Manual Assembly Lines
Most manufactured consumer products are
assembled. Products are assembled by
various assembly processes.
• Assembly Workstations
• Work Transport System
• Line Pacing
• Coping with Product Variety
Manual Assembly Lines
This manufacturing system consist of two
or more stations (n>1), with one or more
workers at each station (wi > 1). The
operations are sequential, usually fixed
routing, same as production line. Work
transport between stations is either
manual or mechanized.
Consumer products manufacturing.
Products usually made on manual
assembly lines
Audio Equipment Lamps Refrigerators
Automobiles Luggage Stoves
Cameras Microwave ovens Telephones
Cooking Ranges Personal Computers Toasters
Dishwashers Computer peripherals-
printers, key boards,etc
Toaster ovens
Dryers monitors, etc.) Automobile sub
assemblies
Electric Motors Power tools (drills,
saws, etc)
Video cassette players
Furniture Pumps Washing machine
Factors for the use of Manual
Assembly Line
• Demand for the product is high or Medium.
• The products made on the line are identical or
similar.
• The total work required to assembly the
product can be divided into small work
elements.
• It is technology impossible or economically
infeasible to automate the assembly operations.
Reasons for manual Assembly lines
• Specialization of labor: Division of labor, when a large job
is divided into small tasks and each task is assigned to one
worker, the worker becomes highly proficient/ specialist.
• Interchangeable parts: each component is manufactured to
sufficiently close tolerances that any part can be selected
for assembly
• Work principle:Each work unit flows smoothly through the
production line, traveling minimum distances between
stations.
• Line pacing :Assigned task at each station is completed in
cycle time, which paces the line to maintain a specified
production rate. Pacing is generally implemented by means
of a mechanized conveyor.
Asby
Man
Asby
Man
Asby
Man
Asby
Man
Asby
Man
Asby
Man
Starting base Parts
Completed Assemblies
Sta 1 Sta 2 Sta 3 Sta n-2 Sta n-1 Sta n
ASSEMBLY WORKSTATIONS
It is a designated location along the flow path at
which one or more work elements are
performed by one or more workers. The worker
begins the task at up stream and move with the
work until it completed. For small products
worker sit and complete the work. Depending
on the product work station is designed.
Manual Assembly Operations
• Arc Welding
• Brazing
• Fitting operation
• Adhesive / sealant
• Press fitting
• Filing
• Taping
• Riveting
• Shrink fitting
• Snap fitting
• Soldering
• Spot welding
• Stamping
• Thread fastening
Line Pacing
• Assembly line operates at certain cycle time
which is established to achieve the required
production rate of the time.
• On an average, each worker must complete the
assigned task at his station with in this cycle time
or else the required production rate will not be
achieved.
• This pacing of the workers is one of the reason
why a manual assembly line is successful. Pacing
provides a discipline for the assembly line
workers that more or less guarantees a certain
Production rate.
Three levels of pacing
• Rigid pacing: Fixed time
• Pacing with margin: Time with
margin
• No pacing: No fixed time.
Rigid pacing
• In this worker is allowed only a certain
fixed time each cycle to complete the
assigned task.
Pacing with Margin
• Task is completed with in the specified
tyime range. The maximum time of the
range is longer than the cycle time, so that a
worker is permitted to take more time if
required.
No pacing:
• It has no time limit exists within which the
task at the station must be finised. It effect
each assembly operator worker at the staion.
Design for Manufacturing
It is the concept of Product design to facilitate
in assembly.
Design the product with few as parts as
possible.
Design the remaining parts so they are easy to
assemble.
To achieve the required design function:
• Use the fewest number of parts posible to
reduce the amount of assembly
• Reduce the number of threaded fasteners
required.
• Standardize fasteners required
• Reduce parts orientation difficulties
• Avoid parts that tangle.
Manual Assembly Lines
FACTORS
• Demand for the product is high or medium.
• Products are identical or similar.
• Total work required can be divided into small
work elements.
• It is technically impossible or economically
infeasible to automate the assembly operations.
5.Mixed Model Assembly Lines
• Determining Number of Workers on the
line
• Mixed Model Line Balancing
• Model Lunching in Mixed Model Lines
6.Consideration in Assembly
Line Design
3.Analysis of Single Mode
Assembly Lines
• Repositioning Losses
• The Line Balance Problem
• Workstations Consideration
4.Line Balancing Algorithms
• Largest Candidate Rule
• Kilbridge and Wester Method
• Computerized Techniques
• Ranked Position Weights Method
4.Line Balancing Algorithms
Assigning the individual work elements to
workstations so that all workers have an
equal amount of work.
Two concepts are:
Minimum Rational Work Elements
Precedence constraints
Minimum Rational Work Elements
It is a small amount of work having a specific
limited objective.
 
e
n
wc ek
k=1
T = T

Tek = Time to perform work element k (min)
ne = number of work elements
Work content
Precedence constraints
The technological requirements of the work
sequence are called precedence constraints.
Graphical representation of precedence constraints
is called precedence diagram.
1
2
3
4
5
7
6
0.2
0.4
0.7
0.1
0.3
0.11
0.32
8
0.38
Largest Candidate Rule
All work elements are arranged in descending
order according to their Tek values.
Assign the elements to the station at the first
work station by starting at the top of the list
and selecting the first element that satisfies
requirements and does not cause the total
sum divided Tek at that station to exceed
the allowableTs .
UNIT -III
Manual Assembly Lines, Fundamentals of Manual
Assembly Lines, Alternative Assembly Systems,
Design for Assembly, Analysis of Single Model
Assembly Lines, Line balancing problem, largest
candidate rule, Kilbridge and Wester method and
Ranked Positional Weights Method. Mixed Model
Assembly Lines, Considerations in assembly line
design.
Unit 3
Manual Assembly lines, Fundamentals,
Design for assembly,
Analysis of Assembly lines,
Line balancing problem,
Largest candidate rule,
Kilbridge and Wester Method, and
Ranked position weights Method,
Considerations in Assembly line Design.

More Related Content

What's hot (20)

Intro to CAD/CAM/CIM
Intro to CAD/CAM/CIMIntro to CAD/CAM/CIM
Intro to CAD/CAM/CIM
 
07 Line Balancing
07 Line Balancing07 Line Balancing
07 Line Balancing
 
CNC machine\ and its types
CNC machine\ and its typesCNC machine\ and its types
CNC machine\ and its types
 
CNC(KAPIL)
CNC(KAPIL)CNC(KAPIL)
CNC(KAPIL)
 
Condition Based Maintenance
Condition Based MaintenanceCondition Based Maintenance
Condition Based Maintenance
 
CAD CAE CAM Lecture
CAD CAE CAM LectureCAD CAE CAM Lecture
CAD CAE CAM Lecture
 
CAD/CAM/CIM (18ME72) Module -4 Part-A
CAD/CAM/CIM (18ME72) Module -4 Part-ACAD/CAM/CIM (18ME72) Module -4 Part-A
CAD/CAM/CIM (18ME72) Module -4 Part-A
 
Inspection metrology
Inspection metrologyInspection metrology
Inspection metrology
 
NC-CNC-DNC |Harin Prajapari |Mechanical Engineering |GTU
NC-CNC-DNC |Harin Prajapari |Mechanical Engineering |GTU NC-CNC-DNC |Harin Prajapari |Mechanical Engineering |GTU
NC-CNC-DNC |Harin Prajapari |Mechanical Engineering |GTU
 
Low Cost Automation
Low Cost AutomationLow Cost Automation
Low Cost Automation
 
Cmm 3
Cmm 3Cmm 3
Cmm 3
 
CIM Computer Integrated Manufacturing
CIM Computer Integrated ManufacturingCIM Computer Integrated Manufacturing
CIM Computer Integrated Manufacturing
 
COMPONENTS OF CIM
COMPONENTS OF CIM COMPONENTS OF CIM
COMPONENTS OF CIM
 
Lecture # 09 Coordinate Measuring Machine (CMM)
Lecture # 09 Coordinate Measuring  Machine (CMM)Lecture # 09 Coordinate Measuring  Machine (CMM)
Lecture # 09 Coordinate Measuring Machine (CMM)
 
COMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGCOMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNING
 
Group technology and cellular manufacturing
Group technology and cellular manufacturingGroup technology and cellular manufacturing
Group technology and cellular manufacturing
 
Automated Assembly Systems
Automated Assembly SystemsAutomated Assembly Systems
Automated Assembly Systems
 
Automated Production Lines.ppt
Automated Production Lines.pptAutomated Production Lines.ppt
Automated Production Lines.ppt
 
Line balancing
Line balancingLine balancing
Line balancing
 
Single-Station Manufacturing Cells
Single-Station Manufacturing CellsSingle-Station Manufacturing Cells
Single-Station Manufacturing Cells
 

Similar to LINE PACING ETC...ppt

Process Selection and Facility layout.ppt
Process Selection and Facility layout.pptProcess Selection and Facility layout.ppt
Process Selection and Facility layout.pptSandipanMaji3
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pliDhyey Shukla
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Mba ii pmom_unit-1.4 process design, analysis & selection a
Mba ii pmom_unit-1.4 process design, analysis & selection aMba ii pmom_unit-1.4 process design, analysis & selection a
Mba ii pmom_unit-1.4 process design, analysis & selection aRai University
 
Aiar. unit ii. transfer lines
Aiar. unit ii. transfer linesAiar. unit ii. transfer lines
Aiar. unit ii. transfer linesKunal mane
 
Process Selection & Facility Layout.ppt
Process Selection & Facility Layout.pptProcess Selection & Facility Layout.ppt
Process Selection & Facility Layout.pptRenu Lamba
 
Product layout in Food Industry and Line Balancing
Product layout in Food Industry and Line BalancingProduct layout in Food Industry and Line Balancing
Product layout in Food Industry and Line BalancingAbhishek Thakur
 
Meenakshi mam Types of plant layout video.ppt
Meenakshi mam Types of plant layout video.pptMeenakshi mam Types of plant layout video.ppt
Meenakshi mam Types of plant layout video.ppttommychauhan
 
Line balancing ppt By Wakil Kumar
Line balancing ppt By Wakil KumarLine balancing ppt By Wakil Kumar
Line balancing ppt By Wakil KumarWakil Kumar
 
M-Box Introduction
M-Box IntroductionM-Box Introduction
M-Box IntroductionHubert Poels
 
Company Presentation 2015
Company Presentation 2015Company Presentation 2015
Company Presentation 2015Mach Cao Xuan
 
Work Sampling in the excavator
Work Sampling in the excavatorWork Sampling in the excavator
Work Sampling in the excavatorSriguru Aithal
 

Similar to LINE PACING ETC...ppt (20)

Process Selection and Facility layout.ppt
Process Selection and Facility layout.pptProcess Selection and Facility layout.ppt
Process Selection and Facility layout.ppt
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pli
 
CIM 15ME62 Module-3
CIM 15ME62  Module-3CIM 15ME62  Module-3
CIM 15ME62 Module-3
 
Manual Assembly Lines
Manual Assembly LinesManual Assembly Lines
Manual Assembly Lines
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
 
Mba ii pmom_unit-1.4 process design, analysis & selection a
Mba ii pmom_unit-1.4 process design, analysis & selection aMba ii pmom_unit-1.4 process design, analysis & selection a
Mba ii pmom_unit-1.4 process design, analysis & selection a
 
Facility Layout,PPT.pptx
Facility Layout,PPT.pptxFacility Layout,PPT.pptx
Facility Layout,PPT.pptx
 
Aiar. unit ii. transfer lines
Aiar. unit ii. transfer linesAiar. unit ii. transfer lines
Aiar. unit ii. transfer lines
 
Manufacturing systems
Manufacturing systems Manufacturing systems
Manufacturing systems
 
Om plant_layout
Om   plant_layoutOm   plant_layout
Om plant_layout
 
Process Selection & Facility Layout.ppt
Process Selection & Facility Layout.pptProcess Selection & Facility Layout.ppt
Process Selection & Facility Layout.ppt
 
Detail Design Review
Detail Design ReviewDetail Design Review
Detail Design Review
 
Product layout in Food Industry and Line Balancing
Product layout in Food Industry and Line BalancingProduct layout in Food Industry and Line Balancing
Product layout in Food Industry and Line Balancing
 
Meenakshi mam Types of plant layout video.ppt
Meenakshi mam Types of plant layout video.pptMeenakshi mam Types of plant layout video.ppt
Meenakshi mam Types of plant layout video.ppt
 
Line balancing ppt By Wakil Kumar
Line balancing ppt By Wakil KumarLine balancing ppt By Wakil Kumar
Line balancing ppt By Wakil Kumar
 
MA1.ppt
MA1.pptMA1.ppt
MA1.ppt
 
M-Box Introduction
M-Box IntroductionM-Box Introduction
M-Box Introduction
 
Pom
PomPom
Pom
 
Company Presentation 2015
Company Presentation 2015Company Presentation 2015
Company Presentation 2015
 
Work Sampling in the excavator
Work Sampling in the excavatorWork Sampling in the excavator
Work Sampling in the excavator
 

More from PRUDHWIDHARREDDYVELM1 (7)

ABS-Notes.ppt
ABS-Notes.pptABS-Notes.ppt
ABS-Notes.ppt
 
firearm-200509151825.pptx
firearm-200509151825.pptxfirearm-200509151825.pptx
firearm-200509151825.pptx
 
02_AutomotiveBody(Aerodynamics).pptx
02_AutomotiveBody(Aerodynamics).pptx02_AutomotiveBody(Aerodynamics).pptx
02_AutomotiveBody(Aerodynamics).pptx
 
LINE PACING ETC..-2.ppt
LINE PACING  ETC..-2.pptLINE PACING  ETC..-2.ppt
LINE PACING ETC..-2.ppt
 
UNIT VI-3.pptx
UNIT VI-3.pptxUNIT VI-3.pptx
UNIT VI-3.pptx
 
MS UNIT-1.ppt
MS UNIT-1.pptMS UNIT-1.ppt
MS UNIT-1.ppt
 
UNIT-I SYLABUS-2.ppt
UNIT-I SYLABUS-2.pptUNIT-I SYLABUS-2.ppt
UNIT-I SYLABUS-2.ppt
 

Recently uploaded

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 

Recently uploaded (20)

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 

LINE PACING ETC...ppt

  • 1.
  • 2. Manual Assembly Lines Most manufactured consumer products are assembled. Products are assembled by various assembly processes. • Assembly Workstations • Work Transport System • Line Pacing • Coping with Product Variety
  • 3. Manual Assembly Lines This manufacturing system consist of two or more stations (n>1), with one or more workers at each station (wi > 1). The operations are sequential, usually fixed routing, same as production line. Work transport between stations is either manual or mechanized. Consumer products manufacturing.
  • 4. Products usually made on manual assembly lines Audio Equipment Lamps Refrigerators Automobiles Luggage Stoves Cameras Microwave ovens Telephones Cooking Ranges Personal Computers Toasters Dishwashers Computer peripherals- printers, key boards,etc Toaster ovens Dryers monitors, etc.) Automobile sub assemblies Electric Motors Power tools (drills, saws, etc) Video cassette players Furniture Pumps Washing machine
  • 5. Factors for the use of Manual Assembly Line • Demand for the product is high or Medium. • The products made on the line are identical or similar. • The total work required to assembly the product can be divided into small work elements. • It is technology impossible or economically infeasible to automate the assembly operations.
  • 6. Reasons for manual Assembly lines • Specialization of labor: Division of labor, when a large job is divided into small tasks and each task is assigned to one worker, the worker becomes highly proficient/ specialist. • Interchangeable parts: each component is manufactured to sufficiently close tolerances that any part can be selected for assembly • Work principle:Each work unit flows smoothly through the production line, traveling minimum distances between stations. • Line pacing :Assigned task at each station is completed in cycle time, which paces the line to maintain a specified production rate. Pacing is generally implemented by means of a mechanized conveyor.
  • 8. ASSEMBLY WORKSTATIONS It is a designated location along the flow path at which one or more work elements are performed by one or more workers. The worker begins the task at up stream and move with the work until it completed. For small products worker sit and complete the work. Depending on the product work station is designed.
  • 9. Manual Assembly Operations • Arc Welding • Brazing • Fitting operation • Adhesive / sealant • Press fitting • Filing • Taping • Riveting • Shrink fitting • Snap fitting • Soldering • Spot welding • Stamping • Thread fastening
  • 10. Line Pacing • Assembly line operates at certain cycle time which is established to achieve the required production rate of the time. • On an average, each worker must complete the assigned task at his station with in this cycle time or else the required production rate will not be achieved. • This pacing of the workers is one of the reason why a manual assembly line is successful. Pacing provides a discipline for the assembly line workers that more or less guarantees a certain Production rate.
  • 11. Three levels of pacing • Rigid pacing: Fixed time • Pacing with margin: Time with margin • No pacing: No fixed time.
  • 12. Rigid pacing • In this worker is allowed only a certain fixed time each cycle to complete the assigned task.
  • 13. Pacing with Margin • Task is completed with in the specified tyime range. The maximum time of the range is longer than the cycle time, so that a worker is permitted to take more time if required.
  • 14. No pacing: • It has no time limit exists within which the task at the station must be finised. It effect each assembly operator worker at the staion.
  • 15. Design for Manufacturing It is the concept of Product design to facilitate in assembly. Design the product with few as parts as possible. Design the remaining parts so they are easy to assemble.
  • 16. To achieve the required design function: • Use the fewest number of parts posible to reduce the amount of assembly • Reduce the number of threaded fasteners required. • Standardize fasteners required • Reduce parts orientation difficulties • Avoid parts that tangle.
  • 17. Manual Assembly Lines FACTORS • Demand for the product is high or medium. • Products are identical or similar. • Total work required can be divided into small work elements. • It is technically impossible or economically infeasible to automate the assembly operations.
  • 18. 5.Mixed Model Assembly Lines • Determining Number of Workers on the line • Mixed Model Line Balancing • Model Lunching in Mixed Model Lines 6.Consideration in Assembly Line Design
  • 19. 3.Analysis of Single Mode Assembly Lines • Repositioning Losses • The Line Balance Problem • Workstations Consideration 4.Line Balancing Algorithms • Largest Candidate Rule • Kilbridge and Wester Method • Computerized Techniques • Ranked Position Weights Method
  • 20. 4.Line Balancing Algorithms Assigning the individual work elements to workstations so that all workers have an equal amount of work. Two concepts are: Minimum Rational Work Elements Precedence constraints
  • 21. Minimum Rational Work Elements It is a small amount of work having a specific limited objective.   e n wc ek k=1 T = T  Tek = Time to perform work element k (min) ne = number of work elements Work content
  • 22. Precedence constraints The technological requirements of the work sequence are called precedence constraints. Graphical representation of precedence constraints is called precedence diagram. 1 2 3 4 5 7 6 0.2 0.4 0.7 0.1 0.3 0.11 0.32 8 0.38
  • 23. Largest Candidate Rule All work elements are arranged in descending order according to their Tek values. Assign the elements to the station at the first work station by starting at the top of the list and selecting the first element that satisfies requirements and does not cause the total sum divided Tek at that station to exceed the allowableTs .
  • 24. UNIT -III Manual Assembly Lines, Fundamentals of Manual Assembly Lines, Alternative Assembly Systems, Design for Assembly, Analysis of Single Model Assembly Lines, Line balancing problem, largest candidate rule, Kilbridge and Wester method and Ranked Positional Weights Method. Mixed Model Assembly Lines, Considerations in assembly line design.
  • 25. Unit 3 Manual Assembly lines, Fundamentals, Design for assembly, Analysis of Assembly lines, Line balancing problem, Largest candidate rule, Kilbridge and Wester Method, and Ranked position weights Method, Considerations in Assembly line Design.