Was the decision to implement ERP justified for CISCO?
1. Repairing the existing Legacy System: Failure of the legacy system led to
business losses and constrained the company in scaling upwards. Repair to the
existing system had already been done before but to no avail. So, repairing the
existing system was not sufficient. Existing system could not handle the high growth
rate which the company was experiencing
2. Requirement of a robust system: CISCO wanted to create a broad product line as
per its CEO’s business strategy. So, they required a robust system to support its new
business requirements.
3. Growing recognition of the power of cross-functional collaboration and internal
demand for systems and processes that facilitate better interactions.
4. Increasing demand for collaboration with suppliers, distributors, partners and
customers.
5. Opportunities for enhancing ERP systems in support of online business models
6. Supply chain automation through ERP system allow market demand signal to flow
directly to contract manufacturer without any distortion or delay.
What were some of the key factors that enabled them to implement the
system in nine months?
a. Opting for standard ERP system- They adopted standard ERP system by
which everyone was trained and not a system that would allow a lot of
customization. A customized system would have stretched the time as it
would require training in every department as in their respective method of
operation.
b. Prioritization of goal- The project was assigned as one of the top goals of the
company. Every department was picked up and asked to implement the
system in a quick and efficient way.
c. Cisco correctly anticipates a surge in demand for their products. The current
operational infrastructure would simply not accommodate this flux of
volume. That level of growth could literally choke the organization. Therefore,
it was necessary to find a feature rich and scalable solution to bring in all the
data silos, compartmentalized operations, and disparate sales methods and
product lines .This paved the way for the replacement of existing systems “big
bang” with one ERP solution in an estimated time period of nine months.
d. Less customisation in the system: They adopted a standard ERP system by which
everyone was trained and not a system that would allow a lot of customisation. A
customised system would have stretched the time as it would require training every
department as per their respective method of operation.
What are the benefits of the Web Enabled architecture at CISCO? What are the
drawbacks of the architecture? As CIO, would you have done anything
differently?
Benefits to employees
 Training and distance learning module are provided
 CEC provides access to information tools, resources and services like HR
 Intranet: employees can use video of CISCO’s quarterly meeting on their PC
 Personalized home page for employees provides information about worldwide
finance market-My Yahoo!
 EIS and DSS- internal methods of sales tracking and reporting provided
information about booking, backlog, revenue, not booked, forecast and plans
for all products, customers, channels, geographic and market.
Benefits to customers
 CISCO.com- To answer questions, diagnose network problem, provide
solution and expert assistance.
 Through CISCO connection online, the customer navigated to the information
needed for the interaction work, or published and subscribed. (i.e. )the
customer directly contributed information request to do business with CISCO’s
intellectual asset base
 Provide 80% of CISCO’s technical support, saving $506 million annually
 Customer service became efficient and transparent
Supply Chain Mechanism
 Integrate suppliers into its production system to respond to customer demand
in real time
 New product introduction reduce time and cost due to web enablement
 Auto test allow quantity issue to be deleted at the source
 Direct order fulfilment from partner to customer by passing CISCO reducing
delivery time
DRAWBACKS:
a. Security breach was a danger as this interconnected model was suspect
ready to web programmers
b. Investment of $100 million in supplanting the framework was gigantic in
connection to the expense of execution of ERP, which was $15 million as
it were
SUGGESTION:
As a CEO, we would ensure that the security issues are given a top priority
and a firewall is installed to make it hacking proof.
How would you justify the expenditure that CISCO incurred in implementing
the web enabled architecture? You do not have enough information to actually
do a cost-benefit analysis. However, you can discuss what approach you
would use to justify the expenditure.
Cisco wanted all their process to be standardized and robust so that the
scalability is improved. They accept to replace systems with one ERP solution
in 9 months for $15M.Project completed successfully on time. Formed
centrepiece of the 2-yr $100 million series of initiatives to replace all IT
applications and platforms worldwide. The following advantages were the
result of this decision.
. It gave Cisco a direct upper hand over others as execution of web
business arrangements put them early and made them innovatively extremely
progressed.
. Workers could be prepared in practical way using self-administration
application.
. Dynamic recharging diminishes postponements and blunders, and
spared them $275 million through increment productivity.
Breakdown of Implementation costs for Cisco ERP Implementation
. Hardware 32%
. Headcount 14%
. System Integration 38%
. Software 6%
Cisco report final

More Related Content

What's hot

Platform & Application Modernization
Platform & Application ModernizationPlatform & Application Modernization
Platform & Application ModernizationJK Tech
 
ERP IT Infrastructure Audit
ERP IT Infrastructure AuditERP IT Infrastructure Audit
ERP IT Infrastructure Auditvelcomerp
 
The Impact of SOA on Traditional Middleware Technologies
The Impact of SOA on Traditional Middleware TechnologiesThe Impact of SOA on Traditional Middleware Technologies
The Impact of SOA on Traditional Middleware Technologiesdigitallibrary
 
The Banner ERP system is constantly being updated to support campuses needs a...
The Banner ERP system is constantly being updated to support campuses needs a...The Banner ERP system is constantly being updated to support campuses needs a...
The Banner ERP system is constantly being updated to support campuses needs a...Jeff Hinds
 
Andy chatha - arc advisory group - rethinking it and automation solutions
Andy chatha - arc advisory group - rethinking it and automation solutionsAndy chatha - arc advisory group - rethinking it and automation solutions
Andy chatha - arc advisory group - rethinking it and automation solutionsARC Advisory Group
 
Salesforce Lightning Process Builder IS the next-generation workflow tool
Salesforce Lightning Process Builder IS the next-generation workflow toolSalesforce Lightning Process Builder IS the next-generation workflow tool
Salesforce Lightning Process Builder IS the next-generation workflow toolBMC Software
 
Leverage your Salesforce Force.com Platform with Remedyforce Cloud ITSM
Leverage your Salesforce Force.com Platform with Remedyforce Cloud ITSMLeverage your Salesforce Force.com Platform with Remedyforce Cloud ITSM
Leverage your Salesforce Force.com Platform with Remedyforce Cloud ITSMBMC Software
 
Data Center Transformation Cisco's Virtualization & Cloud Journey
Data Center Transformation Cisco's Virtualization & Cloud JourneyData Center Transformation Cisco's Virtualization & Cloud Journey
Data Center Transformation Cisco's Virtualization & Cloud JourneyCisco Canada
 
4-15-10 Stratizon Contract History
4-15-10 Stratizon Contract History4-15-10 Stratizon Contract History
4-15-10 Stratizon Contract HistoryNed M. Hunter
 
Susheel Patel, Pivotal_Hadoop&SQL
Susheel Patel, Pivotal_Hadoop&SQLSusheel Patel, Pivotal_Hadoop&SQL
Susheel Patel, Pivotal_Hadoop&SQLThe Hive
 
Application-Aware Network Performance Management
Application-Aware Network Performance ManagementApplication-Aware Network Performance Management
Application-Aware Network Performance ManagementRiverbed Technology
 
Business value of Enterprise Security Architecture
Business value of Enterprise Security Architecture Business value of Enterprise Security Architecture
Business value of Enterprise Security Architecture Ajay Kumar Uppal
 
Flight Plan Design + Blockchain (Fashion / Retail)
Flight Plan Design + Blockchain (Fashion / Retail)Flight Plan Design + Blockchain (Fashion / Retail)
Flight Plan Design + Blockchain (Fashion / Retail)Gendry Morales
 
Are you REALLY ready for the cloud?
Are you REALLY ready for the cloud?Are you REALLY ready for the cloud?
Are you REALLY ready for the cloud?Riverbed Technology
 

What's hot (19)

Platform & Application Modernization
Platform & Application ModernizationPlatform & Application Modernization
Platform & Application Modernization
 
ERP IT Infrastructure Audit
ERP IT Infrastructure AuditERP IT Infrastructure Audit
ERP IT Infrastructure Audit
 
The Impact of SOA on Traditional Middleware Technologies
The Impact of SOA on Traditional Middleware TechnologiesThe Impact of SOA on Traditional Middleware Technologies
The Impact of SOA on Traditional Middleware Technologies
 
The Banner ERP system is constantly being updated to support campuses needs a...
The Banner ERP system is constantly being updated to support campuses needs a...The Banner ERP system is constantly being updated to support campuses needs a...
The Banner ERP system is constantly being updated to support campuses needs a...
 
Andy chatha - arc advisory group - rethinking it and automation solutions
Andy chatha - arc advisory group - rethinking it and automation solutionsAndy chatha - arc advisory group - rethinking it and automation solutions
Andy chatha - arc advisory group - rethinking it and automation solutions
 
Symantec erp turmoil
Symantec erp turmoilSymantec erp turmoil
Symantec erp turmoil
 
Salesforce Lightning Process Builder IS the next-generation workflow tool
Salesforce Lightning Process Builder IS the next-generation workflow toolSalesforce Lightning Process Builder IS the next-generation workflow tool
Salesforce Lightning Process Builder IS the next-generation workflow tool
 
HCL Harnesses The Power Of IT Outsourcing
HCL Harnesses The Power Of IT OutsourcingHCL Harnesses The Power Of IT Outsourcing
HCL Harnesses The Power Of IT Outsourcing
 
Fast Track AIOps Automation with Prebuilt Databots
Fast Track AIOps Automation with Prebuilt DatabotsFast Track AIOps Automation with Prebuilt Databots
Fast Track AIOps Automation with Prebuilt Databots
 
Leverage your Salesforce Force.com Platform with Remedyforce Cloud ITSM
Leverage your Salesforce Force.com Platform with Remedyforce Cloud ITSMLeverage your Salesforce Force.com Platform with Remedyforce Cloud ITSM
Leverage your Salesforce Force.com Platform with Remedyforce Cloud ITSM
 
Data Center Transformation Cisco's Virtualization & Cloud Journey
Data Center Transformation Cisco's Virtualization & Cloud JourneyData Center Transformation Cisco's Virtualization & Cloud Journey
Data Center Transformation Cisco's Virtualization & Cloud Journey
 
4-15-10 Stratizon Contract History
4-15-10 Stratizon Contract History4-15-10 Stratizon Contract History
4-15-10 Stratizon Contract History
 
Susheel Patel, Pivotal_Hadoop&SQL
Susheel Patel, Pivotal_Hadoop&SQLSusheel Patel, Pivotal_Hadoop&SQL
Susheel Patel, Pivotal_Hadoop&SQL
 
IntalTech
IntalTechIntalTech
IntalTech
 
Application-Aware Network Performance Management
Application-Aware Network Performance ManagementApplication-Aware Network Performance Management
Application-Aware Network Performance Management
 
Business value of Enterprise Security Architecture
Business value of Enterprise Security Architecture Business value of Enterprise Security Architecture
Business value of Enterprise Security Architecture
 
Flight Plan Design + Blockchain (Fashion / Retail)
Flight Plan Design + Blockchain (Fashion / Retail)Flight Plan Design + Blockchain (Fashion / Retail)
Flight Plan Design + Blockchain (Fashion / Retail)
 
Software Asset Management
Software Asset ManagementSoftware Asset Management
Software Asset Management
 
Are you REALLY ready for the cloud?
Are you REALLY ready for the cloud?Are you REALLY ready for the cloud?
Are you REALLY ready for the cloud?
 

Similar to Cisco report final

ITM CISCO CASE PPT(REPORT)
ITM CISCO CASE PPT(REPORT)ITM CISCO CASE PPT(REPORT)
ITM CISCO CASE PPT(REPORT)PRINCEKUMAR667
 
How to Monitor Digital Dependencies Across Your Modern IT Stack
How to Monitor Digital Dependencies Across Your Modern IT StackHow to Monitor Digital Dependencies Across Your Modern IT Stack
How to Monitor Digital Dependencies Across Your Modern IT StackThousandEyes
 
MongoDB World 2019: Data Digital Decoupling
MongoDB World 2019: Data Digital DecouplingMongoDB World 2019: Data Digital Decoupling
MongoDB World 2019: Data Digital DecouplingMongoDB
 
2G1721-IT-Mgmt-paper
2G1721-IT-Mgmt-paper2G1721-IT-Mgmt-paper
2G1721-IT-Mgmt-paperHamid Shahzad
 
Cosmos IoT – Scaleup Frugally - Techwave.pdf
Cosmos IoT – Scaleup Frugally - Techwave.pdfCosmos IoT – Scaleup Frugally - Techwave.pdf
Cosmos IoT – Scaleup Frugally - Techwave.pdfAnil
 
Comparison of CXAIR to Traditional BI Technologies
Comparison of CXAIR to Traditional BI Technologies Comparison of CXAIR to Traditional BI Technologies
Comparison of CXAIR to Traditional BI Technologies Connexica
 
Hcl provides an e commerce solution that increases site traffic and sales
Hcl provides an e commerce solution that increases site traffic and salesHcl provides an e commerce solution that increases site traffic and sales
Hcl provides an e commerce solution that increases site traffic and salesHcl Brand
 
Beyond the Vision: Realizing the Promise of Industry 4.0
Beyond the Vision: Realizing the Promise of Industry 4.0Beyond the Vision: Realizing the Promise of Industry 4.0
Beyond the Vision: Realizing the Promise of Industry 4.0Cognizant
 
How to Monitor Digital Dependencies Across Your Modern IT Stack
How to Monitor Digital Dependencies Across Your Modern IT StackHow to Monitor Digital Dependencies Across Your Modern IT Stack
How to Monitor Digital Dependencies Across Your Modern IT StackThousandEyes
 
How to Monitor Digital Dependencies Across Your Modern IT Stack
How to Monitor Digital Dependencies Across Your Modern IT StackHow to Monitor Digital Dependencies Across Your Modern IT Stack
How to Monitor Digital Dependencies Across Your Modern IT StackThousandEyes
 
A research on- Sales force Project- documentation
A research on- Sales force Project- documentationA research on- Sales force Project- documentation
A research on- Sales force Project- documentationPasupathi Ganesan
 
Future-Proofing Asset Failures with Cognitive Predictive Maintenance
Future-Proofing Asset Failures with Cognitive Predictive MaintenanceFuture-Proofing Asset Failures with Cognitive Predictive Maintenance
Future-Proofing Asset Failures with Cognitive Predictive MaintenanceAnita Raj
 
Manufacturing with Internet of Things
Manufacturing with Internet of ThingsManufacturing with Internet of Things
Manufacturing with Internet of ThingsConnected Futures
 
It aac cloud-acquisition_roadmap2012
It aac cloud-acquisition_roadmap2012It aac cloud-acquisition_roadmap2012
It aac cloud-acquisition_roadmap2012John Weiler
 
Value Delivered to Cisco Clients by QD
Value Delivered to Cisco Clients by QDValue Delivered to Cisco Clients by QD
Value Delivered to Cisco Clients by QDqualitydeployment1
 
Efficient Data Centers Are Built On New Technologies and Strategies
Efficient Data Centers Are Built On New Technologies and StrategiesEfficient Data Centers Are Built On New Technologies and Strategies
Efficient Data Centers Are Built On New Technologies and StrategiesCMI, Inc.
 

Similar to Cisco report final (20)

Cisco case report
Cisco case reportCisco case report
Cisco case report
 
ITM CISCO CASE PPT(REPORT)
ITM CISCO CASE PPT(REPORT)ITM CISCO CASE PPT(REPORT)
ITM CISCO CASE PPT(REPORT)
 
How to Monitor Digital Dependencies Across Your Modern IT Stack
How to Monitor Digital Dependencies Across Your Modern IT StackHow to Monitor Digital Dependencies Across Your Modern IT Stack
How to Monitor Digital Dependencies Across Your Modern IT Stack
 
MongoDB World 2019: Data Digital Decoupling
MongoDB World 2019: Data Digital DecouplingMongoDB World 2019: Data Digital Decoupling
MongoDB World 2019: Data Digital Decoupling
 
Information Systems
Information SystemsInformation Systems
Information Systems
 
2G1721-IT-Mgmt-paper
2G1721-IT-Mgmt-paper2G1721-IT-Mgmt-paper
2G1721-IT-Mgmt-paper
 
Cosmos IoT – Scaleup Frugally - Techwave.pdf
Cosmos IoT – Scaleup Frugally - Techwave.pdfCosmos IoT – Scaleup Frugally - Techwave.pdf
Cosmos IoT – Scaleup Frugally - Techwave.pdf
 
FINAL VER - 2015_09
FINAL VER - 2015_09FINAL VER - 2015_09
FINAL VER - 2015_09
 
Comparison of CXAIR to Traditional BI Technologies
Comparison of CXAIR to Traditional BI Technologies Comparison of CXAIR to Traditional BI Technologies
Comparison of CXAIR to Traditional BI Technologies
 
Hcl provides an e commerce solution that increases site traffic and sales
Hcl provides an e commerce solution that increases site traffic and salesHcl provides an e commerce solution that increases site traffic and sales
Hcl provides an e commerce solution that increases site traffic and sales
 
Azure Biz
Azure BizAzure Biz
Azure Biz
 
Beyond the Vision: Realizing the Promise of Industry 4.0
Beyond the Vision: Realizing the Promise of Industry 4.0Beyond the Vision: Realizing the Promise of Industry 4.0
Beyond the Vision: Realizing the Promise of Industry 4.0
 
How to Monitor Digital Dependencies Across Your Modern IT Stack
How to Monitor Digital Dependencies Across Your Modern IT StackHow to Monitor Digital Dependencies Across Your Modern IT Stack
How to Monitor Digital Dependencies Across Your Modern IT Stack
 
How to Monitor Digital Dependencies Across Your Modern IT Stack
How to Monitor Digital Dependencies Across Your Modern IT StackHow to Monitor Digital Dependencies Across Your Modern IT Stack
How to Monitor Digital Dependencies Across Your Modern IT Stack
 
A research on- Sales force Project- documentation
A research on- Sales force Project- documentationA research on- Sales force Project- documentation
A research on- Sales force Project- documentation
 
Future-Proofing Asset Failures with Cognitive Predictive Maintenance
Future-Proofing Asset Failures with Cognitive Predictive MaintenanceFuture-Proofing Asset Failures with Cognitive Predictive Maintenance
Future-Proofing Asset Failures with Cognitive Predictive Maintenance
 
Manufacturing with Internet of Things
Manufacturing with Internet of ThingsManufacturing with Internet of Things
Manufacturing with Internet of Things
 
It aac cloud-acquisition_roadmap2012
It aac cloud-acquisition_roadmap2012It aac cloud-acquisition_roadmap2012
It aac cloud-acquisition_roadmap2012
 
Value Delivered to Cisco Clients by QD
Value Delivered to Cisco Clients by QDValue Delivered to Cisco Clients by QD
Value Delivered to Cisco Clients by QD
 
Efficient Data Centers Are Built On New Technologies and Strategies
Efficient Data Centers Are Built On New Technologies and StrategiesEfficient Data Centers Are Built On New Technologies and Strategies
Efficient Data Centers Are Built On New Technologies and Strategies
 

More from PRINCEKUMAR667

Brand communication of Maggi Noodles
Brand communication of Maggi NoodlesBrand communication of Maggi Noodles
Brand communication of Maggi NoodlesPRINCEKUMAR667
 
Social cause and benefit analysis
Social cause and benefit analysisSocial cause and benefit analysis
Social cause and benefit analysisPRINCEKUMAR667
 
Esomar coca-cola shopper case study ppt
Esomar coca-cola shopper case study pptEsomar coca-cola shopper case study ppt
Esomar coca-cola shopper case study pptPRINCEKUMAR667
 
BCCL (TIMES OF INDIA) SUMMER INTERNSHIP PPT
BCCL (TIMES OF INDIA) SUMMER INTERNSHIP PPTBCCL (TIMES OF INDIA) SUMMER INTERNSHIP PPT
BCCL (TIMES OF INDIA) SUMMER INTERNSHIP PPTPRINCEKUMAR667
 
TIMES OF INDIA SUMMER INTERNSHIP DETAILED REPORT
TIMES OF INDIA SUMMER INTERNSHIP DETAILED REPORTTIMES OF INDIA SUMMER INTERNSHIP DETAILED REPORT
TIMES OF INDIA SUMMER INTERNSHIP DETAILED REPORTPRINCEKUMAR667
 
Lg distribution dossier
Lg distribution dossierLg distribution dossier
Lg distribution dossierPRINCEKUMAR667
 

More from PRINCEKUMAR667 (7)

Brand communication of Maggi Noodles
Brand communication of Maggi NoodlesBrand communication of Maggi Noodles
Brand communication of Maggi Noodles
 
Social cause and benefit analysis
Social cause and benefit analysisSocial cause and benefit analysis
Social cause and benefit analysis
 
Esomar coca-cola shopper case study ppt
Esomar coca-cola shopper case study pptEsomar coca-cola shopper case study ppt
Esomar coca-cola shopper case study ppt
 
BCCL (TIMES OF INDIA) SUMMER INTERNSHIP PPT
BCCL (TIMES OF INDIA) SUMMER INTERNSHIP PPTBCCL (TIMES OF INDIA) SUMMER INTERNSHIP PPT
BCCL (TIMES OF INDIA) SUMMER INTERNSHIP PPT
 
TIMES OF INDIA SUMMER INTERNSHIP DETAILED REPORT
TIMES OF INDIA SUMMER INTERNSHIP DETAILED REPORTTIMES OF INDIA SUMMER INTERNSHIP DETAILED REPORT
TIMES OF INDIA SUMMER INTERNSHIP DETAILED REPORT
 
Mmi saffola
Mmi saffolaMmi saffola
Mmi saffola
 
Lg distribution dossier
Lg distribution dossierLg distribution dossier
Lg distribution dossier
 

Recently uploaded

Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonJericReyAuditor
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 

Recently uploaded (20)

Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lesson
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 

Cisco report final

  • 1. CASE REPORT Cisco Systems Architecture: ERP and Web-enabled IT BY- NIKITA SHAH PRINCE KUMAR SANJEEV SAHU SHEKHAR BARDIA Cisco Systems Architecture :ERP and Web- enabled IT BY-  SANJEEV SAHU  PRINCE KUMAR  NIKITA SHAH  SHEKHAR BARDIA
  • 2. Was the decision to implement ERP justified for CISCO? 1. Repairing the existing Legacy System: Failure of the legacy system led to business losses and constrained the company in scaling upwards. Repair to the existing system had already been done before but to no avail. So, repairing the existing system was not sufficient. Existing system could not handle the high growth rate which the company was experiencing 2. Requirement of a robust system: CISCO wanted to create a broad product line as per its CEO’s business strategy. So, they required a robust system to support its new business requirements. 3. Growing recognition of the power of cross-functional collaboration and internal demand for systems and processes that facilitate better interactions. 4. Increasing demand for collaboration with suppliers, distributors, partners and customers. 5. Opportunities for enhancing ERP systems in support of online business models 6. Supply chain automation through ERP system allow market demand signal to flow directly to contract manufacturer without any distortion or delay. What were some of the key factors that enabled them to implement the system in nine months? a. Opting for standard ERP system- They adopted standard ERP system by which everyone was trained and not a system that would allow a lot of customization. A customized system would have stretched the time as it would require training in every department as in their respective method of operation. b. Prioritization of goal- The project was assigned as one of the top goals of the company. Every department was picked up and asked to implement the system in a quick and efficient way. c. Cisco correctly anticipates a surge in demand for their products. The current operational infrastructure would simply not accommodate this flux of volume. That level of growth could literally choke the organization. Therefore, it was necessary to find a feature rich and scalable solution to bring in all the
  • 3. data silos, compartmentalized operations, and disparate sales methods and product lines .This paved the way for the replacement of existing systems “big bang” with one ERP solution in an estimated time period of nine months. d. Less customisation in the system: They adopted a standard ERP system by which everyone was trained and not a system that would allow a lot of customisation. A customised system would have stretched the time as it would require training every department as per their respective method of operation. What are the benefits of the Web Enabled architecture at CISCO? What are the drawbacks of the architecture? As CIO, would you have done anything differently? Benefits to employees  Training and distance learning module are provided  CEC provides access to information tools, resources and services like HR  Intranet: employees can use video of CISCO’s quarterly meeting on their PC  Personalized home page for employees provides information about worldwide finance market-My Yahoo!  EIS and DSS- internal methods of sales tracking and reporting provided information about booking, backlog, revenue, not booked, forecast and plans for all products, customers, channels, geographic and market. Benefits to customers  CISCO.com- To answer questions, diagnose network problem, provide solution and expert assistance.  Through CISCO connection online, the customer navigated to the information needed for the interaction work, or published and subscribed. (i.e. )the customer directly contributed information request to do business with CISCO’s intellectual asset base  Provide 80% of CISCO’s technical support, saving $506 million annually  Customer service became efficient and transparent Supply Chain Mechanism  Integrate suppliers into its production system to respond to customer demand in real time  New product introduction reduce time and cost due to web enablement  Auto test allow quantity issue to be deleted at the source  Direct order fulfilment from partner to customer by passing CISCO reducing delivery time DRAWBACKS: a. Security breach was a danger as this interconnected model was suspect ready to web programmers
  • 4. b. Investment of $100 million in supplanting the framework was gigantic in connection to the expense of execution of ERP, which was $15 million as it were SUGGESTION: As a CEO, we would ensure that the security issues are given a top priority and a firewall is installed to make it hacking proof. How would you justify the expenditure that CISCO incurred in implementing the web enabled architecture? You do not have enough information to actually do a cost-benefit analysis. However, you can discuss what approach you would use to justify the expenditure. Cisco wanted all their process to be standardized and robust so that the scalability is improved. They accept to replace systems with one ERP solution in 9 months for $15M.Project completed successfully on time. Formed centrepiece of the 2-yr $100 million series of initiatives to replace all IT applications and platforms worldwide. The following advantages were the result of this decision. . It gave Cisco a direct upper hand over others as execution of web business arrangements put them early and made them innovatively extremely progressed. . Workers could be prepared in practical way using self-administration application. . Dynamic recharging diminishes postponements and blunders, and spared them $275 million through increment productivity. Breakdown of Implementation costs for Cisco ERP Implementation . Hardware 32% . Headcount 14% . System Integration 38% . Software 6%