SlideShare a Scribd company logo
1 of 24
Download to read offline
ACHIEVING ZERO BREAKDOWN
PRESENTER : B. R. DEY
A. COMPANY PROFILE
1 OUTLINE OF THE COMPANY
INCORPORATED IN 1972
TOTAL EMPLOYEES : 4818
TOTAL AREA : 26 ACRES
People Growing
Together
TURNOVER IN 2009-10 =
Rs. 7000 Million
GOVT. RECOGNISED R&D
2 MAIN COMPANY DETAILS
TOTAL AREA
105,000 SQ.M
(26 Acres)
STAFF
500
602
3716
OFFICERS
WORKMEN
TOTAL EMPLOYEES 4818
NO OF M/CS
1400
PISTONS RINGS
P I N S ENGINE VALVES
3 PRODUCTS
HFHF
RIKENRIKEN
PISTONS RINGS
ENGINE VALVES
PISTONS
4 FOREIGN COLLABORATION
(1989)
RIKEN CORPN. – JAPAN
(1993)
KOLBENSCHMIDT - GERMANY
(1972)
HONDA FOUNDRY – JAPAN FUJI OOZX –JAPAN
(1978)
1.
2.
3.
4.
Passenger Cars
Two Wheelers
Commercial
Vehicles
Tractors
Industrial
Engines
HINO ENGINES
5. OUR DOMESTIC OE CUSTOMERSSPR IS
SINGLE SOURCESINGLE SOURCE
TO 17 OEMs17 OEMs
6. OUR GLOBAL OEM CUSTOMERS
FRANCE GERMANY/AUSTRALIA/ SOUTH AFRICA
During last few years SPRL has started export business with
6 new global OEM customers
KIA MOTORS HYUNDAI
HONDA MOTORIVECO
IRAN
USA/ CHINA
KOREA
ITALY
PRODUCT BRAND NAMES
No. 1
PISTON EXPORTS No. 1
RING EXPORTS
EXPORTS TO
OVER 30 COUNTRIES
7. EXPORTS
OEM
50%
Aftermarket
23%
Export
25%
Others
2%
B. APPROACH ON ZERO BREAKDOWN
SPRL
Piston
Plant
Aluminium
Foundry
CI Ring
Plant
CI
Foundry
Pin
Plant
EV
Machine
EV
Forge
Steel Ring
plant
Raw Material
Machining InspectionMelting & Alloying Die Casting Packing
1. PROCESS OUTLINE
Piston Production Process
8 5
Process Flow of Aluminium Foundry
RISER CUTTING
CASTING
MELTING
HEAT TREATMENT
INSPECTION
RAW MATERIAL
ROUGH TURNING
& ROUGH
FACING
2. PROCESS OUTLINE OF ALUMINIUM FOUNDRY
32
23 6
69
52
Total nos.of Equipments : 183
Numbers of Machines : Aluminium Foundry
Die Casting
Holding
Melting
Heat
Treat
Others
EQUIPMENT OUTLINE
• Variety of Equipment
Die Casting MachinesHolding Furnace
Metal Treatment
CNC Machines
Melting Furnace Heat Treatment
1.2 Intensification of Time based inspection and maintenance activities on all PM-A and PM-B machines.
• Review of maintenance standards
• Time based maintenance of electrical and mechanical
control system
• Time based replacement of components based on their
failure data from TPM Part 1 activities
S .
N O . I I I I II I V I I I I II I V I I I I I I I V I I I I I I IV I II II I IV I II II I IV I II II I IV I II I II I V I I I I II I V I I I I II I V I I I I II I V I I I I I I I V
1 O I L F IR E D F U R N A C E N O .1
:A LL GEA R,W ORM ,SPROCKET & CHA IN 0 3 M ONTH
C LEA N ING & GREA SING TO B E DONE
:B USH B EA RINGS GREA SING TO B E 0 6 M ONTH
D ONE OF A LL SHA FTS & W HEELS OF
TILTING A SSEM B LY
:OIL IN TILTIN G GEA R B OX TO B E 0 6 M ONTH
FILLED / REPLA CED
:D OOR B EA RING GREA SING TO B E 0 3 M ONTH
D ONE
2 O I L F IR E D F U R N A C E N O .2
:A LL GEA R,W ORM ,SPROCKET & CHA IN 0 3 M ONTH
C LEA N ING & GREA SING TO B E DONE
:B USH B EA RINGS GREA SING TO B E 0 6 M ONTH
D ONE OF A LL SHA FTS & W HEELS OF
TILTING A SSEM B LY
:OIL IN TILTIN G GEA R B OX TO B E 0 6 M ONTH
FILLED / REPLA CED
:D OOR B EA RING GREA SING TO B E 0 3 M ONTH
D ONE
:OIL TO B E FILLED IN A IR LUB RICA TOR 0 3 M ONTH
W ITH CLEA NING OF A IR FILTER
3 HE A T T R E A T M E N T F U R N A C E N O .1
:B EA RING GREA SING TO B E DON E 0 3 M ONTH
4 HE A T T R E A T M E N T F U R N A C E N O .2
:B EA RING GREA SING TO B E DON E 0 3 M ONTH
5 HE A T T R E A T M E N T F U R N A C E N O .3
:B EA RING GREA SING TO B E DON E 0 3 M ONTH
6 HE A T T R E A T M E N T F U R N A C E N O .4
:B EA RING GREA SING TO B E DON E 0 3 M ONTH
7 HE A T T R E A T M E N T F U R N A C E N O .5
:B EA RING GREA SING TO B E DON E 0 3 M ONTH
8 HE A T T R E A T M E N T F U R N A C E N O .6
:B EA RING GREA SING TO B E DON E 0 3 M ONTH
9 HE A T T R E A T M E N T F U R N A C E N O .7
:B EA RING GREA SING TO B E DON E 0 3 M ONTH
1 0 HE A T T R E A T M E N T F U R N A C E N O .8
:B EA RING GREA SING TO B E DON E 0 3 M ONTH
1 1 HE A T T R E A T M E N T F U R N A C E N O .9
:B EA RING GREA SING TO B E DON E 0 3 M ONTH
1 2 HE A T T R E A T M E N T F U R N A C E N O .1 0
:B EA RING GREA SING TO B E DON E 0 3 M ONTH
1 3 HE A T T R E A T M E N T F U R N A C E N O .1 1
:B EA RING GREA SING TO B E DON E 0 3 M ONTH
1 4 S O LU T I O N I S IN G F U R N A C E N O .1
:B EA RING GREA SING TO B E DON E 0 3 M ONTH
:TA NK M OV ING SPROCKET & B EA RIN G 0 3 M ONTH
GREA SING TO B E DONE
SHRIRAM PISTONS : GHAZIABAD
(ALUMINIUM FOUNDRY)
ANNUAL PREVENTIVE MAINTENANCE PLAN - YEAR 2003
M A C HI N E / A C T IV IT IE S F R E Q .
J A N F E B M A R A P R M A Y N O V D E C
R E M A R KS
J U N J U L A U G S E P O C T
Annual Maintenance Plan
2.1 Elimination of minor stoppages by Planned maintenance
on different equipments.
1. 1 Focussed Planned maintenance activities were done to reduce Major and Repetitive Failures.
1.3 Condition based maintenance activities
• Bearing condition monitoring of CNC spindle bearings.
•Temperature monitoring of hydraulic power packs.
•Condition monitoring of hydraulic oil for increase in life of oil.
Hydraulic oil filtration Machine
Temperature Monitoring
69 Equipments
under CBM
SL.NO. MACHINE DETAILS
1 Sol. Cum Ageing Fur.-1 Minor stoppage due to bearing cooling pipe circuit chocked
3 D.C.M/C No.- 29 Minor stoppage due to Burning of flexible pipes of mould coling
4 D.C.M/C No.- 18 Minor stoppage due to misalignment of Eye pad holder box.
5 D.C.M/C No.- 4 , 5 Minor stoppage due to steam generation in water circuit
6 Riser Cutting M/C.-7 Minor stoppage due to overheating of TCT cutters.
7 D.C.M/C No.- 49 , 50 Minor stoppage due to frequent change of cooling pipes.
LIST OFMINORSTOPPAGES :BY PLANNEDMAINTENANCE
Frequency :1 Day Ref : AF/MAINT/10 Month -
Die Cas ting Activity : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Machine no.Abnorm al Noise fr om M otor
Abnorm al Noise fr om Pum p
Coupling m ounting & Tyre condition
Hydraulic Press ure ( )
Oil level in res ervior
Oil tem perature ( M ax.58 Degree Cent.)
Pow er pack Flexible pipe condition
Die Cas ting Activity : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Machine no.Abnorm al Noise fr om M otor
Abnorm al Noise fr om Pum p
Coupling m ounting & Tyre condition
Hydraulic Press ure ( )
Oil level in res ervior
Oil tem perature ( M ax.58 Degree Cent.)
Pow er pack Flexible pipe condition
Die Cas ting Activity : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Machine no.Abnorm al Noise fr om M otor
Abnorm al Noise fr om Pum p
Coupling m ounting & Tyre condition
Hydraulic Press ure ( )
Oil level in res ervior
Oil tem perature ( M ax.58 Degree Cent.)
Pow er pack Flexible pipe condition
O.K. _/ Fitter
NOT O.K. x
Gauge Not OK O Checked By
SHRIRAM PISTONS : GHAZIABAD
( Aluminium Foundry )
DAILY CHECK CHART - DIE CASTING MACHINE
Jan-07
Daily check chart
57 Components /
Assemblies
for replacement
1. Breakdown Reduction
2. Elimination of Minor Stoppages
3. APPROACH FOR ZERO BREAKDOWN
MP
Information
Deep Analysis of
Failures
Horizontal
Replication
Maintenance
Record
Observe for 3
months
Implement
Identification of
potential failures
Study & Analyse
Identify Kaizen
Themes
OK
Not OK
Zero Breakdown
Approach
Observe for 3
months
Implement
OK
Not OK
Horizontal
Replication
Plan Corrective
Maintenance
Analysis of daily
failures with Jishu
Hozen
Review of
Maintenance
standard
APPROACH FOR ZERO BREAKDOWN
Breakage of piston rods in Pin assembly
Frequent failure of quench tank
Failure of eyepad assembly
Oil leakage in center tool assembly
Failure of hydraulic power pack
Water/oil leakage in cooling/hyd ckt
Not attaining required temp of molten metal
LIST OF FAILURES IN ALUMINIUM FOUNDRY
Die Casting
Holding & Metal
Treatment
Aluminium
Foundry
Leakage of heat from furnace doors
38 Kaizens
implemented
Heat Treat
Melting 12 Kaizens
implemented
11 Kaizens
implemented
Premature failure of crucibles
Breakage of lead screw in GBF M/C
Failure due to high temp in furnace coil
Failures in pipes of cooling circuit
Failure of blower bearings
Failure due to breakage of wire ropes
Leakage of heat from furnace doors
21 Kaizens
implemented
4. FAILURE ANALYSIS
17
28
34
60
1
14
12
11
17
0 20 40 60 80
Strut Load assy
Water
Vertical assy
Centre tool assy
Bottom assy
Power pack
Mould assy
Pin assy
Eyepad assy
Nos. of Breakdowns / Year
Breakdowns Frequency in Die casting Machine
Assemblywise analysis
Breakdowns Frequency Trend
Die Casting
Melting 2 %
Heat Treat 3 %
91 %
Holding 2 % Others 2 %
1
3
2
1
0 20 40 60 80
Trolley assy
Basket
carrier
Baffle plate
Blower assy
Nos. of Breakdowns / Year
Breakdowns Frequency in Heat Treatment
Assemblywise analysis
1
2
1
1
0 20 40 60 80
Heating
element
Crucible
Furnace
lining
GBF
Nos. of Breakdowns / Year
Breakdowns Frequency in Holding Furnace
Assemblywise analysis
1
3
2
1
0 20 40 60 80
Trolley assy
Basket
carrier
Baffle plate
Blower assy
Nos. of Breakdowns / Year
Breakdowns Frequency in Melting Furnace
Assemblywise analysis
5. PROBLEM ANALYSIS
1. Elimination of Repetitive Breakdown in eyepad assembly through modification of
guide rod
Reduction of Breakdown by 10 Nos. / Annum
• Guide rods are provided in eyepad assembly to guide the eyepad holder motion
• During movement this rod gets bent due to load
• Guide rod also breaks from thread
•Guide rod was redesigned to prevent it from breakage
• Guide rod dia increased from 20 mm to 28 mm
• Size of thread also increased from M14 to M18
• No breakage of guide rods 10
0 0
0
4
8
12
GOOD
Nos.of
Breakdown/
Year
Problem Analysis :
Guide rod
20 O
20 O
1.5x45
14 O 14 O
M14x1.5P
Eyepad assembly Guide rod
Kaizen details :
1.5x45
28 O
20 O
20 O
28 O
M18x1.5P
Modified Guide rod
Result :
Breakdown Frequency Trend
(Guide Rod)
KAIZEN ON DIE CASTING MACHINE
6. KAIZEN
2. Breakdown reduction of frequent jamming of eyepad slide by redesigning
eyepad holder boxes in Die Casting M/C
Eyepad holder
Eyepad holder
Self lubricating strip
• To provide solution to eliminate external lubrication
• Redesigning of holder boxes by providing self
lubricating strips on all rubbing surfaces
Eyepad
holder box
•No need of external lubrication
•Better machine static accuracy
• Life enhancement of eyepad holders from 1 years to 3 years
Eyepad
holder box
12
0 0
0
5
10
15
GOOD
Nos.of
Breakdown/
Year
Problem analysis :
• Eyepad holder runs in holder box fitted on
eyepad carrier of casting machines
• The holder gets heated up due to casting
operation on machine
• Due to heat external lubrication on holders is
not effective resulting in jamming of holders in
boxes
Kaizen details :
Breakdown Frequency Trend
(Eyepad Holder)
Result :
Reduction of Breakdown by 12 Nos. / Annum
3. Reduction in Breakdown of Quill pin cylinder through design improvement by
introducing guide rods to prevent breakage of piston rod in Die casting Machine
• Redesigning piston rod with support of guide rod.
• To reduce load on Piston rod & coupler due to
jamming of any one pin in mould block by providing
guide rods on both sides of coupler.
• These guide rods share the load coming on
coupler & piston rod.
• No breakage of Piston rod & coupler
•Hydraulic oil saving by 50 Litres / Annuum
11
0
0
5
10
15
GOOD
Nos.of
Breakdown/
Year
Problem analysis : Piston rod
Coupler
Yoke
Quill pin
Cylinder
• Excessive load on Piston rod & coupler due to
jamming of any one pin in mould block
• The excessive load cause breakage of Piston
rod or coupler
• This breakage causes frequent breakdown of
Die Casting Machine
Quill pin
Yoke Piston rod Guide rod
Coupler
Kaizen details :
Result : Breakdown Frequency Trend
(Quill Pin Cylinder)
Reduction of Breakdown by 11 Nos. / Annum
1. Breakdown reduction through modification of lead screw drive system in Gas
Bubbling Fixture machine
• To change the location of gear box assembly
• The gear box is relocated from top to bottom
• No breakage of guide rod of guide rod
Gear Box
Lead screw
Electrical
panel
Rotor
Gear Box
Lead screw
Electrical
panel
Rotor
2
0
0
1
2
3
Nos.of
Breakdown/
Year
GOOD
Problem analysis :
• Gear box is mounted on top at the height of
1.8 mtrs
• Since it is a mobile equipment, hence during
movement the lead screw is unbalanced & falls
down
Kaizen details :
Breakdown Frequency Trend
(GBF)Result :
KAIZEN ON HOLDING & METAL TREATMENT
Reduction of Breakdown by 3 Nos. / Annum
1. Elimination of minor stoppage in Solutionising & Aging Furnace due to variation
of water level
•
• Installed Water level controller and level sensor.
• To control water flow automatically by
interlocking level sensor with a solenoid valve.
• No stoppage due to water level variation
6
0
0
4
8
Nos.of
Stoppages/
Year
GOOD
Electrical panel
Manual valve
Heater
Electrical panel
Level
Controller
Level Sensor
Solenoid valve
Heater
Problem analysis :
• Manual control of water flow in quenching tank
• Stoppages due to breakdown of heaters due
to variation in water level
Kaizen details :
Minor Stoppage Trend
(Soln & Aging Furnace)
Result :
KAIZEN ON MINOR STOPPAGES
Life improvement of heaters from
1month – 1 year
•
7. RESULTS
29
43
0
35
70
B.M. 2007 2010
GOODZero Breakdowns (Nos. of M/Cs)
Nos.ofMachines DIE CASTING MACHINES
54
65
0
40
80
B.M. 2007 2010
GOODZero Breakdowns (Nos. of M/Cs)
Nos.ofMachines
HOLDING FURNACES
20
29
0
20
40
B.M. 2007 2010
GOODZero Breakdowns (Nos. of M/Cs)
Nos.ofMachines
HEAT TREATMENT FURNACES
END OF PRESENTATION

More Related Content

What's hot

Preventive and predictive maintainence
Preventive and predictive maintainencePreventive and predictive maintainence
Preventive and predictive maintainenceAnkit Narain
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozenQC Labs
 
Effective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rulesEffective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rulesLogio_official
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementBisina Keshara
 
Spare Parts Management
Spare Parts ManagementSpare Parts Management
Spare Parts ManagementIEI GSC
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systemsAnil Mohindru
 
Introduction to maintenance
Introduction to maintenanceIntroduction to maintenance
Introduction to maintenanceTanveer Hussain
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenanceSHIVAJI CHOUDHURY
 
Spare parts control for maintenance purposes
Spare parts control for maintenance purposesSpare parts control for maintenance purposes
Spare parts control for maintenance purposesHimalaya Kanwar
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementVijay325
 
Mechanical Maintenance
Mechanical MaintenanceMechanical Maintenance
Mechanical MaintenanceAshutosh Tomar
 
Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Amirul Faiz Amil Azman
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenanceAbhik Rathod
 

What's hot (20)

Preventive and predictive maintainence
Preventive and predictive maintainencePreventive and predictive maintainence
Preventive and predictive maintainence
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozen
 
TPM: Autonomous Maintenance
TPM: Autonomous MaintenanceTPM: Autonomous Maintenance
TPM: Autonomous Maintenance
 
Effective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rulesEffective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rules
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
Introduction to maintenance
Introduction to maintenanceIntroduction to maintenance
Introduction to maintenance
 
Spare Parts Management
Spare Parts ManagementSpare Parts Management
Spare Parts Management
 
TPM: Planned Maintenance
TPM: Planned MaintenanceTPM: Planned Maintenance
TPM: Planned Maintenance
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systems
 
Unit-1 ME 6012
Unit-1 ME 6012Unit-1 ME 6012
Unit-1 ME 6012
 
Introduction to maintenance
Introduction to maintenanceIntroduction to maintenance
Introduction to maintenance
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
Spare parts control for maintenance purposes
Spare parts control for maintenance purposesSpare parts control for maintenance purposes
Spare parts control for maintenance purposes
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
Mechanical Maintenance
Mechanical MaintenanceMechanical Maintenance
Mechanical Maintenance
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...
 
The 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation PosterThe 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation Poster
 
16 major losses tng
16 major losses tng16 major losses tng
16 major losses tng
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenance
 

Similar to Achieving zero breakdown

strict process audit in cement industry.pptx
strict process audit in cement industry.pptxstrict process audit in cement industry.pptx
strict process audit in cement industry.pptxMadan Karki
 
Piping material-specification
Piping material-specificationPiping material-specification
Piping material-specificationChiragShah127
 
Hex cap presentation 2013
Hex cap presentation 2013Hex cap presentation 2013
Hex cap presentation 2013brightonbest
 
FLUID FILM BEARING DETECTION.pdf
FLUID FILM BEARING DETECTION.pdfFLUID FILM BEARING DETECTION.pdf
FLUID FILM BEARING DETECTION.pdfssuserb5b999
 
Cen iso tr 20173 english
Cen iso tr 20173 englishCen iso tr 20173 english
Cen iso tr 20173 englishMete Kuzu
 
VillageCommons-2nd Gen Restauant Space
VillageCommons-2nd Gen Restauant SpaceVillageCommons-2nd Gen Restauant Space
VillageCommons-2nd Gen Restauant SpaceDenise Leyendecker
 
Rail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near MungerRail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near MungerAshish Kumar Yadav
 
CABINET- SWP THU THIEM_Final.pdf
CABINET- SWP THU THIEM_Final.pdfCABINET- SWP THU THIEM_Final.pdf
CABINET- SWP THU THIEM_Final.pdfHongPhmc3
 
Caracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + SiteCaracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + SiteGrant Hepburn
 
L&T Valves - Effects of Stem and Stuffing Box Roughness on Valve Fugitive Emi...
L&T Valves - Effects of Stem and Stuffing Box Roughness on Valve Fugitive Emi...L&T Valves - Effects of Stem and Stuffing Box Roughness on Valve Fugitive Emi...
L&T Valves - Effects of Stem and Stuffing Box Roughness on Valve Fugitive Emi...Babu Kuriakose
 
September 24, 2013 Special Meeting Agenda packet
September 24, 2013 Special Meeting Agenda packetSeptember 24, 2013 Special Meeting Agenda packet
September 24, 2013 Special Meeting Agenda packetCity of San Angelo Texas
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examplesLoren Davis
 
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...John Downs
 

Similar to Achieving zero breakdown (20)

strict process audit in cement industry.pptx
strict process audit in cement industry.pptxstrict process audit in cement industry.pptx
strict process audit in cement industry.pptx
 
Pks0313
Pks0313Pks0313
Pks0313
 
Piping material-specification
Piping material-specificationPiping material-specification
Piping material-specification
 
Hex cap presentation 2013
Hex cap presentation 2013Hex cap presentation 2013
Hex cap presentation 2013
 
FLUID FILM BEARING DETECTION.pdf
FLUID FILM BEARING DETECTION.pdfFLUID FILM BEARING DETECTION.pdf
FLUID FILM BEARING DETECTION.pdf
 
3D Drawing Samples
3D Drawing Samples3D Drawing Samples
3D Drawing Samples
 
Cen iso tr 20173 english
Cen iso tr 20173 englishCen iso tr 20173 english
Cen iso tr 20173 english
 
Generator maintenance
Generator maintenance Generator maintenance
Generator maintenance
 
Applied physics for Anaesthesiologists
Applied physics for AnaesthesiologistsApplied physics for Anaesthesiologists
Applied physics for Anaesthesiologists
 
Accesorios cpvc80
Accesorios cpvc80Accesorios cpvc80
Accesorios cpvc80
 
VillageCommons-2nd Gen Restauant Space
VillageCommons-2nd Gen Restauant SpaceVillageCommons-2nd Gen Restauant Space
VillageCommons-2nd Gen Restauant Space
 
Rail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near MungerRail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near Munger
 
CABINET- SWP THU THIEM_Final.pdf
CABINET- SWP THU THIEM_Final.pdfCABINET- SWP THU THIEM_Final.pdf
CABINET- SWP THU THIEM_Final.pdf
 
Spot weldings
Spot weldingsSpot weldings
Spot weldings
 
Caracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + SiteCaracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + Site
 
L&T Valves - Effects of Stem and Stuffing Box Roughness on Valve Fugitive Emi...
L&T Valves - Effects of Stem and Stuffing Box Roughness on Valve Fugitive Emi...L&T Valves - Effects of Stem and Stuffing Box Roughness on Valve Fugitive Emi...
L&T Valves - Effects of Stem and Stuffing Box Roughness on Valve Fugitive Emi...
 
September 24, 2013 Special Meeting Agenda packet
September 24, 2013 Special Meeting Agenda packetSeptember 24, 2013 Special Meeting Agenda packet
September 24, 2013 Special Meeting Agenda packet
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examples
 
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
 
Refrigeration
RefrigerationRefrigeration
Refrigeration
 

Achieving zero breakdown

  • 3. 1 OUTLINE OF THE COMPANY INCORPORATED IN 1972 TOTAL EMPLOYEES : 4818 TOTAL AREA : 26 ACRES People Growing Together TURNOVER IN 2009-10 = Rs. 7000 Million GOVT. RECOGNISED R&D
  • 4. 2 MAIN COMPANY DETAILS TOTAL AREA 105,000 SQ.M (26 Acres) STAFF 500 602 3716 OFFICERS WORKMEN TOTAL EMPLOYEES 4818 NO OF M/CS 1400
  • 5. PISTONS RINGS P I N S ENGINE VALVES 3 PRODUCTS
  • 6. HFHF RIKENRIKEN PISTONS RINGS ENGINE VALVES PISTONS 4 FOREIGN COLLABORATION (1989) RIKEN CORPN. – JAPAN (1993) KOLBENSCHMIDT - GERMANY (1972) HONDA FOUNDRY – JAPAN FUJI OOZX –JAPAN (1978) 1. 2. 3. 4.
  • 7. Passenger Cars Two Wheelers Commercial Vehicles Tractors Industrial Engines HINO ENGINES 5. OUR DOMESTIC OE CUSTOMERSSPR IS SINGLE SOURCESINGLE SOURCE TO 17 OEMs17 OEMs
  • 8. 6. OUR GLOBAL OEM CUSTOMERS FRANCE GERMANY/AUSTRALIA/ SOUTH AFRICA During last few years SPRL has started export business with 6 new global OEM customers KIA MOTORS HYUNDAI HONDA MOTORIVECO IRAN USA/ CHINA KOREA ITALY
  • 9. PRODUCT BRAND NAMES No. 1 PISTON EXPORTS No. 1 RING EXPORTS EXPORTS TO OVER 30 COUNTRIES 7. EXPORTS OEM 50% Aftermarket 23% Export 25% Others 2%
  • 10. B. APPROACH ON ZERO BREAKDOWN
  • 11. SPRL Piston Plant Aluminium Foundry CI Ring Plant CI Foundry Pin Plant EV Machine EV Forge Steel Ring plant Raw Material Machining InspectionMelting & Alloying Die Casting Packing 1. PROCESS OUTLINE Piston Production Process
  • 12. 8 5 Process Flow of Aluminium Foundry RISER CUTTING CASTING MELTING HEAT TREATMENT INSPECTION RAW MATERIAL ROUGH TURNING & ROUGH FACING 2. PROCESS OUTLINE OF ALUMINIUM FOUNDRY
  • 13. 32 23 6 69 52 Total nos.of Equipments : 183 Numbers of Machines : Aluminium Foundry Die Casting Holding Melting Heat Treat Others EQUIPMENT OUTLINE • Variety of Equipment Die Casting MachinesHolding Furnace Metal Treatment CNC Machines Melting Furnace Heat Treatment
  • 14. 1.2 Intensification of Time based inspection and maintenance activities on all PM-A and PM-B machines. • Review of maintenance standards • Time based maintenance of electrical and mechanical control system • Time based replacement of components based on their failure data from TPM Part 1 activities S . N O . I I I I II I V I I I I II I V I I I I I I I V I I I I I I IV I II II I IV I II II I IV I II II I IV I II I II I V I I I I II I V I I I I II I V I I I I II I V I I I I I I I V 1 O I L F IR E D F U R N A C E N O .1 :A LL GEA R,W ORM ,SPROCKET & CHA IN 0 3 M ONTH C LEA N ING & GREA SING TO B E DONE :B USH B EA RINGS GREA SING TO B E 0 6 M ONTH D ONE OF A LL SHA FTS & W HEELS OF TILTING A SSEM B LY :OIL IN TILTIN G GEA R B OX TO B E 0 6 M ONTH FILLED / REPLA CED :D OOR B EA RING GREA SING TO B E 0 3 M ONTH D ONE 2 O I L F IR E D F U R N A C E N O .2 :A LL GEA R,W ORM ,SPROCKET & CHA IN 0 3 M ONTH C LEA N ING & GREA SING TO B E DONE :B USH B EA RINGS GREA SING TO B E 0 6 M ONTH D ONE OF A LL SHA FTS & W HEELS OF TILTING A SSEM B LY :OIL IN TILTIN G GEA R B OX TO B E 0 6 M ONTH FILLED / REPLA CED :D OOR B EA RING GREA SING TO B E 0 3 M ONTH D ONE :OIL TO B E FILLED IN A IR LUB RICA TOR 0 3 M ONTH W ITH CLEA NING OF A IR FILTER 3 HE A T T R E A T M E N T F U R N A C E N O .1 :B EA RING GREA SING TO B E DON E 0 3 M ONTH 4 HE A T T R E A T M E N T F U R N A C E N O .2 :B EA RING GREA SING TO B E DON E 0 3 M ONTH 5 HE A T T R E A T M E N T F U R N A C E N O .3 :B EA RING GREA SING TO B E DON E 0 3 M ONTH 6 HE A T T R E A T M E N T F U R N A C E N O .4 :B EA RING GREA SING TO B E DON E 0 3 M ONTH 7 HE A T T R E A T M E N T F U R N A C E N O .5 :B EA RING GREA SING TO B E DON E 0 3 M ONTH 8 HE A T T R E A T M E N T F U R N A C E N O .6 :B EA RING GREA SING TO B E DON E 0 3 M ONTH 9 HE A T T R E A T M E N T F U R N A C E N O .7 :B EA RING GREA SING TO B E DON E 0 3 M ONTH 1 0 HE A T T R E A T M E N T F U R N A C E N O .8 :B EA RING GREA SING TO B E DON E 0 3 M ONTH 1 1 HE A T T R E A T M E N T F U R N A C E N O .9 :B EA RING GREA SING TO B E DON E 0 3 M ONTH 1 2 HE A T T R E A T M E N T F U R N A C E N O .1 0 :B EA RING GREA SING TO B E DON E 0 3 M ONTH 1 3 HE A T T R E A T M E N T F U R N A C E N O .1 1 :B EA RING GREA SING TO B E DON E 0 3 M ONTH 1 4 S O LU T I O N I S IN G F U R N A C E N O .1 :B EA RING GREA SING TO B E DON E 0 3 M ONTH :TA NK M OV ING SPROCKET & B EA RIN G 0 3 M ONTH GREA SING TO B E DONE SHRIRAM PISTONS : GHAZIABAD (ALUMINIUM FOUNDRY) ANNUAL PREVENTIVE MAINTENANCE PLAN - YEAR 2003 M A C HI N E / A C T IV IT IE S F R E Q . J A N F E B M A R A P R M A Y N O V D E C R E M A R KS J U N J U L A U G S E P O C T Annual Maintenance Plan 2.1 Elimination of minor stoppages by Planned maintenance on different equipments. 1. 1 Focussed Planned maintenance activities were done to reduce Major and Repetitive Failures. 1.3 Condition based maintenance activities • Bearing condition monitoring of CNC spindle bearings. •Temperature monitoring of hydraulic power packs. •Condition monitoring of hydraulic oil for increase in life of oil. Hydraulic oil filtration Machine Temperature Monitoring 69 Equipments under CBM SL.NO. MACHINE DETAILS 1 Sol. Cum Ageing Fur.-1 Minor stoppage due to bearing cooling pipe circuit chocked 3 D.C.M/C No.- 29 Minor stoppage due to Burning of flexible pipes of mould coling 4 D.C.M/C No.- 18 Minor stoppage due to misalignment of Eye pad holder box. 5 D.C.M/C No.- 4 , 5 Minor stoppage due to steam generation in water circuit 6 Riser Cutting M/C.-7 Minor stoppage due to overheating of TCT cutters. 7 D.C.M/C No.- 49 , 50 Minor stoppage due to frequent change of cooling pipes. LIST OFMINORSTOPPAGES :BY PLANNEDMAINTENANCE Frequency :1 Day Ref : AF/MAINT/10 Month - Die Cas ting Activity : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Machine no.Abnorm al Noise fr om M otor Abnorm al Noise fr om Pum p Coupling m ounting & Tyre condition Hydraulic Press ure ( ) Oil level in res ervior Oil tem perature ( M ax.58 Degree Cent.) Pow er pack Flexible pipe condition Die Cas ting Activity : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Machine no.Abnorm al Noise fr om M otor Abnorm al Noise fr om Pum p Coupling m ounting & Tyre condition Hydraulic Press ure ( ) Oil level in res ervior Oil tem perature ( M ax.58 Degree Cent.) Pow er pack Flexible pipe condition Die Cas ting Activity : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Machine no.Abnorm al Noise fr om M otor Abnorm al Noise fr om Pum p Coupling m ounting & Tyre condition Hydraulic Press ure ( ) Oil level in res ervior Oil tem perature ( M ax.58 Degree Cent.) Pow er pack Flexible pipe condition O.K. _/ Fitter NOT O.K. x Gauge Not OK O Checked By SHRIRAM PISTONS : GHAZIABAD ( Aluminium Foundry ) DAILY CHECK CHART - DIE CASTING MACHINE Jan-07 Daily check chart 57 Components / Assemblies for replacement 1. Breakdown Reduction 2. Elimination of Minor Stoppages 3. APPROACH FOR ZERO BREAKDOWN
  • 15. MP Information Deep Analysis of Failures Horizontal Replication Maintenance Record Observe for 3 months Implement Identification of potential failures Study & Analyse Identify Kaizen Themes OK Not OK Zero Breakdown Approach Observe for 3 months Implement OK Not OK Horizontal Replication Plan Corrective Maintenance Analysis of daily failures with Jishu Hozen Review of Maintenance standard APPROACH FOR ZERO BREAKDOWN
  • 16. Breakage of piston rods in Pin assembly Frequent failure of quench tank Failure of eyepad assembly Oil leakage in center tool assembly Failure of hydraulic power pack Water/oil leakage in cooling/hyd ckt Not attaining required temp of molten metal LIST OF FAILURES IN ALUMINIUM FOUNDRY Die Casting Holding & Metal Treatment Aluminium Foundry Leakage of heat from furnace doors 38 Kaizens implemented Heat Treat Melting 12 Kaizens implemented 11 Kaizens implemented Premature failure of crucibles Breakage of lead screw in GBF M/C Failure due to high temp in furnace coil Failures in pipes of cooling circuit Failure of blower bearings Failure due to breakage of wire ropes Leakage of heat from furnace doors 21 Kaizens implemented 4. FAILURE ANALYSIS
  • 17. 17 28 34 60 1 14 12 11 17 0 20 40 60 80 Strut Load assy Water Vertical assy Centre tool assy Bottom assy Power pack Mould assy Pin assy Eyepad assy Nos. of Breakdowns / Year Breakdowns Frequency in Die casting Machine Assemblywise analysis Breakdowns Frequency Trend Die Casting Melting 2 % Heat Treat 3 % 91 % Holding 2 % Others 2 % 1 3 2 1 0 20 40 60 80 Trolley assy Basket carrier Baffle plate Blower assy Nos. of Breakdowns / Year Breakdowns Frequency in Heat Treatment Assemblywise analysis 1 2 1 1 0 20 40 60 80 Heating element Crucible Furnace lining GBF Nos. of Breakdowns / Year Breakdowns Frequency in Holding Furnace Assemblywise analysis 1 3 2 1 0 20 40 60 80 Trolley assy Basket carrier Baffle plate Blower assy Nos. of Breakdowns / Year Breakdowns Frequency in Melting Furnace Assemblywise analysis 5. PROBLEM ANALYSIS
  • 18. 1. Elimination of Repetitive Breakdown in eyepad assembly through modification of guide rod Reduction of Breakdown by 10 Nos. / Annum • Guide rods are provided in eyepad assembly to guide the eyepad holder motion • During movement this rod gets bent due to load • Guide rod also breaks from thread •Guide rod was redesigned to prevent it from breakage • Guide rod dia increased from 20 mm to 28 mm • Size of thread also increased from M14 to M18 • No breakage of guide rods 10 0 0 0 4 8 12 GOOD Nos.of Breakdown/ Year Problem Analysis : Guide rod 20 O 20 O 1.5x45 14 O 14 O M14x1.5P Eyepad assembly Guide rod Kaizen details : 1.5x45 28 O 20 O 20 O 28 O M18x1.5P Modified Guide rod Result : Breakdown Frequency Trend (Guide Rod) KAIZEN ON DIE CASTING MACHINE 6. KAIZEN
  • 19. 2. Breakdown reduction of frequent jamming of eyepad slide by redesigning eyepad holder boxes in Die Casting M/C Eyepad holder Eyepad holder Self lubricating strip • To provide solution to eliminate external lubrication • Redesigning of holder boxes by providing self lubricating strips on all rubbing surfaces Eyepad holder box •No need of external lubrication •Better machine static accuracy • Life enhancement of eyepad holders from 1 years to 3 years Eyepad holder box 12 0 0 0 5 10 15 GOOD Nos.of Breakdown/ Year Problem analysis : • Eyepad holder runs in holder box fitted on eyepad carrier of casting machines • The holder gets heated up due to casting operation on machine • Due to heat external lubrication on holders is not effective resulting in jamming of holders in boxes Kaizen details : Breakdown Frequency Trend (Eyepad Holder) Result : Reduction of Breakdown by 12 Nos. / Annum
  • 20. 3. Reduction in Breakdown of Quill pin cylinder through design improvement by introducing guide rods to prevent breakage of piston rod in Die casting Machine • Redesigning piston rod with support of guide rod. • To reduce load on Piston rod & coupler due to jamming of any one pin in mould block by providing guide rods on both sides of coupler. • These guide rods share the load coming on coupler & piston rod. • No breakage of Piston rod & coupler •Hydraulic oil saving by 50 Litres / Annuum 11 0 0 5 10 15 GOOD Nos.of Breakdown/ Year Problem analysis : Piston rod Coupler Yoke Quill pin Cylinder • Excessive load on Piston rod & coupler due to jamming of any one pin in mould block • The excessive load cause breakage of Piston rod or coupler • This breakage causes frequent breakdown of Die Casting Machine Quill pin Yoke Piston rod Guide rod Coupler Kaizen details : Result : Breakdown Frequency Trend (Quill Pin Cylinder) Reduction of Breakdown by 11 Nos. / Annum
  • 21. 1. Breakdown reduction through modification of lead screw drive system in Gas Bubbling Fixture machine • To change the location of gear box assembly • The gear box is relocated from top to bottom • No breakage of guide rod of guide rod Gear Box Lead screw Electrical panel Rotor Gear Box Lead screw Electrical panel Rotor 2 0 0 1 2 3 Nos.of Breakdown/ Year GOOD Problem analysis : • Gear box is mounted on top at the height of 1.8 mtrs • Since it is a mobile equipment, hence during movement the lead screw is unbalanced & falls down Kaizen details : Breakdown Frequency Trend (GBF)Result : KAIZEN ON HOLDING & METAL TREATMENT Reduction of Breakdown by 3 Nos. / Annum
  • 22. 1. Elimination of minor stoppage in Solutionising & Aging Furnace due to variation of water level • • Installed Water level controller and level sensor. • To control water flow automatically by interlocking level sensor with a solenoid valve. • No stoppage due to water level variation 6 0 0 4 8 Nos.of Stoppages/ Year GOOD Electrical panel Manual valve Heater Electrical panel Level Controller Level Sensor Solenoid valve Heater Problem analysis : • Manual control of water flow in quenching tank • Stoppages due to breakdown of heaters due to variation in water level Kaizen details : Minor Stoppage Trend (Soln & Aging Furnace) Result : KAIZEN ON MINOR STOPPAGES Life improvement of heaters from 1month – 1 year
  • 23. • 7. RESULTS 29 43 0 35 70 B.M. 2007 2010 GOODZero Breakdowns (Nos. of M/Cs) Nos.ofMachines DIE CASTING MACHINES 54 65 0 40 80 B.M. 2007 2010 GOODZero Breakdowns (Nos. of M/Cs) Nos.ofMachines HOLDING FURNACES 20 29 0 20 40 B.M. 2007 2010 GOODZero Breakdowns (Nos. of M/Cs) Nos.ofMachines HEAT TREATMENT FURNACES