Indoor Air Quality
Risk Management
Plan (IAQMP)
HOW TO MANAGE THE HEALTH RISKS OF BUILDING
OCCUPANTS ASSOCIATED WITH POOR AIR QUALITY.
Opira Pty Ltd – IHEA Annual Meeting 2019
IAQ Risk Management Planning
Background
HVAC Systems Hygiene Audits. AC14 Task Description
Repeated identified hygiene issues led to creating HVAC Hygiene Management Plans
These plans included;
• Meeting and harmonising the inspection requirements of standards like AS/NZS 3666.2
and Queensland Health Task Descriptions AC01, AC02, AC03, AC04, AC07, AC12, AC13,
AC14, AC15, AC20, AC22.
• Clearly defined and standardised hygiene rating and hygiene critical limits based on the
industry guideline – AIRAH Best Practice: HVAC Hygiene,
• Training of maintenance staff or contractors and assessment of competency.
For air quality management there are other factors to consider…
02
Opira Pty Ltd – IHEA Annual Meeting 2019
IAQ Risk Management Planning
What is the Purpose of an IAQMP?
• Minimise the health risk of staff, visitors and patients to exposure of
foreseeable air-related hazards,
• Identifying indoor air quality infection control risks before they
become problematic,
• Prescribe appropriate responses to any identified air quality hazards,
• Comply with relevant standards, legislation and guidelines including
workplace health and safety regulations,
• Assists in preparing budgets and planning for major maintenance
projects for plant involved with air quality control
03
Opira Pty Ltd – IHEA Annual Meeting 2019
IAQ Risk Management Planning
Key components of an indoor
quality risk management plan
1. Policy statement
2. Scope
3. Objectives
4. Roles and responsibilities
5. Hazards and hazard sources
6. Risk assessment associated with the hazards
7. Air monitoring
8. Action plan
04
Opira Pty Ltd – IHEA Annual Meeting 2019
IAQ Risk Management Planning
Relevant Standards, Guidelines, Policies?
Including:
• Queensland: Work Health and Safety Act
• Queensland Health Task Descriptions AC01, AC02, AC03, AC04, AC07, AC12, AC13, AC14, AC15,
AC20, AC22.
• Queensland Health Centre for Healthcare Related Infection Surveillance and Prevention
(CHRISP) program
• AS 1668.2 The use of ventilation and air conditioning in buildings Mechanical ventilation in
buildings
• AS/NZS 3666.2,3 & 4 Air-handling and water systems of buildings – Microbial Control …. Air
handlers & Cooling water systems maintenance
• Queensland Health Asbestos Management Guideline
• EH52: 2011 Australian Drinking Water Guidelines
• AS/NZS 3896:2008, Waters - Examination for Legionella spp. including Legionella pneumophila
05
Opira Pty Ltd – IHEA Annual Meeting 2019
IAQ Risk Management Planning
Who is currently responsible?
• Building Engineering Maintenance Services
• Preventative and Corrective Maintenance Staff and Contractors
• Health and Safety
• Infection Control
• Facility Management
• Health District (multi site) Organisations
06
Opira Pty Ltd – IHEA Annual Meeting 2019
IAQ Risk Management Planning
How do we minimise health risks of
occupants to air quality hazards?
1. IDENTIFICATION
(OUTDOORS)
The management of
air quality hazards
starts outside the
building.
07
Opira Pty Ltd – IHEA Annual Meeting 2019
IAQ Risk Management Planning
How do we minimise health risks of
occupants to air quality hazards?
After the air has entered the building one the biggest contributors to the air quality will be the
air conditioning and exhaust systems (HVAC), including filtration. These systems can effect air
quality both through performance and hygiene.
Other indoor factors include;
• Occupant activity
• Occupancy levels
• Occupant health (i.e.. Communicable illnesses)
• Cleanliness of the spaces
• Maintenance practices (e.g. cleaning, painting, repairs or refurbishment works)
• Space and adjoining space uses (e.g. isolation rooms, waste or cleaning chemicals
storage)
• Materials and furnishings present (i.e.. VOC producing)
08
1. IDENTIFICATION (OUTDOORS)
Opira Pty Ltd – IHEA Annual Meeting 2019
IAQ Risk Management Planning
How do we minimise health risks of
occupants to air quality hazards?
09
2. ESTABLISH
PREVENTATIVE
CONTROLS
Opira Pty Ltd – IHEA Annual Meeting 2019
IAQ Risk Management Planning
Preventative Maintenance Records
• Standardiising maintenance report findings.
• Accurately identifying air quality hazards and nominating them to be
actioned.
• Assists in preparing budgets and planning for major projects
10
Opira Pty Ltd – IHEA Annual Meeting 2019
IAQ Risk Management Planning
AIRAH Best
Practice Guidelines
Defines hygiene levels and the minimal acceptable
system hygiene standards for general use and
special use HVAC systems.
11
CLEAN LIGHT HEAVY
High Levels of visible dust, debris, fibres or any
other contamination that cover the component.
Component surface is barely if not at all visible
beneath the contamination.
MODERATE
Visible levels of general dust with varying
density and limited areas of accumulated fine
debris. Component surface is still visible in
some areas beneath the fine dust but isolated
sections may not be.
Only slight visible layer of fine general dust
consistent over the component surface with no
variations in density. Component surface remains
visible beneath the fine layer of dust.
No visible dust, debris or other contamination
Opira Pty Ltd – IHEA Annual Meeting 2019
HVAC TRAINING - MONTHLY
Mould awareness
Standards and guidelines
How to take a photo of category 3 contamination and above,
How to conduct the inspections and where we normally find contamination,
Action levels and the overall content of this Indoor Air Quality Management plan,
How to use the service sheet,
Evaporative coolers
HVAC Audit Program
AIRAH Best Practice Guidelines
Classifying systems
TECHNICAL
TRAINING
All mechanical technicians shall
complete the HVAC hygiene training
where they will be taught to
recognize various hygiene levels and
correctly rate the AHU and its
internal components on a monthly
basis.
12
Opira Pty Ltd – IHEA Annual Meeting 2019
IAQ Risk Management Planning
Preventative Maintenance Records
• Standardising maintenance report findings.
• Accurately identifying air quality hazards and nominating them to be
actioned.
• Maintaining historical records that could identify a systemic cause for
reoccurring hygiene issues.
• Assists in preparing budgets and planning for major projects.
• Demonstrates responsible hazard risk management.
13
Opira Pty Ltd – IHEA Annual Meeting 2019
QUALITY ASSURANCE CHECKS
To be conducted by Indoor Air Quality Scientist.
The purpose of the Quality Assurance inspections is to make sure that the ratings of the
AHUs and internal components which are conducted on a monthly basis are actually correct
10% randomly selected per building and technician on a quarterly basis.
10% of non-critical annual audits per building and technician once annually.
The technician to accompany the scientist during the quality audit.
HVAC Audit Program
AIRAH Best Practice Guidelines
Classifying systems
QUALITY
ASSURANCE
The outcome of the QA audit
summary report will be:
• Instigate further technician training
if required
• Be stored for annual performance
review HVAC technicians
15
Opira Pty Ltd – IHEA Annual Meeting 2019
IAQ Risk Management Planning
Other Preventative Maintenance Reporting
• Operating Theatres, Sterile Stores, CSD (HEPA Filters, air change rates, pressure
differentials, particle counts)
• Isolation rooms (HEPA Filters, pressure differentials)
• Cooling Towers
• Water quality monitoring
• Occupied space general indoor air quality audits (temperature, humidity, airborne
microbials, total volatile organic compounds, carbon dioxide, carbon monoxide,
airborne particulates.
• Occupied space specific air quality exposure monitoring (e.g. formaldehyde,
anesthetics gases, airborne silica dust)
17
Opira Pty Ltd – IHEA Annual Meeting 2019
IAQ Risk Management Planning
How do we minimise health risks of
occupants to air quality hazards?
18
3. QUANTIFYING
THE RISK
Opira Pty Ltd – IHEA Annual Meeting 2019
IAQ Risk Management Planning
Reactive Works
Procedures
• further investigation
• corrective actions
Responsibilities
• Internal
• External - contractors
19
Opira Pty Ltd – IHEA Annual Meeting 2019
IAQ Risk Management Planning
Review
• Scheduled annual review of outcomes.
• Summary of non-preventable and preventable events and analysis of
reactive works.
• Survey from all stakeholders for their experience with the Indoor Air Quality
Management Plan?
• Continued….
20
INDOOR ENVIRONMENT RISK MANAGEMENT
Thank You.

More Related Content

What's hot

OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019Triumvirate Environmental
 
Roy Smuts C.V.
Roy Smuts C.V.Roy Smuts C.V.
Roy Smuts C.V.Roy Smuts
 
Support, Operation, Performance Evaluation and Improvement Elements
Support,  Operation, Performance  Evaluation and Improvement  ElementsSupport,  Operation, Performance  Evaluation and Improvement  Elements
Support, Operation, Performance Evaluation and Improvement ElementsTeam Web Africa
 
Tony Gleeson, AIRAH (Australian Institute of Refrigeration, Air conditioning ...
Tony Gleeson, AIRAH (Australian Institute of Refrigeration, Air conditioning ...Tony Gleeson, AIRAH (Australian Institute of Refrigeration, Air conditioning ...
Tony Gleeson, AIRAH (Australian Institute of Refrigeration, Air conditioning ...ATMOsphere Conferences & Events
 
Guide to implement AS9100 Rev C
Guide to implement AS9100 Rev CGuide to implement AS9100 Rev C
Guide to implement AS9100 Rev CAshish Michael
 
Performing an Audit (gathering objective evidence) & Audit Checklist
Performing an Audit  (gathering objective  evidence) & Audit ChecklistPerforming an Audit  (gathering objective  evidence) & Audit Checklist
Performing an Audit (gathering objective evidence) & Audit ChecklistTeam Web Africa
 
Refrigeration Brochure
Refrigeration BrochureRefrigeration Brochure
Refrigeration Brochurea1-cbiss
 
CEA Technical Boilerhouse Risk Assessment Conference - Cedar Court Hotel, Wak...
CEA Technical Boilerhouse Risk Assessment Conference - Cedar Court Hotel, Wak...CEA Technical Boilerhouse Risk Assessment Conference - Cedar Court Hotel, Wak...
CEA Technical Boilerhouse Risk Assessment Conference - Cedar Court Hotel, Wak...Leigh Ridlington
 
2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...
2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...
2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...Triumvirate Environmental
 
Cost Comparison of e-Stewards and R2 Certification
Cost Comparison of e-Stewards and R2 CertificationCost Comparison of e-Stewards and R2 Certification
Cost Comparison of e-Stewards and R2 Certificatione-stewards_action
 
AMCA Laboratory Network
AMCA Laboratory NetworkAMCA Laboratory Network
AMCA Laboratory NetworkAndy Fry
 
Pg og sms 018 procedimento de integridade mecânica eng
Pg og sms 018   procedimento de integridade mecânica engPg og sms 018   procedimento de integridade mecânica eng
Pg og sms 018 procedimento de integridade mecânica engFernanda Lopes
 
ISO 14001:2015 Significant Aspects sheet
ISO 14001:2015 Significant Aspects sheet ISO 14001:2015 Significant Aspects sheet
ISO 14001:2015 Significant Aspects sheet Tim Matthews
 
Customer Guidance- Safety & Compliance for Material Handling Equipment
Customer Guidance- Safety & Compliance for Material Handling EquipmentCustomer Guidance- Safety & Compliance for Material Handling Equipment
Customer Guidance- Safety & Compliance for Material Handling EquipmentAna Cristina Coronel
 
Facilities Maintenance Technician
Facilities Maintenance TechnicianFacilities Maintenance Technician
Facilities Maintenance TechnicianJohn Donovan
 
EPA Section 608 Regulation Changes 2018-2019
EPA Section 608 Regulation Changes 2018-2019EPA Section 608 Regulation Changes 2018-2019
EPA Section 608 Regulation Changes 2018-2019Accruent
 
Steam Boiler BG01 Compliance with Flomar
Steam Boiler BG01 Compliance with FlomarSteam Boiler BG01 Compliance with Flomar
Steam Boiler BG01 Compliance with FlomarLeigh Ridlington
 

What's hot (18)

OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019
 
Roy Smuts C.V.
Roy Smuts C.V.Roy Smuts C.V.
Roy Smuts C.V.
 
Support, Operation, Performance Evaluation and Improvement Elements
Support,  Operation, Performance  Evaluation and Improvement  ElementsSupport,  Operation, Performance  Evaluation and Improvement  Elements
Support, Operation, Performance Evaluation and Improvement Elements
 
Tony Gleeson, AIRAH (Australian Institute of Refrigeration, Air conditioning ...
Tony Gleeson, AIRAH (Australian Institute of Refrigeration, Air conditioning ...Tony Gleeson, AIRAH (Australian Institute of Refrigeration, Air conditioning ...
Tony Gleeson, AIRAH (Australian Institute of Refrigeration, Air conditioning ...
 
Guide to implement AS9100 Rev C
Guide to implement AS9100 Rev CGuide to implement AS9100 Rev C
Guide to implement AS9100 Rev C
 
Performing an Audit (gathering objective evidence) & Audit Checklist
Performing an Audit  (gathering objective  evidence) & Audit ChecklistPerforming an Audit  (gathering objective  evidence) & Audit Checklist
Performing an Audit (gathering objective evidence) & Audit Checklist
 
Refrigeration Brochure
Refrigeration BrochureRefrigeration Brochure
Refrigeration Brochure
 
CEA Technical Boilerhouse Risk Assessment Conference - Cedar Court Hotel, Wak...
CEA Technical Boilerhouse Risk Assessment Conference - Cedar Court Hotel, Wak...CEA Technical Boilerhouse Risk Assessment Conference - Cedar Court Hotel, Wak...
CEA Technical Boilerhouse Risk Assessment Conference - Cedar Court Hotel, Wak...
 
2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...
2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...
2019 Healthcare Accreditation Regulatory Updates: How Do the New Regulations ...
 
Aplac tc 006
Aplac tc 006Aplac tc 006
Aplac tc 006
 
Cost Comparison of e-Stewards and R2 Certification
Cost Comparison of e-Stewards and R2 CertificationCost Comparison of e-Stewards and R2 Certification
Cost Comparison of e-Stewards and R2 Certification
 
AMCA Laboratory Network
AMCA Laboratory NetworkAMCA Laboratory Network
AMCA Laboratory Network
 
Pg og sms 018 procedimento de integridade mecânica eng
Pg og sms 018   procedimento de integridade mecânica engPg og sms 018   procedimento de integridade mecânica eng
Pg og sms 018 procedimento de integridade mecânica eng
 
ISO 14001:2015 Significant Aspects sheet
ISO 14001:2015 Significant Aspects sheet ISO 14001:2015 Significant Aspects sheet
ISO 14001:2015 Significant Aspects sheet
 
Customer Guidance- Safety & Compliance for Material Handling Equipment
Customer Guidance- Safety & Compliance for Material Handling EquipmentCustomer Guidance- Safety & Compliance for Material Handling Equipment
Customer Guidance- Safety & Compliance for Material Handling Equipment
 
Facilities Maintenance Technician
Facilities Maintenance TechnicianFacilities Maintenance Technician
Facilities Maintenance Technician
 
EPA Section 608 Regulation Changes 2018-2019
EPA Section 608 Regulation Changes 2018-2019EPA Section 608 Regulation Changes 2018-2019
EPA Section 608 Regulation Changes 2018-2019
 
Steam Boiler BG01 Compliance with Flomar
Steam Boiler BG01 Compliance with FlomarSteam Boiler BG01 Compliance with Flomar
Steam Boiler BG01 Compliance with Flomar
 

Similar to Opira - Indoor Air Quality Risk Management Planning

Developing a Ventilation IPC Compliance strategy 02022015
Developing a Ventilation IPC Compliance strategy 02022015Developing a Ventilation IPC Compliance strategy 02022015
Developing a Ventilation IPC Compliance strategy 02022015William F Middleton, CEM
 
Australian indoor environment rating tools, and the future of building health...
Australian indoor environment rating tools, and the future of building health...Australian indoor environment rating tools, and the future of building health...
Australian indoor environment rating tools, and the future of building health...Michael Taranto
 
Indoor Air Quality
Indoor Air Quality Indoor Air Quality
Indoor Air Quality rafypd
 
ISO 14001:2015 Integrity in Implementation and Auditing the New EMS Standard
 ISO 14001:2015 Integrity in Implementation and Auditing the New EMS Standard ISO 14001:2015 Integrity in Implementation and Auditing the New EMS Standard
ISO 14001:2015 Integrity in Implementation and Auditing the New EMS StandardPECB
 
Corr. management offshore hse
Corr. management offshore hseCorr. management offshore hse
Corr. management offshore hsewaumimfa
 
Managerstraining 12675884284189-phpapp01 (1)
Managerstraining 12675884284189-phpapp01 (1)Managerstraining 12675884284189-phpapp01 (1)
Managerstraining 12675884284189-phpapp01 (1)Alan Crabtree
 
ISO 15000:1998 and ISO 18001:2007
ISO 15000:1998 and ISO 18001:2007ISO 15000:1998 and ISO 18001:2007
ISO 15000:1998 and ISO 18001:2007Hriday Bora
 
Health and safety management system csctp
Health and safety management system csctpHealth and safety management system csctp
Health and safety management system csctpHeshantha Kosala Perera
 
Outdoor air quality and health: Evidence to action - Karen Exley
Outdoor air quality and health: Evidence to action - Karen ExleyOutdoor air quality and health: Evidence to action - Karen Exley
Outdoor air quality and health: Evidence to action - Karen ExleyIES / IAQM
 
afzal malick updated HSE RESUME 30-08-2016
afzal malick updated HSE RESUME 30-08-2016afzal malick updated HSE RESUME 30-08-2016
afzal malick updated HSE RESUME 30-08-2016Afzal Malick
 
DEL HSE C.V updated
DEL HSE C.V  updatedDEL HSE C.V  updated
DEL HSE C.V updatedEid Mohamed
 
SGS API580 Risk based Inspection (RBI).pdf
SGS API580 Risk based Inspection (RBI).pdfSGS API580 Risk based Inspection (RBI).pdf
SGS API580 Risk based Inspection (RBI).pdfMuhammadNasirAbbas4
 
NABIL_WAGDY_ELBAZ_HSE_2015_doc
NABIL_WAGDY_ELBAZ_HSE_2015_docNABIL_WAGDY_ELBAZ_HSE_2015_doc
NABIL_WAGDY_ELBAZ_HSE_2015_docNabil Elbaz
 
Pmtc good cleaning validation practice
Pmtc  good cleaning validation practicePmtc  good cleaning validation practice
Pmtc good cleaning validation practiceRamy Mostafa
 
Environmental Protectionand Industrial Policy1(Ab)
Environmental Protectionand Industrial Policy1(Ab)Environmental Protectionand Industrial Policy1(Ab)
Environmental Protectionand Industrial Policy1(Ab)abtabussam
 
ISO14001 KCR
ISO14001 KCRISO14001 KCR
ISO14001 KCRGary Wong
 
Risk Issues Environmental Monitoring of Cleanrooms
Risk Issues Environmental Monitoring of CleanroomsRisk Issues Environmental Monitoring of Cleanrooms
Risk Issues Environmental Monitoring of Cleanroomsnetomoney
 

Similar to Opira - Indoor Air Quality Risk Management Planning (20)

Developing a Ventilation IPC Compliance strategy 02022015
Developing a Ventilation IPC Compliance strategy 02022015Developing a Ventilation IPC Compliance strategy 02022015
Developing a Ventilation IPC Compliance strategy 02022015
 
Australian indoor environment rating tools, and the future of building health...
Australian indoor environment rating tools, and the future of building health...Australian indoor environment rating tools, and the future of building health...
Australian indoor environment rating tools, and the future of building health...
 
Indoor Air Quality
Indoor Air Quality Indoor Air Quality
Indoor Air Quality
 
ISO 14001:2015 Integrity in Implementation and Auditing the New EMS Standard
 ISO 14001:2015 Integrity in Implementation and Auditing the New EMS Standard ISO 14001:2015 Integrity in Implementation and Auditing the New EMS Standard
ISO 14001:2015 Integrity in Implementation and Auditing the New EMS Standard
 
Corr. management offshore hse
Corr. management offshore hseCorr. management offshore hse
Corr. management offshore hse
 
Managerstraining 12675884284189-phpapp01 (1)
Managerstraining 12675884284189-phpapp01 (1)Managerstraining 12675884284189-phpapp01 (1)
Managerstraining 12675884284189-phpapp01 (1)
 
ISO 15000:1998 and ISO 18001:2007
ISO 15000:1998 and ISO 18001:2007ISO 15000:1998 and ISO 18001:2007
ISO 15000:1998 and ISO 18001:2007
 
Health and safety management system csctp
Health and safety management system csctpHealth and safety management system csctp
Health and safety management system csctp
 
Outdoor air quality and health: Evidence to action - Karen Exley
Outdoor air quality and health: Evidence to action - Karen ExleyOutdoor air quality and health: Evidence to action - Karen Exley
Outdoor air quality and health: Evidence to action - Karen Exley
 
Auditing
AuditingAuditing
Auditing
 
afzal malick updated HSE RESUME 30-08-2016
afzal malick updated HSE RESUME 30-08-2016afzal malick updated HSE RESUME 30-08-2016
afzal malick updated HSE RESUME 30-08-2016
 
ashrae 62.1
ashrae 62.1ashrae 62.1
ashrae 62.1
 
DEL HSE C.V updated
DEL HSE C.V  updatedDEL HSE C.V  updated
DEL HSE C.V updated
 
SGS API580 Risk based Inspection (RBI).pdf
SGS API580 Risk based Inspection (RBI).pdfSGS API580 Risk based Inspection (RBI).pdf
SGS API580 Risk based Inspection (RBI).pdf
 
NABIL_WAGDY_ELBAZ_HSE_2015_doc
NABIL_WAGDY_ELBAZ_HSE_2015_docNABIL_WAGDY_ELBAZ_HSE_2015_doc
NABIL_WAGDY_ELBAZ_HSE_2015_doc
 
Pmtc good cleaning validation practice
Pmtc  good cleaning validation practicePmtc  good cleaning validation practice
Pmtc good cleaning validation practice
 
Environmental Protectionand Industrial Policy1(Ab)
Environmental Protectionand Industrial Policy1(Ab)Environmental Protectionand Industrial Policy1(Ab)
Environmental Protectionand Industrial Policy1(Ab)
 
ISO14001 KCR
ISO14001 KCRISO14001 KCR
ISO14001 KCR
 
2014 resume (2)
2014 resume (2)2014 resume (2)
2014 resume (2)
 
Risk Issues Environmental Monitoring of Cleanrooms
Risk Issues Environmental Monitoring of CleanroomsRisk Issues Environmental Monitoring of Cleanrooms
Risk Issues Environmental Monitoring of Cleanrooms
 

Recently uploaded

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Opira - Indoor Air Quality Risk Management Planning

  • 1. Indoor Air Quality Risk Management Plan (IAQMP) HOW TO MANAGE THE HEALTH RISKS OF BUILDING OCCUPANTS ASSOCIATED WITH POOR AIR QUALITY.
  • 2. Opira Pty Ltd – IHEA Annual Meeting 2019 IAQ Risk Management Planning Background HVAC Systems Hygiene Audits. AC14 Task Description Repeated identified hygiene issues led to creating HVAC Hygiene Management Plans These plans included; • Meeting and harmonising the inspection requirements of standards like AS/NZS 3666.2 and Queensland Health Task Descriptions AC01, AC02, AC03, AC04, AC07, AC12, AC13, AC14, AC15, AC20, AC22. • Clearly defined and standardised hygiene rating and hygiene critical limits based on the industry guideline – AIRAH Best Practice: HVAC Hygiene, • Training of maintenance staff or contractors and assessment of competency. For air quality management there are other factors to consider… 02
  • 3. Opira Pty Ltd – IHEA Annual Meeting 2019 IAQ Risk Management Planning What is the Purpose of an IAQMP? • Minimise the health risk of staff, visitors and patients to exposure of foreseeable air-related hazards, • Identifying indoor air quality infection control risks before they become problematic, • Prescribe appropriate responses to any identified air quality hazards, • Comply with relevant standards, legislation and guidelines including workplace health and safety regulations, • Assists in preparing budgets and planning for major maintenance projects for plant involved with air quality control 03
  • 4. Opira Pty Ltd – IHEA Annual Meeting 2019 IAQ Risk Management Planning Key components of an indoor quality risk management plan 1. Policy statement 2. Scope 3. Objectives 4. Roles and responsibilities 5. Hazards and hazard sources 6. Risk assessment associated with the hazards 7. Air monitoring 8. Action plan 04
  • 5. Opira Pty Ltd – IHEA Annual Meeting 2019 IAQ Risk Management Planning Relevant Standards, Guidelines, Policies? Including: • Queensland: Work Health and Safety Act • Queensland Health Task Descriptions AC01, AC02, AC03, AC04, AC07, AC12, AC13, AC14, AC15, AC20, AC22. • Queensland Health Centre for Healthcare Related Infection Surveillance and Prevention (CHRISP) program • AS 1668.2 The use of ventilation and air conditioning in buildings Mechanical ventilation in buildings • AS/NZS 3666.2,3 & 4 Air-handling and water systems of buildings – Microbial Control …. Air handlers & Cooling water systems maintenance • Queensland Health Asbestos Management Guideline • EH52: 2011 Australian Drinking Water Guidelines • AS/NZS 3896:2008, Waters - Examination for Legionella spp. including Legionella pneumophila 05
  • 6. Opira Pty Ltd – IHEA Annual Meeting 2019 IAQ Risk Management Planning Who is currently responsible? • Building Engineering Maintenance Services • Preventative and Corrective Maintenance Staff and Contractors • Health and Safety • Infection Control • Facility Management • Health District (multi site) Organisations 06
  • 7. Opira Pty Ltd – IHEA Annual Meeting 2019 IAQ Risk Management Planning How do we minimise health risks of occupants to air quality hazards? 1. IDENTIFICATION (OUTDOORS) The management of air quality hazards starts outside the building. 07
  • 8. Opira Pty Ltd – IHEA Annual Meeting 2019 IAQ Risk Management Planning How do we minimise health risks of occupants to air quality hazards? After the air has entered the building one the biggest contributors to the air quality will be the air conditioning and exhaust systems (HVAC), including filtration. These systems can effect air quality both through performance and hygiene. Other indoor factors include; • Occupant activity • Occupancy levels • Occupant health (i.e.. Communicable illnesses) • Cleanliness of the spaces • Maintenance practices (e.g. cleaning, painting, repairs or refurbishment works) • Space and adjoining space uses (e.g. isolation rooms, waste or cleaning chemicals storage) • Materials and furnishings present (i.e.. VOC producing) 08 1. IDENTIFICATION (OUTDOORS)
  • 9. Opira Pty Ltd – IHEA Annual Meeting 2019 IAQ Risk Management Planning How do we minimise health risks of occupants to air quality hazards? 09 2. ESTABLISH PREVENTATIVE CONTROLS
  • 10. Opira Pty Ltd – IHEA Annual Meeting 2019 IAQ Risk Management Planning Preventative Maintenance Records • Standardiising maintenance report findings. • Accurately identifying air quality hazards and nominating them to be actioned. • Assists in preparing budgets and planning for major projects 10
  • 11. Opira Pty Ltd – IHEA Annual Meeting 2019 IAQ Risk Management Planning AIRAH Best Practice Guidelines Defines hygiene levels and the minimal acceptable system hygiene standards for general use and special use HVAC systems. 11 CLEAN LIGHT HEAVY High Levels of visible dust, debris, fibres or any other contamination that cover the component. Component surface is barely if not at all visible beneath the contamination. MODERATE Visible levels of general dust with varying density and limited areas of accumulated fine debris. Component surface is still visible in some areas beneath the fine dust but isolated sections may not be. Only slight visible layer of fine general dust consistent over the component surface with no variations in density. Component surface remains visible beneath the fine layer of dust. No visible dust, debris or other contamination
  • 12. Opira Pty Ltd – IHEA Annual Meeting 2019 HVAC TRAINING - MONTHLY Mould awareness Standards and guidelines How to take a photo of category 3 contamination and above, How to conduct the inspections and where we normally find contamination, Action levels and the overall content of this Indoor Air Quality Management plan, How to use the service sheet, Evaporative coolers HVAC Audit Program AIRAH Best Practice Guidelines Classifying systems TECHNICAL TRAINING All mechanical technicians shall complete the HVAC hygiene training where they will be taught to recognize various hygiene levels and correctly rate the AHU and its internal components on a monthly basis. 12
  • 13. Opira Pty Ltd – IHEA Annual Meeting 2019 IAQ Risk Management Planning Preventative Maintenance Records • Standardising maintenance report findings. • Accurately identifying air quality hazards and nominating them to be actioned. • Maintaining historical records that could identify a systemic cause for reoccurring hygiene issues. • Assists in preparing budgets and planning for major projects. • Demonstrates responsible hazard risk management. 13
  • 14. Opira Pty Ltd – IHEA Annual Meeting 2019 QUALITY ASSURANCE CHECKS To be conducted by Indoor Air Quality Scientist. The purpose of the Quality Assurance inspections is to make sure that the ratings of the AHUs and internal components which are conducted on a monthly basis are actually correct 10% randomly selected per building and technician on a quarterly basis. 10% of non-critical annual audits per building and technician once annually. The technician to accompany the scientist during the quality audit. HVAC Audit Program AIRAH Best Practice Guidelines Classifying systems QUALITY ASSURANCE The outcome of the QA audit summary report will be: • Instigate further technician training if required • Be stored for annual performance review HVAC technicians 15
  • 15. Opira Pty Ltd – IHEA Annual Meeting 2019 IAQ Risk Management Planning Other Preventative Maintenance Reporting • Operating Theatres, Sterile Stores, CSD (HEPA Filters, air change rates, pressure differentials, particle counts) • Isolation rooms (HEPA Filters, pressure differentials) • Cooling Towers • Water quality monitoring • Occupied space general indoor air quality audits (temperature, humidity, airborne microbials, total volatile organic compounds, carbon dioxide, carbon monoxide, airborne particulates. • Occupied space specific air quality exposure monitoring (e.g. formaldehyde, anesthetics gases, airborne silica dust) 17
  • 16. Opira Pty Ltd – IHEA Annual Meeting 2019 IAQ Risk Management Planning How do we minimise health risks of occupants to air quality hazards? 18 3. QUANTIFYING THE RISK
  • 17. Opira Pty Ltd – IHEA Annual Meeting 2019 IAQ Risk Management Planning Reactive Works Procedures • further investigation • corrective actions Responsibilities • Internal • External - contractors 19
  • 18. Opira Pty Ltd – IHEA Annual Meeting 2019 IAQ Risk Management Planning Review • Scheduled annual review of outcomes. • Summary of non-preventable and preventable events and analysis of reactive works. • Survey from all stakeholders for their experience with the Indoor Air Quality Management Plan? • Continued…. 20
  • 19. INDOOR ENVIRONMENT RISK MANAGEMENT Thank You.