, combustion system and steam conditions. Scottish Power in an economic assessment of a biomass project development at Longannet Power Station. AES in combustion optimisation of a biomass conversion from coal in Hungary. 2000 – 2006 Fibrowatt Ltd & EPR Ltd Engineering Manager: Heading a team providing technical support to the operating plants in the Fibrowatt and subsequently EPR groups and heading the engineering development of biomass power projects in Holland and the U.S. 1995 - 2000 Foster Wheeler Energy Ltd Principal Engineer: Thetford Power Station Project engineering management of a main contractor during his proposal development and execution of a "turnkey" contract for the engineering, procurement, construction, commissioning and testing of a 38.5MW (s.o.) biomass fired power station. 1992 - 1995 Babcock Energy Ltd Technical Manager (Overseas) Inspection and technical reporting of operating steam raising plant condition. Originating technical proposals for steam plant modifications and refurbishment of plant up to 250MW capacity in a variety of countries including Argentina, Venezuela, Nigeria, Ghana, Portugal and Cyprus 1986 - 1992 Babcock Energy Ltd Construction and Project Manager Installation of plant and high integrity pipework for BNFL Thorp Project, Sellafield, and at BP KG Ethylene project, Grangemouth. 1985 - 1986 Babcock Power Ltd Technical Services Manager
  • 5. Curriculum Vitae Peter J E Jackson Principal Consultant Date: July 2015 Quality and technical acceptability through performance testing of 660mw boilers for Drax Power Station Completion, working in conjunction with Babcock Service (Commissioning) Department. Re-furbishment of 660MW boilers from original 1972|-5 installation; Re- furbishment of 500MW boiler at Ferrybridge and combustion trials of original Lo-Nox PF burners. 1984 - 1985 Babcock Power Ltd Henley Management College E.I.T.B. sponsored Management Course 1982 - 1983 Babcock Power Ltd Site Manager Installation of 220MW boiler plant at Hwange Power Station, Zimbabwe. 1981 - 1982 Babcock Power Ltd Section Engineer Boiler Plant installation, Drax Power Station Completion Phase. 1981 Babcock Power Ltd Section Engineer Refurbishment of 100MW anthracite fuelled boilers at Aberthaw, Wales 1980 - 1981 Babcock (Australia) Pte Section Engineer Supervision of expanded tube sugar mill plant installation in Pakistan by local contractor. 1980 - 1980 Babcock & Wilcox Section Engineer Supervision of installation of expanded tube waste heat recovery unit at Slough Estates. Supervision of refurbishment of expanded tube boilers at Burri Power Station, Khartoum, Sudan. 1977 - 1980 Babcock & Wilcox Section Engineer Supervision of draft plant installation at Grain Power Station, Kent. 1975 - 1977 Babcock & Wilcox Graduate Trainee Industrial experience for membership of IMechE, including boiler design, combustion technology, project engineering and manufacture processes including high integrity welding. Contact Details 6 Whitehill Place Laurelhill Stirling Scotland
  • 6. Curriculum Vitae Peter J E Jackson Principal Consultant Date: July 2015 FK8 2JL Tel: +44 1786 44 65 46 mob: +44 7804 868941 pjjackson123@btinternet.com