Inspection Procedure
00-SAIP-07 30 July, 2003
Positive Material Identification Requirements
Document Responsibility: Inspection Dept.
Saudi Aramco DeskTop Standards
Table of Contents
1 Scope............................................................ 2
2 Purpose......................................................... 2
3 References.................................................... 2
4 Definitions..................................................... 3
5 Responsibilities............................................. 3
6 Instrument for PMI Analysis.......................... 3
7 Personal Qualifications................................. 4
8 Positive Material Identification
General Requirements............................ 4
9 Alloy Items Subject to PMI............................ 5
10 Extent of Verification..................................... 5
11 Elements for Verification............................... 5
12 Acceptance Criteria....................................... 5
13 Re-Verification / Rejection Criteria................ 5
14 Marking and Color Coding............................ 6
15 Reporting and Documentation...................... 6
Attachment I – PMI Report Form......................... 7
Attachment II – PMI Log Sheet........................... 8
Attachment III – Color Code for Material
Identification........................................... 9
Attachment IV– PMI Procedure Flow Chart....... 10
Previous Issue: 30 June, 2003 Next Planned Update: 1 July, 2008
Revised paragraphs are indicated in the right margin Page 1 of 10
Document Responsibility: Inspection Department 00-SAIP-07
Issue Date: 30 July, 2003
Next Planned Update: 1 July, 2008 Positive Material Identification Requirements
1 Scope
1.1 This SAIP provides functional guidance for Plant Inspectors performing Positive
Material Identification (PMI) in all Saudi Aramco Facilities.
1.2 This SAIP also instructs the assigned Saudi Aramco Inspector, on color coding
of PMI verified materials, reporting and documentation.
1.3 This SAIP does not include PMI requirements for the following:
As per SAES-A-206 Paragraph 1.3.
2 Purpose
The purpose of this SAIP is to ensure that the nominal composition of the materials
specified has been correctly supplied and installed in the fabricated equipment or
piping. Also, it ensures that the correct welding by testing the welds has been
performed.
Commentary Note:
PMI is a testing method which is independent of any material certification, mill test reports
and marking or color coding of materials.
3 References
All references defined in SAES-A-206 section 3 plus the following:
3.1 Saudi Aramco References
Saudi Aramco Form
SA 2093-ENG Equipment Inspection Record-General
Saudi Aramco Inspection Procedure
00-SAIP-12 Equipment Deficiency Reports
3.2 Industry Codes and Standards
American Society of Mechanical Engineers
ASME SEC VIII Boiler and Pressure Vessel Code
Page 2 of 10
Document Responsibility: Inspection Department 00-SAIP-07
Issue Date: 30 July, 2003
Next Planned Update: 1 July, 2008 Positive Material Identification Requirements
American Society for Testing Materials
ASTM E353 Chemical Analysis of Stainless, Heat-Resisting,
Maraging, and other Similar Chromium-
Nickel-Iron Alloys
Pipe Fabrication Institute
PFI ES-42 Positive Material Identification of Piping
Components Using Portable X-Ray Emission
Type Test Equipment
4 Definitions
All definitions of SAES-A-206 apply with the following addition or changes:
Saudi Aramco Inspector: The person authorized by the Saudi Aramco responsible
inspection unit to verify implementation of the requirements of this SAIP and SAES-A-
206.
Construction Organization: The organization responsible for fabrication, installation
or repair of the alloy material in the field (e.g., maintenance organizations).
PMI Instrument Operator: Trained technician assigned by Plant Inspection Unit
supervisor to operate the PMI testing machine and record the PMI testing result.
5 Responsibilities
The Assigned Inspector shall verify that the proper color coding and PMI tests are
conducted and that the installed materials are of the specified metallurgy. In case a
discrepancy is found, the inspector shall initiate an Equipment Deficiency Report
(EDR) and ensure that the requirements of this SAIP and SAES-A-206 are satisfied.
6 Instrument for PMI Analysis
6.1 Instruments for performing the PMI analysis of weld and the base metals is as
stated by SAES-A-206.
6.2 Both method and frequency of calibration and standardization shall be based upon
equipment manufacturer's recommendations. Records shall be maintained for the
checks and the date of calibration noted in the PMI report (Attachment-I).
6.3 When the inspector doubts the reliability of the measurement, he may calibrate
the instrument on shorter periods (e.g., on weekly basis or before every use).
Page 3 of 10
Document Responsibility: Inspection Department 00-SAIP-07
Issue Date: 30 July, 2003
Next Planned Update: 1 July, 2008 Positive Material Identification Requirements
6.4 In addition to the manufacturer's standard calibration samples, certified samples
with the traceability of "known" material shall be made available for a random
(spot) check.
6.5 The date of the latest calibration of the instrument shall be stated in the PMI
report. (Attachment-I)
7 Personal Qualifications
The person(s) performing the PMI test should be knowledgeable about all aspects of
operation of PMI test equipment and the PMI test method used. Qualification of the
person performing the PMI test, including training and experience, should be
documented and submitted for review and approval by the responsible inspection unit.
Personnel shall be trained, tested, and certified to:
a) Safely use the PMI analyzers(s) (i.e., electrical arcing, X-Ray emission or
chemical testing methods).
b) Properly apply material specification such as ASTM and ASME.
c) Fully understand the PMI requirements, including the verification method to be
used, the period during fabrication when verification will be conducted, and the
method of marking and color coding verified material and segregation and
reporting non-compliant material.
8 Positive Material Identification General Requirements
8.1 When PMI testing is performed by the material supplier or third-party agency,
the Company should review and approve the adequacy of the material PMI
program and testing procedure of the fabricator or material supplier prior to
testing.
8.2 PMI shall be conducted before any post weld heat treatment, hydro test, painting
or insulation of any equipment or piping.
8.3 The area to be tested shall be solvent cleaned to remove any grease/oil/paint.
8.4 Surface (base metal and welds) to be examined shall be prepared by light
grinding to remove any rust/scale as per manufacturer's recommendations.
8.5 Weld surface of overlay or clad restoration shall be prepared by removing 2-3
mm of weld metal.
8.6 The PMI test report shall be reviewed prior to hydro test and made part of the
hydro test package supporting documents.
Page 4 of 10
Document Responsibility: Inspection Department 00-SAIP-07
Issue Date: 30 July, 2003
Next Planned Update: 1 July, 2008 Positive Material Identification Requirements
8.7 The responsible inspection unit shall audit the PMI test program to ensure its
effective functionality. The Operation Inspection Division of the Inspection
Department can be contacted for assistance.
9 Alloy Items Subject to PMI
The following components shall be subject to PMI testing in accordance with this
procedure.
- Plates (heads, shells, tube sheets, etc) and internals such as trays if required by the
purchase order
- Forgings
- Flanges
- Pipe and fittings such as tees, elbows, reducers, and special pipe components
- Valves (body and bonnet) internals as per SAES-A-206
- Thermowells
- Furnace tubes and fittings
- Casings for pumps, compressors, turbines
- Alloy welds joining pressure parts to pressure parts
- Heat exchanger tubes
- Metallic alloy gaskets
10 Extent of Verification
As per SAES-A-206.
11 Elements for Verification
As per SAES-A-206.
12 Acceptance Criteria
As per SAES-A-206.
13 Re-Verification / Rejection Criteria
As per SAES-A-206.
Page 5 of 10
Document Responsibility: Inspection Department 00-SAIP-07
Issue Date: 30 July, 2003
Next Planned Update: 1 July, 2008 Positive Material Identification Requirements
14 Marking and Color Coding
As per SAES-A-206 and Attachment III.
15 Reporting and Documentation
15.1 The PMI report form (Attachment-I) shall be completely filled out by the
assigned inspector/technician for each PMI analysis.
15.2 A log shall be maintained (see form in Attachment-II) to identify each
component that has been alloy verified and the results.
15.3 The Report should be part of the permanent Equipment Inspection Record.
Revision Summary
30 June, 2003 Delete the duplicated paragraphs with SAES-A-206.
Delete the N/A paragraphs.
Re-assigning the responsibility of the PMI equipment operator.
Revised the "Next Planned Update."
30 July, 2003 Deleted paragraph 8.6 and renumbered rest of paragraphs.
Page 6 of 10
Document Responsibility: Inspection Department 00-SAIP-07
Issue Date: 30 July, 2003
Next Planned Update: 1 July, 2008 Positive Material Identification Requirements
Attachment I – PMI Report Form
Request No.
POSITIVE MATERIAL
IDENTIFICATION REPORT
Date: / /
Location of Test:
Plant/P.O.: Report No.:
Sheet ______of________
Equipment/Line No.: Drawing No: (e.g., Equipment or ISO)
Item Type:( weld, valve, pipe, etc.) Item Description: (Manufacturer & Heat #)
Type of Instrument Used:
Model:
Serial No.:
Date of Calibration:
Analysis Result:
Elements for verification Result of Analysis
Equipment
/Line No.
P.O.&
Line item
Sub-
Item
C Cr Ni Mo Nb Accept Reject
Pending
chemical
analysis
Color code
(Refer to 00-
SAIP-07)
Attachment III
and PFI ES-22)
This is to certify that the above materials verification is done in accordance with the requirement of
SAES-A-206 and the above alloying element percentages were evaluated in accordance with the
criteria stated in the above-mentioned standard and this SAIP procedure. The items above were also
color coded/marked in accordance with above two documents.
PMI Operator /Plant
Inspector
Date Signature Verified by Inspector
(Name &ID#)
Date
Page 7 of 10
Document Responsibility: Inspection Department 00-SAIP-07
Issue Date: 30 July, 2003
Next Planned Update: 1 July, 2008 Positive Material Identification Requirements
Attachment II – PMI Log Sheet
LOG
NO. Plant/P.O. #
Equipment/
Line# Item Description PMI Report No.& Date Remarks
Page 8 of 10
Document Responsibility: Inspection Department 00-SAIP-07
Issue Date: 30 July, 2003
Next Planned Update: 1 July, 2008 Positive Material Identification Requirements
Attachment III – Color Code for Material Identification
Material
Common
Designation
UNS
Designation Color of Stripe(s)
Low Alloy Materials
7 Cr-1/2 Mo Steel A335 GR. P7 S50300 2 solid green
Nickel Based Alloys
Copper based Alloys
90-10 Cu-Ni B111 C70600 1 solid green
70-30 Cu-Ni B111 C71500 1 solid red
Note: Any product manufactured by welding shall have an additional white stripe. Any
additional alloy material not included in this table or PFI ES-22 shall be referred to the
Operations Inspection Division of the Inspection Department for obtaining a Color
Code.
Page 9 of 10
Document Responsibility: Inspection Department 00-SAIP-07
Issue Date: 30 July, 2003
Next Planned Update: 1 July, 2008 Positive Material Identification Requirements
Page 10 of 10

More Related Content

What's hot

03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf
RajkumarArikumar
 
Piping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfPiping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdf
MDAbdullah621330
 
Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)
ghani386
 

What's hot (20)

QC Welding Inspector Interview Question & Answers.pdf
QC Welding Inspector Interview Question & Answers.pdfQC Welding Inspector Interview Question & Answers.pdf
QC Welding Inspector Interview Question & Answers.pdf
 
03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf03-hira-for-welding-work-_compress.pdf
03-hira-for-welding-work-_compress.pdf
 
Piping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfPiping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdf
 
Full report (Petronas Prai)
Full report (Petronas Prai)Full report (Petronas Prai)
Full report (Petronas Prai)
 
ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdf
 
Flange management presentation
Flange management presentationFlange management presentation
Flange management presentation
 
presentation
presentationpresentation
presentation
 
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxPresentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptx
 
Qc piping guide
Qc piping guideQc piping guide
Qc piping guide
 
AIR COMPRESSOR CHECKLIST Form # HSEQ - ACL Rev 2.docx
AIR COMPRESSOR CHECKLIST Form # HSEQ - ACL Rev 2.docxAIR COMPRESSOR CHECKLIST Form # HSEQ - ACL Rev 2.docx
AIR COMPRESSOR CHECKLIST Form # HSEQ - ACL Rev 2.docx
 
Piping interview
Piping interviewPiping interview
Piping interview
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0
 
Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)
 
asme sec ix w
 asme sec ix w asme sec ix w
asme sec ix w
 
Saes a-206-pmi
Saes a-206-pmiSaes a-206-pmi
Saes a-206-pmi
 
Saudi Aramco Inspection Checklist (SAIC)
Saudi Aramco Inspection Checklist (SAIC)Saudi Aramco Inspection Checklist (SAIC)
Saudi Aramco Inspection Checklist (SAIC)
 
Ndt report sample and answer cswip 3.2
Ndt report sample and answer cswip 3.2Ndt report sample and answer cswip 3.2
Ndt report sample and answer cswip 3.2
 
Radiographic interpretation
Radiographic interpretation Radiographic interpretation
Radiographic interpretation
 
HSE-BMS-013 Color Coding and Inspection.ppt
HSE-BMS-013 Color Coding and Inspection.pptHSE-BMS-013 Color Coding and Inspection.ppt
HSE-BMS-013 Color Coding and Inspection.ppt
 

Similar to 00 saip-07

R rep-m.2133-2008-pdf-e
R rep-m.2133-2008-pdf-eR rep-m.2133-2008-pdf-e
R rep-m.2133-2008-pdf-e
Pfedya
 
8.3 Control of Nonconforming Material
8.3 Control of Nonconforming Material8.3 Control of Nonconforming Material
8.3 Control of Nonconforming Material
Brian McAuliffe
 
IATF-Rules-5th-Edition_Sanctioned-Interpretations-Dec-2020.pdf
IATF-Rules-5th-Edition_Sanctioned-Interpretations-Dec-2020.pdfIATF-Rules-5th-Edition_Sanctioned-Interpretations-Dec-2020.pdf
IATF-Rules-5th-Edition_Sanctioned-Interpretations-Dec-2020.pdf
martinusteddy
 
Pg og sms 018 procedimento de integridade mecânica eng
Pg og sms 018   procedimento de integridade mecânica engPg og sms 018   procedimento de integridade mecânica eng
Pg og sms 018 procedimento de integridade mecânica eng
Fernanda Lopes
 
1. ENGINE MANAGEMENT SYSTEM.pdf
1. ENGINE MANAGEMENT SYSTEM.pdf1. ENGINE MANAGEMENT SYSTEM.pdf
1. ENGINE MANAGEMENT SYSTEM.pdf
afiqahnasir8
 
209422504 process-audit-check-list
209422504 process-audit-check-list209422504 process-audit-check-list
209422504 process-audit-check-list
Usama Waly
 

Similar to 00 saip-07 (20)

SAEP-1151_inspection requirement.PDF
SAEP-1151_inspection requirement.PDFSAEP-1151_inspection requirement.PDF
SAEP-1151_inspection requirement.PDF
 
Nes 362
Nes 362Nes 362
Nes 362
 
RDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni Ranjan
 
Rdso vendor registration guideline
Rdso vendor registration guidelineRdso vendor registration guideline
Rdso vendor registration guideline
 
Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013
 
UM docs2016
UM docs2016UM docs2016
UM docs2016
 
R rep-m.2133-2008-pdf-e
R rep-m.2133-2008-pdf-eR rep-m.2133-2008-pdf-e
R rep-m.2133-2008-pdf-e
 
Awereness ISO3834 Rev 0.pptx
Awereness ISO3834 Rev 0.pptxAwereness ISO3834 Rev 0.pptx
Awereness ISO3834 Rev 0.pptx
 
Satip nde-ut-01
Satip nde-ut-01Satip nde-ut-01
Satip nde-ut-01
 
2. ELECTRIC POWER STEERING.doc.docx
2. ELECTRIC POWER STEERING.doc.docx2. ELECTRIC POWER STEERING.doc.docx
2. ELECTRIC POWER STEERING.doc.docx
 
8.3 Control of Nonconforming Material
8.3 Control of Nonconforming Material8.3 Control of Nonconforming Material
8.3 Control of Nonconforming Material
 
IATF-Rules-5th-Edition_Sanctioned-Interpretations-Dec-2020.pdf
IATF-Rules-5th-Edition_Sanctioned-Interpretations-Dec-2020.pdfIATF-Rules-5th-Edition_Sanctioned-Interpretations-Dec-2020.pdf
IATF-Rules-5th-Edition_Sanctioned-Interpretations-Dec-2020.pdf
 
Pg og sms 018 procedimento de integridade mecânica eng
Pg og sms 018   procedimento de integridade mecânica engPg og sms 018   procedimento de integridade mecânica eng
Pg og sms 018 procedimento de integridade mecânica eng
 
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
 
1. ENGINE MANAGEMENT SYSTEM.pdf
1. ENGINE MANAGEMENT SYSTEM.pdf1. ENGINE MANAGEMENT SYSTEM.pdf
1. ENGINE MANAGEMENT SYSTEM.pdf
 
Aplac tc 006
Aplac tc 006Aplac tc 006
Aplac tc 006
 
Q46N-Dissolved-Ammonia-Measurement-System-Old-Version.pdf
Q46N-Dissolved-Ammonia-Measurement-System-Old-Version.pdfQ46N-Dissolved-Ammonia-Measurement-System-Old-Version.pdf
Q46N-Dissolved-Ammonia-Measurement-System-Old-Version.pdf
 
209422504 process-audit-check-list
209422504 process-audit-check-list209422504 process-audit-check-list
209422504 process-audit-check-list
 
Saes s-060
Saes s-060Saes s-060
Saes s-060
 
jabil-production-part-approval-process.pdf
jabil-production-part-approval-process.pdfjabil-production-part-approval-process.pdf
jabil-production-part-approval-process.pdf
 

Recently uploaded

Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7
Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7
Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
ZurliaSoop
 
K Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CVK Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CV
K VENKAT NAVEEN KUMAR
 
Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...
gajnagarg
 
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
nirzagarg
 
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
gynedubai
 
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
yynod
 
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
nirzagarg
 

Recently uploaded (20)

Mysore Escorts Service Girl ^ 9332606886, WhatsApp Anytime Mysore
Mysore Escorts Service Girl ^ 9332606886, WhatsApp Anytime MysoreMysore Escorts Service Girl ^ 9332606886, WhatsApp Anytime Mysore
Mysore Escorts Service Girl ^ 9332606886, WhatsApp Anytime Mysore
 
Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
 
Low Cost Coimbatore Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi Call ...
Low Cost Coimbatore Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi Call ...Low Cost Coimbatore Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi Call ...
Low Cost Coimbatore Call Girls Service 👉📞 6378878445 👉📞 Just📲 Call Ruhi Call ...
 
Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7
Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7
Girls in Aiims Metro (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Joshua Minker Brand Exploration Sports Broadcaster .pptx
Joshua Minker Brand Exploration Sports Broadcaster .pptxJoshua Minker Brand Exploration Sports Broadcaster .pptx
Joshua Minker Brand Exploration Sports Broadcaster .pptx
 
UIowa Application Instructions - 2024 Update
UIowa Application Instructions - 2024 UpdateUIowa Application Instructions - 2024 Update
UIowa Application Instructions - 2024 Update
 
Dating Call Girls inTiruvallur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Dating Call Girls inTiruvallur { 9332606886 } VVIP NISHA Call Girls Near 5 St...Dating Call Girls inTiruvallur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Dating Call Girls inTiruvallur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
 
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
 
Miletti Gabriela_Vision Plan for artist Jahzel.pdf
Miletti Gabriela_Vision Plan for artist Jahzel.pdfMiletti Gabriela_Vision Plan for artist Jahzel.pdf
Miletti Gabriela_Vision Plan for artist Jahzel.pdf
 
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
 
K Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CVK Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CV
 
Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Agartala [ 7014168258 ] Call Me For Genuine Models ...
 
Guide to a Winning Interview May 2024 for MCWN
Guide to a Winning Interview May 2024 for MCWNGuide to a Winning Interview May 2024 for MCWN
Guide to a Winning Interview May 2024 for MCWN
 
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
 
drug book file on obs. and gynae clinical pstings
drug book file on obs. and gynae clinical pstingsdrug book file on obs. and gynae clinical pstings
drug book file on obs. and gynae clinical pstings
 
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
 
Complete Curriculum Vita for Paul Warshauer
Complete Curriculum Vita for Paul WarshauerComplete Curriculum Vita for Paul Warshauer
Complete Curriculum Vita for Paul Warshauer
 
7737669865 Call Girls In Ahmedabad Escort Service Available 24×7 In In Ahmedabad
7737669865 Call Girls In Ahmedabad Escort Service Available 24×7 In In Ahmedabad7737669865 Call Girls In Ahmedabad Escort Service Available 24×7 In In Ahmedabad
7737669865 Call Girls In Ahmedabad Escort Service Available 24×7 In In Ahmedabad
 
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
 
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
 

00 saip-07

  • 1. Inspection Procedure 00-SAIP-07 30 July, 2003 Positive Material Identification Requirements Document Responsibility: Inspection Dept. Saudi Aramco DeskTop Standards Table of Contents 1 Scope............................................................ 2 2 Purpose......................................................... 2 3 References.................................................... 2 4 Definitions..................................................... 3 5 Responsibilities............................................. 3 6 Instrument for PMI Analysis.......................... 3 7 Personal Qualifications................................. 4 8 Positive Material Identification General Requirements............................ 4 9 Alloy Items Subject to PMI............................ 5 10 Extent of Verification..................................... 5 11 Elements for Verification............................... 5 12 Acceptance Criteria....................................... 5 13 Re-Verification / Rejection Criteria................ 5 14 Marking and Color Coding............................ 6 15 Reporting and Documentation...................... 6 Attachment I – PMI Report Form......................... 7 Attachment II – PMI Log Sheet........................... 8 Attachment III – Color Code for Material Identification........................................... 9 Attachment IV– PMI Procedure Flow Chart....... 10 Previous Issue: 30 June, 2003 Next Planned Update: 1 July, 2008 Revised paragraphs are indicated in the right margin Page 1 of 10
  • 2. Document Responsibility: Inspection Department 00-SAIP-07 Issue Date: 30 July, 2003 Next Planned Update: 1 July, 2008 Positive Material Identification Requirements 1 Scope 1.1 This SAIP provides functional guidance for Plant Inspectors performing Positive Material Identification (PMI) in all Saudi Aramco Facilities. 1.2 This SAIP also instructs the assigned Saudi Aramco Inspector, on color coding of PMI verified materials, reporting and documentation. 1.3 This SAIP does not include PMI requirements for the following: As per SAES-A-206 Paragraph 1.3. 2 Purpose The purpose of this SAIP is to ensure that the nominal composition of the materials specified has been correctly supplied and installed in the fabricated equipment or piping. Also, it ensures that the correct welding by testing the welds has been performed. Commentary Note: PMI is a testing method which is independent of any material certification, mill test reports and marking or color coding of materials. 3 References All references defined in SAES-A-206 section 3 plus the following: 3.1 Saudi Aramco References Saudi Aramco Form SA 2093-ENG Equipment Inspection Record-General Saudi Aramco Inspection Procedure 00-SAIP-12 Equipment Deficiency Reports 3.2 Industry Codes and Standards American Society of Mechanical Engineers ASME SEC VIII Boiler and Pressure Vessel Code Page 2 of 10
  • 3. Document Responsibility: Inspection Department 00-SAIP-07 Issue Date: 30 July, 2003 Next Planned Update: 1 July, 2008 Positive Material Identification Requirements American Society for Testing Materials ASTM E353 Chemical Analysis of Stainless, Heat-Resisting, Maraging, and other Similar Chromium- Nickel-Iron Alloys Pipe Fabrication Institute PFI ES-42 Positive Material Identification of Piping Components Using Portable X-Ray Emission Type Test Equipment 4 Definitions All definitions of SAES-A-206 apply with the following addition or changes: Saudi Aramco Inspector: The person authorized by the Saudi Aramco responsible inspection unit to verify implementation of the requirements of this SAIP and SAES-A- 206. Construction Organization: The organization responsible for fabrication, installation or repair of the alloy material in the field (e.g., maintenance organizations). PMI Instrument Operator: Trained technician assigned by Plant Inspection Unit supervisor to operate the PMI testing machine and record the PMI testing result. 5 Responsibilities The Assigned Inspector shall verify that the proper color coding and PMI tests are conducted and that the installed materials are of the specified metallurgy. In case a discrepancy is found, the inspector shall initiate an Equipment Deficiency Report (EDR) and ensure that the requirements of this SAIP and SAES-A-206 are satisfied. 6 Instrument for PMI Analysis 6.1 Instruments for performing the PMI analysis of weld and the base metals is as stated by SAES-A-206. 6.2 Both method and frequency of calibration and standardization shall be based upon equipment manufacturer's recommendations. Records shall be maintained for the checks and the date of calibration noted in the PMI report (Attachment-I). 6.3 When the inspector doubts the reliability of the measurement, he may calibrate the instrument on shorter periods (e.g., on weekly basis or before every use). Page 3 of 10
  • 4. Document Responsibility: Inspection Department 00-SAIP-07 Issue Date: 30 July, 2003 Next Planned Update: 1 July, 2008 Positive Material Identification Requirements 6.4 In addition to the manufacturer's standard calibration samples, certified samples with the traceability of "known" material shall be made available for a random (spot) check. 6.5 The date of the latest calibration of the instrument shall be stated in the PMI report. (Attachment-I) 7 Personal Qualifications The person(s) performing the PMI test should be knowledgeable about all aspects of operation of PMI test equipment and the PMI test method used. Qualification of the person performing the PMI test, including training and experience, should be documented and submitted for review and approval by the responsible inspection unit. Personnel shall be trained, tested, and certified to: a) Safely use the PMI analyzers(s) (i.e., electrical arcing, X-Ray emission or chemical testing methods). b) Properly apply material specification such as ASTM and ASME. c) Fully understand the PMI requirements, including the verification method to be used, the period during fabrication when verification will be conducted, and the method of marking and color coding verified material and segregation and reporting non-compliant material. 8 Positive Material Identification General Requirements 8.1 When PMI testing is performed by the material supplier or third-party agency, the Company should review and approve the adequacy of the material PMI program and testing procedure of the fabricator or material supplier prior to testing. 8.2 PMI shall be conducted before any post weld heat treatment, hydro test, painting or insulation of any equipment or piping. 8.3 The area to be tested shall be solvent cleaned to remove any grease/oil/paint. 8.4 Surface (base metal and welds) to be examined shall be prepared by light grinding to remove any rust/scale as per manufacturer's recommendations. 8.5 Weld surface of overlay or clad restoration shall be prepared by removing 2-3 mm of weld metal. 8.6 The PMI test report shall be reviewed prior to hydro test and made part of the hydro test package supporting documents. Page 4 of 10
  • 5. Document Responsibility: Inspection Department 00-SAIP-07 Issue Date: 30 July, 2003 Next Planned Update: 1 July, 2008 Positive Material Identification Requirements 8.7 The responsible inspection unit shall audit the PMI test program to ensure its effective functionality. The Operation Inspection Division of the Inspection Department can be contacted for assistance. 9 Alloy Items Subject to PMI The following components shall be subject to PMI testing in accordance with this procedure. - Plates (heads, shells, tube sheets, etc) and internals such as trays if required by the purchase order - Forgings - Flanges - Pipe and fittings such as tees, elbows, reducers, and special pipe components - Valves (body and bonnet) internals as per SAES-A-206 - Thermowells - Furnace tubes and fittings - Casings for pumps, compressors, turbines - Alloy welds joining pressure parts to pressure parts - Heat exchanger tubes - Metallic alloy gaskets 10 Extent of Verification As per SAES-A-206. 11 Elements for Verification As per SAES-A-206. 12 Acceptance Criteria As per SAES-A-206. 13 Re-Verification / Rejection Criteria As per SAES-A-206. Page 5 of 10
  • 6. Document Responsibility: Inspection Department 00-SAIP-07 Issue Date: 30 July, 2003 Next Planned Update: 1 July, 2008 Positive Material Identification Requirements 14 Marking and Color Coding As per SAES-A-206 and Attachment III. 15 Reporting and Documentation 15.1 The PMI report form (Attachment-I) shall be completely filled out by the assigned inspector/technician for each PMI analysis. 15.2 A log shall be maintained (see form in Attachment-II) to identify each component that has been alloy verified and the results. 15.3 The Report should be part of the permanent Equipment Inspection Record. Revision Summary 30 June, 2003 Delete the duplicated paragraphs with SAES-A-206. Delete the N/A paragraphs. Re-assigning the responsibility of the PMI equipment operator. Revised the "Next Planned Update." 30 July, 2003 Deleted paragraph 8.6 and renumbered rest of paragraphs. Page 6 of 10
  • 7. Document Responsibility: Inspection Department 00-SAIP-07 Issue Date: 30 July, 2003 Next Planned Update: 1 July, 2008 Positive Material Identification Requirements Attachment I – PMI Report Form Request No. POSITIVE MATERIAL IDENTIFICATION REPORT Date: / / Location of Test: Plant/P.O.: Report No.: Sheet ______of________ Equipment/Line No.: Drawing No: (e.g., Equipment or ISO) Item Type:( weld, valve, pipe, etc.) Item Description: (Manufacturer & Heat #) Type of Instrument Used: Model: Serial No.: Date of Calibration: Analysis Result: Elements for verification Result of Analysis Equipment /Line No. P.O.& Line item Sub- Item C Cr Ni Mo Nb Accept Reject Pending chemical analysis Color code (Refer to 00- SAIP-07) Attachment III and PFI ES-22) This is to certify that the above materials verification is done in accordance with the requirement of SAES-A-206 and the above alloying element percentages were evaluated in accordance with the criteria stated in the above-mentioned standard and this SAIP procedure. The items above were also color coded/marked in accordance with above two documents. PMI Operator /Plant Inspector Date Signature Verified by Inspector (Name &ID#) Date Page 7 of 10
  • 8. Document Responsibility: Inspection Department 00-SAIP-07 Issue Date: 30 July, 2003 Next Planned Update: 1 July, 2008 Positive Material Identification Requirements Attachment II – PMI Log Sheet LOG NO. Plant/P.O. # Equipment/ Line# Item Description PMI Report No.& Date Remarks Page 8 of 10
  • 9. Document Responsibility: Inspection Department 00-SAIP-07 Issue Date: 30 July, 2003 Next Planned Update: 1 July, 2008 Positive Material Identification Requirements Attachment III – Color Code for Material Identification Material Common Designation UNS Designation Color of Stripe(s) Low Alloy Materials 7 Cr-1/2 Mo Steel A335 GR. P7 S50300 2 solid green Nickel Based Alloys Copper based Alloys 90-10 Cu-Ni B111 C70600 1 solid green 70-30 Cu-Ni B111 C71500 1 solid red Note: Any product manufactured by welding shall have an additional white stripe. Any additional alloy material not included in this table or PFI ES-22 shall be referred to the Operations Inspection Division of the Inspection Department for obtaining a Color Code. Page 9 of 10
  • 10. Document Responsibility: Inspection Department 00-SAIP-07 Issue Date: 30 July, 2003 Next Planned Update: 1 July, 2008 Positive Material Identification Requirements Page 10 of 10