DETAILED PLAN OF DISSERTATION
         Start               Meeting #2              Meeting #3                      Draft system analysis   First prototype of   Final prototype of          Finish
        Project           with supervisor          with supervisor                        and design          e-menu system        e-menu system              Project
        1 June           19 June at 3.30pm          3 July at 1pm                         documents              by 17 Aug            by 5 Sep                10 Sep
                                                                                           by 22 July



              Draft literature         Contact           Gathering      System       System      Coding, testing and      Develop final
                  review              restaurant       requirements     analysis     design           interview             prototype
                9-17 June             18-30 June          1-8 July     10-15 July   16-22July     23 July – 17 Aug       18 Aug – 5 Sep
3.5 MONTHS




                                    Contact for SHU                                                       Receive      Final analysis         Early Presented
                                                                         Delayed for 12 days                                                   the first & final
                  Project Plan       Web services                                                      feedback from    and design
                                                                        But the final prototype is                                               Prototype
                   9-17 June            Server                                                          stakeholders     document
                                                                            almost finished.                                                   on 20 Jul & 10
                                      18-30 June                                                          7-17 Aug       18-22Aug
                                                                                                                                                     Aug

                                        Gathering                                     Draft artifact and
                                      requirements                                      document of                      Finalize artifact and document of
                                       in advance                                       dissertation                       dissertation 18 Aug – 9 Sep
                                     on 20, 29 June                                   16 July – 10 Aug



                         Draft Literature Summit formal letter Summarise List            Submit overarching        Receive advice                        Hand-in
                            Review        to chosen restaurant of requirements             documentation           from supervisor                     dissertation
                             18 Jun            by 31 May           by 8 July                                                                             10 Sep
                                                                                               9 Aug                   14 Aug
                                                                                                                  (Meeting at 1pm)

     Schedule
     1. Present the first prototype at restaurant on 20 July 2012 and
     2. Present the final prototype at restaurant & interview on 10 August 2012
     Issue
     1. Delay of making artifact document because of development issues. However, process of coding can be finished by 17
        August.
     2. Delay of making the final prototype and interview from 5 September to 9 September because the restaurant manager                                     2
        was unavailable.
ACTION PLAN OF “PREPARATION STAGE”
                                             IN JUNE 2012

                                                                                                               Jun-12
No           Description         Due-date    Measurement
                                                           1   2   3   4   5   6   7   8   9   10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30


                                                Plan

1       Project Start Date       01-Jun-12     Actual

                                               Result

                                                Plan                                           Draft literature review

2      Draft literature review   18-Jun-12     Actual                                          Draft literature review

                                               Result

                                                Plan                                                                     Contact restaurant & web services server
       Contact restaurant &
3                                30-Jun-12     Actual                                                                    Contact restaurant & web services server
       web services server
                                               Result




 Activities
 1. Prepared draft literature review and dissertation document format between 9 – 17 June (Finished)
 2. Sent e-mail to request using .NET and SQL servers provided by the university on 16 June (Finished, available until 28 Feb
     2013)
 3. Meeting with supervisor on 19 June at 3.30pm (Finished)                                                                                                         3
 4. Meeting with the restaurant owner on 20 June at 1pm (Finished)
ACTION PLAN OF “SYSTEM ANALYSIS & DESIGN STAGE”
                                 BETWEEN JULY AND AUGUST
                                                                        Jul-12                                                                  Aug-12
                               Measur
No      Description   Due-date
                               ement 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3
                                                       0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1                   0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1

                                Plan    Gathering Req.                                                                          Receive Feedback
           Gather
                      8-Jul-12          Gathering Req.                                                                              Gathering Req.
4       requirements           Actual
                     16-Aug-12
       and feedbacks
                               Result

                                Plan                      System Analysis
                                                                                                      Iterative Process                                     Final
      Analyse system                                                                                                                                       Analysis
        and create   15-Jul-12
5                              Actual                                                  Analyse system and create document artifacts
       documents & 23-Aug-12
          artifact
                               Result

                                Plan                                                                            Iterative Process
                                                                            System Design                                                                Final Design
       Design system
         and create  22-Jul-12
6                              Actual                                                           Design system and create document artifacts
        documents & 23-Aug-12
           artifact
                               Result



                                        Need to finalize the artifact after getting feedback from a presentation of
                                                                     the first prototype.



    Activities

    1. Present the first prototype on 20 July 2012 by using website & some user interfaces on iPad
    2. Present the final prototype on 10 Sep 2012 by using video presentation, website and application on iPad
    Issues
    1. Developing on iPad by was really slow because I was not familiar with the objective-c language. Therefore, the first prototype was
       mainly presented on .NET website. However, I could take advantage from creating .NET website because it could test web
       services developed before implementing on iPad by xCode lanaguage.                                                              4
ACTION PLAN OF “IMPLMENTATION AND DOCUMENTATION STAGE”
                        BETWEEN JULY AND SEPTERMBER
                                                         Jul-12                                       Aug-12                                   Sep-12
                                    Measure
No      Description     Due-date
                                     ment 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 1 2 3 4 5 6 7 8 9 1
                                            6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1                 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1                   0
                                     Plan                           Develop the first prototype: Develop, test the application         Develop the final prototype and interview
       Implement e-
       menu (Coding,    17-Jul-12   Actual     Frist
                                                                   Develop the final prototype and interview
7                                            Prototype
        testing and     5-Sep-12
         interview)                 Result

                                     Plan                Create document & artifacts for dissertation                                   Finalise document & artifacts for dissertation
           Create
       documents &      10-Aug-12
8                                   Actual                                       Create document & artifacts for dissertation             Final document & artifacts for dissertation
        artefacts for   10-Sep-12
        dissertation
                                    Result
                                                                                                                                 Having more time to focus document because prototype
                                     Plan                                                                                          and interview was already finished on 10 Aug 2012
          Submit
9       overarching     10-Aug-12   Actual
       documentation                                                                                                               Insufficient information need to focus more following
                                    Result                                                                                                marking criteria and portfolio templates

                                     Plan
          Receive
10     comment back     16-Aug-12   Actual
      from supervisor
                                    Result

                                     Plan
          Hand-in
11                      10-Sep-12   Actual
        dissertation
                                    Result



     Activities
     1. Present the final prototype & interview between 6-10 Aug 2012
     Issues
     1. Delay of making document because of developing issues. However, process of coding can be finished by 17 Aug 2012.

                                                                                                                                                                                           5
SUMMARY OF ACTIVITIES AT THE RESTAURANT
 Activities: Discussion, presentation, getting feedback and interviews


         No        Date             Time                                            Activities

          1       29-Jun-12      14.00 - 16.00     Discussing and observing with the restaurant manager#1

          2       06-Jul-12      14.00 - 17.00     Discussing and observing with the restaurant manager and waiting staffs#2

          3       12-Jul-12      18.00 - 23.00     Discussing and observing with the restaurant manager and waiting staffs#3

                                  14.00-16.30      Presenting the first prototype and getting feedback from restaurant manager
          4       20-Jul-12
                                 18.00 - 23.00     Observation by working as a waiter at the restaurant

                                  15.00-16.00      Presenting the final prototype

          5        10-Aug                          Interviewing the restaurant manager, waiting staffs and chefs
                                 16.30 - 23.30
                                                   Final observing with the restaurant manager, waiting staffs and chefs#4


                        Main activities: Discussion, presentation, getting feedback and interviews




                                                                                                                                 6

More Related Content

More from Traitet Thepbandansuk

06 1 st_honour_award_certification.pdf
06 1 st_honour_award_certification.pdf06 1 st_honour_award_certification.pdf
06 1 st_honour_award_certification.pdfTraitet Thepbandansuk
 
01 dissertation_Restaurant e-menu on iPad
01 dissertation_Restaurant e-menu on iPad01 dissertation_Restaurant e-menu on iPad
01 dissertation_Restaurant e-menu on iPadTraitet Thepbandansuk
 
MSc Dissertation: Restaurant e-menu software on iPad
MSc Dissertation: Restaurant e-menu software on iPadMSc Dissertation: Restaurant e-menu software on iPad
MSc Dissertation: Restaurant e-menu software on iPadTraitet Thepbandansuk
 

More from Traitet Thepbandansuk (20)

IT_FOR_BUSINESS_30NOV15
IT_FOR_BUSINESS_30NOV15IT_FOR_BUSINESS_30NOV15
IT_FOR_BUSINESS_30NOV15
 
06 1 st_honour_award_certification.pdf
06 1 st_honour_award_certification.pdf06 1 st_honour_award_certification.pdf
06 1 st_honour_award_certification.pdf
 
Change attitude change life scg
Change attitude change life scgChange attitude change life scg
Change attitude change life scg
 
01 dissertation_Restaurant e-menu on iPad
01 dissertation_Restaurant e-menu on iPad01 dissertation_Restaurant e-menu on iPad
01 dissertation_Restaurant e-menu on iPad
 
MSc Dissertation: Restaurant e-menu software on iPad
MSc Dissertation: Restaurant e-menu software on iPadMSc Dissertation: Restaurant e-menu software on iPad
MSc Dissertation: Restaurant e-menu software on iPad
 
03 outcome navigator
03 outcome navigator03 outcome navigator
03 outcome navigator
 
O1 research overview
O1 research overviewO1 research overview
O1 research overview
 
D4 recommendation emenu_development
D4 recommendation emenu_developmentD4 recommendation emenu_development
D4 recommendation emenu_development
 
D3 users perceptions_emenu
D3 users perceptions_emenuD3 users perceptions_emenu
D3 users perceptions_emenu
 
D2 users perceptions_features
D2 users perceptions_featuresD2 users perceptions_features
D2 users perceptions_features
 
A30 test functional_requirements
A30 test functional_requirementsA30 test functional_requirements
A30 test functional_requirements
 
A22 functions on_web
A22 functions on_webA22 functions on_web
A22 functions on_web
 
A21 functions on_ipad
A21 functions on_ipadA21 functions on_ipad
A21 functions on_ipad
 
A2 annotation approach
A2 annotation approachA2 annotation approach
A2 annotation approach
 
A1 annotation knowledge
A1 annotation knowledgeA1 annotation knowledge
A1 annotation knowledge
 
A1 analysis design
A1 analysis designA1 analysis design
A1 analysis design
 
10 wrap around_conclusion
10 wrap around_conclusion10 wrap around_conclusion
10 wrap around_conclusion
 
00 how to_test_app
00 how to_test_app00 how to_test_app
00 how to_test_app
 
R01 all references
R01 all referencesR01 all references
R01 all references
 
D2 users perceptions_features
D2 users perceptions_featuresD2 users perceptions_features
D2 users perceptions_features
 

Recently uploaded

Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 

Recently uploaded (20)

Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 

E-menu system development plan

  • 1. Created date: 10 June 2012 Last updated: 11 Aug 2012 Create by Traitet Th.
  • 2. DETAILED PLAN OF DISSERTATION Start Meeting #2 Meeting #3 Draft system analysis First prototype of Final prototype of Finish Project with supervisor with supervisor and design e-menu system e-menu system Project 1 June 19 June at 3.30pm 3 July at 1pm documents by 17 Aug by 5 Sep 10 Sep by 22 July Draft literature Contact Gathering System System Coding, testing and Develop final review restaurant requirements analysis design interview prototype 9-17 June 18-30 June 1-8 July 10-15 July 16-22July 23 July – 17 Aug 18 Aug – 5 Sep 3.5 MONTHS Contact for SHU Receive Final analysis Early Presented Delayed for 12 days the first & final Project Plan Web services feedback from and design But the final prototype is Prototype 9-17 June Server stakeholders document almost finished. on 20 Jul & 10 18-30 June 7-17 Aug 18-22Aug Aug Gathering Draft artifact and requirements document of Finalize artifact and document of in advance dissertation dissertation 18 Aug – 9 Sep on 20, 29 June 16 July – 10 Aug Draft Literature Summit formal letter Summarise List Submit overarching Receive advice Hand-in Review to chosen restaurant of requirements documentation from supervisor dissertation 18 Jun by 31 May by 8 July 10 Sep 9 Aug 14 Aug (Meeting at 1pm) Schedule 1. Present the first prototype at restaurant on 20 July 2012 and 2. Present the final prototype at restaurant & interview on 10 August 2012 Issue 1. Delay of making artifact document because of development issues. However, process of coding can be finished by 17 August. 2. Delay of making the final prototype and interview from 5 September to 9 September because the restaurant manager 2 was unavailable.
  • 3. ACTION PLAN OF “PREPARATION STAGE” IN JUNE 2012 Jun-12 No Description Due-date Measurement 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Plan 1 Project Start Date 01-Jun-12 Actual Result Plan Draft literature review 2 Draft literature review 18-Jun-12 Actual Draft literature review Result Plan Contact restaurant & web services server Contact restaurant & 3 30-Jun-12 Actual Contact restaurant & web services server web services server Result Activities 1. Prepared draft literature review and dissertation document format between 9 – 17 June (Finished) 2. Sent e-mail to request using .NET and SQL servers provided by the university on 16 June (Finished, available until 28 Feb 2013) 3. Meeting with supervisor on 19 June at 3.30pm (Finished) 3 4. Meeting with the restaurant owner on 20 June at 1pm (Finished)
  • 4. ACTION PLAN OF “SYSTEM ANALYSIS & DESIGN STAGE” BETWEEN JULY AND AUGUST Jul-12 Aug-12 Measur No Description Due-date ement 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 Plan Gathering Req. Receive Feedback Gather 8-Jul-12 Gathering Req. Gathering Req. 4 requirements Actual 16-Aug-12 and feedbacks Result Plan System Analysis Iterative Process Final Analyse system Analysis and create 15-Jul-12 5 Actual Analyse system and create document artifacts documents & 23-Aug-12 artifact Result Plan Iterative Process System Design Final Design Design system and create 22-Jul-12 6 Actual Design system and create document artifacts documents & 23-Aug-12 artifact Result Need to finalize the artifact after getting feedback from a presentation of the first prototype. Activities 1. Present the first prototype on 20 July 2012 by using website & some user interfaces on iPad 2. Present the final prototype on 10 Sep 2012 by using video presentation, website and application on iPad Issues 1. Developing on iPad by was really slow because I was not familiar with the objective-c language. Therefore, the first prototype was mainly presented on .NET website. However, I could take advantage from creating .NET website because it could test web services developed before implementing on iPad by xCode lanaguage. 4
  • 5. ACTION PLAN OF “IMPLMENTATION AND DOCUMENTATION STAGE” BETWEEN JULY AND SEPTERMBER Jul-12 Aug-12 Sep-12 Measure No Description Due-date ment 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 1 2 3 4 5 6 7 8 9 1 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 0 Plan Develop the first prototype: Develop, test the application Develop the final prototype and interview Implement e- menu (Coding, 17-Jul-12 Actual Frist Develop the final prototype and interview 7 Prototype testing and 5-Sep-12 interview) Result Plan Create document & artifacts for dissertation Finalise document & artifacts for dissertation Create documents & 10-Aug-12 8 Actual Create document & artifacts for dissertation Final document & artifacts for dissertation artefacts for 10-Sep-12 dissertation Result Having more time to focus document because prototype Plan and interview was already finished on 10 Aug 2012 Submit 9 overarching 10-Aug-12 Actual documentation Insufficient information need to focus more following Result marking criteria and portfolio templates Plan Receive 10 comment back 16-Aug-12 Actual from supervisor Result Plan Hand-in 11 10-Sep-12 Actual dissertation Result Activities 1. Present the final prototype & interview between 6-10 Aug 2012 Issues 1. Delay of making document because of developing issues. However, process of coding can be finished by 17 Aug 2012. 5
  • 6. SUMMARY OF ACTIVITIES AT THE RESTAURANT Activities: Discussion, presentation, getting feedback and interviews No Date Time Activities 1 29-Jun-12 14.00 - 16.00 Discussing and observing with the restaurant manager#1 2 06-Jul-12 14.00 - 17.00 Discussing and observing with the restaurant manager and waiting staffs#2 3 12-Jul-12 18.00 - 23.00 Discussing and observing with the restaurant manager and waiting staffs#3 14.00-16.30 Presenting the first prototype and getting feedback from restaurant manager 4 20-Jul-12 18.00 - 23.00 Observation by working as a waiter at the restaurant 15.00-16.00 Presenting the final prototype 5 10-Aug Interviewing the restaurant manager, waiting staffs and chefs 16.30 - 23.30 Final observing with the restaurant manager, waiting staffs and chefs#4 Main activities: Discussion, presentation, getting feedback and interviews 6